CIOB TIME AND COST MANAGEMENT CONTRACT CONSULTANCY APPOINTMENT CONTRACT ADMINISTRATOR SCHEDULES EDITION

Similar documents
CIOB TIME AND COST MANAGEMENT CONTRACT SUBCONTRACT APPENDICES 2015 EDITION

CIOB TIME AND COST MANAGEMENT CONTRACT CONTRACT APPENDICES 2015 EDITION

Goal General Terms and Conditions

AGREEMENT AND CONDITIONS OF SUB-CONTRACT (DOMESTIC)

Section 7. General Conditions of Contract for the Procurement of Works

Conditions of Contract for PLANT and Design-Build

Construction Management Approach based on FIDIC Conditions of Contract for Construction, st Edition. Dr. Munther M.

SECTION 2 : JURONG HEALTH SERVICES PTE LTD STANDARD CONDITIONS OF CONTRACT FOR CONSTRUCTION AND IMPROVEMENT WORKS

Construction Management Contract This agreement is made by (Contractor) and (Owner) on the date written beside our signatures.

FIDIC CONTRACTS A COMPARATIVE. Uttam Sengupta Sr. GM Contracts & Risk Management

ALCOA INC Alcoa Stock Incentive Plan, as Amended and Restated

Construction Management Contract This agreement is made by (Contractor) and (Owner) on the date written beside our signatures.

AGREEMENT No... FOR THE SUPPLY, FABRICATION AND DELIVERY OF... BETWEEN

Alcoa Corporation 2016 Stock Incentive Plan

AH: STANDARD CONDITIONS OF CONTRACT FOR CONSTRUCTION AND IMPROVEMENT WOPKS SCC.1

P.O. Number SERVICES CONTRACT [NOT BUILDING CONSTRUCTION]

NEW HOMES CONTRACT WHERE THE CONTRACT PRICE IS MORE THAN $10,000

SOUTHERN RESPONSE CANTERBURY EARTHQUAKE RECONSTRUCTION PROJECT GENERAL CONDITIONS OF CONTRACT FOR HOUSING REBUILD AND REPAIRS

FEDERAL EMERGENCY MANAGEMENT AGENCY S GRANT PROGRAM REQUIREMENTS FOR PROCUREMENT CONTRACTS

Form of Agreement Between the Client And the Quantity Surveyor

Conditions of Contract

Subcontract conditions

HOW TO REGISTER ON THE OECD ESOURCING PORTAL

AEROS, Inc. Standards Terms and Conditions of Sale

MDB Harmonised Particular Conditions

REQUEST FOR INFORMATION NO HEALTH & WELLNESS SERVICES. Cooperative Purchasing Program c/o Rick D. Konrad

EXHIBIT A SPECIFIC TERMS AND CONDITIONS HOMELESS GRANT ASSISTANCE PROGRAM

AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER. Pre-Construction and Construction Phase Services

USAC Terms & Conditions

BRITISH COLUMBIA ROYALTY CREDIT PROGRAM CLEAN INFRASTRUCTURE ROYALTY DEDUCTION AGREEMENT XXXXX PROJECT

AGREEMENT ON SOCIAL SECURITY BETWEEN THE GOVERNMENT OF CANADA AND THE GOVERNMENT OF SWEDEN

2 THE EMPLOYER Provision of Site 2.2 Permits and Licenses 2.3 Employer s Instructions 2.4 Approvals

BRITISH COLUMBIA ROYALTY CREDIT PROGRAM ROAD DEVELOPMENT ROYALTY DEDUCTION AGREEMENT XXXXXXX PROJECT

The Royal Bank of Scotland plc

The NEC 3 Engineering and Construction Contract

TIF CONSTRUCTION LOAN AGREEMENT

How to Methodically Research WTO Law

1 In these Domestic Sub-Contract Conditions the following expressions and terms shall have the meanings given below:

CONDITIONS OF CONTRACT. The Builder must execute and complete the Works in a workmanlike manner and ensure the Works are adequately supervised.

