FIRST MAJESTIC SILVER CORP.

Similar documents
FIRST MAJESTIC SILVER CORP.

NEWS RELEASE New York - AG Toronto FR November 16, 2015 Frankfurt FMV Mexico - AG. First Majestic Reports Third Quarter Financial Results

NEWS RELEASE. First Majestic Reports First Quarter Financial Results

First Majestic Reports Third Quarter Financial Results

NEWS RELEASE New York AG February 25, 2019 Toronto FR Frankfurt FMV

FIRST MAJESTIC SILVER CORP. NEWS RELEASE. First Majestic Reports Second Quarter Financial Results

NEWS RELEASE. First Majestic Reports Second Quarter Financial Results

SUITE WEST HASTINGS STREET VANCOUVER, BC V6C 2W2 CANADA TEL: FAX: November 12, 2009

Capstone Mining 2017 Production Results and 2018 Operating and Capital Guidance

GOLDCORP DELIVERS RECORD 2009 GOLD PRODUCTION; PEER-LEADING FIVE-YEAR GROWTH PROFILE EXTENDED

2014 First Quarter Highlights

STRATEGY. DISCIPLINE. EXECUTION. FEBRUARY 15, 2013 FOURTH QUARTER CONFERENCE CALL

Great Panther Reports First Quarter 2019 Production Results

Gold Hawk Resources Inc.

Argonaut Gold Announces First Quarter 2015 Production of 43,255 Gold Equivalent Ounces

Orvana reports results for the first quarter of fiscal 2014 with adjusted net income of $1.2 million or $0.01 per share

NEWS RELEASE GREAT PANTHER SILVER REPORTS POSITIVE PRELIMINARY ECONOMIC ASSESSMENT FOR THE CORICANCHA MINE

Northgate Minerals Reports Second Quarter Results

ELGIN MINING PROVIDES STRONG FOURTH QUARTER CASH COSTS AND POSITIVE 2014 OUTLOOK

SECOND QUARTER 2018 RESULTS. August 10, 2018

Allied Nevada Announces Hycroft Mill Expansion Feasibility Results Highlighted by Improved Projected Returns

LEAGOLD FILES UPDATED TECHNICAL REPORT FOR LOS FILOS GOLD MINE, INCREASING RESERVES BY 59% TO 2.7 MILLION OUNCES GOLD

CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS

2014 Third Quarter Highlights

N E W S R E L E A S E

Hudbay Announces 2016 Production Guidance and Capital and Exploration Expenditure Forecasts

Claude Produces 20,672 Ounces of Gold in Q1

(PEA) for its project in. anticipated. which are. to produce. Highlights. ounces is now. The 3,500 tpd. After-tax NAV. Guatemala this year,

New Gold Reports Strong Fourth Quarter Rainy River Achieves Revised Annual Guidance New Afton Exceeds Annual Guidance

Claude Produces 15,722 Ounces of Gold in Q3 and Improves Full Year Guidance

Velocity Hole RDD-009 Intersects New Zone at Rozino Gold Project, Southeast Bulgaria

DUNDEE PRECIOUS METALS ANNOUNCES 2017 FIRST QUARTER RESULTS (All monetary figures are expressed in U.S. dollars unless otherwise stated)

N E W S R E L E A S E

Goldcorp and Teck Combine El Morro and Relincho Projects in Chile

PRIMERO REPORTS FIRST QUARTER 2015 RESULTS; SAN DIMAS ACHIEVES RECORD QUARTERLY PRODUCTION

Alio Gold Reports Second Quarter 2018 Results

Bank of America Merrill Lynch 2014 Global Metals, Mining & Steel Conference

Argonaut Gold Announces Third Quarter 2018 Operating and Financial Results

AVINO SILVER & GOLD MINES LTD.

