Mining High Grade Gold in Burkina Faso

Similar documents
Mining High Grade Gold in Burkina Faso

Mining High Grade Gold in Burkina Faso

Mining High Grade Gold in Burkina Faso

Mining High Grade Gold in Burkina Faso

Mining High Grade Gold in Burkina Faso

NEWS RELEASE ROXGOLD DELIVERS RECORD GOLD PRODUCTION AND CASH FLOW IN FIRST QUARTER 2018; ANNOUNCES INCREASE IN FULL YEAR PRODUCTION GUIDANCE

Mining High Grade Gold in Burkina Faso

Mining High Grade Gold in Burkina Faso

Mining High Grade Gold in Burkina Faso

High Grade, Low Cost Gold Producer in West Africa. Mining High Grade Gold in Burkina Faso TSX: ROXG

NEWS RELEASE ROXGOLD REPORTS FIRST QUARTER 2017 OPERATING RESULTS AND 2016 FINANCIAL RESULTS

CANADA S INTERMEDIATE GOLD PRODUCER

UNEARTHING THE FUTURE

UNEARTHING THE FUTURE. THE 28 TH ANNUAL GOLD FORUM The Broadmoor, Colorado Springs, Colorado September 2017

GROWTH THROUGH CASH FLOW. Q Results 3 August 2017

Detour Gold Achieves Production and Cost Guidance for 2017 and Provides 2018 Guidance

CANADA S INTERMEDIATE GOLD PRODUCER

Detour Gold Reports Third Quarter 2018 Results

West African Resources awards underground mining contract for M1 South to Byrnecut

Gold production for the quarter of 38,500 ounces with cash flow generation from operations of $18.9 million ( M ).

CANADA S INTERMEDIATE GOLD PRODUCER

Detour Gold Announces 2016 Operating Results and 2017 Guidance

CANADA S INTERMEDIATE GOLD PRODUCER

SEMAFO Reports Cash Flow from Operations of $110 Million in 2018

Corporate Presentation. March 2019

LEAGOLD ANNOUNCES 2018 EARNINGS, INCLUDING AISC OF $974/oz AND AISC MARGIN OF $83.2 MILLION

CANADA S INTERMEDIATE GOLD PRODUCER

Stock Symbol: AEM (NYSE and TSX) For further information: Investor Relations (416)

Detour Gold Reports Fourth Quarter and Full-Year 2014 Results and Year-end 2014 Mineral Reserve and Resource Estimates

SAS REPORTS STRONG 2015 FIRST QUARTER RESULTS

Orvana reports results for the first quarter of fiscal 2014 with adjusted net income of $1.2 million or $0.01 per share

SEMAFO: Positive Mana PFS and Reserve Additions at Mana and Boungou. 5-Year Average Target of 413,000 Ounces of Annual Production, AISC $696

SEMAFO Reports Cash Flow from Operations of $107 Million in Net Income Attributable to Equity Shareholders of $20.0 Million

Corporate Presentation. March 2018

PRESS RELEASE SEMAFO FOR IMMEDIATE RELEASE. SEMAFO: Cash Flow from Operations of $18.4 Million in First Quarter 2018

NEWS RELEASE FOR IMMEDIATE RELEASE

Kişladağ Update March 2018

Q4 and Year End 2012 Conference Call. ArgonautGold.com

Detour Gold Reports 2017 Fourth Quarter and Year-End Results

KINROSS GOLD CORPORATION

1. Production numbers are considered approximate because monthly production has not been reconciled yet for November 2017.

Spanish Mountain Gold Announces Results of New PEA for the First Zone

TSX:AR CORPORATE PRESENTATION

LEAGOLD FILES UPDATED TECHNICAL REPORT FOR LOS FILOS GOLD MINE, INCREASING RESERVES BY 59% TO 2.7 MILLION OUNCES GOLD

YEAR END 2015 CONFERENCE CALL

Claude Produces 15,722 Ounces of Gold in Q3 and Improves Full Year Guidance

Claude Produces 20,672 Ounces of Gold in Q1

Trevali Reports Record Preliminary Q and 2017 Annual Production, and Provides 2018 Production and Cost Guidance

SIMPLE & LEAN PRODUCER

PRIMERO ACHIEVES 2016 REVISED PRODUCTION AND COST GUIDANCE;

Q P R E S T E A P E A R E S U L T S

Detour Gold Reports First Quarter 2018 Results and Provides Update on Mine Plan Assessment with Guidance Revisions for 2018