Consultancy Services Contract

AGREEMENT ON SOCIAL SECURITY BETWEEN THE GOVERNMENT OF CANADA AND THE GOVERNMENT OF THE REPUBLIC OF TRINIDAD AND TOBAGO

BIBBY FINANCIAL SERVICES STANDARD CONDITIONS FOR THE PURCHASE OF DEBTS (EDITION A/2004 SCOTLAND) INCORPORATED INTO THE AGREEMENT MADE WITH

Document A General Conditions of the Contract for Construction, Construction Manager as Adviser Edition

AGREEMENT between The United Nations and

STANDARD FORM OF AGREEMENT GENERAL TERMS

Conditions of Contract for Construction

NOTICE INVITING PROPOSALS VARIOUS ENVIRONMENTAL SERVICES RFP NO City of Santa Ana RFP Page ii

UNION TERRITORY GOODS AND SERVICES TAX ACT, 2017

Supplement 1 Federal Acquisition Regulation (FAR) Government Contract Provisions

Disclaimer for this translation:

Document A133 TM. AGREEMENT made as of the day of in the year Two Thousand and Sixteen. BETWEEN the Owner:

CCTS IT Solutions Pty Ltd

EX-10.Z(1) 6 dex10z1.htm AMENDED AND RESTATED 2009 ALCOA STOCK INCENTIVE PLAN Exhibit 10.Z(1)

CUSTOMERS. PEOPLE. PARTNERS.

Australian Standard. Subcontract conditions for design and construct. AS (Incorporating Amendment No. 1) AS

Accounting Policies for the ASOSAI

U.S. DEPARTMENT OF HOMELAND SECURITY'S URBAN AREAS SECURITY INITIATIVE GRANT PROGRAM REQUIREMENTS FOR PROCUREMENT CONTRACTS

Pay Later Terms and Conditions

Document A SP General Conditions of the Contract for Construction, for use on a Sustainable Project, Construction Manager as Adviser Edition

Session 3 by Zoltán Záhonyi, FIDIC AIT,

MEMORANDUM OF ASSOCIATION EASTSIDE EDUCATIONAL TRUST

AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER PRE-CONSTRUCTION AND CONSTRUCTION SERVICES

MAIN CIVIL WORKS CONTRACT SCHEDULE 12 CHANGES TABLE OF CONTENTS

SHORT FORM SUBCONTRACT AGREEMENT

INTER-COUNTY MUTUAL AID AGREEMENT Omnibus Agreement 2010 Revision

Standard forms of partnering contracts The ultimate contractual commitment? Part 4

CONTRACT FOR PROFESSIONAL SERVICES - ARCHITECT

NZS 3915:2005 AMENDMENTS. No. Date of issue Description Entered by, and date

[ ] - AND - [ ] POWER PURCHASE AGREEMENT RELATING TO DATED [ ]

Audit Committee Charter

NHS BORDERS SGTC3 CONDITIONS OF CONTRACT FOR CONSULTANCY SERVICES (other than Works Consultancies)

Scottish Conditions of Appointment of an Architect SCA/2014 (Apr 2015)

INDEPENDENT CONTRACTOR CONSULTING AGREEMENT INSTRUCTIONS, ROUTING AND APPROVAL COVER SHEET

Southern California Contractors Association, Inc E. Washington Blvd., Suite 200 Los Angeles, CA / Fax 323/

Rules and Regulations of Professional Competence and Conduct

AIRPORT AUTHORITY HONG KONG

Standard Form of Agreement Between. Owner and Design-Builder Cost Plus Fee with an Option for a Guaranteed Maximum Price

CLASS 7, THE WAR RISKS CLASS

2 nd Edition September 2005 (Second Edition of CIDB document 1020)

ADDENDUM TO THE ANZ PRIVATE BANK TERMS AND CONDITIONS SINGAPORE

Cosmos Projects - Standard Terms and Conditions of Sub-Contract

Australian/New Zealand Standard

II Copyright and related rights 36. contents

INTERIOR ARCHITECTURE & DESIGN TERMS & CONDITIONS DESIGN SERVICES ZUNICA P/L LEVEL 1, 216 CHAPEL STREET PRAHRAN VICTORIA 3181

(1) In these sub-contract conditions of agreement, the following words and phrases shall have the following meanings:-

Conditions of Appointment for an Architect for a Domestic Project 2010 (2012 revision) Incorporating Amendment 1, September 2011

(Non-legislative acts) REGULATIONS

AIA Document A201 TM 2007

MSU Standard Terms and Conditions Cost Reimbursement Subaward 01-09

ATKINSON POLICE DEPARTMENT POLICY AGREEMENT. Town of Atkinson Wrecker Service Agreement

THE STATE OF TEXAS Landscape Maintenance and Use Agreement COUNTY OF TARRANT

Terms and Conditions for the Sale of Products & Services directly to Consumers United Kingdom

TERMS OF BUSINESS AGREEMENT. The terms of this agreement confirm that the Insurer will be pleased to accept Business from (the "Adviser").

