PUBLIC WORKS CIP SUPPORT

TOWN OF TIBURON ENCROACHMENT PERMIT APPLICATION EP Number:

CHECKLIST FOR CONSTRUCTION STAGING PLAN IN CORAL GABLES

ENGINEER'S ESTIMATE OF PROBABLE COST CCTA I 680 NORTH EXPRESS LANE PROJECT (SOUTHBOUND ONLY) EA 04 4H % PS&E Submittal

CITY OF CHINO ENGINEERING COST ESTIMATE. Quantity Unit Item Unit Total Cost Price Per Item. LS Traffic Control (5% of construction cost) 5% $

COUNTY ADMINISTRATOR PUBLIC WORKS

2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction)

Where the Money Goes (Uses) FY 2011

Maintenance Funding & Investment Decisions STACEY GLASS, P.E. STATE MAINTENANCE ENGINEER ALABAMA DEPARTMENT OF TRANSPORTATION

FY Annual Budget: Mobility Solutions, Infrastructure, & Sustainability

STORMWATER ADVISORY GROUP August 26, 2009 Clarkston School District Admin Office 1294 Chestnut Street, Clarkston 5:30-7:30 p.m.

Right of Way Permits. Contact Information:

Stormwater Management Utility Fee Reduction Credit Application

PERMIT APPLICATION PLEASE PRINT CLEARLY AND FILL IN ALL APPLICABLE SECTIONS

TRANSPORTATION CAPITAL PROGRAM

City of Dallas Infrastructure Management Plan

Master Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 6: Preliminary Cost Estimates.

City of Pacifica General Fund Budget

Maricopa County DOT. Transportation Asset Management (TAM) Planning. March 1, 2018 DYE MANAGEMENT GROUP, INC.

SAMPLE BALLOT NOT FOR OFFICIAL USE

SUBDIVISION IMPROVEMENTS AGREEMENT

Rock Chalk Park - Infrastructure Report. July 2013

BIDDER'S PROPOSAL TO THE HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL

NON-STATE SYSTEM STREET-AID ALLOCATION (STATE AID TO MUNICIPALITIES POWELL BILL ) N.C. Department of Transportation Financial Management Division

Storm Water Mitigation Services ITB SEMINOLE TRIBE OF FLORIDA INVITATION TO BID

Bid No.: PO Box Cone Rd Asphalt Ave th Ave. E. Dunedin, FL Tampa, FL Tampa, FL Palmetto, FL 34221

CITY OF PALM DESERT PUBLIC WORKS DEPARTMENT

2011 PUBLIC PARKING LOT & ALLEY IMPROVEMENTS Village of Whitefish Bay Project No March 17, 2011 ITEM DESCRIPTION UNIT QTY.

BID TABULATION REPORT ABRAM STREET (SH CITY LIMITS) PROJECT No. PWST09016 BID OPENED : April 22, 2014 at 1:30 p.m.

Adopt-A-Road Program. For more information, please contact:

PO BOX 2619 Ventnor, NJ 08406

CITY OF YUBA CITY STATE OF CALIFORNIA PUBLIC WORKS DEPARTMENT NOTICE TO CONTRACTORS

STORMWATER MANAGEMENT FUND Department of Environmental Services

CITY ENGINEER'S ESTIMATE ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL REMOVALS

Appendix B Example Project Designs and Engineers Opinion of Costs

DRAFT C APITAL I MPROVEMENT P LAN C ITY OF G EORGETOWN, TEXAS S TREETS/ DRAINAGE/AIRPORT F ISCAL Y EAR 201 6

NON-MOTORIZED FACILITIES

Exhibit 4 Page 1 of 8

MVMCC CAPITAL IMPROVEMENT PROGRAM (CIP) UPDATE AND ADOPTING A RESOLUTION APPROVING A MVMCC CAPITAL BUDGET ALLOCATION AMENDMENT

AVERAGE OF BID ITEMS ENGINEERS ESTIMATE

PUBLIC WORKS DEPARTMENT PUBLIC WORKS ADMINISTRATION & ENGINEERING STREETS MAINTENANCE PARKS MAINTENANCE GOVERNMENT BUILDINGS

