CAPITAL IMPROVEMENTS ELEMENT

Similar documents
INTRODUCTION CAPITAL IMPROVEMENTS ELEMENT

CAPITAL IMPROVEMENTS. City of St. Augustine Comprehensive Plan EAR-Based Amendments

CAPITAL IMPROVEMENTS ELEMENT

Nassau County 2030 Comprehensive Plan. Capital Improvements Element (CI) Goals, Objectives and Policies. Goal

CAPITAL IMPROVEMENTS ELEMENT:

CAPITAL IMPROVEMENTS ELEMENT

TABLE OF CONTENTS LIST OF TABLES

1. identifies the required capacity of capital improvements to serve existing and future development based on level-of-service (LOS) standards;

Chapter Ten, Capital Improvements Element City of St. Petersburg Comprehensive Plan

CAPITAL IMPROVEMENTS ELEMENT

Policy CIE The following are the minimum acceptable LOS standards to be utilized in planning for capital improvement needs:

CAPITAL IMPROVEMENTS ELEMENT GOALS, OBJECTIVES AND POLICIES. Goal 1: [CI] (EFF. 7/16/90)

8. CAPITAL IMPROVEMENT ELEMENT Goals, Objectives, and Policies

Capital Improvements

Introduced by the Council President at the request of the Joint. Planning Committee & substituted by the Land Use and Zoning Committee:

Goals, Objectives, and Policies Capital Improvements Element

TABLE OF CONTENTS INTRODUCTION... 1 CAPITAL IMPROVEMENTS INVENTORY AND ANALYSIS... 1 DEFINITIONS... 2 DATA INVENTORY... 23

The $1.620 million Commercial Container Acquisition CIP project is planned through Solid Waste funds.

ARTICLE 8.6 PROPORTIONATE FAIR-SHARE PROGRAM [Enacted by Ord /5/06]

PALM BEACH COUNTY CAPITAL IMPROVEMENT PROGRAM

Working with Proportionate Fair-Share

CAPITAL IMPROVEMENT ELEMENT Inventory Analysis

Working with Proportionate Fair-Share

CAPITAL BUDGET AND MULTI-YEAR CAPITAL PLAN SECTION 1 INTRODUCTION INTRODUCTION. Purpose of the Capital Improvement Plan

C APITA L IMPRO VEMENTS S CHEDULE (FIGURE CI-14)

CAPITAL IMPROVEMENTS ELEMENT GOALS, OBJECTIVES, AND POLICIES

ARTICLE 12 TRAFFIC PERFORMANCE STANDARDS

C APITA L IMPRO VEMENTS S CHEDULE (FIGURE CI-14)

CHAPTER 9 CAPITAL FACILITIES ELEMENT

ORDINANCE NO

Chapter CONCURRENCY

IMPACT FEE CREDIT APPLICATION & GUIDELINES

This page intentionally blank. Capital Facilities Chapter Relationship to Vision. Capital Facilities Chapter Concepts

Georgia Funders Forum June 20, Impact Fees. Georgia s Most Ignored State Law? Bill Ross ROSS+associates

INTRODUCTION. Introduction Page 1 of 5. G:\Comp\Adopted Comprehensive Plans\15. Cylce 16-2 and 16-3\Elements not changed\_d. Introduction.

Minimum Elements of a Local Comprehensive Plan

HACKBERRY HIDDEN COVE PUBLIC IMPROVEMENT DISTRICT NO. 2 SERVICE AND ASSESSMENT PLAN (UTILITY IMPROVEMENTS)

2025 Comprehensive Plan for the City of Temple Terrace Florida. Capital Improvements. Adopted by City Council June 30, 2009

Item Amend Capital Improvements Element

2017 WATER AND WASTEWATER IMPACT FEE STUDY CITY OF AZLE, TEXAS

REVENUE MANUAL PALM BEACH COUNTY Edition February 2018

2025 COMPREHENSIVE PLAN PASCO COUNTY, FLORIDA CHAPTER 11 TABLE OF CONTENTS

AGENDA REPORT. DATE: November 27, City Commission. Kim D. Leinbach, Interim City Manager

