PROJECT FICHE. 2.2 Project purpose: To provide sustainable access to longer-term financing to SMEs at market conditions in Cyprus.

Similar documents
SUMMARY PROJECT FICHE

SUMMARY PROJECT FICHE. 1. BASIC INFORMATION 1.1 Title: Measures to develop the operational capacity of the Department of Customs & Excise.

COMMISSION DECISION. C(2007)6376 on 18/12/2007

STANDARD PROJECT FICHE

STANDARD SUMMARY PROJECT FICHE PROJECT PREPARATION FACILITY FOR THE PHARE CBC PROGRAMME BULGARIA-GREECE

1.2 Title: Project Preparation and Support Facility (PPF)

1.5 Contracting Authority (EC) European Commission, EC Delegation, on behalf of the beneficiary

COMMISSION OF THE EUROPEAN COMMUNITIES REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL

Standard Summary Project Fiche Project Number

Project number: TR Twinning number: TR03-SPP Location: Turkey Public Administration at Central and Regional level.

04.02 EAGGF EAGGF - p.1

Standard Summary Project Fiche No. HU

Standard Summary Project Fiche. The project meets the following Accession Partnership priorities:

Standard Summary Project Fiche for the Transition Facility

STANDARD SUMMARY PROJECT FICHE

2002 SUMMARY PROJECT FICHE

2002 SUMMARY PROJECT FICHE

STANDARD SUMMARY PROJECT FICHE Project Fiche Number: CZ

PHARE 2003 STANDARD SUMMARY PROJECT FICHE

Standard Summary Project Fiche IPA centralised programmes Project Fiche: 18

STANDARD SUMMARY PROJECT FICHE TRANSITION FACILITY

Standard Project Fiche. 1.2 Title: Further Institutional Strengthening of the Court of Accounts

SUMMARY PROJECT FICHE

IPA National Programme 2009 Part II - Bosnia and Herzegovina Fiche 3 Preparation for IPA components III and IV

Standard Summary Project Fiche. Project number: TR Twinning number: TR02-JH-05

Cross Border Co-operation between Bulgaria & Romania Multi-annual Programme Project Fiche for Programme Support

STANDARD SUMMARY PROJECT FICHE

STANDARD SUMMARY PROJECT FICHE - TRANSITION FACILITY

01.05 Tax administration/1

STANDARD SUMMARY PROJECT FICHE

Standard Summary Project Fiche IPA Decentralised National Programmes Project Number TR

Standard Summary Project Fiche for the Transition Facility

Standard Summary Project Fiche Project No. TR Twinning No. TR/2004/IB/EC/06

STANDARD SUMMARY PROJECT FICHE - TRANSITION FACILITY

01.02 National Bank of Poland/1

Standard Summary Project Fiche. Project Number 2002/

IPA National Programme 2010 for Albania Project Fiche 09 "Support to the Food Safety Infrastructure "

Energy Regulatory Commission and Insurance Supervisory Agency (to be established) 1.2 Title: Support to regulatory and supervisory bodies

Standard Summary Project Fiche

Standard Summary Project Fiche. Project PL : Improved Tax Administration

Neighbourhood Programme Romania - Serbia & Montenegro 2005 fiche for Project 3 Priority 3 Technical Assistance

Project Fiche IPA National programmes / Component I

Contacts: Anastasija Trajkovska, Head of Sector, telephone: (0)

Final PF2 Project Fiche IPA centralised programmes Part II of the Horizontal Programme on Nuclear Safety and Radiation Protection

Standard Summary Project Fiche

BOSNIA AND HERZEGOVINA

PHARE 2004 STANDARD PROJECT FICHE

ANNEX: IPA 2010 NATIONAL PROGRAMME PART II - BOSNIA AND HERZEGOVINA. at the latest by 31 December years from the final date for contracting.