Forward Looking Statement

NEWS RELEASE. Centerra Gold Reports 2009 Gold Production of 675,592 ounces

PRESS RELEASE. Banro Announces Q Financial and Operating Results

Three months ended Twelve months ended December 31, December 31, US$ Millions (except per share amounts)

2018 A Transformational Year Rod Antal, President & Chief Executive Officer

Detour Gold Updates Life of Mine Plan for Detour Lake

INTERIM QUARTERLY HIGHLIGHTS

Metro Toronto Convention Centre March 6 March 9, 2016 Toronto, Canada Booth 2724

ANNUAL GENERAL MEETING APRIL 28, 2017

Detour Gold Reports Second Quarter 2017 Results

EDV EVR NEWS RELEASE. ENDEAVOUR MINING UPDATES HOUNDÉ PROJECT ECONOMICS FOLLOWING INCREASE IN MINERAL RESERVES TO 2.1Mozs

Eldorado Gold Reports Results of Technical Studies

Orezone Announces Positive Preliminary Economic Assessment

KINROSS GOLD CORPORATION

Argonaut Gold Announces First Quarter 2018 Operating and Financial Results

Q Results. Conference Call. October 26, Kışladağ, Turkey

ELGIN MINING PROVIDES STRONG FOURTH QUARTER CASH COSTS AND POSITIVE 2014 OUTLOOK

Pretivm Reports Third Quarter 2018 Results

NEWS RELEASE GREAT PANTHER SILVER REPORTS THIRD QUARTER 2018 PRODUCTION RESULTS AND PROVIDES CORPORATE UPDATE

TOREX REPORTS FIRST QUARTER 2017 FINANCIAL AND OPERATIONAL RESULTS (All amounts expressed in U.S. Dollars unless otherwise stated)

NEWS RELEASE February 15, 2017

March 2016 Prospectors & Developers Conference Toronto, Canada

RICHMONT MINES INC. REPORT TO SHAREHOLDERS Q Third Quarter ended September 30, 2016

For further information: Investor Relations (416)

Jaguar Mining Reports Q Operating Performance and Improving Costs; On Track to Achieve 2018 Gold Production of 95, ,000 Ounces

Detour Gold Reports Second Quarter 2018 Results and Reaffirms Guidance for 2018

GOLDEN STAR ACHIEVES 2017 PRODUCTION GUIDANCE AND PROVIDES GUIDANCE FOR % increase in gold production in 2017 compared to 2016

SUITE WEST HASTINGS STREET VANCOUVER, BC V6C 2W2 CANADA TEL: FAX: November 12, 2009

HARTE GOLD CORP. Management s Discussion and Analysis of Financial Condition and Results of Operations for the 12 months ended December 31, 2016

HBM. Creating Sustainable Value through High Quality Long Life Deposits

Revenues of $152.0 million on gold sales of 113,845 ounces at an average realized price of $1,281 per ounce

Kışladağ Update and Consolidated Outlook

Jaguar Mining Reports Q4 and Full Year 2017 Production and Provides 2018 Outlook

Skouries Update March 2018

Three and six months ended June 30, 2014 and (Expressed in Thousands of United States Dollars)

STRATEGY. DISCIPLINE. EXECUTION. FEBRUARY 15, 2013 FOURTH QUARTER CONFERENCE CALL

Annual & Special Meeting of Shareholders Tuesday, May 2, 2017

Trevali Reports 2017 Annual Financial Results

RNC MINERALS Results Conference Call TSX:RNX. April 3, 2018

A Leading High-Grade Underground Gold Producer Q4 & Full Year 2018 Results

TSX.V:ORG Page 1 of 7. Orca Gold Inc West Georgia St. Vancouver, B.C., V6C 3E8, Canada Tel: Fax: HIGHLIGHTS

Argonaut Gold Announces Third Quarter 2018 Operating and Financial Results

Capstone Mining 2017 Production Results and 2018 Operating and Capital Guidance

SAS REPORTS 2013 THIRD QUARTER RESULTS, WITH A SIXTH CONSECUTIVE QUARTER OF POSITIVE CASH FLOW FROM OPERATIONS

Jaguar Mining Reports Second Quarter Financial Results; Revises 2018 Production Guidance

Mako Mining Provides Corporate Update

FIRST MAJESTIC SILVER CORP.