REQUEST FOR QUALIFICATIONS TERMINAL 3 HEADLINE DOLPHIN DESIGN & MAINTENANCE PROGRAM

INTERMEDIARIES ONLINE WEBSITE CONDITIONS

Agreement for Supply of Goods and Services - Standard Terms & Conditions

FACILITIES AND SERVICES SERVICE LEVEL AGREEMENT - ONGOING SERVICES. Research School of Social Sciences TABLE OF CONTENTS

MANITOBA HOUSING SUPPLEMENTAL CONDITIONS CONTRACT #: XXXX GENERAL

QBCC PERIOD MINOR WORKS SUBCONTRACT

NEC4 ENGINEERING & CONSTRUCTION CONTRACT

Transcription:

CIOB TIME AND COST MANAGEMENT CONTRACT CONSULTANCY APPOINTMENT 09 CONTRACT ADMINISTRATOR SCHEDULES 8 + 9 2015 EDITION

CIOB TIME AND COST MANAGEMENT CONTRACT CONSULTANCY APPOINTMENT 09 CONTRACT ADMINISTRATOR SCHEDULES 8 + 9 2015 EDITION 1

2

SCHEDULES 8 AND 9 These Schedules 8 and 9 are suitable for use only in connection with the appointment of the Contract Administrator under the Consultancy Appointment for use with the Time and Cost Management Contract. They are to be completed, as appropriate, and either attached to the signed Consultancy Appointment, or referred to within it and initialed. If a Model Schedule is used in a modified form, the amendments to it should also be initialed by the parties. AVAILABILITY Model Schedules 8 and 9 are also available for use with the appointment of the Time Manager DISCLAIMER Model Schedules 8 and 9 have been produced for use where the Contract Administrator is appointed under the Consultancy Appointment for use with the Time and Cost Management Contract. The parties will need to rely upon their own skill and judgement (and that of their advisers) in making use of these model schedules or any other standard form comprised in, or for use in connection with,the appointment of the Contract Administrator. Neither the Chartered Institute of Building nor any author or contributor assumes any liability to anyone for any loss or damage caused by any error or omission whether such error or omission is the result of negligence or any other cause. GRAPHIC DESIGN Concept, design and artwork by Thompson Graphics COPYRIGHT AND PUBLISHING Published in 2015 by The Chartered Institute of Building, 1 Arlington Square, Downshire Way, Bracknell, Berkshire, RG12 1WA, United Kingdom, Registered Charity No. (England and Wales) 280795; (Scotland) SC041725. All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording or otherwise, except in accordance with the provisions of the Copyright, Design and Patents Act 1988, without prior written permission of the publisher. The Chartered Institute of Building, CIOB and the Lion Logo are registered trademarks of the Institute. The Chartered Institute of Building 2015 3

Schedule 8 Services S 8.0. INTRODUCTION 1. Where these Schedules require anything to be done, they require action by the Consultant whose name appears in the signed Appointment Agreement S 8.1. GENERAL SERVICES 1. Whenever necessary for the competent discharge of the Services, consult with the Employer and any parties appointed, or to be appointed, as Listed Persons 2. Uphold the fundamental collaborative and transparent character of the Construction Contract and, in particular, co-operate in a spirit of mutual trust and fairness and, exercise discretion fairly and independently 3. Advise on, and contribute to, completion of the Schedules to the Appointment of the Listed Persons and the Appendices to the Construction Contract 4. Administer the Construction Contract 5. Advise the Employer of any breach, or possible breach, of a) Applicable Law of the Construction Contract any Subcontract, or any Consultant s Appointment b) health and safety requirements, and/or c) anti-corruption law 6. Prepare reports on, and advise generally on, the administration of the construction of the Project 7. Maintain a database of time records in connection with the Appointment, and submit this for acceptance at the periods required by the Appointment 8. 4