NEWS RELEASE Lundin Mining Third Quarter Results

GOLDCORP REPORTS FOURTH QUARTER 2018 RESULTS

2018 FIRST QUARTER RESULTS. May 3, 2018

Velocity Extends East Zone Discovery at Rozino Gold Project, Southeast Bulgaria

Revenues of $152.0 million on gold sales of 113,845 ounces at an average realized price of $1,281 per ounce

Sandstorm Gold Announces

El Compas is scheduled to achieve commercial production by the end of July 2018

LEAGOLD ANNOUNCES 2018 EARNINGS, INCLUDING AISC OF $974/oz AND AISC MARGIN OF $83.2 MILLION

Detour Gold Achieves Production and Cost Guidance for 2017 and Provides 2018 Guidance

(All amounts are expressed in United States dollars unless otherwise indicated.)

Coeur Provides Updated Palmarejo Mine Plan

NEWS RELEASE GREAT PANTHER SILVER REPORTS FOURTH QUARTER AND ANNUAL 2017 PRODUCTION RESULTS AND PROVIDES 2018 OUTLOOK

Spanish Mountain Gold Announces Results of New PEA for the First Zone

2012 First Quarter Results

PRIMERO ACHIEVES 2016 REVISED PRODUCTION AND COST GUIDANCE;

Aura Minerals Announces Third Quarter 2012 Financial and Operating Results and Corporate Office Relocation in 2013

NEWS RELEASE GREAT PANTHER SILVER REPORTS FOURTH QUARTER AND ANNUAL 2018 PRODUCTION RESULTS AND PROVIDES CORPORATE UPDATE

The accompanying unaudited interim financial statements of the Company have been prepared by and are the responsibility of the Company s management.

GOLDEN STAR ACHIEVES 2017 PRODUCTION GUIDANCE AND PROVIDES GUIDANCE FOR % increase in gold production in 2017 compared to 2016

Q4 and Year End 2012 Conference Call. ArgonautGold.com

RBC Capital Markets Underground Mining Technical Session Ernest Mast President & COO October 22, 2015

News Release. B2Gold Corp. Announces Positive Results from the Preliminary Economic Assessment for the Gramalote Project in Colombia

Argonaut Gold Announces Q2 Production of 29,237 Gold Equivalent Ounces. Cash Balance Increases to $54.1 Million. 2 nd Quarter.

Q PRESENTATION

PRUDENTAND DISCIPLINED

Mako Mining Provides Corporate Update

MANAGEMENT S DISCUSSION & ANALYSIS QUARTERLY HIGHLIGHTS SEPTEMBER 30, 2017

PURE GOLD ANNOUNCES POSITIVE PRELIMINARY ECONOMIC ASSESSMENT FOR THE MADSEN GOLD PROJECT

NEWS RELEASE GREAT PANTHER SILVER REPORTS FISCAL YEAR 2014 FINANCIAL RESULTS

Detour Gold Announces 2016 Operating Results and 2017 Guidance

GOLDCORP REPORTS FIRST QUARTER 2016 RESULTS

GOLDCORP PROVIDES A SUMMARY OF FOURTH QUARTER 2018 MILESTONES AND 2019 PRODUCTION AND COST GUIDANCE

Kişladağ Update March 2018

2015 First Quarter Highlights

NEWS RELEASE Lundin Mining Second Quarter Results

EDV EVR NEWS RELEASE. ENDEAVOUR MINING UPDATES HOUNDÉ PROJECT ECONOMICS FOLLOWING INCREASE IN MINERAL RESERVES TO 2.1Mozs

Eldorado Gold Reports Results of Technical Studies

Trevali Reports Record Preliminary Q and 2017 Annual Production, and Provides 2018 Production and Cost Guidance

World s largest silver producing country. Six producing silver mines; 100% owned. Two advanced stage silver projects

AGNICO-EAGLE MINES LIMITED. Corporate Update. May 2012

KINROSS GOLD CORPORATION

ALAMOS GOLD INC. 130 Adelaide Street West, Suite 2200 Toronto, Ontario M5H 3P5 Telephone: (416) or 1 (866)

SILVERCORP REPORTS Q1 RESULTS: NET INCOME UP 73%, CASH FLOWS FROM OPERATIONS UP 52% TO US$20.2 MILLION

January 18, 2016 Capstone Extends Pinto Valley Mine Life to 2039 (all amounts in US dollars)