A Story of Transformation

Transcription:

Mining High Grade Gold in Burkina Faso 2017 Fourth Quarter and Full Year Financial Results March 29, 2017 1

Cautionary Statement This presentation contains forward-looking information. Forward looking information contained in this presentation includes, but is not limited to, statements with respect to: (i) the estimation of measured, inferred and indicated mineral resources and proven and probable mineral reserves including, without limitation, statements with respect to the potential establishment of new mineral resources and/or reserves and the expansion potential of existing mineral resources/reserves and the expansion potential of mining operations including with respect to proposed development at Bagassi South and the anticipated production, cost, funding, benefits and timing thereof; (ii) proposed exploration and development activities (including proposed plant expansion and the 2018 proposed drilling program), and the anticipated nature, cost, success and timing thereof; (iii) production, earnings and cost guidance as well as future sources of funding, capital expenditures and exploration budgets, (iv) permitting; and (v) expansion and growth potential and the anticipated timing thereof including the anticipated production for 2018 at Bagassi South and the timing thereof, and future economics and development activities related thereto and; (vi) expectations the Company will be within its 2018 cost guidance; (vii) statements that are not of historical fact. For further details regarding the Yaramoko project, please refer to the technical report entitled Technical Report for the Yaramoko Gold Mine, Burkina Faso dated December 20, 2017 (the Technical Report ) as well as the press releases of Roxgold Inc. (the Company ) dated April 18, 2017 and the November 6, 2017, Bagassi South Feasibility Study news release. These statements are based on information currently available to the Company and the Company provides no assurance that actual results will meet management's expectations. In certain cases, forward-looking information may be identified by such terms as "anticipates", "believes", "could", "estimates", "expects", "may", "shall", "will", or "would". Forward-looking information contained in this presentation is based on certain factors and assumptions regarding, among other things, the estimation of mineral resources and mineral reserves (and potential establishment and increases in respect thereof), the potential expansion of mining operations, the realization of resource estimates and reserve estimates, gold metal prices, the timing and amount of future exploration and development expenditures, and materials to continue to explore and develop the Yaramoko project in the short and long-term, the progress of exploration and development activities, the receipt of necessary regulatory approvals and permits, and assumptions with respect to currency fluctuations, environmental risks, title disputes or claims, and other similar matters. While the Company considers these assumptions to be reasonable based on information currently available to it, they may prove to be incorrect. Forward looking information involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking information. Such factors include risks inherent in the exploration, risks relating to variations in mineral resources and mineral reserves, grade or recovery rates resulting from current exploration and development activities (including risks that new mineral resources and/or reserves may not be established, or the anticipated expansion potential of existing mineral resources/reserves or mining operations may not be realized), risks relating to changes in gold prices and the worldwide demand for and supply of gold, risks related to increased competition in the mining industry generally, risks related to current global financial conditions, uncertainties inherent in the estimation of mineral resources and mineral reserves, access and supply risks, reliance on key personnel, operational risks inherent in the conduct of mining activities including the risk of accidents, labour disputes, increases in capital and operating costs and the risk of delays or regulatory risks, including risks relating to the acquisition of the necessary licenses and permits, capitalization and liquidity risks, risks related to disputes concerning property titles and interest, and environmental risks, as well as the assumptions and risks set forth in the Technical Report. Please refer to the 2017 Management s Discussion and Analysis filed on SEDAR at www.sedar.com on March 28, 2018, for political, environmental or other risks that could materially affect the development of mineral resources and mineral reserves and other forward looking matters. This list is not exhaustive of the factors that may affect any of the Company's forward-looking information. These and other factors should be considered carefully and readers should not place undue reliance on the Company's forward-looking information. The Company does not undertake to update any forward-looking information that may be made from time to time by the Company or on its behalf, except in accordance with applicable securities laws. Unless stated otherwise herein, the following Qualified Persons, as defined in National Instrument 43-101, have prepared or supervised the preparation of the scientific or technical information presented in this presentation: Benny Zhang, P. Eng (SRK Consulting Canada Inc.), Sebastien Bernier (SRK Consulting Canada Inc.), Paul Criddle, Chief Operating Officer (Roxgold), Craig Richards (Roxgold) and Yan Bourassa (Roxgold). All amounts are in U.S. dollars unless otherwise stated. 2

2017 Fourth Quarter and Full Year Conference Call Participants John Dorward President & CEO Natacha Garoute CFO Paul Criddle COO Yan Bourassa VP, Geology Eric Pick VP, Business Development 3

2017 Fourth Quarter Highlights 108,094 t Ore Mined 35,016 oz Gold Production $417 Cash Operating Cost 1 /oz $22.0 Cash Flow from Mining Operations 1 70,815 t Ore Processed $45.5M In Revenue $609 All-In Sustaining Cost 1 /oz $0.06 Cash Flow from Mining Operations per Share 1 1. This is a non-ifrs financial performance measure with no standard definition under IFRS. See the non- IFRS financial performance measure section of the Company s 2017 MD&A available on the Company s website at www.roxgold.com or www.sedar.com 4