PLEASANT GROVE, UTAH TRANSPORTATION IMPACT FEE FACILITIES PLAN AND ANALYSIS

Chapter 5: Cost and Revenues Assumptions

THIS AMENDED AND RESTATED DEVELOPMENT AGREEMENT (DA) is made and entered into by W I T N E S S E T H:

Capital Improvements Data and Analysis Report

REVENUE ESTIMATING CONFERENCE Tax: Ad Valorem Tax Issue: Agricultural Classification & VAB Reviews Bill Number(s): CS/SB1200

CHAPTER 11. CAPITAL FACILITIES PLAN ELEMENT

Capital Improvements Element. Goals, Objectives and Policies

Chapter VIII. General Plan Implementation A. INTRODUCTION B. SUBMITTAL AND APPROVAL OF SUBSEQUENT PROJECTS C. SPHERE OF INFLUENCE

CHAPTER Committee Substitute for House Bill No. 1049

NON-MOTORIZED FACILITIES

CITY OF LANCASTER FISCAL BUDGET REVENUE SOURCES

Capital Facilities Element 2/15/2016

FINDINGS. The Board of Supervisors finds that: Resolution No declaring its intention to form Community Facilities District No.

RESOLUTION NUMBER 3305

Section II: Overview of the Annual Growth Policy 1. Background

Traffic Impact Analysis Guidelines Methodology

APPENDIX B EVALUATION OF EXISTING PROGRAMS AND POLICIES. Hillsborough County Local Mitigation Strategy Appendix B-1

Financial Resources Report BAY COUNTY DIRECTION 2035 SHAPING OUR FUTURE LONG RANGE TRANSPORTATION PLAN. Prepared for

Attachment B. Project Cost Estimates. Ridge Road Extension Alternatives Analysis

COMMUNITY FACILITIES DISTRICT NO.

HEMSON C o n s u l t i n g L t d

System Development Charge Methodology

The Board of Supervisors of the County of Riverside ordains as follows:

ALL Counties. ALL Districts

County-wide Planning Policies

Presented By: L. Carson Bise II, AICP President

COMMUNITY FACILITIES DISTRICT NO.

PRELIMINARY DRAFT -- FOR DISCUSSION PURPOSES ONLY

Special Assessment Methodology

Funding Methods and Revenue Generating Capacity

Vision, Mission, Values and Critical Success Factors

City of North Port. Planning, Zoning and Engineering Department 4970 City Hall Boulevard North Port, Florida Programs/Issues Updates.

PUBLIC FACILITIES ELEMENT

Chapter 6: Financial Resources

CITY OF LANCASTER FISCAL BUDGET REVENUE SOURCES

City of Redding, California Development Impact Mitigation Fee Nexus Study

COMMUNITY FACILITIES DISTRICT NO.

EXHIBIT A DESCRIPTION OF AUTHORIZED FACILITIES AND SERVICES I. PUBLIC CAPITAL FACILITIES AND RELATED INCIDENTAL EXPENSES

Capital Improvements Element

CITIZEN S POPULAR ANNUAL FINANCIAL REPORT

Sec Transportation management special use permits Purpose and intent.

Technical Report No. 4. Revenue and Costs

Total Current Revenue: $450 million Current need: $1.12 Billion Funding Deficiency: 60%

TAUSSIG. & Associates, Inc. DAVID. Public Finance Facilities Planning Urban Economics. Newport Beach Fresno Riverside San Francisco Chicago Dallas

City Services Appendix

Technical Appendix. FDOT 2040 Revenue Forecast

GENERAL FUND REAL ESTATE TAXES. Total Real Estate Taxes $ 7,993,595 $ 8,287,442 $ 8,055,000 $ 8,232,500 $ 8,278,500

CITY OF PALM DESERT COMPREHENSIVE GENERAL PLAN

Floodplain Development Permit Application

TAUSSIG DEVELOPMENT IMPACT FEE JUSTIFICATION STUDY CITY OF ESCALON. Public Finance Public Private Partnerships Urban Economics Clean Energy Bonds

SECTION 9: MAPS AND DATA

Public Works and Development Services

sources for FY , only a portion of the statedistributed revenue would be available for new capital projects.