Rehabilitation and Partial Reconstruction of Road II-19 Razlog Bansko Gotse Delchev Sadovo

IPA National Programme 2009 part 1 Bosnia and Herzegovina Fiche 3 - "Energy" 1.2 Title: Construction of small hydro power plant Cijevna III

SUMMARY PROJECT FICHE. 1. BASIC INFORMATION 1.1 Désirée Number: RO-2002/ Title: Connection to EU customs systems

STANDARD SUMMARY PROJECT FICHE

STANDARD SUMMARY PROJECT FICHE

Having regard to the Treaty on the Functioning of the European Union, and in particular Article 291 thereof,

ANNEX. 1. IDENTIFICATION Beneficiary CRIS/ABAC Commitment references Total cost EU Contribution Budget line. Turkey IPA/2017/40201

Standard Summary Project Fiche for the Transition Facility

Standard Summary Project Fiche IPA decentralised National programmes

Project Fiche: No. 14 Systematic Electronic Exchange of Data (SEED) in the Western Balkans

STANDARD SUMMARY PROJECT FICHE

COMMISSION IMPLEMENTING DECISION. of

COMMISSION DECISION. of on technical provisions necessary for the operation of the transition facility in the Republic of Croatia

COMMISSION DECISION. C(2007)6121 of 12/12/2007

MONETARY POLICY AND EUROPEAN INDUSTRY

05.01 Strengthen environmental impact assessment

Project Fiche: No. 15 Systematic Electronic Exchange of Data (SEED) in the Western Balkans

Official Journal of the European Union

Standard Summary Project Fiche IPA decentralised National programmes. Project number: TR

Standard Summary Project Fiche IPA centralised programmes

2010 IPA Horizontal Programme on Nuclear Safety and Radiation Protection PF1 Albania - Final Project Fiche No. 1

MULTI-COUNTRY. Support to Western Balkans Infrastructure Investment Projects for 2014 INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II)

SUMMARY PROJECT FICHE

Project fiche IPA National programmes 2012/ Component I

Standard Summary Project Fiche IPA centralised programmes

COMMISSION OF THE EUROPEAN COMMUNITIES COMMISSION DECISION. of 2008

1.5 Contracting Authority (EC) European Commission, EC Delegation, on behalf of the beneficiary

(Acts whose publication is obligatory) REGULATION (EC) No 1927/2006 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL. of 20 December 2006

Standard Summary Project Fiche

Guidance for Member States on Article 42(1)(d) CPR Eligible management costs and fees

Guidance for Member States on Performance framework, review and reserve

Project Fiche IPA National programmes IPA 2012/Component I

Summary Project Fiche

1) Bank for Small Industries and Commerce (BASIC) 2) Industrial Development Leasing Company (IDLC) 3) United Leasing Company (ULC)

COMMISSION IMPLEMENTING DECISION. of

COMMISSION IMPLEMENTING DECISION. of adopting a Country Action Programme on Bosnia and Herzegovina for the year 2015

prudential requirements for credit institutions and investment firms and amending Regulation (EU) No 648/

FINAL VERSION. 1. Basic information. 1.1 CRIS Number: 2009/

CENTRAL FINANCE AND CONTRACTS UNIT (CFCU) POLAND MEMORANDUM OF UNDERSTANDING. Article 1 - Explanatory Statement

Strenghtening the Court Management System FINAL Standard Summary Project Fiche IPA decentralized National programmes

-TR Support to the Court Management System (ver ) Standard Summary Project Fiche. Project number:

2002/ Sulechow by-pass

Negotiating Position of the Republic of Slovenia on Chapter 13 SOCIAL POLICY AND EMPLOYMENT

ELIGIBILITY RULES. Rule No 1: Expenditure Actually Paid Out

COMMISSION IMPLEMENTING DECISION. of

Draft COMMISSION DECISION

Guidance on a common methodology for the assessment of management and control systems in the Member States ( programming period)

STANDARD TWINNING PROJECT FICHE

Official Journal of the European Union

STANDARD SUMMARY PROJECT FICHE. 1.2 Title: Upgrade of the Latvian Statistical System in accordance with EU requirements

JESSICA JOINT EUROPEAN SUPPORT FOR SUSTAINABLE INVESTMENT IN CITY AREAS JESSICA INSTRUMENTS FOR ENERGY EFFICIENCY IN LITHUANIA FINAL REPORT

Standard Summary Project Fiche. Project number: TR

Transcription:

