Contractor and subcontractor insolvency January 2010

Similar documents
Cosmos Projects - Standard Terms and Conditions of Sub-Contract

Accountable Grant Arrangement

ABA Film Services Ltd. Terms and Conditions of Hire

ANDRA JEWELS LIMITED TERMS & CONDITIONS OF SUPPLY

HOUSING, ALTERATIONS AND SMALL BUILDINGS CONTRACT

AKD TIMBER TRADING PTY LTD ACN TERMS OF SALE

CONTRACT 10: AGREEMENT WITH A SELF-EMPLOYED CONSULTANCY WHO HAS OPTED OUT OF THE CONDUCT REGULATIONS (OUTSIDE IR35) (1) (registered company no.

Accountable Grant Arrangement

DOUKPSC04 Rev Feb 2013

Standard Terms & Conditions for Purchase Order

Finance Terms and Conditions

DATED 201 THE KENT COUNTY COUNCIL (1) - and - [NAME OF SCHEME EMPLOYER] (2) - and - [NAME OF ADMISSION BODY] (3)

CUSTOMER CREDIT APPLICATION FOR TRADE ACCOUNT CORP-FIN-CON-005 Standard Credit Terms and Application Form

JC PAYNE SPECIALIST SERVICES LIMITED TERMS AND CONDITIONS FOR SERVICE

TERMS AND CONDITONS PARTIES

3 Delivery. 4 Terms of Payment

(1) In these sub-contract conditions of agreement, the following words and phrases shall have the following meanings:-

1 In these Domestic Sub-Contract Conditions the following expressions and terms shall have the meanings given below:

INTERIOR ARCHITECTURE & DESIGN TERMS & CONDITIONS DESIGN SERVICES ZUNICA P/L LEVEL 1, 216 CHAPEL STREET PRAHRAN VICTORIA 3181

APPLIED PHOTONICS LIMITED GENERAL TERMS AND CONDITIONS OF SUPPLY

APPLICATION FOR COMMERCIAL CREDIT 30 DAY TRADING ACCOUNT Date:

TERMS AND CONDITIONS OF SALE OF GOODS AND SUPPLY OF SERVICES

Northants Concrete Group Ltd Bradfield Road, Wellingborough. NN8 4HB

UK v

Standard Trading Terms

Welcome to. Dorchester Finance. Your Finance. Your Way

TERMS AND CONDITIONS OF SALE. 1.1 the following words and expressions shall have the following meanings unless the context otherwise requires:

Insert heading depending. Insert heading depending on line on line length; please delete cover options once

APPLICATION FOR CREDIT ACCOUNT, AND CONDITIONS OF SALE

Terms and Conditions

STANDARD TRADING CONDITIONS

an undertaking substantially in the form set out in Schedule 2 (Form of Creditor Accession Undertaking); or

STANDARD TERMS OF BUSINESS

Plain English Commercial and Industrial Building Contract

MAPS MPS AGREEMENT PART B - TERMS & CONDITIONS

Pella Certified Contractor Agreement. This Agreement is made this day of, 20, by and between. _ ( Pella Sales Entity ) and. ( Remodeler ).

KNIGHTSTONE CAPITAL PLC

Application for commercial credit account

MIRAGE DOORS NSW ABN:

CEMEX UK MATERIALS LIMITED STANDARD CONDITIONS OF SALE (READYMIX) 1.1 In these Conditions the following words have the following meanings:

Emtelle UK Limited Conditions Of Sale Of Goods

STANDARD TERMS AND CONDITIONS FOR THE SALE OF GOODS ALL MARKETS EXCEPT OIL AND GAS

MAPS FUSION PLUS AGREEMENT PART B - TERMS & CONDITIONS

Electronic & Mechanical Calibrations Pty Ltd Terms & Conditions of Trade Definitions Acceptance Change in Control 4.

THE SOFTWARE BUREAU LIMITED TERMS OF BUSINESS

PHOTOGRAPHIC GOODS RENTAL/HIRE SERVICE TERMS AND CONDITIONS

Admission Agreement To participate in the Local Government Pension Scheme [relating to services provided to [school/other employer]]

1. PURPOSE OF THESE TERMS AND CONDITIONS 2. DEFINITIONS AND INTERPRETATION

Contract for Services Ltd Contractors

JPL Telecom Limited Conditions of Sale. The customer's attention is drawn in particular to the provisions of clause 9.

