Standard Form of Agreement Between Owner and Contractor for a Residential or Small Commercial Project

Document A Standard Abbreviated Form of Agreement Between Owner and Contractor

Educational Use Only S A M P L E S A M P L E

General Conditions for Construction GCC201. Contract Type: Document No. for the following PROJECT: (Name and location or address) EXAMPLE

Document A General Conditions of the Contract for Construction, Construction Manager as Adviser Edition

AIA Document A201 TM 1997

Document A107. Standard Form of Agreement Between Owner and Contractor for a Project of Limited Scope

AGC s Preliminary Commentary to the 2007 Edition of the AIA A201 General Terms and Conditions Document

Document A SP General Conditions of the Contract for Construction, for use on a Sustainable Project, Construction Manager as Adviser Edition

AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER PRE-CONSTRUCTION AND CONSTRUCTION SERVICES

Standard Form of Agreement Between Contractor and Subcontractor

C R D A Capital Region Development Authority

AIA Document A201 TM 2007

Document A201 TM 2007 SP

Document A201 TM. General Conditions of the Contract for Construction. (Name and location or address)

Document A Standard Form of Agreement Between Contractor and Subcontractor

ARTICLE 1 ARTICLE 3 CONTRACTOR THE SUBCONTRACT DOCUMENTS ARTICLE 2 MUTUAL RIGHTS AND RESPONSIBILITIES

GENERAL CONDITIONS of the CONTRACT FOR CONSTRUCTION for the ARCHDIOCESE OF CHICAGO (2004 Archdiocese Edition)

AIA Document A201 TM 2007

Document A201 TM. General Conditions of the Contract for Construction

August 2016 Edition 1

Standard Form of Agreement Between Contractor and Subcontractor

AIA Document A201 TM 1997

Document A104 TM. Standard Abbreviated Form of Agreement Between Owner and Contractor

Document A401 TM. Standard Form of Agreement Between Contractor and Subcontractor

AIA Document A201 TM 2007

Document A401 TM. Standard Form of Agreement Between Contractor and Subcontractor

ConsensusDocs 751 STANDARD SHORT FORM AGREEMENT BETWEEN CONSTRUCTOR AND SUBCONTRACTOR

OREGON STATE UNIVERSITY CM/GC CONTRACT. (Construction Manager/General Contractor)

3.1.2 The Contractor shall perform the Work in accordance with the Contract Documents.

Document A401. Standard Form of Agreement Between Contractor and Subcontractor

AIA Document A103 TM 2007

1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES

AIA Document A107 TM 1997

Subcontract Agreement

AGC TEXT COPY THE ASSOCIATED GENERAL CONTRACTORS OF AMERICA AGC DOCUMENT NO. 603 STANDARD SHORT FORM AGREEMENT BETWEEN CONTRACTOR AND SUBCONTRACTOR

ICSC CENTERBUILD CONFERENCE DECEMBER 2-5, 1998 ARIZONA BILTMORE PHOENIX, ARIZONA

AIA A201 General Conditions of the Contract for Construction

Document A South Carolina Division of Procurement Services, Office of the State Engineer Version of

GENERAL CONDITIONS. of the CONTRACT FOR CONSTRUCTION. for the ARCHDIOCESE OF CHICAGO. for SOLE SOURCE CONTRACTS. (2004 Archdiocese Edition)

Document A201 TM. General Conditions of the Contract for Construction

AIA Document A101 TM 2007

STANDARD FORM OF AGREEMENT BETWEEN DESIGN-BUILDER AND GENERAL CONTRACTOR - COST PLUS FEE WITH AN OPTION FOR A GUARANTEED MAXIMUM PRICE

STANDARD FORM OF AGREEMENT BETWEEN DESIGN-BUILDER AND GENERAL CONTRACTOR - LUMP SUM

AIA Document A133 TM 2009

Document A201 TM. General Conditions of the Contract for Construction

ConsensusDocs 751 STANDARD SHORT FORM AGREEMENT BETWEEN CONSTRUCTOR AND SUBCONTRACTOR

Document A133 TM. AGREEMENT made as of the day of in the year 20 (In words, indicate day, month and year.)