TRANSPORTATION CAPITAL PROGRAM

Okaloosa-Walton 2035 Long Range Transportation Plan Amendment

FY 2011 Continuing Appropriations Act. TIGER Discretionary Grant Program

Indian River County 2030 Comprehensive Plan

Transcription:

[COMPREHENSIVE PLAN] 2025 INTRODUCTION EXHIBIT F CAPITAL IMPROVEMENTS ELEMENT A primary purpose of the Capital Improvements Element (CIE) is to assess and demonstrate the financial feasibility of the Clay County Comprehensive Plan. Feasibility will be assessed by examining projected increases in capital and operating expenditures in relation to anticipated revenues available to the county. A full fiscal analysis is performed, in that a complete set of capital and operating expenditures are analyzed including those necessitated by the improvements and standards specified in the plan as well as other non-plan-related expenditures. Only by including these other expenditures can the financial feasibility of the Comprehensive Plan be accurately assessed. The CIE has a critical role within the county's comprehensive planning process. The elements of the plan that involve capital improvements, such as Transportation and Recreation, are tied together through the CIE. The improvements specified in these elements are set within an overall economic and financial framework which evaluates their combined fiscal impact, as well as the underlying fiscal impact of the growth and development efforts to be accommodated in the Comprehensive Plan. The CIE also has a key relationship to the Future Land Use Element, which is mandated and strengthened through the concurrency requirement stipulated in state regulatory policy. This requirement, simply stated, says that facilities and services must be available at their adopted service standard concurrent with the impacts of development. This mandates that decisions concerning the planning of capital improvements and land use being correlated with each other. The CIE provides for the continued maintenance of the Concurrency Management System (CMS) to ensure that new development will have adequate infrastructure capacity and that the adopted LOS standards will be maintained. GOALS, OBJECTIVES AND POLICIES Unless otherwise specified, all policies will be implemented upon Plan adoption. GOAL: To provide necessary public facilities and services to the County's residents, businesses and industries in a timely manner that maximizes the use of the existing infrastructure and promotes orderly growth. Exhibit F Capital Improvements Element 1

2025 [CLAY COUNTY] Objective 1: Policy 1.1: Policy 1.2: Policy 1.3: Capital improvements will be provided to correct existing deficiencies, to accommodate desired future growth, and to replace worn out or obsolete facilities, as indicated in the five-year schedule of improvements and the School District of Clay County s annually updated financially feasible Five- Year Educational Facilities Plan. Capital Improvement projects shall be those projects that are determined to cost at least $25,000 and will maintain or improve the adopted levels of service in this Plan. The County shall monitor capital facilities to identify deficiencies, to evaluate whether improvements have met demands, and to identify needed maintenance. (EAR recommendation, II-41.) All capital improvement projects shall be reviewed, for consideration by the Board of County Commissioners, for funding using the criteria listed below. Projects will be scheduled in each subsequent fiscal year up to the limit of available existing revenue sources. Ranking of public school facilities will be the responsibility of the School District. Criteria: a. Facility is required to eliminate health or safety hazard. b. Facility is required to remedy existing capacity deficiency. c. Impact of resulting increases in operating costs on Clay County General Operating Budget. d. Consistency with the future land use element e. Facility is necessary to accommodate new development and redevelopment service demands. f. Facility is consistent and compatible with the plans of state agencies, including the Florida Department of Transportation, and the St. Johns River Water Management District. Policy 1.4: Policy 1.5: A plan amendment, pursuant to the applicable law, shall be required to eliminate or delay the construction of any road or mass transit facility or service listed in the Five-Year Schedule of Capital Improvements. The Five-Year Schedule of Capital Improvements and the School District of Clay County s annually adopted financially feasible Five-Year Educational Facilities Plan may be amended by ordinance and not deemed to be an amendment to the plan for corrections, updates, and modifications concerning costs; revenue sources; acceptance of facilities pursuant to dedications which are 2 Capital Improvements Element Exhibit F