Updated 20.11.2002 2003 PROJECT FICHE 1. BASIC INFORMATION 1.1 CRIS Number: 2003/004-643. Project 3 1.1. Title: SME Finance Facility in Cyprus 1.3 Sector: Small and Medium-sized Enterprises 1.4 Location: Cyprus 2. OBJECTIVES 2.1 Overall Objective(s): To contribute to the economic development, the improvement of conditions for enterprise development, and the expansion of the financial sector in Cyprus. 2.2 Project purpose: To provide sustainable access to longer-term financing to SMEs at market conditions in Cyprus. 2.3 Accession Partnership and NPAA priority Accession Partnership (AP) Economic Criteria Improve conditions for enterprise and development, with particular attention on sectoral diversification and small and medium-sized enterprises. National Programme for the Adoption of the Acquis (NPAA) The NPAA (Chapter 3.4.6(I) (a)) states the following: The economy of Cyprus is dominated by small enterprises. Almost all enterprises (99,9%) employ less than 250 persons, whereas the overwhelming majority (95%) employ less than 10 persons. One of the primary objectives of the government development policy concerns the restructuring and modernisation of the economy in order to assist enterprises to meet the challenges of globalisation and accession to the European Union. To this end, various support schemes have been introduced in the different sectors of the economic activity. Although schemes do not generally distinguish between micro, small, medium or larger units, in view of the predominance of the SMEs in all sectors, size is one of the parameters which is taken into account in policy formulation. 3. DESCRIPTION 3.1 Background and justification Project 3: SME Facility 1

The Financing problems of small and medium-sized enterprises (SMEs) in the candidate countries are becoming increasingly serious because of the rapid growth in the sector combined with the continued problems in relation to the provision of long-term finance to the sector. Financing is often not available to SMEs because of lack of sufficient collateral or not available at longer-term maturity because of the allegedly higher risks of SMEs, making new projects particularly difficult to finance. Also, there is frequently a perception that the costs of administering small loans are disproportionately high, leading banks to concentrate their efforts on larger companies. Experience in most EU Member States shows that unless stimulated through focused schemes such as the SME Finance Facility, banks tend to focus on larger companies, thereby undermining the financing of SMEs and micro enterprises. In April 1999, the European Commission launched the SME Finance Facility under the Phare Programme. The key objective of the SME Finance Facility for candidate countries is to induce local financial intermediaries and investment funds to develop their financing activities for SMEs. To achieve this objective, the SME Finance Facility provides the local financial intermediaries with incentives aimed at encouraging loans, leases and equity capital to SMEs. From 2001 onwards, it was decided to extend the scope of the Facility to include all candidate countries, including Cyprus, and to provide funding for the operation of the Facility within the preaccession assistance instrument applied to each candidate country in the context of the annual Preaccession National Programme. Within this framework, the present Project aims at extending to Cyprus the SME Finance Facility already active in other candidate countries to provide loans and financial leases to SMEs. 3.2 Linked activities N/A 3.3 Results The Project results can be summarised as follows: - an increased level of long-term small loans/financial leases granted to Cypriot SMEs by local banks; - an enhanced ability of the Cypriot banks to develop their financial services for SMEs; - a growth of the national SME sector. 3.4 Activities: Cyprus will participate in the SME Finance Facility in accordance with the rules and conditions to be specified in the Contribution Arrangement between the European Commission and CEB/KfW. The Project will be phased as follows: - As a first step, the relevant authorities in Cyprus and the Council of Europe Development Bank (CEB), in co-operation with Kreditanstalt für Wiederaufbau (KfW), will identify the particular deficiencies of the SME financing in Cyprus in order to design the appropriate EU-funded incentives in favour of the financial intermediaries. Project 3: SME Facility 2

