Installation Analysis

Similar documents
#161. Connecting Garage Door Jambs to Building Framing. Introduction

Connecting Garage Door Jambs to Building Framing

STRUCTURAL PERFORMANCE TEST REPORT

IRC Bracing Methods, Relevant Test Data, and Recommended Design Values for Wind Bracing Analysis of Conventional Wood-Frame Homes

High Load Diaphragm Design for Panelized Roofs. Copyright Materials. A Cost Effective Solution for Large Low Slope Roofs. Learning Objectives

Access Fasteners Vic. Ph: (03) FAX: (03) W.A. Ph: (08) FAX (08)

SAMPLE PROJECT IN LONDON DOCUMENT NO. STR-CALC UNITISED CURTAIN WALL 65 ENGINEER PROJECT. Pages REVISION TITLE

Part 2-Offset Shear Walls

PACIFIC SPECIALTY INSURANCE COMPANY STATE OF CALIFORNIA. Underwriting Rules Stand-Alone Earthquake

PACIFIC SPECIALTY INSURANCE COMPANY STATE OF CALIFORNIA. Underwriting Guidelines Embedded Stand-Alone (Mini) Earthquake

Citizens Opening Protection Requirements for Homes in the Wind-Borne Debris Region (WBDR)

California Stand Alone Earthquake Program

C E R T I F I C A T E O F C O M P L I A N C E

Structural Calculations

LIST OF APPROVED COMPONENTS AND SYSTEMS Issue Date: April 9, 2018

Shear Wall Design with Examples DES 413-1

Installation Instructions: JK Inner Fender Liners Part Number(s): & Ratchet 3/8 & 7/16 Sockets. Plastic Clip Removal Tool

SPRI Roof System Listing Service Program

MINUTES PRODUCT APPROVAL PROGRAM OVERSITE COMMITTEE PRESENT: PRODUCT APPROVAL PROGRAM OVERSITE COMMITTEE NOT PRESENT: STAFF PRESENT: OTHERS PRESENT:

MASSACHUSETTS PROPERTY INSURANCE UNDERWRITING ASSOCIATION

MASSACHUSETTS PROPERTY INSURANCE UNDERWRITING ASSOCIATION (MPIUA)

Hydraulic Series Coupon Holders

NEW. Multifunction frame plug MFR. The all-rounder for your projects. Fire resistance class F 90 see approval

Investor Presentation. April 2019

FIRE RESISTANCE OF A SLIDING ACCORDION DOOR ASSEMBLY. This report replaces FAR 3847 issued on the 2 April 2012

CARROLL COUNTY ELECTRICAL DEPARTMENT SERVICE POLICIES. EFFECTIVE MARCH 1, 1995 Revised (09/01/2015)

EXHIBIT 'A' SCOPE OF WORK

Hurricane Deductible

DWELLING PROGRAM GENERAL INSTRUCTIONS...

990 Sliding Doors JUNE, 2018 EC FEATURES ADMB010EN

Concrete Screw BSZ. Annex C1

UNC Imaging Research Building Chapel Hill, NC

Invitation to Bid ALUMINUM CANOPY - GBE

Re-Shingle And Firewall Wraps At SUNNYSIDE ES STEDMAN ES LILLIAN BLACK ES CUMBERLAND COUNTY BOARD OF EDUCATION

200. PROFILE ON THE PRODUCTION OF WOOD SCREW & RIVETS

LEXINGTON INSURANCE COMPANY HO3 & DP3 UNDERWRITING GUIDELINES

INVITATION FOR TENDER FOR SUPPLY OF EQUIPMENT

LEXINGTON INSURANCE COMPANY HO3 & DP3 UNDERWRITING GUIDELINES

City Of Hammond Purchasing Department. Request for Pricing: RFP For Construction of Metal Building at 190 Maintenance Yard

Offset Diaphragms. Presentation Based On: By: R. Terry Malone, PE, SE.