All-in Sustaining Costs ($/oz)

MANAGEMENT S DISCUSSION AND ANALYSIS FOR THE THIRD QUARTER ENDED SEPTEMBER 30, 2015

Detour Gold Reports Third Quarter 2018 Results

NEWS RELEASE February 15, 2017

Blackwater Gold Project Update. Minerals North. Prince George, BC. April 26, 2017

January 11, 2017 News Release SILVER STANDARD REPORTS FOURTH QUARTER 2016 PRODUCTION RESULTS AND 2017 GUIDANCE

NEWS RELEASE GREAT PANTHER SILVER REPORTS THIRD QUARTER 2018 PRODUCTION RESULTS AND PROVIDES CORPORATE UPDATE

2016 Second Quarter Highlights

Operational Outlook & Update Conference Call November 29, 2018

TSX.V:ORG Page 1 of 7. Orca Gold Inc West Georgia St. Vancouver, B.C., V6C 3E8, Canada Tel: Fax: HIGHLIGHTS

Argonaut Gold Announces Third Quarter 2017 Operating and Financial Results

Corporate Update. June 2013

For Immediate Release Date: July 4, 2017 # ORVANA PROVIDES UPDATE ON DON MARIO OPERATION; ANNOUNCES US$11.3 MILLION DEBT FINANCING

NEWS RELEASE. Lundin Mining Announces 2018 Production Results and Fourth Quarter and Full Year 2018 Results Date

MAG Silver Corp. August 14, 2013

New Gold Delivers on 2017 Production and Cost Guidance and Provides 2018 Outlook (All dollar figures are in US dollars unless otherwise indicated)

Q3 and First Nine Months 2017 Highlights

Transcription:

FIRST MAJESTIC SILVER CORP. Suite 1805 925 West Georgia Street Vancouver, B.C., Canada V6C 3L2 Telephone: (604) 688-3033 Fax: (604) 639-8873 Toll Free: 1-866-529-2807 Web site: www.firstmajestic.com; E-mail: info@firstmajestic.com NEWS RELEASE TSX FR October 16, 2013 NYSE - AG Frankfurt FMV (WKN: A0LHKJ) First Majestic Produces a New Record of 3.37 million Silver Equivalent Ounces First Majestic Silver Corp. ("First Majestic" or the "Company") is pleased to announce that total production at its five operating silver mines in Mexico for the third quarter ending September 30, 2013, reached a new quarterly record of 3,370,457 equivalent ounces of silver, representing a 38% increase compared to the same quarter in 2012. Total silver production for the quarter consisted of 2,689,237 ounces of silver, representing an increase of 22% compared to the same quarter in 2012. In addition, 8,543,551 pounds of lead and 2,232,881 pounds of zinc were produced representing an increase of 158% and 164%, respectively, compared to the same quarter of the previous year. Also, 2,942 ounces of gold were produced, representing an increase of 91% compared to the third quarter of 2012. Keith Neumeyer, President & CEO of First Majestic, states, While the third quarter was another volatile period for silver prices, we continue to make progress with our growth strategy in Mexico. The San Martin mill expansion, which is now complete, marks the third major project completed by First Majestic in 2013, following the recent production start-up of Phase 1 at the Del Toro Silver Mine and the completion of the mill expansion at the La Guitarra Silver Mine. Our operations team deserves to be recognized for a job well done. Production Details Table: Consolidated Production Results Quarter Ended September 30, 2013 Quarter Ended September 30, 2012 % Change over Prior Year s Quarter Ore processed/tonnes milled 641,345 666,688-4% Total production - ounces of silver equivalent 3,370,457 2,438,085 38% Total silver ounces produced 2,689,237 2,205,237 22% Silver Grade (g/t) 202 167 21% Silver Recovery (%) 65% 62% 5% Pounds of lead produced 8,543,551 3,307,944 158%