2017 Full Year Highlights >4,000,000 Hours Free of Lost Time Injuries ( LTI ) 126,990 oz Gold Production $438 Cash Operating Cost 1 /oz $83.9M Cash Flow from Mining Operations 1 $159.4M In Revenue 126,555 oz Gold Sold $740 All-in Sustaining Cost 1 /oz $0.23 Cash Flow from Mining Operations per Share 1 1. This is a non-ifrs financial performance measure with no standard definition under IFRS. See the non- IFRS financial performance measure section of the Company s 2017 MD&A available on the Company s website at www.roxgold.com or www.sedar.com 5

Safety Statistics Rolling twelve month period Currently more than 4 million hours Lost Time Injury free Strong safety culture established Over 18,000 hours of health and safety training programs in 2017 6

Au oz Produced Exceeded Increased 2017 Production Guidance 35,594 63,564 91,974 Q4 2017 Highlights Record tonnes mined of 108,094 leading to record quarterly throughput of 70,815 tonnes Produced 35,016 ounces of gold and sold 34,876 ounces during the quarter 7

Beat and Achieved Low End of 2017 Cost Guidance While Investing in Underground Development Cash Operating Cost 1 (oz/produced) All-in Sustaining Cost 1 (oz/sold) $445 $490 GUIDANCE RANGE $740 $790 GUIDANCE RANGE $438 ACTUAL FY2017 $740 ACTUAL FY2017 1. This is a non-ifrs financial performance measure with no standard definition under IFRS. See the non- IFRS financial performance measure section of the Company s 2017 MD&A available on the Company s website at www.roxgold.com or www.sedar.com 8

2017 Operational Highlights Ore Development (m) Gold Produced (ounces) Q1 Q2 Q3 Q4 2017 Gold Produced (ounces) 35,594 27,970 28,410 35,016 126,990 Gold Sold (ounces) 3 34,979 28,788 27,912 34,876 126,555 Ore Mined (tonnes) 69,237 66,044 76,480 108,094 319,855 Ore Processed (tonnes) 63,955 65,159 66,670 70,815 266,599 1,200 1,000 800 600 400 200 0 40,000 35,000 30,000 25,000 20,000 15,000 10,000 5,000 0 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Head Grade (g/t Au) 17.3 12.8 13.6 17.6 15.3 Ore Mined (tonnes) Ore Processed (tonnes) Gold Recovery (%) 99.2 99.0 98.6 99.1 98.9 Mill Operating Time (%) 94.0 97.2 95.8 97.6 96.2 120,000 100,000 80,000 60,000 40,000 20,000 0 70,000 60,000 50,000 40,000 30,000 20,000 10,000 Q1 Q2 Q3 Q4 0 Q1 Q2 Q3 Q4 9

2017 Operational Highlights: Ore Processed and Gold Recovery 72,000 70,000 68,000 66,000 64,000 62,000 60,000 Ore Processed (tonnes) Q1 Q2 Q3 Q4 100.0 99.0 98.0 97.0 96.0 95.0 94.0 93.0 92.0 91.0 90.0 Ore Processed (tonnes) Gold Recovery (%) 10

2017 Financial Highlights Q4 2017 FY 2017 Gold produced (ounces) 35,016 126,990 Gold sold (ounces) 34,876 126,555 Revenue $45M $159M Average realized gold price $1,270/oz $1,260/oz Cash operating cost 1 $417/oz $438/oz Total cash cost 1 (per ounce sold) $488/oz $491/oz Sustaining capital cost 1 (per ounce sold) $67/oz $202/oz Site all-in sustaining cost 1,2 (per ounce sold) $554/oz $692/oz Corporate, sustaining and in-country costs 1 $55/oz $48/oz All-in sustaining cost 1 (per ounce sold) $609/oz $740/oz Cash flow from mining operations 1 $22M $84M Cash flow from mining operations per share 1 $0.06/C$0.07 $0.23/C$0.28 Adjusted earnings per share 1 $0.02/C$0.03 $0.08/C$0.10 Cash Operating Cost 1 $438/oz Produced All-In Sustaining Cost 1 $740/oz Sold Cash Balance US$63M Gold Production 126,990 oz Cash Flow From Mining Operations Per Share 1 $0.23/C$0.28 1. This is a non-ifrs financial performance measure with no standard definition under IFRS. See the non-ifrs financial performance measure section of the Company s 2017 MD&A available on www.roxgold.com or www.sedar.com 2. Site All-in sustaining costs excludes corporate G&A and in-country corporate costs. 11