Alan's Factory Outlet Carport Prices in Colorado, New Mexico, Nebraska & Nevada NOTE: FRAME WORK LENGTH 20, 25, 30, 35, 40, 45, 50.

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005

NEW CASTLE COUNTY Purchasing Division New Castle County Government Center 87 Read s Way New Castle, DE (302)

The Analysis of Offset Diaphragms and Shear Walls

HAZUS-MH Hurricane Model Methodology. II: Damage and Loss Estimation

Specified Professions Professional Liability Product

Builder s Risk Renovation Application

Flood Resistant Provisions of Connecticut s Newest Building Codes. Laura E. Ghorbi, PE, CFM Risk Management & Resilience

FLORIDA BUILDING COMMISSION MEETING July 10, 11 and 12, 2006 Hard Rock Hotel Seminole Indian Country, FL

Casing Design Workshop: Final Surface Casing Design with Combined Loads Exercise. (Last Updated 16 December 2015) COPYRIGHT

INVITATION FOR BID. TITLE: Maintenance Storage Building #2

Presenters. Bracken Engineering. Structures Disasters Forensics

ATTIC FAN - DECEMBER 1995

FINANCIAL STATEMENTS and Supplementary Information. For the Years Ended DECEMBER 31, 2013 AND 2012

by Dr. Madan M. Singh Arizona Department of Mines & Mineral Resources Special Report 26 November 2009 State of Arizona Jan Brewer, Governor

Disaster Mitigation. Kevin M. Simmons, Ph.D. Austin College. Fulbright Research Scholar International Centre for Geohazards Oslo, Norway

INVITATION TO BID THE OWNER RESERVES THE RIGHT TO REJECT ANY OR ALL BIDS AND WAIVE ANY FORMALITIES.

WARRANTY THERMOPLASTIC COATED PRODUCTS

MIDWAY ANNOUNCES SIGNIFICANT UPGRADE IN RESOURCE AND 2014 BUDGET INCREASE AT SPRING VALLEY PROJECT, NEVADA

Shower Column SHCM Installation Guide

2019 MIBS EXHIBITOR MANUAL

CR# Issued Date: June 14, 2016 Waterville, OH

Norseman Structures LIMITED WARRANTY

Investor Presentation March 2018

All outstanding quotes will be honored at current pricing and discounts until October 19, 2004.

E ective February 2015 Supersedes IL 29C166C Dated 02/2011. Instruction Leaflet IL 29C166D

TITLE 110 LEGISLATIVE RULE STATE TAX DEPARTMENT

TWBS1-WIS UNIT WEIGHT: 28 LB WEIGHT CAPACITY PER SHELF/TIER: 15 LB. Sacramento Bookcase

ARKANSAS PUBLIC SERVICE COMMISSION

COUNTOUR CANOPY ASSEMBLY, INSTALLATION & USE MANUAL READ CAREFULLY KEEP THESE INSTRUCTIONS MODEL NUMBERS 24108

Windstorm Insurance in Florida Protect Our Economy

Bankruptcy Department Vol. 1, Issue 2 March, 2006 Newsletter

CFRP Repair of Pipelines The Current State of the Art

May 21, 2009 MORTGAGEE LETTER SUBJECT: Manufactured Housing Policy Guidance Property and Underwriting Eligibility

VENTUS. Let the. breeze in.tm

PAGETWO free fax UK: Amend 1-1 January 1997

PUBLIC WORKS DEPARTMENT Engineering Division 303 West Commonwealth Avenue, Fullerton, California

OUTAGAMIE COUNTY REQUEST FOR PROPOSAL FOR ODOR CONTROL SYSTEM FOR DEPARTMENT OF RECYCLING AND SOLID WASTE

Service is our Hallmark.