Equivalent ounces from lead 382,385 99,263 285% Pounds of zinc produced 2,232,881 844,953 164% Equivalent ounces from zinc 88,754 24,577 261% Gold ounces produced 2,942 1,537 91% Equivalent ounces from gold 182,891 91,690 99% Tonnes of iron ore produced 5,203 4,673 11% Equivalent ounces from iron 27,190 17,318 57% Operational Review: The total ore processed during the quarter at the Company's five operating silver mines, La Encantada, La Parrilla, San Martin, La Guitarra and Del Toro, amounted to 641,345 tonnes milled, representing a slight decrease of 4% over the previous quarter primarily due to the continued optimization at the La Encantada mine in addition to the effects of two major hurricanes which hit Mexico in the month of September. Silver grades in the quarter for the five mines remained relatively unchanged from the previous quarter at 202 g/t of silver. Combined silver recoveries averaged 65% in the quarter and remained in line with the second quarter average of 64%. The Company's underground development in the third quarter consisted of 10,923 metres, a 19% decrease compared to 13,479 metres completed in the previous quarter. This decrease is part of a planned reduction of capital expenditures aimed at reducing costs due to the lower metal price environment. During the quarter, six diamond drill rigs were operating at the Company s five operations. The Company completed 7,823 metres of diamond drilling in the quarter, compared to 25,469 metres in the prior quarter, representing a 69% decrease resulting from the previously announced exploration budget cuts. At the Del Toro Silver Mine: Throughput in the new flotation mill averaged 1,061 tpd in the third quarter with head grades of 244 g/t silver, 4.3% lead and 2.8% zinc. Silver recoveries averaged 69% during the quarter compared to 72% from the previous quarter due to a variation in the ore feed from a transition zone between oxides and sulfides. Further testing is underway at the Company s central lab with the objective of improving overall metallurgical recoveries, however, once the new cyanidation circuit is operational, some of these ores will be processed through this circuit. Phase 2 construction, including the Merrill-Crowe area, the clarification circuit, and the installation of two precipitate filter presses and two induction furnaces is nearing completion. Phase 2 includes the addition of a 1,000 tpd cyanidation circuit allowing the facility to produce silver doré bars. Once completed, which is expected in November, the facility will have total capacity of 2,000 tpd. During the quarter, the crushing circuit was expanded to allow for the capacity increase to 2,000 tpd. In addition, the installation of the 12' by 14' oxide ball mill, pumps, motors and other mechanisms for the cyanidation circuit were also completed. During the quarter, tailings filter #3 was successfully installed and tested. Progress continues in regards to the installation of the final tailings filter #4, which is now 95% complete and undergoing 2