S 8.2. PRE-CONSTRUCTION STAGE SERVICES 1. In conjunction with the Employer and Listed Persons, produce, advise on and contribute to the strategy for the administration of the Project, including but not limited to a) project planning b) risk management c) record keeping d) quality control e) communications 2. Advise on, and contribute to, the Risk Register, including but not limited to a) an appraisal of, and advice on, the risks which are likely to disrupt and delay the progress of the Works b) a practically achievable strategy for dealing with Events during the procurement, construction, commissioning and occupation processes c) the calculation of time contingencies for the Employer s and Listed Persons risks d) a construction sequence that, to the greatest extent economically viable, permits the parts of the Works which are likely to be disrupted and delayed by foreseeable events to be separated into parallel rather than sequential paths 3. Advise on, and contribute to a) the Development Schedule for use with the Tender Documents b) the requirements of any Common Data Environment or File Transfer Protocol c) the Appendices under the Consultants Appointment and the Construction Contract d) the competence and reliability of the Contractor s tender or bid 4. S 8.3. CONSTRUCTION STAGE SERVICES 1. Carry out all Services envisaged by the Construction Contract 2. Give notice to the appropriate party, including copies to others as required, in regard to 5

a) default by the Contractor in i. performance of the Contractor s personnel ii. compliance with an instruction iii. publication b) performance giving rise to termination for Contractor s default c) the Contract Administrator s intention i. to issue the Certificate of Substantial Completion ii. not to attend an inspection or test d) the need for an accident report e) the occurrence of an Event f) any Payment Due to and from the Contractor 3. Certify to the appropriate party, including copies to others as required, in regard to a) failure to complete b) making good of defects c) Partial Possession d) Substantial Completion e) tests and Completion Testing 4. Award extensions of time to the appropriate party, including copies to others as required 5. Respond to requests for information 6. Issue further information to the Contractor and Listed Persons including issuing copies to others as required 7. Receive and consider submissions, and issue responses to approve, accept, conditionally approve, or reject the submission, including issuing copies to others as required, in regard to a) appointment and replacement of Authorised Representatives b) appointment and replacement of Subcontractors c) Contractor s Plant d) Contractor s statement of working methods e) work, materials, goods and/or Permanent Plant i. described as to be to the Contract Administrator s satisfaction ii. inspection, prior to being covered up or packaged for transportation iii. samples iv. test reports and certificates 8. Prepare and issue, including issuing copies to others as required 6

a) all instructions required by the Construction Contract, including (as appropriate) instructions to i. accelerate progress ii. attend Progress Meetings iii. commence early any Design Stage, or Design Level of Development iv. consult with Time Manager and Cost Manager to draft, distribute and publish proposals for acceleration or recovery v. correct any actual or potential impossibility, clash, conflict, discrepancy, omission, error, inconsistency and/or ambiguity in, and/or between, the Contract Documents and/or between the Contract Documents and Local Law vi. exclude and/or replace the Contractor s personnel vii. execute a Variation viii. expend Prime Cost Sums Provisional Sums Employer s Cost Contingencies, or Employer s Time Contingencies ix. investigate excavate, recover and dispose of Findings test and confirm or otherwise Unforeseeable Conditions x. make good defects xi. maintain the Contractor s Federated Model or other Model xii. mitigate risks xiii. provide further information required regarding loss and/or expense claimed to have been suffered xiv. publish the Contractor s Design Contribution at any time xv. reallocate Employer s Time Contingencies as appropriate xvi. revise and publish the Working Schedule and Planning Method Statement to take account of compliance with instructions to accelerate progress omit work omit or reduce obligations omit in whole or in part an Employer s Time Contingency, and/or recover culpable delay xvii. remedy a default in publication of submissions defective work, goods, materials and/or Permanent Plant damaged insured work xviii. remove defective work from the Site xix. search for defects in other work xx. suspend all or any of the Contractor s obligations 7