- In a second step, the Council of Europe Development Bank (CEB), in co-operation with Kreditanstalt für Wiederaufbau (KfW), will identify not more than three financial intermediaries which are eligible to act as Participating Banks (PB) in Cyprus under the SME Finance Facility. The selection of the Financial Intermediaries will be on the basis of the financial strength, branch networks and capacity to participate in and promote the Facility and its objectives. More specifically, the potential PBs need to have a strong SME orientation. They need to grant their loans according to sound banking principles and apply loan policies and procedures suitable for SME borrowers. - CEB/KfW, who will be responsible for the selection of the PBs, will negotiate project agreements under which global credit lines will be provided to the PBs in combination with incentives financed by pre-accession funds. The global credit lines will be used by the PBs for granting longer-term sub-loans and financial leases at market interest rates to SMEs (subprojects). The PBs will assume the credit/repayment risk of the final borrowers (SMEs). - Incentives funded by this Project shall be used to induce the PBs to expand their lending and leasing operations to SMEs in order to overcome the deficiencies of SME financing in Cyprus. The main types of incentives provided are: Performance Fees, Guarantees, and Technical Assistance. Upon proposal of CEB/KfW and subject to approval by the competent Commission services, other appropriate incentives for the benefit of the PB may be paid. 4. INSTITUTIONAL FRAMEWORK The CEB, in co-operation with KfW, will be entrusted with the implementation of this Project. The CEB will manage a special fund to which the pre-accession contribution will be transferred. The Steering Committee will supervise the correct implementation of the Facility, including the Cyprus Project. The Steering Committee comprises representatives of the Commission and one representative of each International Financial Institution having signed Contribution Arrangements with the Commission. Monitoring will be ensured by the Secretariat of the Facility. Copies of the project proposals and reports will be made available to the Cypriot authorities involved in the Project. 5. DETAILED BUDGET Investment Institution Building Total EU financing (=I+IB) National cofinancing (Million Euro) IFI TOTA L Loan/Guarantee/ Leasing Window 1.5 1.5 15 at least 16.5 at least Project 3: SME Facility 3

Investment Institution Building Total EU financing (=I+IB) National cofinancing TOTAL 1.5 1.5 15 at least IFI TOTA L 16.5 at least A management fee shall be paid to the CEB/KfW as 1.25% of each tranche transferred to the Special Fund and corresponding to a maximum amount of 18,750. The annual cost for auditing the Special Fund is included in the management fee. The Commission shall not provide any additional amount to support the ordinary CEB/KfW cost resulting from the implementation of this Project, except where duly justified. 6. IMPLEMENTATION ARRANGEMENTS The Commission shall allocate the additional contribution for the Cyprus Project in the already existing Special Fund created in the framework of the SME Finance Facility and managed by CEB. A particular account (Special Account) will be opened for Cyprus. Interest earned on the Special Account at CEB and amounts paid out from the Special Account and possibly recovered from projects shall be reinvested for the purposes of the SME Finance Facility in Cyprus. Implementation will be delegated to CEB/KfW on the basis of a Contribution Arrangement with the European Commission. The Commission's supervision will be exercised throughout the duration of the Project, through the Steering Committee and through activities of monitoring and evaluation, various reports and audits. The detailed procedures for implementation of the projects with the PBs shall be set out in the specific project agreements concluded between the PBs and CEB/KfW. These project agreements shall specify the terms and conditions applicable to the use of CEB/KfW and Fund resources. The PBs will submit to KfW and the Government of Cyprus semi-annual progress reports containing all relevant information, using an agreed reporting format. Major indicators for monitoring and project evaluation are the number, average size and average maturity of the subloans, amounts disbursed, the average interest rates, sectors of activity as well as average figures of employees, annual turnover and total assets of the financed SMEs. The EU contribution will be disbursed by CEB directly to the PBs after KfW s confirmation of a request for disbursement submitted by the PBs. 6.1 Implementing Agency The European Commission will entrust the CEB/KfW with the implementation of this programme under a Contribution Agreement to be signed, similar to the existing one for other candidate Project 3: SME Facility 4

countries. The management of the programme by the Commission will be subdelegated to DG Economic and Financial Affairs. 6.2 Twinning N.A. 6.3 Non-standard aspects The Project will be managed centrally by the European Commission. 6.4 Contracts The EC will sign a Contribution Arrangement with CEB/KfW. A maximum of three project agreements shall be concluded between the PBs and CEB/KfW. 7. IMPLEMENTATION SCHEDULE 7.1 Start of tendering / call of proposals: Start of Project activity: October 2003 7.2 Project completion: June 2012 8. EQUAL OPPORTUNITY Article 28 of the constitution safeguards the right of all persons to equality before the law, the administration and justice and of equal protection thereof and treatment thereby. Any direct or indirect discrimination against any person on the ground, i.e. of sex, is prohibited. Furthermore, the prevailing legislation with respect to equality of treatment for men and women is partly in conformity with the acquis communautaire. Harmonised legislation is under preparation and full compliance with the acquis communautaire will be achieved gradually by 1/1/2003. The following laws, currently in force in Cyprus, cover equality issues: the Equal Pay between men and women for Work of Equal Value Law (Law 158/89), the Protection of Maternity Law of 1997 (Law 100(1)/97), the Termination of Employment Law of 1967 (Law 24/67) as amended, the Commissioner for Administration Law of 1991 (Law 3/91) as amended and the Social Security (Amended) legislation (Law 51(1)/2000). Cyprus has ratified by Law 39/62 the European Convention for the Protection of Human Rights and Fundamental Freedoms. Various International Conventions, which guarantee equal rights between men and women, have also been ratified. Also, as regards domestic violence, a new law, The Domestic Violence (Prevention and Protection of Victims) Law (Law 119(1)/2000) has been enacted to effect substantial improvements to initial legislation of 1994. 9. ENVIRONMENT The PBs shall examine or at least be assured that the SMEs financed under the SME Finance Facility comply with national environmental and employee health laws and regulations. Project 3: SME Facility 5