RFP # for Addition to Parks Recreation 190 Facility

City of Saratoga Springs

Conduit Bodies SECTION. August 1, 2010

Business Statistics Homework #4, Spring 2014

PROJECT MANUAL TABLE OF CONTENTS PROJECT NAME AND LOCATION: Bellepark East Apartments. 02 Invitation to Bid (1 Page) 03 Specifications (20 Pages)

Diesel Rx Diaphragm Fuel Pressure Regulator

CONTRACTOR QUALIFICATION FORM

Investor Presentation. Mike Covey Chairman & Chief Executive Officer. Jerry Richards Vice President & Chief Financial Officer.

ANIXTER ANNOUNCES ACQUISITION OF HD SUPPLY S POWER SOLUTIONS BUSINESS JULY 15, 2015

Users Guide for Ac-MINI

F E N CE S A N D G A T E S

UNION ELECTRIC COMPANY GAS SERVICE

195. PROFILE ON THE PRODUCTION OF WATER HEATER

Turquoise Hill files 2016 Oyu Tolgoi Technical Report

Introduction Stephen Harris

Introduction to Earning Interest: APR, APY and Compound Interest

Engineering Services Grayloc Products...3 How to Select Grayloc Connectors...9 Quality Programs Part Numbers/ Dimensions

157. PROFILE ON THE PRODUCTION OF BOLTS AND NUTS

AEP SPAN 20 YEAR STANDARD FULL SYSTEM WEATHERTIGHTNESS LIMITED WARRANTY AGREEMENT

General Moly Reports 2018 Results

BID RESULTS AB HUNT HOUSE BARN CONVERSION AND REED BRYAN FARM IMPROVEMENTS APRIL 8, 2015

Transcription:

PROJECT NO.: G8908.01-122-34 CKD: JCW SHEET: 1 OF 17 Installation Analysis Alumaboard Cladding Clip Analysis Report G8908.01-122-34 Rendered to: ROLLFAB METAL PRODUCTS, LLC 2529 West Jackson Street Phoenix, Arizona 85009 Prepared by: Jason C. Walus, P.E. Daniel C. Culbert, P.E. Architectural Testing, Inc. 130 Derry Court York, Pennsylvania 17406 (717) 764-7700 March 28, 2017 Jason C. Walus, P.E. Manager Engineering Services Daniel C. Culbert, P.E. Senior Project Engineer

PROJECT NO.: G8908.01-122-34 CKD: JCW SHEET: 2 OF 17 Scope Architectural Testing, Inc., an Intertek company, was contracted by Rollfab Metal Products, LLC to perform installation analysis for the panel clips to be installed on 4" and 6" Alumaboard panel system. The analyses performed satisfy the methods and requirements of the following: 2012 International Building Code, International Code Council, Inc., 2012. AAMA TIR-A9-14 Metal Curtain Wall Fasteners, American Architectural Manufacturers Association, 2015. ESR-1976 ITW Buildex TEKS Self-Drilling Fasteners. ICC Evaluation Service, LLC. July 1, 2013. The calculations presented herein are for the integrity of the panel clip installations based on wind load only. The weather tightness of the installation is not addressed by this report. The air/water/structural performance of the individual products is not proven by this report. The building substrate is assumed to have the integrity to resist the anchor loads developed by the products. Furthermore, the results of the analyses present a solution that satisfies the scope of the project, but other feasible solutions may exist.