for convenience for default in providing financing information, complying with requirements regarding Contractor s working methods, working hours and/or Business Days, an accident notice Working Schedule and Planning Method Statement publishing a compliant Working Schedule and Planning Method Statement, Design Contribution and/or Progress Records xxi. uncover work or Permanent Plant wrongfully covered up xxii. use insurance monies for repair or replacement of damaged work particular records or schedules to calculate the Contractor s entitlement to additional time and/or money xxiii. witness and/or defer testing and/or Completion Testing xxiv. work outside normal Working Hours or Business Days xxv. correct instructions requiring anything impossible or illegal b) endorsed certificate of compliance with tests and Completion Testing c) minutes of Progress Meetings d) lists of defects e) the Risk Register f) statused database of Contractor s submissions 9. Receive, review, advise upon, and respond to notices received in regard to a) acceptance of i. Progress Records ii. revised Working Schedule and Planning Method Statement iii. updated Working Schedule and Planning Method Statement iv. values of Activities in the Working Schedule and Planning Method Statement v. Working Schedule and Planning Method Statement b) accidents c) appointment of Contractor s design coordinator d) as-built Drawings e) calculated impact of Events f) completion of making good defects g) Contractor s i. Business Days and hours ii. Design Execution Plan iii. statements of Payment Due iv. Notices of Payment Due v. Plant 8

vi. proposals for rectifying its default vii. working methods h) database submissions maintained by i. the Design Coordination Manager ii. the Time Manager i) data maintained in a Common Data Environment j) Early Warnings k) emergency work l) Employer s i. notice of termination ii. proposals for rectifying default m) errors in the Contractor s Design n) estimates of time and cost effect of Variations o) facts and calculated effect of Events on i. time ii. cost p) failure to publish q) impossibility, clash, conflict, discrepancy, omission, error, inconsistency and/or ambiguity r) inspection before covering up or packaging for transportation s) intention to i. terminate for convenience Contractor s default Employer s default impossibility, illegality or prolonged suspension ii. take measurements iii. make tests and carry out Completion Testing t) Issue Resolution required u) loss and expense incurred v) published, distributed and other submissions convenience of Employer Contractor s default illegality, impossibility or prolonged suspension vi. value of Variations w) work, goods, materials and Permanent Plant 10. Receive, review, and maintain for record and inspection a) a database of the Contractor s submissions b) a copy of the Contractor s Design c) the Risk Register 9

11. Attend, manage, prepare and issue minutes of a) Progress Meetings b) risk management meetings 12. 10

S 8.4. POST- CONSTRUCTION STAGE SERVICES* * Complete as required. If not completed the Contract Administrator will not be required to perform any Services after the issue of the Notice of Final Payment Due 11

Schedule 9 Fees and Expenses BASIS OF PRICING S 9.1 RATES 1. The rates identified below are fixed until * and shall then be reviewed and revised upwards by * % and at intervals of thereafter until Completion. (*if no limitation is indicated on the period during which the rates are fixed they shall be fixed until Completion. If no incremental percentage is indicated it shall be 5%. If no interval is stated for further review, the rates shall not be reviewed again before Completion.) S 9.2. OUT OF POCKET EXPENSES 1. Out of pocket expenses shall be paid on the basis of a) having been included in the rates or charges for Services b) the addition of % to the invoiced amount for Services c) the expenses identified as recoverable in the Appointment Documents, supported by receipts S 9.3. SPECIAL EXPENSES 1. Those expenses which, in advance, the Employer has agreed to reimburse the Consultant shall be paid at cost, on the presentation of a receipted invoice S 9.4. SERVICES IN CONNECTION WITH THE OCCURRENCE OF INTERFERENCES 1. Services in connection with the impacting of Interferences under Clauses 27, 28 and 35 of the Appointment of other Consultants, and Construction Contract Clauses 34, 35 and 43, which are not caused or contributed to by the Contract Administrator, shall be paid on the basis of the following rates a) Contract Administrator per hour/day* b) assistant contract administrator per hour/day* c) IT manager per hour/day* * Delete whichever is inapplicable 12

