Interconnection Request Application Form for Interconnecting a Certified Inverter-Based Generating Facility No Larger than 20 kw

Similar documents
Southern California Edison Company FERC Electric Tariff, Second Revised Volume No. 5. APPENDIX 10 to GIP

Name: City: State: Zip Code: Is the applicant the property owner at the system address? Yes No. City: State: Zip Code: City: State: Zip Code:

AN APPLICATION FEE OF $50.00 MUST BE SUBMITTED WITH THE APPLICATION. Interconnection Applicant Contact Information. Name: Address:

Steps/Process. <COOPERATIVE NAME> 10 kw INVERTER PROCESS Page 1

Exhibit A Simplified Process Interconnection Application

LEVEL 1: STANDARD APPLICATION FORM AND INTERCONNECTION AGREEMENT

FIRSTENERGY INTERCONNECTION APPLICATION/AGREEMENT - PART

FIRSTENERGY INTERCONNECTION AGREEMENT

delma,va power A PHI Company DELAWARE LEVEL 1 INTERCONNECTION APPLICATION/AGREEMENT

Section 25 COGENERATION AND SMALL POWER PRODUCTION Effective Date: June 15, 2016

STANDARD INTERCONNECTION AGREEMENT Fayetteville Public Works Commission

Town of Highlands Board Approved as of May 17, 2012

Section 24 COGENERATION AND SMALL POWER PRODUCTION

Renewable Generation (Category 1-20 kw and less):

Interconnection of Electric Generators

Renewable Generation (Category 1 20 kw and less):

ENTERGY NEW ORLEANS, INC. STANDARD INTERCONNECTION AGREEMENT FOR NET METERING FACILITIES LOCATED IN ORLEANS PARISH

ENTERGY LOUISIANA, LLC STANDARD INTERCONNECTION AGREEMENT FOR NET METERING FACILITIES

INTERCONNECTION GENERATION AND NET METERING POLICY

NET METERING CUSTOMER SITED RENEWABLE GENERATION FACILITIES POLICY

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Standard for Interconnecting Small Generation 100 kw or Less with Electric Power Systems (EPS) (Interconnection Standard)

South Carolina Standard for Interconnecting Small Generation 100 kw or Less With Electric Power Systems (EPS) (Interconnection Standard)

Section 25 COGENERATION AND SMALL POWER PRODUCTION Electric Tariff Third Revised Sheet No. 1 Filed with IUB Cancels Second Revised Sheet No.

Berkeley Electric Cooperative, Inc. Standard for Interconnecting Distributed Resources Up To 500 KVA with the Cooperative s Electric Systems (CES)

EASTERN ILLINI ELECTRIC COOPERATIVE REGULATION NO. 27. SUBJECT: Interconnection and Parallel Operation of Distribution Generation

STANDARD INTERCONNECTION APPLICATION FOR NET METERING FACILITIES

CAPE HATTERAS ELECTRIC COOPERATIVE

SOLAR PV INSTALLATION AT USC BASEBALL STADIUM

ROCK ENERGY COOPERATIVE INTERCONNECTION POLICY Policy M Board Policy Interconnection and Parallel Operation of Distributed Generation

Standard for Interconnecting Small Generation 100 kw or Less with Electric Power Systems (EPS) (Interconnection Standard)

Standard for Interconnecting Small Generation 100 kw or Less with Electric Power Systems (EPS) 1. Overview:

Parkland Light & Water Company Park Ave Tacoma, WA 98444

Application for Interconnection and Net Metering Level 1

STANDARD INTERCONNECTION AGREEMENT FOR NET METERING FACILITIES

Please Refer to Attached Sample Form

MicroFIT-Generation Connection Application For Connection of Micro-Generation Facilities of 10 kw

EASTERN ILLINI ELECTRIC COOPERATIVE REGULATION NO. 27. SUBJECT: Interconnection and Parallel Operation of Distribution Generation

Black Hills 2017 Community Solar Garden ( CSG ) RFP Program

RECITALS. Now, Therefore, in consideration of the mutual covenants and agreements herein set forth, the Parties do hereby agree as follows:

PEPCO CUSTOMER NET ENERGY METERING CONTRACT. Qualifying facility of 1000 KW or less

Superseding REVISED Sheet No. 38 REVISED SHEET NO. 38 Effective March 20, 2008 Effective February 6, 2014 RULE NO. 18. Net Energy Metering