PROJECT NO.: G8908.01-122-34 CKD: JCW SHEET: 3 OF 17 Analyses Design Wind Pressure Analysis Various design wind pressures are to be used on this project to compare to the anchorage capacities of the various fastening methods. Design pressure will range from +/-20 psf to +/-70 psf, increase in 10 psf increments. Capacities The panel clips are to be attached to various substrates. The capacities of the various anchorage details are calculated as shown on page 7 through page 13. These capacities are compared to reactions induced by design wind pressures. The calculated anchorage capacities are summarized in the table below. Table 1 Various Capacities Detail Connection Capacity Comment #8x1-1/2" Pan Head Wood 1. Limited by withdrawal Screw Connecting Clip to 2x 46 lb 2. Minimum 1" penetration S-P-F Wood Stud Screw into Wood Stud Screw into Steel Stud Screw into Sheathing #8x2" Pan Head Wood Screw Connecting Clip to 2x S-P-F Wood Stud #8-18 Pan Head TEKS Screw Connecting Clip to 20 ga 33 KSI Steel Stud #8-18 Pan Head TEKS Screw Connecting Clip to 18 ga 33 KSI Steel Stud #8-18 Pan Head TEKS Screw Connecting Clip to 16 ga 33 KSI Steel Stud #8x1-1/2" Pan Head Wood Screw Connecting Clip to 1/2" Plywood Sheathing #8x1-1/2" Pan Head Wood Screw Connecting Clip to 3/4" Plywood Sheathing 69 lb 75 lb 100 lb 125 lb 1. Limited by withdrawal 2. Minimum 1-1/2" penetration 1. Limited by pull out 2. Full penetration +3 threads 3. Qualifies 50 KSI steel 1. Limited by pull out 2. Full penetration +3 threads 3. Qualifies 50 KSI steel 1. Limited by pull out 2. Full penetration +3 threads 3. Qualifies 50 KSI steel 21 lb 1. Limited by withdrawal 31 lb 1. Limited by withdrawal Note(s): The building substrate is assumed to have the integrity to resist the anchor loads developed by the products.

PROJECT NO.: G8908.01-122-34 CKD: JCW SHEET: 4 OF 17 age Requirements ages must be capable of resisting the loads caused by the various design wind pressures. The individual anchor capacities and applied loads on the products are used to calculate the anchor spacing for the products specified for the project. Calculations are presented on page 14 through page 16. requirements are summarized in the tables below for the various substrates. Table 2 Wood Stud Clip Connection Design Load Clip 4" Plank 6" Plank +/-20 psf Every Other Stud Every Other Stud +/-30 psf Every Other Stud Every Other Stud #8x1-1/2" to Wood Stud +/-40 psf Every Other Stud Every Stud +/-50 psf Every Other Stud Every Stud +/-60 psf Every Stud Every Stud +/-70 psf Every Stud Every Stud +/-20 psf Every Other Stud Every Other Stud +/-30 psf Every Other Stud Every Other Stud #8x2" to Wood Stud +/-40 psf Every Other Stud Every Other Stud +/-50 psf Every Other Stud Every Other Stud +/-60 psf Every Other Stud Every Stud +/-70 psf Every Other Stud Every Stud Note(s): 1. Analysis assumes studs are placed at 16" maximum on center, therefore, spacing is limited to every other stud, or 32" on center maximum. 2. The building substrate is assumed to have the integrity to resist the anchor loads developed by the products.

PROJECT NO.: G8908.01-122-34 CKD: JCW SHEET: 5 OF 17 Table 3 Steel Stud Clip Connection Design Load Clip 4" Plank 6" Plank +/-20 psf Every Other Stud Every Other Stud +/-30 psf Every Other Stud Every Other Stud #8-18 TEKS to 20 ga Steel Stud +/-40 psf Every Other Stud Every Other Stud +/-50 psf Every Other Stud Every Other Stud +/-60 psf Every Other Stud Every Stud +/-70 psf Every Other Stud Every Stud +/-20 psf Every Other Stud Every Other Stud +/-30 psf Every Other Stud Every Other Stud #8-18 TEKS to 18 ga and 16 ga Steel Stud +/-40 psf Every Other Stud Every Other Stud +/-50 psf Every Other Stud Every Other Stud +/-60 psf Every Other Stud Every Other Stud +/-70 psf Every Other Stud Every Other Stud Note(s): 1. Analysis assumes studs are placed at 16" maximum on center, therefore, spacing is limited to every other stud, or 32" on center maximum. 2. The building substrate is assumed to have the integrity to resist the anchor loads developed by the products.