[COMPREHENSIVE PLAN] 2025 consistent with the plan; or the date of construction of any facility enumerated in the Five-Year Schedule of Capital Improvements. Policy 1.6: Policy 1.7: Capital Improvements funded by the same revenue source not included in the Five-Year Schedule of Capital Improvements may be amended by ordinance provided the financial feasibility of the Five-Year Schedule of Capital Improvements is maintained. Amendment 04-1, July 2004. The following roadway segments and schedule of construction of said segments will be added to Capital Improvements Table 1, Clay County Capital Improvements, at such time as the improvements fall within the fifth year of the schedule, consistent with the conditions of the stipulated settlement agreement (DOAH #03-3140GM) entered into on November 8, 2005 and revised pursuant to Ordinance 09-45. Said improvements are to be constructed by the developer/owner at the developer/owner s expense. Roadway Segment Construction E-W Connector from the western Peters Creek property line to CR 315 Connector Date As development occurs New 6a Peters Creek Internal Road from the property line to CR 218 Extension As development occurs New 2 Remedial Plan Amendment 03-1, November 22, 2005; CIE Amendment EAR-04, October 27, 2009 Objective 2: Policy 2.1: Policy 2.2: Policy 2.3: Objective 3: The County will manage its fiscal resources to ensure the provision of needed capital improvements for previously issued development orders and for future development and redevelopment. In providing capital improvements, the County shall limit the maximum ratio of outstanding indebtedness to no greater than four percent of the property tax base. The County shall continue to adopt an annual capital budget as a part of its budgeting process throughout the planning period and should continue to improve the submittal process of budget requests from County departments. (EAR p. II-41) The County should increase efforts to secure grants or private funds, whenever available, to finance the provision of capital improvements. (EAR p. II-41) All land use decisions shall be coordinated with the availability of fiscal resources and the schedule of capital improvements and subsequent years capital improvements programs to maintain adopted LOS and to provide existing and future facility needs. Exhibit F Capital Improvements Element 3

2025 [CLAY COUNTY] Policy 3.1: The County shall use the following LOS standards in reviewing the impacts of new development and redevelopment upon public facility provision: a. Solid Waste Design Capacity (Class I Waste) 2008-2025 3.43 3.99 pounds per capita per day b. Sanitary Sewer Average Flow 279 GPD*/ERC* or as approved by FDEP c. Potable Water Peak Flow 311 GPD/ERC or as approved by FDEP Pressure 20 pounds per square inch *GPD = Gallons Per Day ERC = Equivalent Residential Connections d. Drainage Facility Drainage Facility Design Frequency Crossdrains for major watersheds 50 years 24 Detention/Retention/Attenuation Basins Bridges and Bridge Culverts Crossdrains for minor watersheds Crossdrains and ditches for internal drainage Sidedrains for roadway ditches Storm Sewers 1` hours 25-year, 24 hour critical event with protection to a 100 year rainfall 50 years 25 years 25 years 10 years 5 years 1 Unless conditions prevail that indicate a lower control elevation desirable; the optimum hydraulic grade control shall be one foot below the invert of the gutter at the upstream end. 4 Capital Improvements Element Exhibit F