Important information for customers with equipment finance contracts of $1,000,000 or less.

Conditions of Sale Scania Australia Pty Ltd General Terms (ACN Scania ) 1. General Customer Goods Manufacturer Purchase Price

CONDITIONS OF CONTRACT FOR QUOTATION

FIDIC CONTRACTS A COMPARATIVE. Uttam Sengupta Sr. GM Contracts & Risk Management

Credit Accouint Application Form

TERMS AND CONDITIONS OF SALE AND/OR HIRE OF PRODUCTS

USERS GUIDE FORM OF INTERCREDITOR AGREEMENT FOR REAL ESTATE FINANCE TRANSACTIONS (SENIOR/MEZZANINE) 10 June 2014

AGR Enterprises Pty Ltd T/A All About Cabinets Terms & Conditions of Trade

BURFORD CAPITAL FINANCE LLC GUARANTEED BY BURFORD CAPITAL LIMITED AND BURFORD CAPITAL PLC

GUIDE TO A MORTGAGE. Your mortgage is a serious commitment which you should not undertake without careful consideration.

Purchase Order general terms and conditions for the supply of goods and services

TERMS AND CONDITIONS OF SALE

Loan Contract. The party identified in the Specific Loan Terms as the borrower (you), as borrower

STANDARD TERMS AND CONDITIONS FOR THE COMMERCIAL HIRE OF GOODS AND EQUIPMENT

Home Loans Terms & Conditions

Application Form. Dear Client,

Jewson Limited Terms and Conditions of Hire and Repair

STATE OF COLORADO BUILDING EXCELLENT SCHOOLS TODAY SUBLEASE OF MORGAN COUNTY SCHOOL DISTRICT RE-3. by and between

These Standard Terms and Conditions form a contract between the Company and the Supplier. SUPPLY OF GOODS / SERVICES QUALITY PRICE AND PAYMENT

Terms of Business for Intermediaries. Effective from 17 May 2018

SUBCONTRACTOR TERMS AND CONDITIONS

Hightown Housing Association Limited 4 per cent. Bonds due 31 October 2027 (including Retained Bonds)

Scottish Conditions of Appointment of an Architect SCA/2014 (Apr 2015)

Commercial Lender Policy

Consumer General Collateral Mortgage Standard Charge Terms Land Registration Reform Act

Appendix K Model Letters for Use by the Engineer

SEADRILL CAPRICORN HOLDINGS LLC

Prospectus Liability Insurance

NAB EQUITY LENDING. Facility Terms

2 CONTRACT 3 SPECIFIC ITEMS INCLUDED AND EXCLUDED FROM QUOTE. Balclutha. Cromwell

WELLESLEY SECURED FINANCE PLC

RAIL SETTLEMENT PLAN LIMITED. [SUPPLIER or RETAILER] ACCREDITATION CONTRACT v01-00

Terms & Conditions Supply of Goods or Services

Uncontrolled If Printed

NSW Residential Building Contract for New Dwellings

CODE OF BANKING PRACTICE

Standard Trading Terms and Conditions

Section 7. General Conditions of Contract for the Procurement of Works

Plain English Commercial and Industrial Building Contract

DESERT COMMUNITY COLLEGE DISTRICT General Terms and Conditions

Invoice Finance. General Conditions

LOAN FACILITY AGREEMENT

Construction traps and solutions for development projects

CS ENERGY LIMITED SERVICE CONDITIONS

JC PAYNE SPECIALIST SERVICES LIMITED TERMS AND CONDITIONS FOR REPAIR AND MAINTENANCE

Exclaimer Cloud Signatures For Office 365: Terms and Conditions

Approved Installer Scheme Terms and Conditions

SHORT FORM STANDARD SUBCONTRACT. This Agreement is made this day of, 20, between

ARCHITECTURAL CONSULTANCY AGREEMENT TERMS AND CONDITIONS

VIRIDOR WASTE MANAGEMENT LIMITED TERMS AND CONDITIONS OF TRADE

Transcription:

Contractor and subcontractor insolvency January 2010

1 Early warning signs: what sort of behaviour or warning signs might indicate a contractor beginning to get into trouble? 1.1 The contractor's employees not turning up for work or a general decrease in the amount of labour on site. 1.2 A slow-down in progress of the works. 1.3 Plant, equipment and materials "disappearing" from site. 1.4 An increase in the number of defects to the works. 1.5 The contractor seeking to negotiate further payments or release of the retention, or any other change in payment patterns (such as an advance payment or more frequent instalments or certificates). 1.6 The contractor raising spurious or unjustified claims or contra-charges to increase the amount payable to it. 1.7 The contractor assigning (or seeking the employer's consent to assign) the proceeds of the building contract to a bank or other creditor. 1.8 If the contractor is a company, late filing of accounts or annual returns with the relevant authorities, or auditor's reports that are signed off subject to a qualification (depending on the nature of the qualification). 1.9 Unsatisfied court judgments against the contractor. These may be revealed by a business information report on the contractor from a specialist business information provider, such as Dun & Bradstreet. 1.10 Sub-contractors not being paid. 1.11 Persistent rumours about the contractor's financial position in the press and from other sources. 1.12 An underlying trend in the contractor's behaviour that suggests it is in financial difficulty. 1.13 The contractor's parent company (or other companies in the same group as the contractor) displaying any of the warning signs listed in this note. 2 What can be done to protect the position if the warning signs are spotted 2.1 Check that all bank bonds and parent company guarantees are in place. If not, the employer should take steps to obtain any missing parent company guarantees or bank bonds. 2.2 Check whether the employer will be able to call any bonds in its favour or make a claim under a parent company guarantee. This includes checking any technical requirements about the way in which the claim must be notified to the bondsman or guarantor. The employer should carefully consider if the bonds provide for a right to make a claim on the occurrence of an insolvency event without first having to obtain the decision of an adjudicator or a decision in any other form of dispute resolution. If the decision of an adjudicator is required, adjudication proceedings must be instigated prior to the date of the insolvency type event to avoid insolvency law implications. If more protracted proceedings are required, consider whether there will be time to obtain a decision in advance of the insolvency occurring.

2.3 Ensure that the Employer is familiar with the terms of any parent company guarantee and check that the guarantor's obligations will not be discharged by: (a) Terminating the contractor's employment under the building contract. (b) Renegotiating the scope of works with the contractor or varying the underlying building contract without first obtaining the guarantor's consent. (Consider whether this would extend to any agreement to make direct payments to subcontractors.) (c) Reaching a settlement with the contractor. (d) Employing a new contractor if the guarantor has a duty to complete the works. 2.4 Closely monitor the contractor s performance (including the financial performance of the contractor and any guarantor). Agreements with third parties 2.5 Check that all necessary collateral warranties have been procured in accordance with the terms of the contract. If not, it should take steps to obtain any missing collateral warranties. 2.6 If third party rights are being granted instead of collateral warranties (under the Contracts (Rights of Third Parties) Act 1999), check that all notices granting third party rights have been issued. 2.7 Check that the employer will not breach any third party agreements if it terminates the contractor's employment without that third party's consent. For example, under a facility agreement, before the employer terminates the contractor's employment it usually needs the bank's consent. It is likely that the contractor entering into administration or becoming insolvent will be an event of default under the facility agreement in any event. Protecting the site 2.8 Ensure legal protection by checking that all insurance cover required by the construction contract is in place. 2.9 Ensure physical protection by making arrangements for site security, to ensure plant, equipment and materials do not "disappear. Securing material and documents 2.10 Check whether the employer has rights over design and copyright relating to the project, and that the employer obtains copies of any drawings or documents that are not already in its possession. 2.11 Secure off-site plant, equipment and materials (to the extent possible). 2.12 Undertake an audit of on-site plant, equipment and materials. Payment 2.13 Establish the precise amount already paid to the contractor. This enables the employer to check whether: (a) the contractor has been overpaid; or