PROJECT NO.: G8908.01-122-34 CKD: JCW SHEET: 6 OF 17 Table 4 Sheathing Clip Connection Design Load Clip 4" Plank 6" Plank +/-20 psf 32'' 24'' +/-30 psf 24'' 16'' #8x1-1/2" to 1/2" Sheathing +/-40 psf 16'' 12'' +/-50 psf 12'' 8'' +/-60 psf 12'' 8'' +/-70 psf 8'' 4'' +/-20 psf 32'' 32'' +/-30 psf 32'' 24'' #8x1-1/2" to 3/4" Sheathing +/-40 psf 24'' 16'' +/-50 psf 20'' 12'' +/-60 psf 16'' 12'' +/-70 psf 12'' 8'' Note(s): 1. spacing is conservatively rounded to the nearest 4-inch increment. 2. The building substrate is assumed to have the integrity to resist the anchor loads developed by the products. Referenced Drawings The drawings referenced below are the basis of the analysis presented herein and may not reflect the requirements established by this analysis. Alumaboard. Sheets 0 to 7. 07/24/14. (8 pages)

PROJECT NO.: G8908.01-122-34 CKD: JCW SHEET: 7 OF 17 #8 x 1-1/2" Pan Head Wood Screw to 2x S-P-F Wood Stud #8 x 1-1/2" Pan Head Screw 1" Penetration into Wood Blocking 20 Ga 316 Stainless Steel Clip (assumed) 2x Spruce Pine Fir (S-P-F) Wood Stud Withdrawal of #8 Wood Screw W' = Cd Cm Ct Ceg Ctn 2850 G 2 DL (NDS12 11.2-2) W' = (1.6)(0.7)(0.5)(1.0)(1.0)(2850)(0.42) 2 (0.164)(1.0") W' = 46 lb Pull-Over of #8 Pan Head Wood Screw Pnov = 1.5t1d ' wfu1/3.0 Pnov = 1.5(0.0359")(0.287")(45,000 psi)/3.0 Pnov = 232 lb Capacity of Connection is 46 lb

PROJECT NO.: G8908.01-122-34 CKD: JCW SHEET: 8 OF 17 #8 x 2" Pan Head Wood Screw to 2x S-P-F Wood Stud #8x 2" Pan Head Screw 1-1/2" Penetration into Wood Blocking 20 Ga 316 Stainless Steel Clip (assumed) 2x Spruce Pine Fir (S-P-F) Wood Stud Withdrawal of #8 Wood Screw W' = Cd Cm Ct Ceg Ctn 2850 G 2 DL (NDS12 11.2-2) W' = (1.6)(0.7)(0.7)(1.0)(1.0)(2850)(0.42) 2 (0.164)(1.5") W' = 69 lb Pull-Over of #8 Pan Head Wood Screw Pnov = 1.5t1d ' wfu1/3.0 Pnov = 1.5(0.0359")(0.287")(45,000 psi)/3.0 Pnov = 232 lb Capacity of Connection is 69 lb

PROJECT NO.: G8908.01-122-34 CKD: JCW SHEET: 9 OF 17 #8-18 TEKS Screw to 20 ga 33 KSI Steel Stud #8-18 Pan Head TEKS Screw, 316 Stainless Steel Full Penetration of Stud + 3 Threads 20 Ga 316 Stainless Steel Clip (assumed) 20 Ga 33 KSI Steel Clip Allowable Tension of #8-18 316 TEKS Screw Pts/Ω = 315 lb (TIR-A9) Pull-Over of #8 Pan Head TEKS Screw Pnov = 1.5t1d ' wfu1/3.0 Pnov = 1.5(0.0359")(0.306")(45,000 psi)/3.0 Pnov = 247 lb Pull-Out of #8 TEKS Screw Pnot = 0.85tcdFu2/3.0 Pnot = 0.85(0.0359")(0.164")(45,000 psi)/3.0 Pnot = 75 lb Capacity of Connection is 75 lb

