Approved by the Roanoke Valley-Alleghany Regional Commission April 25, 2013

Similar documents
FY 2017 Rural Transportation Planning Work Program SCOPE OF WORK

AGENDA Other Business HB2 Update... Michael Gray

INVESTING STRATEGICALLY

Transportation Funding and Improving Roadway Services Delivery

Chapter 5: Cost and Revenues Assumptions

Fiscal Year VDOT Annual Budget June 2011

GLOSSARY. At-Grade Crossing: Intersection of two roadways or a highway and a railroad at the same grade.

JACKSONVILLE URBAN AREA METROPOLITAN PLANNING ORGANIZATION UNIFIED PLANNING WORK PROGRAM AMENDMENT 1 FISCAL YEAR 2018 TABLE OF CONTENTS

SFY 2018 (July 1, 2017 to June 30, 2018) Annual Report

401 E. Water St, Charlottesville, VA (434)

FY Unified Planning Work Program. FY 2017 Unified Planning Work Program

ANNUAL PERFORMANCE AND EXPENDITURE REPORT

2007 Legislative Program Northern Virginia Transportation Authority Approved: November 10, 2006

The Feasibility of the Commonwealth to Match Funds Generated by Local Transportation Referendum

Fiscal Year VDOT Annual Budget June 2017

Fiscal Year Revised VDOT Annual Budget November 2014

Transportation Improvement Program and Incentives for Local Planning

WEST PIEDMONT PLANNING DISTRICT COMMISSION MINUTES of the May 22, 2008, Meeting

HB2 and HB1887 Update

Technical Report No. 4. Revenue and Costs

A. HAMPTON ROADS TRANSPORTATION FUND: MONTHLY FINANCIAL REPORT

Wake County. People love to be connected. In our cyberspace. transit plan CONNECTING PEOPLE, CONNECTING THE COUNTY

VERMONT AGENCY OF TRANSPORTATION. FY2016 Budget. Sue Minter, Secretary of Transportation House Transportation Committee

REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA UNIFIED PLANNING WORK PROGRAM FISCAL YEAR 2018 AMENDMENT 1

Minimum Elements of a Local Comprehensive Plan

SCOPE OF SERVICES FOR CONSULTING ENGINEERING SERVICES PLANNING FEASIBILITY STUDY

Action: Amend the TIP to change the project from NonMPO to MPO and add the CN: Bridge/Rehab grouping.

1 (b) Reconstruct and rehabilitate state highways to better maintain 2 them and prevent and avoid costly future repairs; 3 (c) Support local

2012 Ballot Initiatives Report

CHAPTER 2 BACKGROUND. Update of Previous Planning Work. Plan Development Process. Public Involvement and Review Process

MADISON ATHENS-CLARKE OCONEE REGIONAL TRANSPORTATION STUDY UNIFIED PLANNING WORK PROGRAM FY

SOUND TRANSIT RESOLUTION NO. R99-14

FY2018 UNIFIED PLANNING WORK PROGRAM (UPWP)

Unified Planning Work Program Fiscal Year 2017 (July 1, 2016 June 30, 2017)

DRAFT (April 1, 2019 March 31, 2020) UNIFIED PLANNING WORK PROGRAM and CENTRAL STAFF STAFFING PLAN

Draft. Amendment FY Unified Planning Work Program

UNIFIED PLANNING WORK PROGRAM

City of Manassas, Virginia Planning Commission Meeting AGENDA. Work Session

BRISTOL TENNESSEE / VIRGINIA URBAN AREA METROPOLITAN PLANNING ORGANIZATION

Traffic Impact Analysis Guidelines Methodology

REQUEST FOR PROPOSAL. Long Range Transportation Plan (LRTP) Update

BOSTON REGION METROPOLITAN PLANNING ORGANIZATION

APPENDIX B HIGH PRIORITY INVESTMENT PROGRAM (HPP) ( )

FY2014 Unified Planning Work Program - Revision 1

Review and Update of Year 2035 Regional Transportation Plan

INVESTMENT STRATEGIES

Chapter 6: Financial Resources

Okaloosa-Walton 2035 Long Range Transportation Plan Amendment

Financial Capacity Analysis

Revenue Sharing Program Guidelines

Revenue Sharing Program Guidelines

APPENDIX B TECHNICAL MEMORANDUM #2 TRANSPORTATION FUNDING

Prepared by the South East Texas Regional Planning Commission-Metropolitan Planning Organization (SETRPC-MPO) December 6, 2013