[COMPREHENSIVE PLAN] 2025 e. Roadway Facilities Limited Access Controlled Trip Funded TRIP funded County Minor SIS and FIHS Access SIS and Other Multilaned Two Lane Arterials, FIHS State State Roads Collectors and Roads Local Roads Rural Areas B B 1 B C D Transitioning Urbanized Areas, Urban C C C C N/A Areas or Communities Urbanized D D D D E Areas over 500,000 Source: 14-94.003 F.A.C. Statewide Minimum Level of Service Standards. Notes: There are no exclusive through lanes and no HOV Lanes; There are no existing Limited Access Facilities. 1. For rural two lane controlled access facilities the standard is C. 4. Constrained or Backlogged Facilities - The facility will be allowed to operate at a level no more than ten percent (10%) of traffic volumes or at no more than three miles per hour (3 m.p.h.) below the average travel speed, whichever is greater, as measured at the time the facility is classified as constrained or backlogged. Constrained facilities shall be maintained and backlogged facilities shall be maintained and improved. 5. The County, in collaboration with FDOT and FDCA, shall develop innovative methods to address and improve constrained and backlogged facilities. The methods may include designation of a Transportation Concurrency Exception Area, Transportation Concurrency Management Area, Transportation Concurrency Backlogged Area, Multi-modal Transportation District or Long Term Concurrency Management System. f. Parks and Recreation Facilities: Neighborhood Park 1 acre per 2,100 persons Community Park 1 acre per 2,000 700 persons Boat Ramps 1 lane per 785 boats 25,000 persons Baseball Fields 1 field per 7,500 persons Softball Fields 1 field per 5,500 persons Football Fields 1 field per 24,000 persons Soccer Fields 1 field per 5,500 persons Basketball Courts 1 court per 5,500 persons Tennis Courts 1 court per 4,500 persons Exhibit F Capital Improvements Element 5

2025 [CLAY COUNTY] g. Public School Facilities: Elementary Schools Middle Schools High Schools 110 percent of capacity* 110 percent of capacity* 110 percent of capacity* * School Capacity shall be determined by the lesser of FISH Capacity or core capacity. h. Mass Transit Facilities: The minimum level of service acceptable for JTA fixed route transit shall be: Frequency of Service: Minimum service four times per day, twice daily in the morning and afternoon/evening. Passenger Comfort: The LOS on JTA routes shall be D as defined in Highway Capacity Manual: Special Report 209. (Transportation Research Board, 1985) This stipulates that the occupancy shall not exceed 1.25 persons per seat. Policy 3.2: Objective 4: Policy 4.1: Policy 4.2: Decisions regarding the issuance of development permits will be based upon coordination of the development requirements included in this plan, the land development regulations, and the availability of necessary public facilities needed to support such development at the time needed to serve the development. The County will continue, as needed, to develop formal procedures regarding the issuance of development permits and the findings included within staff reports submitted to appointed and elected officials during the development review process. The County shall maintain a Concurrency Management System (CMS) as a part of the land development regulations which shall ensure that the impacts resulting from the issuance of final development permits shall not result in a reduction in the adopted level of service for the affected public facilities as established in this element. The County shall maintain a CMS as a part of its land development regulations. The CMS shall incorporate provisions which shall require that the level of service standards for the following public facilities are met prior to the issuance of a final development permit: roads, sanitary sewer, potable water, solid waste, drainage, mass transit, parks and recreation and public school facilities. To ensure that public facilities and services to support development are available concurrent with the impacts of development, the CMS shall require that the following minimum standards by satisfied: 6 Capital Improvements Element Exhibit F

[COMPREHENSIVE PLAN] 2025 a. At the time a Concurrency Reservation Certificate (CRC) is issued, the necessary solid waste, drainage, sanitary sewer andpotable water facilities must be: 1. in place and available to serve the new development; or 2. guaranteed in an enforceable development agreement, pursuant to Section 163.3220, F.S., or development order issued pursuant to Chapter 380, F.S., to be in place and available to serve the new development at the time a certificate of occupancy is issued. b. School facilities necessary to achieve and maintain the established level of service standard must be in place or under construction within three years of the issuance of final subdivision or site plan approval. c. For parks and recreation facilities, one of the following must be met: At the time the CRC is issued, the necessary facilities and services are: 1. in place or under actual construction; or 2. in place and available to serve the new development; or 3. guaranteed in an enforceable development agreement, pursuant to Section 163.3220, F.S., or development order issued pursuant to Chapter 380, F.S., to be in place and available to serve the new development at the time a certificate of occupancy is issued; or 4. a CRC is issued subject to the condition that at the time a certificate of occupancy is issued: i. acreage for the necessary facilities and services is dedicated or acquired by the County or funds in the amount of the developer s fair share are committed; and ii. the necessary facilities and services are scheduled to be in place or under actual construction not more than one year after a certificate of occupancy is issued as provided in the County s Five-Year Schedule of Capital Improvements, a binding executed agreement, or an enforceable development agreement, pursuant to Section 163.3220, F.S., or development order issued pursuant to Chapter 380, F.S. Amendment 04-1, July 2004. d. For transportation facilities (roads and mass transit), one of the following must be met: 1. At the time the CRC is issued, the necessary facilities and services are in place or under actual construction; or Exhibit F Capital Improvements Element 7