ANNEX A Standard Special Conditions For The Salvation Army

CONSTRUCTION CONTRACT

AIA Document A107 TM 2007

SHORT FORM STANDARD SUBCONTRACT. This Agreement is made this day of, 20, between

Amount of Contract work per the plans and specifications for project. Specifications Attached. Plans Attached

Document A133 TM. AGREEMENT made as of the day of in the year Two Thousand and Sixteen. BETWEEN the Owner:

Standard Form of Agreement Between Owner and Architect for a Federally Funded or Federally Insured Project

SHORT FORM OF AGREEMENT BETWEEN OWNER AND ENGINEER FOR PROFESSIONAL SERVICES

General Conditions of the Contract for Construction

Construction Law Report Special Edition

Agreement. Preconstruction Services

Document B101 TM. Standard Form of Agreement Between Owner and Architect

Document A201/CMa. General Conditions of the Contract for Construction where the Construction Manager is NOT a Constructor

Document A201 TM. General Conditions of the Contract for Construction

STANDARD SUBCONTRACT AGREEMENT FOR BUILDING CONSTRUCTION

SUBCONTRACTOR TERMS AND CONDITIONS

Attachment 1 CITY OF SAN ANGELO, TEXAS OWNER S CONSTRUCTION GENERAL CONDITIONS. (Effective April 16, 2018)

SUBCONTRACT (SHORT FORM)

AIA CONTRACT DOCUMENTS

AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER. Pre-Construction and Construction Phase Services

AIA Document A133 TM 2009

Construction Law Update Comparing Contracts-A Review Of The AIA 201 and ConsensusDocs

AIA Document A104 TM 2017

Document A105. Standard Form of Agreement Between Owner and Contractor for a Residential or Small Commercial Project

STATE OF VERMONT STANDARD FORM. GENERAL CONDITIONS FOR F P R DESIGN BUILD CONTRACTS (March 2017)

For further information on the AIA s approach to drafting contract documents, see AIA Document M120, Document Drafting Principles.

AIA Document A102 TM 2007

Document A141 TM. Standard Form of Agreement Between Owner and Design-Builder

Standard Form of Agreement Between Design-Builder and Contractor. The Design-Builder has entered into a Design-Build Contract with the Owner dated:

AGREEMENT BETWEEN THE BOARD OF REGENTS OF THE TEXAS A&M UNIVERSITY SYSTEM AND SPAWGLASS CONSTRUCTION CORP., CONSTRUCTION MANAGER-AT-RISK

Document A101 TM. Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum

MASTER SUBCONTRACT AGREEMENT

STANDARD FORM OF AGREEMENT BETWEEN DESIGN CONSULTANT AND DESIGN SUB-CONSULTANT

Please ensure that the following information is enclosed in your subcontract package:

Document A Exhibit A Determination of the Cost of the Work

AIA Document A105 TM 2017

CONTRACT AND GENERAL CONDITIONS BETWEEN OWNER AND CONTRACTOR. THIS AGREEMENT, made this day of, 2018, by and

OSE FORM STANDARD MODIFICATIONS TO THE STANDARD FORM OF AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER AS CONSTRUCTOR

MASTER AGREEMENT BETWEEN OWNER AND ARCHITECT/ENGINEER Contract No.

General Conditions of the Contract for Construction

AGREEMENT FOR CONSTRUCTION MANAGEMENT SERVICES FOR

AIA Document A102 TM 2007

Attachment 1. University System of New Hampshire USNH General Conditions of the Contract for Design-Build Version 1.3 TABLE OF ARTICLES

Washington University in St. Louis

Tri-Cities Academic Building Washington State University Richland, WA Project Manual

Standard Form of Agreement Between Owner and Architect without a Predefined

Terre View Research Facility Relocation Washington State University Pullman, WA Project Manual

SC BUILDERS, Inc. SAMPLE MASTER SUBCONTRACT AGREEMENT TABLE OF CONTENTS

DOUKPSC04 Rev Feb 2013

Transcription:

CONSENSUSDOCS 200 STANDARD AGREEMENT AND GENERAL CONDITIONS BETWEEN OWNER AND CONTRACTOR (Where the Contract Price is a Lump Sum) This document was developed through a collaborative effort of entities representing a wide cross-section of the construction industry. The organizations endorsing this document believe it represents a fair and reasonable consensus among the collaborating parties of allocation of risk and responsibilities in an effort to appropriately balance the critical interests and concerns of all project participants. These endorsing organizations recognize and understand that users of this document must review and adapt this document to meet their particular needs, the specific requirements of the project, and applicable laws. Users are encouraged to consult legal, insurance and surety advisors before modifying or completing this document. Further information on this document and the perspectives of endorsing organizations is available in the ConsensusDOCS Guidebook. 1. AGREEMENT 2. GENERAL PROVISIONS 3. CONTRACTOR'S RESPONSIBILITIES 4. OWNER'S RESPONSIBILITIES TABLE OF ARTICLES 1