PROJECT NO.: G8908.01-122-34 CKD: JCW SHEET: 10 OF 17 #8-18 TEKS Screw to 18 ga 33 KSI Steel Stud #8-18 Pan Head TEKS Screw, 316 Stainless Steel Full Penetration of Stud + 3 Threads 20 Ga 316 Stainless Steel Clip (assumed) 18 Ga 33 KSI Steel Clip Allowable Tension of #8-18 316 TEKS Screw Pts/Ω = 315 lb (TIR-A9) Pull-Over of #8 Pan Head TEKS Screw Pnov = 1.5t1d ' wfu1/3.0 Pnov = 1.5(0.0359")(0.306")(45,000 psi)/3.0 Pnov = 247 lb Pull-Out of #8 TEKS Screw Pnot = 0.85tcdFu2/3.0 Pnot = 0.85(0.0478")(0.164")(45,000 psi)/3.0 Pnot = 100 lb Capacity of Connection is 100 lb

PROJECT NO.: G8908.01-122-34 CKD: JCW SHEET: 11 OF 17 #8-18 TEKS Screw to 20 ga 33 KSI Steel Stud #8-18 Pan Head TEKS Screw, 316 Stainless Steel Full Penetration of Stud + 3 Threads 20 Ga 316 Stainless Steel Clip (assumed) 16 Ga 33 KSI Steel Clip Allowable Tension of #8-18 316 TEKS Screw Pts/Ω = 315 lb (TIR-A9) Pull-Over of #8 Pan Head TEKS Screw Pnov = 1.5t1d ' wfu1/3.0 Pnov = 1.5(0.0359")(0.306")(45,000 psi)/3.0 Pnov = 247 lb Pull-Out of #8 TEKS Screw Pnot = 0.85tcdFu2/3.0 Pnot = 0.85(0.0598")(0.164")(45,000 psi)/3.0 Pnot = 125 lb Capacity of Connection is 125 lb

PROJECT NO.: G8908.01-122-34 CKD: JCW SHEET: 12 OF 17 #8 x 1-1/2" Pan Head Wood Screw to 1/2" Plywood Sheathing #8 x 1-1/2" Pan Head Screw Full Penetration of Sheathing 20 Ga 316 Stainless Steel Clip (assumed) 1/2" Plywood Sheathing Group 1-5 Withdrawal of #8 Wood Screw W' = W As / Ω W' = (240 lb)(47%)/(6/1.10) (APA E830) W' = 21 lb Pull-Over of #8 Pan Head Wood Screw Pnov = 1.5t1d ' wfu1/3.0 Pnov = 1.5(0.0359")(0.287")(45,000 psi)/3.0 Pnov = 232 lb Capacity of Connection is 21 lb

PROJECT NO.: G8908.01-122-34 CKD: JCW SHEET: 13 OF 17 #8 x 1-1/2" Pan Head Wood Screw to 1/2" Plywood Sheathing #8 x 1-1/2" Pan Head Screw Full Penetration of Sheathing 20 Ga 316 Stainless Steel Clip (assumed) 1/2" Plywood Sheathing Group 1-5 Withdrawal of #8 Wood Screw W' = W As / Ω W' = (355 lb)(47%)/(6/1.10) (APA E830) W' = 31 lb Pull-Over of #8 Pan Head Wood Screw Pnov = 1.5t1d ' wfu1/3.0 Pnov = 1.5(0.0359")(0.287")(45,000 psi)/3.0 Pnov = 232 lb Capacity of Connection is 31 lb