CalACT Expo Transit Asset Management (TAM) Plan Workshop 49 CFR 625 April 24, 2017

Pennsylvania Department of Transportation s Statewide Procedures for STIP and TIP Revisions

Glossary Candidate Roadway Project Evaluation Form Project Scoring Sheet... 17

Safety Target Meeting Summary 10/3/2017

3. Performance targets for asset condition and system performance (Attached) John Madera, NSVRC

CHAPTER 4 1 Transportation Financial Analysis

10-Year Capital Highway Investment Plan DRAFT

House Bill 20 Implementation. House Select Committee on Transportation Planning Tuesday, August 30, 2016, 1:00 P.M. Capitol Extension E2.

BINGHAMTON METROPOLITAN TRANSPORTATION STUDY CERTIFICATION NARRATIVE FY 2016

PROCEDURES FOR SPECIAL EVENTS

Prioritization and Programming Process. NCDOT Division of Planning and Programming November 16, 2016

OHIO MPO AND LARGE CITY CAPITAL PROGRAM SFY 2015 SUMMARY

N A D O N A D O R E S E A R C H F O U N D AT I O N R P O A M E R I C A

REQUEST FOR INFORMATION

Act 89 of January 2014


UCI Legislative Update. May 26, 2016 Julie Brown Local Assistance Division

Annual Listing of Obligated Projects Federal Fiscal Year 2013

Joplin Area Transportation Study Organization

QUALITY TRANSPORTATION SUMMARY

TEXAS DEPARTMENT OF TRANSPORTATION

Richmond Area MPO RSTP and CMAQ Project Review, Selection, and Funds Allocation Process

Fiscal Year Commonwealth Transportation Fund Budget June 2018

Analysis of the Alameda County Transportation Expenditure Plan Prepared by Alameda County Transportation Commission

Support Material Agenda Item No. 5

TRANSPORTATION DEVELOPMENT ACT Guidelines

Financial Analysis Working Paper 1 Existing Funding Sources Draft: April 2007

RPO Technical Advisory Committee May 24th, :30 Pisgah Room (Medium) Conference Room Land of Sky Regional Council

Fiscal Year Commonwealth Transportation Fund Budget June 2014

How to Read the Project Modification Listings - Roadway Section

Fiscal Year VDOT Annual Budget June 2018

Transportation Planning

MPO Staff Report MPO EXECUTIVE BOARD: August 16, 2017

DMP (Decision Making Process)

SOUTH CENTRAL PLANNING AND DEVELOPMENT COMMISSION. Scope of Services. Terrebonne Parish

2017 UNIFIED TRANSPORTATION PROGRAM AND HB 20 IMPLEMENTATION

Metropolitan Planning Organizations in North Carolina. Chris Lukasina NCAMPO

GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2009 SESSION LAW HOUSE BILL 148

FY Statewide Capital Investment Strategy... asset management, performance-based strategic direction

TEXAS TRANSPORTATION COMMISSION

OHIO MPO & LARGE CITY CAPITAL PROGRAM SFY 2017 SUMMARY

Transportation Funding

Implementation Project Development and Review 255

Capital Budgeting and Programming

VANPOOL SECTION 5307 PROGRAM PRELIMINARY RECOMMENDATIONS FY 2020 APRIL, 2018

ALL Counties. ALL Districts

System Development Charge Methodology

Transcription:

FY 2014 Rural Transportation Planning Assistance Program SCOPE OF WORK For the Roanoke Valley-Alleghany Regional Commission (July 1, 2013 June 30, 2014) Approved by the Roanoke Valley-Alleghany Regional Commission April 25, 2013 Prepared by the Roanoke Valley-Alleghany Regional Commission staff through a cooperative process involving the city of Covington, the town of Clifton Forge, the counties of Alleghany, Botetourt, Craig, Franklin and Roanoke, the Virginia Department of Transportation, and the Federal Highway Administration.