2025 [CLAY COUNTY] 2. A CRC is issued subject to the condition that the necessary facilities are scheduled to be in place or under actual construction at the time a certificate of occupancy is issued as provided in the first year of the adopted Florida Department of Transportation s Five-Year Work Program or the County s Five-Year Schedule of Capital Improvements, a binding executed agreement, or an enforceable development agreement, pursuant to Section 163.3220, F.S. or development order issued pursuant to Chapter 380, F.S. Amendment 04-1, July 2004, Amendment 04-2, November 2004. 3. For the purpose of issuing a CRC, a proposed urban redevelopment project located within a defined and mapped Existing Urban Service Area as established in the County Comprehensive Plan pursuant to Section 163.3164(29), Florida Statutes, shall not be subject to the concurrency requirements of 1 and 2 above for up to 110 percent of the transportation impact generated by the previously existing development. For the purposes of this provision, a previously existing development is the actual previous built use which was occupied and active within two years of the date of CRC application submittal. Amendment 02-2, October 2002. 4. For multiuse Development of Regional Impact, the Board of County Commissioners may allow such projects to satisfy the transportation concurrency requirements of the Comprehensive Plan, the CMS and section 380.06, Florida Statutes if the criteria in section 163.3180(12), Florida Statutes, are met. The County may authorize the use of this subsection through the adoption of a DRI Development Order or by separate resolution. Policy 4.3: Policy 4.4: The County shall maintain a monitoring system, as part of the land development regulations, that shall at least annually (a) update the available capacity for roads, sanitary sewer, potable water, solid waste, drainage, parks and recreation, and mass transit (if applicable) facilities; and (b) update the County s compliance with the scheduling contained in the Five-Year Schedule of Capital Improvements. Amendment 04-1, July 2004. The County shall annually adopt into its Capital Improvement Element that portion of the School Board s Educational Facilities Plan (EFP) providing a fiveyear schedule and long term schedule of capital improvements which include those necessary school capacity projects to address existing deficiencies and future needs to achieve and maintain the adopted level of service standard for public schools. 8 Capital Improvements Element Exhibit F

[COMPREHENSIVE PLAN] 2025 Objective 5: Policy 5.1: Policy 5.2: Policy 5.3: Policy 5.4: Future development will bear a pro rata share of the costs necessary to finance improvements necessitated by such development in order to adequately maintain adopted LOS standards. New developments will be required to contribute a proportionate or fair share of the costs necessary to provide the public facility capacity necessary to serve such developments and maintain the LOS standards stipulated in this plan. The County may establish by ordinance alternative funding mechanisms as a means of assessing new development a fair share of the costs necessary to provide public facilities and services to accommodate new growth. Such alternative funding shall include, but are not limited to, impact fees and franchise fees. The County may allow a landowner to proceed with development of a specific parcel of land notwithstanding a failure of the development to satisfy transportation concurrency, when all of the following factors are shown to exist: a. The County has adopted a comprehensive plan that is in compliance; b. The proposed development would be consistent with the future land use designation for the specific property and with applicable sections of the County s adopted comprehensive plan; c. The transportation facilities necessary to serve the proposed development are included in a financially feasible capital improvement schedule and the County has not implemented the necessary transportation improvements as required by the schedule; d. The County has adopted policies within this element to assess a fair share of the cost of providing the transportation facilities necessary to serve the proposed development; e. The fair share assessment shall have a reasonable relationship to the transportation impact that is generated by the proposed development; and f. The landowner has made a binding commitment to the County to pay the fair share of the cost of providing the transportation facilities necessary to serve the proposed development. For the purpose of assessing a landowner s fair share of the cost of providing the transportation facilities necessary to serve a proposed development, the County shall use a quantitative formula where the landowner s fair share contribution shall equal the total peak hour trips generated by the proposed development (a) divided by the total peak hour trip capacity created by the transportation improvement needed (b), times the total cost of the transportation improvement needed includes all associated costs of the improvement (c), to wit: Landowner s Fair Share = (a/b)* c Exhibit F Capital Improvements Element 9