5. SUBCONTRACTS 6. CONTRACT TIME 7. CONTRACT PRICE 8. CHANGES 9. PAYMENT 10. INDEMNITY, INSURANCE, WAIVERS AND BONDS 11. SUSPENSION, NOTICE TO CURE AND TERMINATION OF THE AGREEMENT 12. DISPUTE RESOLUTION 13. MISCELLANEOUS PROVISIONS 14. CONTRACT DOCUMENTS This Agreement has important legal and insurance consequences. Consultations with an attorney and with insurance and surety consultants are encouraged with respect to its completion or modification. Notes indicate where information is to be inserted to complete this Agreement. ARTICLE 1 AGREEMENT This Agreement is made this day of in the year, by and between the OWNER and the CONTRACTOR for services in connection with the following PROJECT NOT FOR REPRODUCTION Notice to the Parties shall be given at the above addresses. ARTICLE 2 GENERAL PROVISIONS 2.1 RELATIONSHIP OF PARTIES The Owner and the Contractor agree to proceed with the Project on the basis of mutual trust, good faith and fair dealing. 2.1.1 The Contractor shall furnish construction administration and management services and use the Contractor's diligent efforts to perform the Work in an expeditious manner consistent with the 2

Contract Documents. The Owner and Contractor shall endeavor to promote harmony and cooperation among all Project participants. 2.1.2 The Contractor represents that it is an independent contractor and that in its performance of the Work it shall act as an independent contractor. 2.1.3 Neither Contractor nor any of its agents or employees shall act on behalf of or in the name of Owner except as provided in this Agreement or unless authorized in writing by Owner's Representative. 2.1.4 The Owner and the Contractor shall perform their obligations with integrity, ensuring at a minimum that 2.1.4.1 Conflicts of interest shall be avoided or disclosed promptly to the other Party; and 2.1.4.2 The Contractor and the Owner warrant that they have not and shall not pay nor receive any contingent fees or gratuities to or from the other Party, including its agents, officers and employees, Subcontractors or others for whom they may be liable, to secure preferential treatment. 2.2 EXTENT OF AGREEMENT This Agreement is solely for the benefit of the Parties, represents the entire and integrated agreement between the Parties, and supersedes all prior negotiations, representations or agreements, either written or oral. This Agreement and each and every provision is for the exclusive benefit of the Owner and Contractor and not for the benefit of any third party except to the extent expressly provided in this Agreement. 2.3 ARCHITECT/ENGINEER The Owner, through its Architect/Engineer, shall provide all architectural and engineering design services necessary for the completion of the Work, except the following:. The Contractor shall not be required to provide professional services which constitute the practice of architecture or engineering except as otherwise provided in Paragraph 3.15. 2.3.1 The Owner shall obtain from the Architect/Engineer either a license for Contractor and Subcontractors to use the design documents prepared by the Architect/Engineer or ownership of the copyrights for such design documents, and shall indemnify and hold harmless the Contractor against any suits or claims of infringement of any copyrights or licenses arising out of the use of the design documents for the project. 2.4 DEFINITIONS 2.4.1 Agreement means this ConsensusDOCS 200 Standard Agreement and General Conditions Between Owner and Contractor (Where the Contract Price is a Lump Sum), as modified by the Parties, and exhibits and attachments made part of this Agreement upon its execution. 2.4.2 Architect/Engineer means the licensed Architect, Architect/Engineer or Engineer and its consultants, retained by Owner to perform design services for the Project. The Owner's Architect/Engineer for the Project is. 2.4.3 A Change Order is a written order signed by the Owner and the Contractor after execution of this Agreement, indicating changes in the scope of the Work, the Contract Price or Contract Time, including substitutions proposed by the Contractor and accepted by the Owner. 2.4.4 The Contract Documents consist of this Agreement, the drawings, specifications, addenda issued prior to execution of this Agreement, approved submittals, information furnished by the 3