TABLE OF CONTENTS FY 2014 Rural Transportation Planning Assistance Program - Scope of Work Program Management and Activities, and Budget PURPOSE AND OBJECTIVE...1 I. PROGRAM ADMINISTRATION...2 A. Rural Transportation Planning Program Management... 2 B. Rural Transportation Planning Assistance Program Scope of Work... 2 II. PROGRAM ACTIVITIES...3 A. Rural Public Transportation... 3 B. Bicycle and Pedestrian Planning... 3 C. Corridor Studies and Traffic Analysis... 4 D. VDOT Outreach Meetings & Data Review... 4 E. General Technical Assistance.... 4 III. BUDGET...6 RESOLUTION F Y 2 0 1 2 R u r a l T r a n s p o r t a t i o n P l a n n i n g W o r k P r o g r a m

PURPOSE AND OBJECTIVE The Virginia Department of Transportation (VDOT) allocates part of the State Planning and Research (SPR) funding to provide annual transportation planning assistance for non-urbanized areas within the Commonwealth. The Rural Transportation Planning (RTP) Program was created to aid the State in fulfilling the requirements of the State Planning Process to address the transportation needs of non-metropolitan areas. Funds appropriated under 23 U.S.C. 307(c) (SPR funds) are used in cooperation with the Department of Transportation, Commonwealth of Virginia for transportation planning as required by Section 135, Title 23, U.S. Code. These Federal funds provide 80 percent funding and require a 20 percent local match. In FY-2014 each planning district commission / regional commission will receive $58,000 from VDOT s Rural Transportation Planning Assistance Program and each planning district commission / regional commission will provide a local match of $14,500 to conduct rural transportation planning activities. This resource may be supplemented with additional planning funds, but note that the arrangement of all such funds involves development of a scope of work, approval and other coordination in TMPD administrative work programs. The scope of work shall include specific activities as requested by VDOT and/or the Federal Highway Administration. The scope of work may also include activities or studies addressing other transportation planning related issues that may be of specific interest to the region. The criteria for the determination of eligibility of studies for inclusion as part of this work program are based upon 23 U.S.C. 307 (c), State Planning and Research. Agencies and/or governments participating in the selection of projects for the Rural Transportation Planning Assistance Program Scope of Work include the Federal Highway Administration, the Virginia Department of Transportation, the Town of Clifton Forge, the City of Covington, and the counties of Alleghany, Botetourt, Craig, Franklin and Roanoke. 1 F Y 2 0 1 4 R u r a l T r a n s p o r t a t i o n P l a n n i n g W o r k P r o g r a m

I. PROGRAM ADMINISTRATION ($) A. Rural Transportation Program Management Description: This activity includes all ongoing department-wide management and administrative activities, not attributable to specific program activities. There are two objectives for this work task: (1) the administration of transportation planning work program activities; and (2) the completion of necessary contracts, invoices, progress reports, correspondence, and grant applications in support of the work program. Deliverable End Product: The primary result of this task will be a well functioning transportation program. Preparation of Commission and Rural Transportation Technical Committee (RTC) agendas, notices, minutes and memorandums. Preparation of quarterly financial progress reports. Purchase of professional reports, materials, equipment, and services as needed to assist staff in work activities. B. Rural Transportation Planning Assistance Program Scope of Work Description: This task provides for the annual preparation of the Rural Transportation Planning Assistance Program Scope of Work for the upcoming fiscal year. Any amendments or revisions to the existing scope of work are also a part of this element. Deliverable End Product: The FY 2014 Rural Transportation Planning Assistance Program Scope of Work, which documents the activities to be accomplished by the Roanoke Valley-Alleghany Regional Commission staff in the upcoming fiscal year. It will also include any amendments or revisions to the existing scope of work. SPR Funds (80%) $6,017 PDC Funds (20%) $1,504 Total Budgeted Expenditure for Program Administration $7,521 2 F Y 2 0 1 4 R u r a l T r a n s p o r t a t i o n P l a n n i n g W o r k P r o g r a m