10. RATES OF RETURN N/A 11. INVESTMENT CRITERIA N/A 12. CONDITIONALITY AND SEQUENCING The components of the Project are inter-related and adopt a logical approach to design and implementation. ******************** Project 3: SME Facility 6

ANNEXES 1. Logical framework matrix in standard format 2. Detailed implementation time chart in standard format 3. Contracting and disbursement schedule by quarter for full duration of programme Project 3: SME Facility 7

PROJECT: LOGFRAME PLANNING MATRIX FOR SME Finance Facility in Cyprus Contracting period expires: December 2004 ANNEX 1 Disbursement period expires: December 2005 Total Budget: 21.5 M EU contribution: 1.5 M Overall Objective Objectively Verifiable Indicators Sources of Verification To contribute to the economic development, the improvement of conditions for enterprise development and the expansion of the financial sector in Cyprus Growth of SME market share of Participating Financial Intermediaries (PFIs) versus non Participating Financial Institutions before, throughout and after the Programme The evolution of the average size and maturity of SME loans/leases before, throughout and at the end of the Programme PBs reports Reports of the National Statistical Office Reports of the Chamber of Commerce Project Purpose Objectively Verifiable Indicators Sources of Verification Assumptions To provide sustainable access to longer-term credit to SMEs at market conditions in Cyprus Average loan/lease size Loan/lease maturity Share of SME loan portfolio / total loan portfolio of PB PBs reports No lending/leasing to SMEs with subsidised interest rates SME lending/leasing in the long-term profitable for PBs Results Objectively Verifiable Indicators Sources of Verification Assumptions An increased level of long-term small loans/leases granted to Cypriot SMEs by local banks An enhanced ability of the Cypriot banks to develop their financial services for SMEs A growth of the national SME sector Number of SMEs which benefit from the Facility by the end of the Project Amount of EU funds disbursed Number of sub-projects financed PBs reports KfW s reports Agreements with SMEs Sufficient demand from SMEs Efficient handling of the incentive schemes Sufficient demand by SMEs Project 3: SME Facility

Project 3: SME Facility

Activities Means Assumptions Identification of eligible PBs in Cyprus Conclusion of project agreements with selected PBs Financing activities for SMEs 1.5 M project agreements with PBs and individual contracts with SMEs Successful identification of Financial Intermediaries Smooth and timely approval procedures Preconditions Full commitment of all the services involved Budgets approved and available in time Project 3: SME Facility

ANNEX 2 DETAILED TIME IMPLEMENTATION CHART FOR THE PROJECT Title: SME Finance Facility in Cyprus Component 1 COMPONENT 2003 2004.... 2012 J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O D = Design C = Tendering and Contracting I = Implementation X = Closure I I I I I I I I I I I I I I I I I I I I X Project 3: SME Facility

ANNEX 3 CUMULATIVE CONTRACTING AND DISBURSEMENT SCHEDULE Title: SME Finance Facility in Cyprus (Million Euro) 01/01/03 01/04/03 01/07/03 01/10/03 01/01/04 01/04/04 01/07/04 01/10/04 01/01/05../../.. 01/07/12 CONTRACTED - - - 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 DISBURSEMENT - - - - 1.5 1.5 1.5 1.5 1.5 1.5 1.5 The above table is an approximation. The actual disbursements will depend on the demand of the projects financed under the Facility which have not yet been selected. Project 3: SME Facility