Owner under Paragraph 4.3, other documents listed in this Agreement and any modifications issued after execution. 2.4.5 The Contract Price is the amount indicated in Paragraph 7.1 of this Agreement. 2.4.6 The Contract Time is the period between the Date of Commencement and Final Completion. See Article 6. 2.4.7 The Contractor is the person or entity identified in Article 1 and includes the Contractor's Representative. 2.4.8 The term Day shall mean calendar day unless otherwise specifically defined. 2.4.9 Final Completion occurs on the date when the Contractor's obligations under this Agreement are complete and accepted by the Owner and final payment becomes due and payable, as established in Article 6. This date shall be confirmed by a Certificate of Final Completion signed by the Owner and the Contractor. 2.4.10 A Material Supplier is a person or entity retained by the Contractor to provide material or equipment for the Work. 2.4.11 Others means other contractors, material suppliers and persons at the Worksite who are not employed by the Contractor or Subcontractors. 2.4.12 The term Overhead shall mean 1) payroll costs and other compensation of Contractor employees in the Contractor's principal and branch offices; 2) general and administrative expenses of the Contractor's principal and branch offices including deductibles paid on any insurance policy, charges against the Contractor for delinquent payments, and costs related to the correction of defective work; and 3) the Contractor's capital expenses, including interest on capital used for the Work. 2.4.13 Owner is the person or entity identified in Article 1, and includes the Owner's Representative. 2.4.14 The Project, as identified in Article 1, is the building, facility or other improvements for which the Contractor is to perform Work under this Agreement. It may also include construction by the Owner or Others. 2.4.15 The Schedule of the Work is the document prepared by the Contractor that specifies the dates on which the Contractor plans to begin and complete various parts of the Work, including dates on which information and approvals are required from the Owner. 2.4.16 A Subcontractor is a person or entity retained by the Contractor as an independent contractor to provide the labor, materials, equipment or services necessary to complete a specific portion of the Work. The term Subcontractor does not include the Architect/Engineer or Others. 2.4.17 Substantial Completion of the Work, or of a designated portion, occurs on the date when the Work is sufficiently complete in accordance with the Contract Documents so that the Owner may occupy or utilize the Project, or a designated portion, for the use for which it is intended, without unscheduled disruption. The issuance of a certificate of occupancy is not a prerequisite for Substantial Completion if the certificate of occupancy cannot be obtained due to factors beyond the Contractor's control. This date shall be confirmed by a Certificate of Substantial Completion signed by the Owner and Contractor. 2.4.18 A Sub-subcontractor is a person or entity who has an agreement with a Subcontractor to perform any portion of the Subcontractor's Work. 4

2.4.19 Terrorism means a violent act, or an act that is dangerous to human life, property or infrastructure, that is committed by an individual or individuals and that appears to be part of an effort to coerce a civilian population or to influence the policy or affect the conduct of any government by coercion. Terrorism includes, but is not limited to, any act certified by the United States government as an act of terrorism pursuant to the Terrorism Risk Insurance Act, as amended. 2.4.20 Work means the construction and services necessary or incidental to fulfill the Contractor's obligations for the Project in conformance with this Agreement and the other Contract Documents. The Work may refer to the whole Project or only a part of the Project if work is also being performed by the Owner or Others. 2.4.20.1 Changed Work means work that is different from the original scope of Work; or work that changes the Contract Price or Contract Time. 2.4.20.2 Defective Work is any portion of the Work that is not in conformance with the Contract Documents, as more fully described in Paragraphs 3.5 and 3.8. 2.4.21 Worksite means the geographical area at the location of the Project as identified in Article 1 where the Work is to be performed. 3.1 GENERAL RESPONSIBILITIES ARTICLE 3 CONTRACTOR'S RESPONSIBILITIES 3.1.1 The Contractor shall provide all labor, materials, equipment and services necessary to complete the Work, all of which shall be provided in full accord with and reasonably inferable from the Contract Documents as being necessary to produce the indicated results. 3.1.2 The Contractor shall be responsible for the supervision and coordination of the Work, including the construction means, methods, techniques, sequences and procedures utilized, unless the Contract Documents give other specific instructions. In such case, the Contractor shall not be liable to the Owner for damages resulting from compliance with such instructions unless the Contractor recognized and failed to timely report to the Owner any error, inconsistency, omission or unsafe practice that it discovered in the specified construction means, methods, techniques, sequences or procedures. 3.1.3 The Contractor shall perform Work only within locations allowed by the Contract Documents, applicable permits and applicable local law. 3.2 COOPERATION WITH WORK OF OWNER AND OTHERS 3.2.1 The Owner may perform work at the Worksite directly or by Others. Any agreements with Others to perform construction or operations related to the Project shall include provisions pertaining to insurance, indemnification, waiver of subrogation, coordination, interference, cleanup and safety which are substantively the same as the corresponding provisions of this Agreement. 3.2.2 In the event that the Owner elects to perform work at the Worksite directly or by Others, the Contractor and the Owner shall coordinate the activities of all forces at the Worksite and agree upon fair and reasonable schedules and operational procedures for Worksite activities. The Owner shall require each separate contractor to cooperate with the Contractor and assist with the coordination of activities and the review of construction schedules and operations. The Contract Price and Contract Time shall be equitably adjusted, as mutually agreed by the Parties, for changes made necessary 5

This is a E X C E R P T. To order full document, visit www.agc.org/bookstore.