Palmetto Electric Cooperative, Inc. Standard for Interconnecting Distributed Resources Less Than 2 MVA With Cooperative s Electric Systems (CES)

RECITALS. Now, Therefore, in consideration of the mutual covenants and agreements herein set forth, the Parties do hereby agree as follows:

Standard Interconnection Agreement for Customer-Owned Renewable Generation System kw

SURPLUS ENERGY PURCHASE AGREEMENT PARALLEL CUSTOMER GENERATION CGS 8 WISCONSIN AGGREGATE RENEWABLE CAPACITY OF 20 KILOWATTS OR LESS

Tier 1 Standard Interconnection Agreement Customer-Owned Renewable Generation System

Net Metering Interconnections Standards

EL PASO ELECTRIC COMPANY SCHEDULE NO. DG INTERCONNECTION AND PARALLEL OPERATION OF DISTRIBUTED GENERATION

SCHEDULE SGI : SMALL GENERATOR INTERCONNECTIONS OTHER THAN NET METERING

ENTERGY MISSISSIPPI, INC. STANDARD INTERCONNECTION APPLICATION AND AGREEMENT FOR NON-RESIDENTIAL NET METERING FACILITIES (for kw systems)

ENTERGY MISSISSIPPI, INC. STANDARD INTERCONNECTION APPLICATION AND AGREEMENT FOR RESIDENTIAL NET METERING FACILITIES (for systems 20 kw or less)

Net Metering Interconnection Standards

Jefferson Energy Cooperative Policy 124 DISTRIBUTED GENERATION POLICY

TRI-COUNTY ELECTRIC COOPERATIVE APPLICATION AND AGREEMENT FOR INTERCONNECTION AND NET METERING OF SYSTEMS WITH CAPACITY OF 100 kw OR LESS

RECITALS. Now, Therefore, in consideration of the mutual covenants and agreements herein set forth, the Parties do hereby agree as follows:

STANDARD INTERCONNECTION AGREEMENT FOR RENEWABLE GENERATION SYSTEM

Interconnection of Electric Generators

microfit LDC CONNECTION REQUEST CHECKLIST

ABSTRACT Interconnection agreement for net energy billing DER systems or DER systems up to 100 kw that are compensated at avoided cost.

I. Members Applying for New Interconnection/Submission of Plans/Specifications.

Electric Interconnection Policy Category 1 Projects Aggregate Generator Output (20 kw and Under)

Customer s Name: Address: Contact Person: Telephone Number: Service Point Address: (Name and Address) Signature

Lane Electric Cooperative, Inc. Eugene, Oregon Policy 311 (Net-Metering Services)

Please Refer to Attached Sample Form

Standard Interconnection Agreement for Customer-Owned Renewable Generation System

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

INTERCONNECTION AGREEMENT FOR CUSTOMER-OWNED RENEWABLE GENERATION SYSTEMS

Interconnection Application and Compliance Form For Photovoltaic Systems Up to 2 MW

7 th Revision of Sheet No. 150 Canceling 6 th Revision WN U-60 of Sheet No. 150

NET ENERGY METERING AND INTERCONNECTION AGREEMENT

STANDARD GENERATION INTERCONNECTION AGREEMENT BETWEEN CITY OF ANAHEIM AND

POLICY NO I. INTRODUCTION

Small Generator Interconnection Application

Renewable Generation (Category 2 20 kw to 150 kw)

INTERCONNECTION AND OPERATING AGREEMENT

MODEL DISTRIBUTION COOPERATIVE AGREEMENT FOR INTERCONNECTION AND PARALLEL OPERATION OF DISTRIBUTED GENERATION LONG FORM CONTRACT

Solar: Wind: Total: (AC Nameplate Rating) x (720 hrs/mo) x (0.15 = solar/ 0.10 = wind) Date(s) of Parallel Operation Rebate Expiration

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

WEST OREGON ELECTRIC COOPERATIVE, INC. VERNONIA, OREGON POLICY 311 NET METERING SERVICE

Issued by authority of an Order of the Public Service Commission of Kentucky Executive in Director Case No , Dated January 8,2009.