initial testing. Filters #1 and #2 are currently in operation. These four tailing filters will be able to handle up to 4,000 tpd and will recycle approximately 80% of the water used throughout the milling process. The construction of the 45 km, 115,000 kw power line from the state of Durango has experienced several delays due to its length and complexities. Originally scheduled for completion in July, then expected by November, the Company s latest estimate for completion is prior to year end. In order to have sufficient power for Phase 2, the National power company, CFE, has arranged to increase the current power levels on the existing 34,000 kw power line by providing up to 6 MW for the interim period until the new power line is completed. This upgrade will allow the Company to commission the cyanidation circuit in November. Once connected to the larger 115,000 kw power line, cost savings are expected to be achieved resulting from the discontinued use of diesel powered generators which are currently working together with the 34,000 kw power line to supply the required power to the operation. In order to conserve capital in 2014, and to better utilize the abundance of oxide ore being produced from the San Juan area, the Company is evaluating the earlier ramping up of the cyanidation circuit to 2,000 tpd and the delay of the construction of the 4,000 tpd shaft and postponing the installation of the second SAG Mill which would be for the purpose of reaching 2,000 tpd through the flotation circuit. The current evaluation underway is determining the capital savings of bringing on the 2,000 tpd cyanidation circuit in 2014 and delaying the expansion of production through the flotation circuit until 2015. It is currently not expected that this modification of the expansion plan at Del Toro will materially affect 2014 production guidance, however, once the evaluation is completed, the Company will release full guidance for the year as it does in normal course in January. Total exploration metres drilled in the third quarter amounted to 2,856 metres, compared to 6,579 metres drilled in the previous quarter as a result of the reduction to the exploration budget. In addition, 1,817 metres of development were completed in the third quarter of 2013, compared to 3,194 metres of development in the previous quarter. During the quarter, one underground drill rig was active at Del Toro. At the La Encantada Silver Mine: The cyanidation mill averaged 2,959 tpd during the quarter consisting of 54% fresh mine ore and 46% of old tailings. Due to a breakdown that occurred in the gear and motor at ball mill #1, a complete upgrade of the motor foundation and gear system was required. The ball mill remained offline for a period of 6 weeks resulting in the reduction of fresh ore processing and the increase of old tailings sent to the plant. The reduction of fresh ore and the increase of tailings feed produced a combined head grade of 228 g/t of silver with a mill recovery of 49%. Ball mill #1 is now fully operational and silver grades and recoveries are back to normal levels. Underground development continues to be focused on new areas within the mine defined by the latest exploration program. Currently, the primary areas of focus are the surrounding ore bodies of the Milagros and San Javier breccia pipes. Additionally, mine development and production continue from the San Francisco vein and the recently discovered "990" and "990-2" chimneys. At the newly discovered Regalo vein, a new area was prepared for long-hole drilling aimed at increasing the production of fresh ore to a rate of 2,000 tpd by the middle of next year. A total of 2,928 metres of exploration drilling was completed in the third quarter, compared to 2,140 metres of drilling in the previous quarter, representing an increase of 37%. In addition, a total of 3,195 metres of underground development were completed in the third quarter, compared to 3,597 metres of development in the previous quarter, representing a decrease of 11%. Three diamond drill rigs are active underground at La Encantada with the objective of defining Reserves and Resources in the newly discovered areas in addition to assisting in mining activities. 3

A substantial portion of the current drilling and develop is for the purpose of the planned release of an updated NI 43-101 Technical Report in the middle of 2014. At the La Parrilla Silver Mine: La Parrilla had excellent results during the quarter and continues to operate above budget. Silver production totaled 866,710 ounces during the quarter, representing a 22% increase from the previous quarter, due to improved silver grades and recoveries. The construction of three new leaching tanks was completed during the quarter allowing for longer leaching times with the objective of further increasing recoveries. Underground development completed in the quarter totaled 2,213 metres compared with 3,088 metres developed in the previous quarter. As part of the planned reduction in exploration spending, a total of 177 metres were drilled in the third quarter compared to 4,065 in the previous quarter. At the San Martin Silver Mine: Due to a heavy rain fall season caused by hurricanes along the Pacific Coast, total silver production reached 339,099 ounces of silver in the quarter representing a decrease of 9% compared to the previous quarter. Silver grades averaged 165 g/t during the quarter and continue to show positive improvement as higher grade ore is processed from the new Rosarios area. The mill expansion from 900 tpd to 1,300 tpd was completed on October 11, 2013 and increased production is already underway. The production ramp up will increase from 900 tpd to 1,200 tpd in the fourth quarter with immediate commercial production. Due to a decision to change out the older 8.5 x 12 ball mill for a new larger 9.5 x 12 ball mill, full capacity to 1,300 tpd is now expected to be reached in the first quarter of 2014. This change does not impact the expected annual operating results and should result in a more reliable operation in future years. At full capacity of 1,300 tpd, San Martin s annual silver production is anticipated to increase by over 50% to approximately 1.4 to 1.6 million ounces of silver in the form of doré bars plus potential upside resulting from higher silver grades and higher gold credits over the life of the mine. Underground development completed in the third quarter totaled 2,267 metres, compared with 2,276 metres of development in the previous quarter. The mine development continues to be focused at the new Rosarios area where seven areas are now in production. One underground drill rig was active within the San Martin property during the quarter. Total metres drilled in the third quarter amounted to 376 metres, compared to 6,133 metres of drilling in the previous quarter. At the La Guitarra Silver Mine: During the third quarter, the full production of silver-gold concentrates were sold under the previously announced new smelter agreement allowing the Company to discontinue concentrate shipments to the La Parrilla mine for further refining. As a result of this new agreement, the Company has achieved a significant reduction in treatment charges and transportation costs. Mine development at the Joya Larga structure within the El Coloso area has now reached 112 metres along the vein. Development continues to advance towards the target production area located approximately 90 metres away from the current face. Initial production from this new area is expected to begin in November at an approximate rate of 100 tpd. During the third quarter, production ore came from areas within the La Guitarra vein which contained higher gold grades in conjunction with lower silver grades. Looking ahead, the average silver grade is 4