(b) a retention has been deducted from payments due to the contractor (and when the retention has to be released). 2.14 Check whether there is a right to set-off over-payments under the construction contract against other amounts payable to the contractor. (a) at law or in equity; (b) contractually, under the construction contract or other agreements between the employer and the contractor; and (c) in case of a liquidation or administration in England, under the Insolvency Act 1986 and the Insolvency Rules 1986 (SI 1986/1925). (Note that there is no automatic right to set-off if the contractor goes into administration (rule 2.85, Insolvency Rules 1986).) 2.15 Even if it has no right of set-off, check whether it can avoid making any further payments to the contractor by relying on: (a) an abatement (that is, a common law right to withhold payment because of a reduction in the value of the project due to defects); or (b) the payment provisions in the Housing Grants, Construction and Regeneration Act 1996 (if that Act applies). 2.16 Check whether it can make direct payments to sub-contractors, suppliers or professional consultants engaged by the contractor. Direct payment provisions require careful drafting in order to: (a) ensure that the employer's liability to the contractor reduces by an amount equal to any direct payment the employer makes to a sub-contractor, supplier or professional consultant. The employer should also ensure that, before the employer makes a direct payment, the recipient indemnifies the employer against any liability the employer might have to pay the same amount to the contractor; and (b) avoid falling foul of the pari passu rule on insolvency. In general, a direct payment clause will avoid the pari passu rule if it is set out expressly in the building contract and independent of the contractor's insolvency, so that the employer can exercise it in other circumstances. 2.17 Check whether the contractor has been paid too much due to over-certification by the professional consultant who is administering the construction contract. If so, the employer may be entitled to recover the over-certified amount from the professional consultant (possibly from the consultant s professional indemnity insurance). 3 Termination of the contractor 3.1 Most construction contracts will provide the employer with a right to terminate the contract upon the contractor s insolvency. You should check how widely the contract defines insolvency for these purposes as well as the procedure to be followed to bring the contract to an end. Note that absent a contractual right of this nature, insolvency is not a breach of contract under English law. The employer cannot, therefore, simply rely on a right to terminate for default/breach. Express wording dealing with insolvency is required. 3.2 If Works are outstanding (or there are ongoing variations), it is likely that termination of the construction contract will be necessary. The termination provisions in the construction contract should be considered carefully as they may restrict the right to

claim against the contractor in certain circumstances (e.g. a sole remedy provision may limit common law rights on termination). 3.3 It is likely that a breach by the contractor or the contractor entering into administration will be an event of default under the terms of the facility agreement. If so, this will provide the banks with certain remedies including the right to impose a draw stop or accelerate repayment of the loan. Replacement of the contractor on terms acceptable to the banks may prevent the banks from exercising such rights, although it is likely that it will instead be necessary for the employer to seek a formal waiver of default from the bank. 3.4 It is likely that the consent of the project banks will be necessary for the termination and replacement of the contractor. 4 Key considerations once the insolvency process has begun Establishing loss 4.1 Ascertain to the fullest extent possible the cost of carrying out the remaining Works, including the cost of the remediation of defects present in the Works. This may involve carrying out intrusive surveys of the project. 4.2 Ascertain other losses, including deductions and liabilities that may be reallocated to the employer under the terms of any interface agreement. 4.3 Loss of a 12 year warranty in the Works - any claim for future/contingent losses may be subject to challenge from the contractor (or its administrator) on the basis that the employer will be unable to demonstrate a crystallised loss. The cost of procuring a replacement guarantee in the form of latent defects insurance would however represent a crystallised loss occasioned by the contractor s failure to perform its obligations under the construction contract. Right to recover 4.4 The employer should look to the contractual mechanisms that provide the quickest and easiest access to cash. (a) Calls should be made on any bonds available prior to the date on which the right to call expires. The employer should consider the procedure for making a call under the terms of the bond. (b) To the extent monies are payable to the contractor but the final date for payment of such monies has not yet passed, the employer should consider exercising a right to withhold sums due to the contractor to cover losses occasioned by the contractor s failure to perform. 4.5 To the extent that the guarantor remains solvent and has good covenant, the employer may wish to either require the guarantor to complete or procure the completion of all outstanding works. There would also normally be indemnity provisions on which the employer may rely. 5 Key considerations when selecting an alternative supplier 5.1 Ability to mobilise quickly. 5.2 Good track record and experience in the sector. 5.3 Ability to provide forms of security acceptable to the banks and the employer.