II. PROGRAM ACTIVITIES ($) A. Rural Public Transportation ($) Description: Planning and development of rural public transportation service in the region. This item will include the following projects: Regional Transit Vision Plan - Staff will partner with GRTC, RADAR, DRPT, and local governments, to develop a regional transit vision plan that includes a vision for future transit service, transit coverage, and operations. The plan will cover the entire Regional Commission service area and will also be supported by the Roanoke Valley Area MPO. Craig County Public Transportation Service - Development of new public transportation service in Craig County. Mountain Express Service - Review of the Mountain Express service in the Alleghany Highlands and changes to service map and flyer. Clifton Forge Projects Relocation of the AMTRAK passenger rail station and possible shuttle service between Douthat State Park and Clifton Forge. Deliverable End Product: 1.) Revised map and brochure for Mountain Express Service 2.) planning and feasibility analysis for Clifton Forge projects 3.) Regional Transit Vision Plan. B. Bicycle and Pedestrian Planning ($) Description: Planning and development of non-motorized transportation infrastructure, such as sidewalks, trails, greenways, bike lanes, and other facilities. This item will include the following projects: Pedestrian Infrastructure Mapping (Phase I) - Identify gaps in pedestrian infrastructure such as missing sidewalk segments. Provide a shape file with lat/long locations to include whether the gap is located adjacent to the roadway. Botetourt County Trail Development Planning and development services to implement the trail plan that was developed with the assistance of RVARC staff in 2012. Continue trail counts within the Carvins Cove Nature Reserve. Craig County Greenway Development Planning and development assistance for a greenway to connect downtown New Castle with the Craig County Sports Complex. Deliverable End Product: 1.) Pedestrian Infrastructure Mapping 3 F Y 2 0 1 4 R u r a l T r a n s p o r t a t i o n P l a n n i n g W o r k P r o g r a m

C. Corridor Studies and Traffic Analysis ($) Description: Analysis of existing and future corridor conditions, as well as the evaluation of traffic conditions at specific intersections or proposed developments. This item will include the following projects: Route 122 Corridor Review Inventory of the existing conditions from Burnt Chimney to Bedford County, including analysis of average daily traffic, levelof-service, accidents, driveway entrances, and right-of-way widths. Rocky Mount Site Review Evaluate the possible traffic impacts for a variety of potential uses on a commercial property in Rocky Mount. Recommend potential on-site and off-site improvements that may be needed. Deliverable End Product: 1.) Route 122 Corridor Review 2.) Rocky Mount Site Review D. VDOT Outreach Meetings and Data Review ($) Description: Participate in outreach meetings and review data as requested by VDOT throughout the fiscal year pertaining to: VTrans Update Functional Classification Update Virginia Surface Transportation Plan Update (VSTP) Park and Ride Lots Inventory / Study Bicycle and Pedestrian planning Freight planning Other meetings as requested Deliverable End Product: Specific assistance to be requested by VDOT or necessary to provide input into the statewide transportation planning process. E. General Technical Assistance ($) Description: RVARC staff will research, develop, maintain, and analyze data for use in a variety of technical support and planning support activities. Work activities will be organized around the following subtasks. Any combination of subtasks may be completed in FY2014 as opportunities and needs arise; however, circumstances may not permit all subtasks to be finalized by the end of the fiscal year. 4 F Y 2 0 1 4 R u r a l T r a n s p o r t a t i o n P l a n n i n g W o r k P r o g r a m

General Technical Assistance to local governments, planners and citizens as requested. Technical Support Activities a variety of planning support activities to support work program projects and/or the general planning process (i.e. turning movement counts). Regional Greenways Mapping Assistance GPS and mapping assistance to the Regional Greenway Commission and member governments as needed. Transportation Alternative Assistance Local government assistance on the preparation of Transportation Alternative (TA) grants as needed. Review of Traffic Impact Analysis Assist local governments in their review and consideration of traffic impact analysis, as required under Chapter 527 regulations. VTRANS Performance Measures - Assist VDOT with the collection of data relevant to VTRANS 2035 performance measures. Deliverable End Product: Specific technical assistance products requested by member local governments and other partner agencies. SPR Funds (80%) $51,983 PDC Funds (20%) $12,996 Total Budgeted Expenditure for Program Activities $64,979 5 F Y 2 0 1 4 R u r a l T r a n s p o r t a t i o n P l a n n i n g W o r k P r o g r a m

III. BUDGET Tasks VDOT (SPR) Local Total Program Administration A. Program Management 4,814 1,203 6,017 B. RTPAP- Scope of Work 1,203 301 1,504 Total Administration $6,017 $1,504 $7,521 Program Activities A. Rural Public Transportation 13,817 3,454 17,271 B. Bicycle and Pedestrian Planning 18,763 4,691 23,454 C. Corridor Studies and Traffic Analysis 10,887 2,722 13,609 D. VDOT Outreach Meetings & Review 4,951 1,238 6,189 E. General Technical Assistance 3,565 891 4,456 Total Program Activities $51,983 $12,996 $64,979 Total $58,000 $14,500 $72,500 6 F Y 2 0 1 4 R u r a l T r a n s p o r t a t i o n P l a n n i n g W o r k P r o g r a m