expected to improve in the fourth quarter once production commences at the new Joya Larga structure. This new area has indicated grades ranging between 200 g/t to 350 g/t silver. A total of 1,431 metres of development were completed in the third quarter, compared to 1,324 metres of development in the previous quarter. One underground drill rig was active in the third quarter within the La Guitarra property. Total metres drilled in the quarter amounted to 1,486 metres compared to 6,552 metres drilled in the previous quarter. The La Guitarra exploration program continues to focus on defining Reserves and Resources to support an updated NI 43-101 Technical Report scheduled to be released by the middle of 2014. Outlook: With San Martin s mill expansion to 1,300 tpd now complete and ramping up to 1,200 tpd immediately, and with the addition of the new 1,000 tpd cyanidation circuit at Del Toro, the Company expects silver production in the fourth quarter to be very robust. Furthermore, with year-to-date production totaling 9.4 million silver equivalent ounces, the Company expects to meet or exceed its 2013 guidance of producing 12.3 million to 13.0 million silver equivalent ounces. Silver production for the first nine months in 2013 has totaled 7.9 million ounces and remains in line with annual guidance of 11.1 to 11.7 million ounces of silver. First Majestic is a mining company focused on silver production in México and is aggressively pursuing its business plan of becoming a senior silver producer through the development of its existing mineral property assets and the pursuit through acquisition of additional mineral assets which contribute to the Company achieving its aggressive corporate growth objectives. FOR FURTHER INFORMATION contact info@firstmajestic.com, visit our website at www.firstmajestic.com or call our toll free number 1.866.529.2807. FIRST MAJESTIC SILVER CORP. "signed" Keith Neumeyer, President & CEO Cautionary Note Regarding Forward Looking Statements This press release contains "forward-looking statements", within the meaning of the United States Private Securities Litigation Reform Act of 1995 and applicable Canadian securities legislation, concerning the business, operations and financial performance and condition of First Majestic Silver Corp. Forward-looking statements include, but are not limited to, statements with respect to the future price of silver and other metals, the estimation of mineral reserves and resources, the realization of mineral reserve estimates, the timing and amount of estimated future production, costs of production, capital expenditures, costs and timing of the development of new deposits, success of exploration activities, permitting time lines, hedging practices, currency exchange rate fluctuations, requirements for additional capital, government regulation of mining operations, environmental risks, unanticipated reclamation expenses, timing and possible outcome of pending litigation, title disputes or claims and limitations on insurance coverage. Generally, these forward-looking statements can be identified by the use of forward-looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved". Forward-looking statements are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of First Majestic Silver Corp. to be materially different from those expressed or implied by such forward-looking statements, including but not limited to: risks related to the integration of acquisitions; risks related to international operations; risks related to joint venture operations; actual results of current exploration activities; actual results of current reclamation activities; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; future prices of metals; possible variations in ore reserves, grade or recovery rates; failure of plant, equipment or processes to operate as anticipated; accidents, labour disputes and other risks of the mining industry; delays in obtaining governmental approvals or financing or in the completion of development or construction activities, as well as those factors discussed in the section entitled "Description of the Business - Risk Factors" in First Majestic Silver Corp.'s Annual Information Form for the year ended December 31, 2012, available on www.sedar.com, and Form 40-F on file with the United States Securities and Exchange Commission in Washington, D.C. Although First Majestic Silver Corp. has attempted to identify important factors that could cause 5

actual results to differ materially from those contained in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. First Majestic Silver Corp. does not undertake to update any forward-looking statements that are incorporated by reference herein, except in accordance with applicable securities laws. 6