Please Refer to Attached Sample Form

GENERATING FACILITY INTERCONNECTION AGREEMENT FOR MULTIPLE TARIFFS USING A NEM-ST GENERATING FACILITY SIZED GREATER THAN ONE MEGAWATT.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Original Cal. PUC Sheet No E.

Mason County PUD No. 1. Net Energy Metering Interconnection Agreement

With Terms and Conditions for Interconnection For a Level 2, 3, & 4 Review of Small Generator Facilities Less than or Equal to 10 MW

Issued: September 2, 2014 Effective: October 3, 2014 WN U-60 Attachment B to Schedule 150, Page 1

CITY OF UKIAH PHOTOVOLTAIC INTERCONNECTION AGREEMENT FOR NET ENERGY METERING FROM SOLAR ELECTRIC GENERATING FACILITIES OF 1 KW (KILOWATT) TO 100 KW

POWER PURCHASE and INTERCONNECTION AGREEMENT FOR SNAP GENERATION

Tier 1 Net Metering and Renewable Resource Interconnection Agreement. Grantee: Abbreviated Legal Description: Assessor s Tax Parcel Number(s):

STANDARD INTERCONNECTION AGREEMENT FOR TIER 2 RENEWABLE GENERATOR SYSTEMS

Holden Municipal Light Department Interconnection Agreement for Net Metering Service

STANDARD INTERCONNECTION AGREEMENT FOR TIER 1 RENEWABLE GENERATOR SYSTEMS

PHOTOVOLTAIC INTERCONNECTION AGREEMENT FOR ELECTRIC GENERATING FACILITES Customer Owned Generation-Distribution Rate (Schedule G-1)

INTERCONNECTION AGREEMENT FOR NET BILLING FOR RENEWABLE ELECTRICAL GENERATING FACILITIES OF ONE MEGAWATT OR LESS

Central Texas Electric Cooperative, Inc. Tariff for Electric Service

Weatherford Municipal Utility System. Distributed Generation Procedures & Guidelines Manual for Customers

Policy Bulletin No. 25 Net Metering. Public Utility District No. 1 of Klickitat County 1313 South Columbus Goldendale, WA 98620

State of Minnesota Interconnection Agreement For the Interconnection of Extended Parallel Distributed Generation Systems With Minnesota Power

Please Refer to Attached Sample Form

Transcription:

Attachment 6 Interconnection Request Application Form for Interconnecting a Certified Inverter-Based Generating Facility No Larger than 20 kw This Interconnection Request Application Form is considered complete when it provides all applicable and correct information required below. Additional information to evaluate the Interconnection Request may be required. Processing Fee A non-refundable processing fee of $100 must accompany this Interconnection Request Application Form. If the Interconnection Request is submitted solely due to a transfer of ownership of the Generating Facility, the fee is $50. Interconnection Customer Name: Contact Person: E-Mail Address: County: Telephone (Day): Fax: (Evening): Contact (if different than Interconnection Customer) Name: E-Mail Address: County: Telephone (Day): (Evening): Fax: 1

Owner(s) of the Generating Facility: Generating Facility Information Facility Location (if different from above): County: Utility: Account Number: Inverter Manufacturer: Model: Nameplate Rating (each inverter): kw (AC) (each inverter) kva (AC) (each inverter) Volts (AC) (each inverter) Single Phase: Three Phase: System Design Capacity 1 : kw (AC) (system total) kva (AC) (system total) For photovoltaic sources only: Total panel capacity: kw (DC) (system total) Maximum Physical Export Capability Requested: 2 _(calculated) 3 _ kw (AC) For other sources: Maximum Physical Export Capability Requested: 2 kw (AC) Prime Mover: Photovoltaic Reciprocating Engine Fuel Cell Turbine Other 1 Total inverter capacity. 2 At the Point of Interconnection, this is the maximum possible export power that could flow back to the utility. Unless special circumstances apply, load should not be subtracted from the System Design Capacity. 3 For a photovoltaic installation, the utility will calculate this value as the lesser of (1) the total kw inverter capacity and (2) the total kw panel capacity (no DC to AC losses included, for simplicity). 2