JANUARY 18, Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: Respectfully submitted,

Region 5 Upcoming Projects for Summer/Fall 2018

FOR OFFICE USE ONLY CONTRACTOR/DEVELOPER APPLICATION AND PERMIT TO CONSTRUCT, OPERATE, USE AND/OR MAINTAIN WITHIN THE RIGHT-OF-WAY/EASEMENT

QUALITY TRANSPORTATION SUMMARY

SHIPLEY S CHOICE DAM REHABILITATION COMMUNITY MEETING MINUTES

GENERAL PROVISIONS I. WORK REQUIREMENTS

PART A ROADWAY - BASE BID

LETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY

Capital Investment Program (CIP) About CIP

Allen County Highway Engineering Department Problems and Progress

Addendum 1 13 TH Street Streetscape. September 1, 2017

Department of Public Works Engineering

REPLACEMENT RESERVE REPORT FY 2011 VILLAGE GREEN HOA. Ravenel Associates, Inc. Community Management by: Chad Hammond, Property Manager

PUBLIC WORKS DEPARTMENT

NON-STATE SYSTEM STREET-AID ALLOCATION (POWELL BILL) N.C. Department of Transportation Financial Management Division

CURB CUTS SPECIFICATIONS AND STANDARDS

Public Works Department

Fees: An application fee of one hundred dollars ($100) shall be included with the application submission.

LETTING : CALL : 056 COUNTIES : MILLE LACS

The Engineer has been requested to provide an estimate to complete Fontana 233 rd Avenue to 237 th Avenue.

Subject: Addendum No. 1 Project #C CCE Parking Lot Replacement Phase 2 Robert Bishop Drive 4380 Richmond Road, Highland Hills, Ohio 44122

Engineer's Preliminary Estimate - 100% Submittal

Crushed Surfacing Base Course, per ton. Pages 8-8, Special Provisions Section , Materials. This Section is supplemented with the following:

Available Fund Balance $ 5,268,755 $ 4,551,743 $ 5,442,764 $ 5,442,764 $ 3,411,136

DRAFT. Stormwater Management Program Credit Policy and Appeals Process Manual Policies & Procedures LOWER ALLEN TOWNSHIP STORMWATER AUTHORITY

STORMWATER MANAGEMENT FUND Department of Environmental Services

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET

BID TABULATION PAGE 1 OF 6

PUBLIC WORKS DEPARTMENT Departmental Summary FUND/ACTIVITY ACTUAL ADOPTED AMENDED ADOPTED General Fund: Revenue Administration

The City of Owen Sound Asset Management Plan

County Administrator Departments Organization Department Summary

DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates

NE WEST KINGSTON ROAD CULVERT REPLACEMENT

City of Centerville BMP Pages Table of Contents. Minimum Control Measure 1. Public Education and Outreach

ALABAMA DEPARTMENT OF TRANSPORTATION AGREEMENT FOR THE COOPERATIVE MAINTENANCE OF PUBLIC RIGHT OF WAY WITH REIMBURSEMENT

BID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012

RANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO Item Description Est. Qty. Units Unit Price

RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION

33 Ditch Bottom Inlet (DBI) -Type E $ 2, EA - 0 $ - 35 Ditch Bottom Inlet (DBI) -Type H (Modified) $ 5, EA $ 5,600.

BID TABULATION BID REQUEST NO

Instructions for Completing the Annual Road and Street Finance Report

City of Mountlake Terrace. Second Quarter 2016 Financial Report September 19, 2016

OKLAHOMA TURNPIKE AUTHORITY

TAUSSIG. Annual Report Fiscal Year City of Irvine Community Facilities District No (Great Park) & Associates, Inc.

CAPE GEORGE COLONY CLUB MARINA RESERVES

TRENCH PERMIT. CITY OF SOMERSWORTH NH 18 Lilac Lane - (603) Please Fax at (603) Date: Permit# Dig Safe # Fee = $70.