PROJECT NO.: G8908.01-122-34 CKD: JCW SHEET: 14 OF 17 Wood Stud Design Pressure #8 x 1-1/2" Pan Head Wood Screw to 2x S-P-F Wood Stud 4" Wide Plank 6" Wide Plank +/-20 psf 331 4'' 82.8'' 32'' 331 6'' 55.2'' 32'' +/-30 psf 221 4'' 55.2'' 32'' 221 6'' 36.8'' 32'' +/-40 psf 166 4'' 41.4'' 32'' 166 6'' 27.6'' 27'' +/-50 psf 132 4'' 33.1'' 32'' 132 6'' 22.1'' 22'' +/-60 psf 110 4'' 27.6'' 27'' 110 6'' 18.4'' 18'' +/-70 psf 95 4'' 23.7'' 23'' 95 6'' 15.8'' 15'' Design Pressure #8 x 2" Pan Head Wood Screw to 2x S-P-F Wood Stud 4" Wide Plank 6" Wide Plank +/-20 psf 497 4'' 124.2'' 32'' 497 6'' 82.8'' 32'' +/-30 psf 331 4'' 82.8'' 32'' 331 6'' 55.2'' 32'' +/-40 psf 248 4'' 62.1'' 32'' 248 6'' 41.4'' 32'' +/-50 psf 199 4'' 49.7'' 32'' 199 6'' 33.1'' 32'' +/-60 psf 166 4'' 41.4'' 32'' 166 6'' 27.6'' 27'' +/-70 psf 142 4'' 35.5'' 32'' 142 6'' 23.7'' 23''

PROJECT NO.: G8908.01-122-34 CKD: JCW SHEET: 15 OF 17 Steel Stud Design Pressure #8-18 TEKS Screw to 20 ga 33 KSI Steel Stud 4" Wide Plank 6" Wide Plank +/-20 psf 540 4'' 135.0'' 32'' 540 6'' 90.0'' 32'' +/-30 psf 360 4'' 90.0'' 32'' 360 6'' 60.0'' 32'' +/-40 psf 270 4'' 67.5'' 32'' 270 6'' 45.0'' 32'' +/-50 psf 216 4'' 54.0'' 32'' 216 6'' 36.0'' 32'' +/-60 psf 180 4'' 45.0'' 32'' 180 6'' 30.0'' 30'' +/-70 psf 154 4'' 38.6'' 32'' 154 6'' 25.7'' 25'' Design Pressure #8-18 TEKS Screw to 18 ga 33 KSI Steel Stud 4" Wide Plank 6" Wide Plank +/-20 psf 720 4'' 180.0'' 32'' 720 6'' 120.0'' 32'' +/-30 psf 480 4'' 120.0'' 32'' 480 6'' 80.0'' 32'' +/-40 psf 360 4'' 90.0'' 32'' 360 6'' 60.0'' 32'' +/-50 psf 288 4'' 72.0'' 32'' 288 6'' 48.0'' 32'' +/-60 psf 240 4'' 60.0'' 32'' 240 6'' 40.0'' 32'' +/-70 psf 206 4'' 51.4'' 32'' 206 6'' 34.3'' 32''

PROJECT NO.: G8908.01-122-34 CKD: JCW SHEET: 16 OF 17 Steel Stud (Continued) Design Pressure #8-18 TEKS Screw to 16 ga 33 KSI Steel Stud 4" Wide Plank 6" Wide Plank +/-20 psf 900 4'' 225.0'' 32'' 900 6'' 150.0'' 32'' +/-30 psf 600 4'' 150.0'' 32'' 600 6'' 100.0'' 32'' +/-40 psf 450 4'' 112.5'' 32'' 450 6'' 75.0'' 32'' +/-50 psf 360 4'' 90.0'' 32'' 360 6'' 60.0'' 32'' +/-60 psf 300 4'' 75.0'' 32'' 300 6'' 50.0'' 32'' +/-70 psf 257 4'' 64.3'' 32'' 257 6'' 42.9'' 32''

PROJECT NO.: G8908.01-122-34 CKD: JCW SHEET: 17 OF 17 Revision Log Rev. # Date Page(s) Revision(s) 0 03/28/17 N/A Original report issue