2025 [CLAY COUNTY] Policy 5.5: Policy 5.6: Policy 5.7: Policy 5.8: The County shall use costs published by FDOT that most closely match the facility to be constructed to calculate the value of (c) in the formula found in Policy 5.4. The County shall use the most recent edition of the publication put forth by the Institute of Transportation Engineers entitled Trip Generation to calculate the value of (a) in the formula found in Policy 5.4. Cash fair share payments which are allocated for the construction of roads as specified in the transportation impact fee ordinance s Designated Road List and shall be credited towards the payment of transportation impact fees. (Amendment Ordinance 2008-56) The County shall establish procedures and requirements within the Concurrency Management System to implement the fair share assessment, which shall include the following, as a minimum: a. By ordinance, the County may approve any transportation improvement associated with a fair share assessment that is not included in a financially feasible capital improvements schedule. Thereafter, the County shall prepare and submit necessary amendments to the Capital Improvements Plan. Amendment 04-1, July 2004. b. Assessment and improvement districts shall be created for the purpose of collecting and distributing fair share funds. c. A special revenue fund shall be established for the deposit of payments associated with a fair share assessment. The fund shall be segregated into accounts for each improvement district and the funds collected shall be deposited into the account(s) for the affected benefit district(s). d. Expenditures from the special revenue fund shall be made when there are sufficient funds within the account equal to the amount necessary to commence engineering, acquisition of rights-of-way, construction, or any other costs associated with the selected transportation improvement within the improvement district for which the account was created. 10 Capital Improvements Element Exhibit F

[COMPREHENSIVE PLAN] 2025 CAPITAL IMPROVEMENTS SCHEDULES The Five-Year Schedule of Capital Improvements consists of the following attached hereto: Clay County Capital Improvements 2008/09 2012/14 (Table 1) Clay County Capital Program Revenue Sources (Table 2) Clay County Capital Improvements Funding Sources (Table 3) The School District of Clay County s annually adopted financially feasible Five-Year Educational Facilities Plan (EFP) consists of the following attachments: Projected New Revenue (Table 4: EFP Table 3.1) District Capital Outlay Expenditures (Table 5: EFP Table 3.2) Capital Projects Plan Worksheet (Table 6: EFP Table 3.3) The FDOT and TPO 5-Year Transportation Improvement Program has been updated: FDOT and TPO 5-Year Transportation Improvement Program (Table 7) Exhibit F Capital Improvements Element 11

2025 [CLAY COUNTY] Table 1. Clay County Capital Improvements 2008/09 2012/14 12 Capital Improvements Element Exhibit F

[COMPREHENSIVE PLAN] 2025 Table 2. Clay County Capital Program Revenue Sources Exhibit F Capital Improvements Element 13

2025 [CLAY COUNTY] Table 3. Capital Improvement Funding Sources 14 Capital Improvements Element Exhibit F

[COMPREHENSIVE PLAN] 2025 Table 4. School District s Projected New Revenue Table 5. School District Capital Outlay Expenditures Exhibit F Capital Improvements Element 15

2025 [CLAY COUNTY] Table 6. School Capital Projects Plan Worksheet 16 Capital Improvements Element Exhibit F

[COMPREHENSIVE PLAN] 2025 Table 7. TPO 5-Year Transportation Improvement Program Exhibit F Capital Improvements Element 17

2025 [CLAY COUNTY] 18 Capital Improvements Element Exhibit F