DUNN LORING VILLAGE SEQUOIA MANAGEMENT COMPANY. Craig Courtney Property Manager. Vienna, Virginia. Property Management: Consultant:

FY15 Actual FY16 Budget FY17 Budget. $1,195,618 $1,277,780 $1,306,550 2% General Fund Highway Construction/Parks

Memorandum. CITY OF DALLAS (Report No. A15-008) June 19, 2015

STORMWATER MANAGEMENT FUND DEPARTMENT OF ENVIRONMENTAL SERVICES

What are Capital Reserves?

FY13 Actual FY14 Budget FY15 Budget. $793,850 $1,123,080 $1,225,110 9% General Fund Highway Construction/Parks

Appendix E: Revenues and Cost Estimates

Pavlick, Kenneth - DEN Date: :26:57-07'00'

FLINT HILL MANOR FLINT HILL MANOR. Replacement Reserve Study. Oakton, Virginia. Property Management: Flint Hill Manor Townhouse Association

CITY OF LEE S SUMMIT DESIGN AND CONSTRUCTION MANUAL SECTION GENERAL PROVISIONS

Transcription:

Public Works Maintenance STORMWATER AND TRANSPORTATION

Mission Statement T H E P U B L I C W O R K S M A I N T E N A N C E D I V I S I O N I S T H E M A I N C U S T O D I A N A N D P R I N C I P A L C O N T R A C T O R O F T H E P U B L I C R I G H T - OF- W A Y. W I T H P R O P E R P L A N N I N G A N D T H O R O U G H M A I N T E N A N C E W E W I L L E N S U R E T H E P U B L I C S S A F E T Y A N D S E R V I C E A B I L I T Y O F C A P E C O R A L S B R I D G E S, R O A D S, C A N A L S, S T O R M W A T E R S Y S T E M S, S W A L E S, A N D M E D I A N S ; W H I L E P R E S E R V I N G T H E C I T Y S C L E A N L I N E S S, A N D A E S T H E T I C A P P E A L I N A N E F F I C I E N T A N D P R O F E S S I O N A L M A N N E R.

Transportation Operations A D O P T - A - R O A D P R O G R A M M E D I A N M O W I N G P O T H O L E R E P A I R S R O A D S H O U L D E R R E P A I R S T R E E T R I M M I N G B R I D G E M A I N T E N A N C E M E D I A N A N D R O W T R A S H R E M O V A L S I D E W A L K I N S T A L L A T I O N S I G N I N G A N D S T R I P I N G P R O G R A M

Adopt-A-Road Program Program resurrected in FY2010. Select divided roadways, with unimproved medians, have trash picked up six times a year by volunteer groups. City provides a sign acknowledging their efforts, as well as trash bags, rubber gloves, and safety vest. Collected trash is bagged by the volunteer group, and picked up by the city for proper disposal.

Median Mowing Mowing and general clean up is performed along all unimproved medians throughout the city, except those maintained by the lot mowing program. Retention ponds, and sod around select sidewalks are also maintained by this program. Length of medians maintained 94 miles Number of crews Two four-man crews spring through fall One two-man crew in the winter Number of retention ponds maintained 20

This program fills potholes throughout the city, and assists in some minor asphalt related repairs. Centerline length of twolane roads in Cape Coral: 1,236 miles Centerline length of multi-lane roads in Cape Coral: 158 miles Number of lane miles of roads in Cape Coral: 3,111 lane miles 2 pothole trucks with a 2 man crew Tons of asphalt laid per week: 5 tons per truck Pothole Repairs

This program fills in the drop off edges of roads throughout the City. Some unpaved parking or travel areas are also maintained by this program. One five-man crew Dispatched multiple times per month. 100-120 tons of base rock spread per month. Road Shoulder Repairs

This program provides tree trimming in all non professionally landscaped/maintained medians, cul-de-sacs, and city right-of-ways. This crew also removes vegetation interfering with regulatory signs, fire hydrants, catch basins, street signs, and any other obstructions impacting the safety of motor vehicles or the travelling public. Tree Trimming

Bridge Maintenance This program performs cleaning and sealing of expansion joints, mowing/spraying around guardrails, repairing damaged guardrails, graffiti removal, sidewalk maintenance, replacing hardware on railings, trash/vegetation removal, structural repairs, etc. Bridges with spans of over 20 feet are inspected biannually by FDOT. Reports are provided to the City with repair recommendations. Bridges with spans under 20 feet are the responsibility of the City to inspect. Number of bridges in the City of Cape Coral: 157 Number of bridges in Cape Coral inspected by FDOT: 101