ENERGY SOURCE TABLE Renewable H-1. Solar Photovoltaic H-2. Solar thermal H-3. Biomass landfill gas H-4. Biomass manure digester gas H-5. Biomass directed biogas H-6. Biomass solid waste H-7. Biomass sewage digester gas H-8. Biomass wood H-9. Biomass other (specify below) H-10. Hydro power run of river H-11. Hydro power - storage H-12. Hydro power tidal H-13. Hydro power wave H-14. Wind H-15. Geothermal H-16. Other (specify below) Non-Renewable H-17. Fossil Fuel - Diesel H-18. Fossil Fuel - Natural Gas (not waste) H-19. Fossil Fuel - Oil H-20. Fossil Fuel Coal H-21. Fossil Fuel Other (specify below) H-22. Other (specify below) Energy Source: (choose from list above) Is the equipment UL 1741 Listed? Yes No If Yes, attach manufacturer s cut-sheet showing UL 1741 listing Estimated Installation Date: Estimated In-Service Date: The 20 kw Inverter Process is available only for inverter-based Generating Facilities no larger than 20 kw that meet the codes, standards, and certification requirements of Attachments 3 and 4 of the North Carolina Interconnection Procedures, or the Utility has reviewed the design or tested the proposed Generating Facility and is satisfied that it is safe to operate. 3

List components of the Generating Facility equipment package that are currently certified: 1. 2. 3. 4. 5. Number Equipment Type Certifying Entity Interconnection Customer Signature I hereby certify that, to the best of my knowledge, the information provided in this Interconnection Request Application Form is true. I agree to abide by the Terms and Conditions for Interconnecting a Certified Inverter-Based Generating Facility No Larger than 20 kw and return the Certificate of Completion when the Generating Facility has been installed. Signed: Title: Date: Contingent Approval to Interconnect the Generating Facility (For Utility use only) Interconnection of the Generating Facility is approved contingent upon the Terms and Conditions for Interconnecting a Certified Inverter-Based Generating Facility No Larger than 20 kw and return of the Certificate of Completion. Utility Signature: Title: Date: Interconnection Request ID number: Utility waives inspection/witness test? Yes No 4

Certificate of Completion for Interconnecting a Certified Inverter-Based Generating Facility No Larger than 20 kw Is the Generating Facility owner-installed? Yes No Interconnection Customer Name: Contact Person: E-Mail Address: County: Telephone (Day): Fax: (Evening): Location of the Generating Facility (if different from above) Electrician Name: Company: E-Mail Address: County: Telephone (Day): (Evening): Fax: License Number: Date Approval to Install Generating Facility granted by the Utility: 5

Interconnection Request ID Number: Inspection: The Generating Facility has been installed and inspected in compliance with the local building/electrical code of Signed (Local electrical wiring inspector, or attach signed electrical inspection): Signature: Print Name: Date: As a condition of interconnection, you are required to send/ email/ fax a copy of this form along with a copy of the signed electrical permit to (insert Utility information below): Utility Name: Attention: E-Mail Address: Fax: Approval to Energize the Generating Facility (For Utility use only) Energizing the Generating Facility is approved contingent upon the Terms and Conditions for Interconnecting a Certified Inverter-Based Generating Facility No Larger than 20 kw. Utility Signature: Title: Date: 6

Terms and Conditions for Interconnecting a Certified Inverter-Based Generating Facility No Larger than 20 kw 1.0 Construction of the Facility The Interconnection Customer (Customer) may proceed to construct (including operational testing not to exceed two hours) the Generating Facility when the Utility approves the Interconnection Request and returns it to the Customer. 2.0 Interconnection and Operation The Customer may interconnect the Generating Facility with the Utility s System and operate in parallel with the Utility s System once all of the following have occurred: 2.1 Upon completing construction, the Customer will cause the Generating Facility to be inspected or otherwise certified by the appropriate local electrical wiring inspector with jurisdiction, and 2.2 The Customer returns the Certificate of Completion to the Utility, and 2.3 The Utility has either: 2.3.1 Completed its inspection of the Generating Facility to ensure that all equipment has been appropriately installed and that all electrical connections have been made in accordance with applicable codes. All inspections must be conducted by the Utility, at its own expense, within ten Business Days after receipt of the Certificate of Completion and shall take place at a time agreeable to the Parties. The Utility shall provide a written statement that the Generating Facility has passed inspection or shall notify the Customer of what steps it must take to pass inspection as soon as practicable after the inspection takes place; or 2.3.2 If the Utility does not schedule an inspection of the Generating Facility within ten Business Days after receiving the Certificate of Completion, the witness test is deemed waived (unless the Parties agree otherwise); or 2.3.3 The Utility waives the right to inspect the Generating Facility. 7