d) other per hour/day* e) overheads per day S 9.5. SERVICES IN CONNECTION WITH ACCELERATION OR RECOVERY 1. Services in connection with Acceleration and Recovery under Clauses 38 to 42 of the Appointment of other Consultants, and Construction Contract Clauses 46 to 50, from delays which are not caused or contributed to by the Contract Administrator, shall be paid on the basis of the following rates a) Contract Administrator per hour/day* b) assistant contract administrator per hour/day* c) IT manager per hour/day* d) other per hour/day* e) overheads per day S 9.6. SERVICES IN CONNECTION WITH TERMINATION 1. Services in connection with Termination under Clauses 56 to 60 of the Appointment of other Consultants, and Construction Contract Clauses 68 to 71, which are not caused or contributed to by the Contract Administrator, shall be paid on the basis of the following rates a) Contract Administrator per hour/day* b) assistant contract administrator per hour/day* c) IT manager per hour/day* d) other per hour/day* e) overheads per day S 9.7. SERVICES IN CONNECTION WITH ISSUE AND DISPUTE RESOLUTION 1. Services in connection with Issue and Dispute Resolution under Clauses 61 and 62 of the Appointment of other Consultants, and Construction Contract Clauses 73 and/or 74, which are not required as a result of default on the part of the Contract Administrator shall be paid on the basis of the following rates a) Contract Administrator per hour/day* b) assistant contract administrator per hour/day* c) IT manager per hour/day* d) other per hour/day* e) overheads per day * Delete whichever is inapplicable 13

S 9.8. BASIS OF PRICING 1. Where the cost of Services is calculated on the basis of the cost of the Works, the charges (other than those described under Paragraphs S 9.4 to S 9.7) shall be based upon the* a) Budget cost of the Works, as adjusted upwards from time to time b) Predicted Cost of the Works under the Construction Contract, as adjusted upwards from time to time c) The Predicted Cost of the Works under the Construction Contract figure, as adjusted upwards from time to time, together with the sum of which represents the agreed value of additional items to be managed, which do not form part of the Predicted Cost of the Works d) S 9.9. OPTION A ALL INCLUSIVE PRICE (Where the Services are to be paid for on an all-inclusive basis, this Paragraph S 9.9 A is operable. The alternative, Stage basis, Paragraph S 9.9 Option B, should be deleted.) 1. The Employer shall pay the Contract Administrator for the Stages performed* a) % of the Basis of Pricing* b) the lump sum price of 2. Stage payments shall be made in relation to the all-inclusive price identified under Option A, as follows: a) at Appointment % per week/month* b) during Pre-Construction Stage S 8.2 % per week/month* c) during Construction Stage S 8.3 % per week/month* d) during Post Construction Stage S 8.4 % per week/month* * Delete whichever is inapplicable 14

OPTION B - ON A SERVICE BASIS (Where the Services are to be paid for on a Stage basis, this Paragraph S 9.9 B is operable. The alternative, all-inclusive basis, Paragraph S 9.9 Option A, should be deleted.) 1. The Employer shall pay the Contract Administrator on the basis of the Services, or the following rates, as indicated a) Contract Administrator per hour/day* b) assistant Contract Administrator per hour/day* c) IT manager per hour/day* d) other per hour/day* e) overheads per day 2. General Services in accordance with Paragraph S 8.1* a) % of the Basis of Pricing. b) the lump sum price of c) at the stated rates (Delete whichever is inapplicable. If none is deleted, it shall be at the stated rates) 3. Pre-Construction Services in accordance with Paragraph S 8.2* a) % of the Basis of Pricing. b) the lump sum price of c) at the stated rates (Delete whichever is inapplicable. If none is deleted, it shall be at the stated rates) 4. Construction Services in accordance with Paragraph S 8.3* a) % of the Basis of Pricing of General Services. b) the lump sum price of c) at the stated rates (Delete whichever is inapplicable. If none is deleted, it shall be at the stated rates) 15

5. Post Construction in accordance with Paragraph S 8.4* a) % of the Basis of Pricing of General Services. b) the lump sum price of c) at the stated rates (Delete whichever is inapplicable. If none is deleted, it shall be at the stated rates) 16

1 Arlington Square Downshire Way Bracknell Berkshire RG12 1WA United Kingdom T: + 44 (0) 1344 630 700 F: + 44 (0) 1344 306 430 W: www.ciob.org