Median and ROW Trash Removal Medians and public right-ofways have trash removed on an as needed basis. One crew uses a grapple truck for removing large items, and another crew picks up smaller items while dispatched from a pick up truck. Civicall action items and code enforcement requests account for the majority of work dispatched. Trash on private property is not picked up, unless it is relocated to the public right-of-way. Grappler truck: One two-man crew Pick-up truck: One two-man crew

This program installs sidewalks throughout the City, for safer pedestrian foot traffic, making schools more accessible, and connecting neighborhoods to commercial districts. An eight-man crew performs all site preparation, form work, driveway replacements, concrete pouring, sod installation, and ensures that all projects are ADA compliant. This eight man crew also performs select repairs to existing sidewalks and concrete curbing throughout the City. All sidewalk projects in 2012 are grant funded from a variety of different sources. Sidewalk Installation

Signing and Striping Program Sign technicians install, maintain, and replace all regulatory, guide and warning signs throughout the City in the public right of way. The striping crew installs and refreshes all pavement markings (e.g. lane lines, symbols, arrows, etc.) throughout the City in paint (in summer months) and thermoplastic (in winter months). They use a combination of walk-behind spray applicators and the striping truck.

Stormwater Operations C A T C H B A S I N P R O G R A M D R A I N P I P E R E P L A C E M E N T P R O G R A M F L O T S A M, W E I R S, E X C A V A T O R S D R A I N A G E M A N A G E M E N T P R O G R A M S W A L E P R O G R A M C A N A L D R E D G I N G P R O G R A M S W E E P I N G P R O G R A M V A C U U M T R U C K P R O G R A M

Catch Basin Program This program maintains 22,000 basins located throughout the City and are maintained on a yearly schedule to comply N.P.D.E.S. under the clean water act. They also respond to citizen s requests to replace damaged metal grates, basin lids, catch basin repairs due to accidents, install new inlets where necessary, and remove vegetation.

Drainpipe Replacement Program This program performs the repair, replacement and modification of existing underground stormwater drainage systems throughout the City. The pipe crews will replace approximately 15,000 linear feet of decayed and unserviceable pipe per year. 31% of the City pipe is 40+ year old corroded metal pipe and needs to be replaced.

Flotsam, Weirs, Excavators Weir maintenance is needed to maintain unimpeded flow in the canals. Removing debris keeps the canals healthy. This crew cleans up fish kills during cold snaps, maintains canal name signs on seawalls, and builds/maintains gravel boat ramps throughout the city. The long reach excavator is used to clean drainage ditches throughout the city, and performs spot dredging as needed. Crews also empty blue barrels and monofilament collection stations that the public fills with debris.

Drainage Management Program This program utilizes an inspector who responds to citizen concerns involving drainage problems. After initial evaluation a survey team will establish proper elevations. The team will profile and stake the project for our swale grading crew to correct the flooding problem.

Swale Program This program performs swale restoration to alleviate flooding issues from developed properties, and to re-establish grades on an as-needed basis; thus allowing the proper movement and treatment of storm water with infiltration as mandated by National Pollutant Discharge Elimination System (N.P.D.E.S.) permit.

Canal Dredging Program This program is responsible for maintaining over 400 miles of fresh and saltwater canal systems within the City. Dredging is performed in order to maintain a navigable condition for the safe movement of boats and provide ecologically sound conditions. The dredge operates in the center of the canal and does not come within 20 feet of seawall.

This program is our first line of defense against pollution in our waterways. It has been implemented pick up debris on curbed and guttered streets, bike lanes, parking lots, and alleys within the City. Street sweeping helps prevent silt from building up in the canals, and beautifies areas in the sweeping program. Since April 2011, this program is now being performed by outside contractors on the City s behalf. Sweeping Program

Vacuum Truck Program This program maintains the underground stormwater drainage system after installation. Two vacuum trucks are deployed for removing sand, vegetation, tree roots and other debris from the drainage network.