2.4 The Utility has the right to disconnect the Generating Facility in the event of improper installation or failure to return the Certificate of Completion. 2.5 Revenue quality metering equipment must be installed and tested in accordance with applicable American National Standards Institute (ANSI) standards and all applicable regulatory requirements. 3.0 Safe Operations and Maintenance The Customer shall be fully responsible to operate, maintain, and repair the Generating Facility as required to ensure that it complies at all times with the interconnection standards to which it has been certified. 4.0 Access The Utility shall have access to the disconnect switch (if a disconnect switch is required) and metering equipment of the Generating Facility at all times. The Utility shall provide reasonable notice to the Customer, when possible, prior to using its right of access. 5.0 Disconnection The Utility may temporarily disconnect the Generating Facility upon the following conditions: 5.1 For scheduled outages upon reasonable notice. 5.2 For unscheduled outages or emergency conditions. 5.3 If the Generating Facility does not operate in a manner consistent with these Terms and Conditions. 5.4 The Utility shall inform the Customer in advance of any scheduled disconnection, or as soon as is reasonable after an unscheduled disconnection. 6.0 Indemnification The Parties shall at all times indemnify, defend, and save the other Party harmless from, any and all damages, losses, claims, including claims and actions relating to injury to or death of any person or damage to property, demand, suits, recoveries, costs and expenses, court costs, attorney fees, and all other obligations by or to third parties, arising out of or resulting from the other Party s action or inactions of its obligations hereunder on 8

behalf of the indemnifying Party, except in cases of gross negligence or intentional wrongdoing by the indemnified Party. 7. 0 Insurance All insurance policies must be maintained with insurers authorized to do business in North Carolina. The Parties agree to the following insurance requirements: 7.1 If the Customer is a residential customer of the Utility, the required coverage shall be a standard homeowner s insurance policy with liability coverage in the amount of at least $100,000 per occurrence. 7.2 For an Interconnection Customer that is a non-residential customer of the Utility proposing to interconnect a Generating Facility no larger than 250 kw, the required coverage shall be comprehensive general liability insurance with coverage in the amount of at least $300,000 per occurrence. 7.3 The Customer may provide this insurance via a self-insurance program if it has a self-insurance program established in accordance with commercially acceptable risk management practices. 8.0 Limitation of Liability Each Party s liability to the other Party for any loss, cost, claim, injury, or expense, including reasonable attorney s fees, relating to or arising from any act or omission hereunder, shall be limited to the amount of direct damage actually incurred. In no event shall either Party be liable to the other Party for any indirect, special, incidental, consequential, or punitive damages of any kind. 9.0 Termination The agreement to interconnect and operate in parallel may be terminated under the following conditions: 9.1 By the Customer By providing written notice to the Utility and physically and permanently disconnecting the Generating Facility. 9

9.2 By the Utility If the Generating Facility fails to operate for any consecutive 12-month period or the Customer fails to remedy a violation of these Terms and Conditions. 9.3 Permanent Disconnection In the event this Agreement is terminated, the Utility shall have the right to disconnect its facilities or direct the Customer to disconnect its Generating Facility. 9.4 Survival Rights This Agreement shall continue in effect after termination to the extent necessary to allow or require either Party to fulfill rights or obligations that arose under the Agreement. 10.0 Assignment/Transfer of Ownership of the Facility 10.1 This Agreement shall not survive the transfer of ownership of the Generating Facility to a new owner. 10.2 The new owner must complete and submit a new Interconnection Request agreeing to abide by these Terms and Conditions for interconnection and parallel operations within 20 Business Days of the transfer of ownership. The Utility shall acknowledge receipt and return a signed copy of the Interconnection Request Application Form within ten Business Days. 10.3 The Utility shall not study or inspect the Generating Facility unless the new owner s Interconnection Request Application Form indicates that a Material Modification has occurred or is proposed. 1 0

Duke Energy Progress Facility s intended design: Sell All Net Meter If Net Metering, do you intend to keep your current retail rate schedule? Yes No Length of contract term and option under the Purchased Power Schedule PP-1 (select one): Variable 5-Year Fixed 10-Year Fixed 15-Year Fixed Option (Select One): Option A Option B