2017 Full Year Cash Position In millions of U.S. dollars 12

Balance Sheet Strength Cash and Debt position change from December 31, 2016 to December 31, 2017 Face Value of Long-term debt 1 reduced by $28 million $64.8 M Cash on Hand and NWC 2016 2017 $75.0M Long-term debt 1 $71.8 M Cash on Hand and NWC $46.9M Long-term debt 1 Cash and NWC LTD Face value Cash and NWC LTD 1. Long-term debt face value represents the remaining balance owing on the Amended Facility. 13

Bagassi South Expansion 14

Bagassi South Second High-Grade, Low Cost Underground Mine ~40% increase in Yaramoko gold production Estimated average gold production of 40,000 oz per year Cash Operating Cost 1 $361 per oz (LOM) All-in Sustaining Cost 1 $630 per oz (LOM) Funded by internal cash flow Pre-production capital - $29.6 million Utilizes synergies with the existing Yaramoko operation personnel and equipment Early works at site have commenced including boxcut construction for underground portal First ore expected Q4 2018 1. This is a non-ifrs financial performance measure with no standard definition under IFRS. See the non- IFRS financial performance measure section of the Company s 2017 MD&A available on the Company s website at www.roxgold.com or www.sedar.com 15

Process Plant Expansion Progressing Well Expanded crushing circuit Expanded gold room Expanded leaching circuit Plant expansion sees throughput increased from 750 tonnes per day ( tpd ) to 1,100 tpd Engineering and procurement activities are advanced with key lump sum contracts executed Contractor has commenced construction Expansion expected to be completed on schedule in Q4 Low voltage switch room and transformer Additional water tank 16

Growth 17

Focus on Exploration Siou 10 Km Large regional land package of approximately 230 km 2, located on the Houndé Belt Yaramoko Niankongo Boni Shear North Boni Shear Central Yaro 300 Zone Haho 109 Zone 55 Zone 55 Zone Majority of known anomalies and deposits are located along the Boni Shear regional break and the second order Yaramoko Shear 2017 drilling program focused mostly on resource growth at depth at the 55 Zone and resource conversion at Bagassi South - 65,000 meters drilled in 2017 Legend Basaltic Flows Tonalite Granite Granodiorite Tarkwaian Basin Volcaniclastic Houko Bagassi South Kaho 2018 drilling program will shift to a more regional focus with drilling along the Boni Shear, Haho, Kaho and Houko - 64,000 metres of drilling planned for 2018 Two large auger grids on the Houko concession and Tarkwaian basin Hounde Project 12 Km 18

Yaramoko Induced Polarization (IP) Compilation Ground Geophysical IP Compilation: Primary geophysical tool Exploring for late Eburnean dextral reactivation within the Yaramoko granite 2017 Boni Grid 2017 Houko Grid 2014 Bagassi Grid Boni Shear Anomalies Haho Anomaly Several areas of regional disruption of structural fabric Potential extension of 55 Zone on western portion of the concession Currently drilling Boni Shear and Haho anomalies with three drill rigs Legend Basaltic Flows Granodiorite 55 Extension 55 Zone Bagassi South Tonalite Tarkwaian Basin Granite Volcaniclastic Kaho Anomaly 19

2018 Guidance Gold production of 110,000 120,000 oz Cash Operating Cost (per ounce produced) 1 $450-$500 AISC (per ounce sold) 1 $780-$830 Site AISC (per ounce sold) 2 $730-$780 Bagassi South Pre-Production Capital Expenditure $30 million Exploration Budget $9 million 1. This is a non-ifrs financial performance measure with no standard definition under IFRS. See the non-ifrs financial performance measure section of the Company s 2017 MD&A available on www.roxgold.com or www.sedar.com 2. Site All-in sustaining costs excludes corporate G&A and in-country corporate costs. 55 Zone Operations Update Since October 2017, daily mine production averaged 1,124 tonnes per day ( tpd ) or 50% above nameplate capacity of 750 tpd Tonnes from stoping increasing from 55% in October 2017 to 80% in January 2018 Run-of-Mine stocks totalled ~40,000 tonnes at 14.9 g/t Au as of end of January 2018 January achieved a record month of 24,363 tonnes milled at an average rate of 785 tpd Average of 98.8% recovery rate to date since commissioning 20

Q&A Kelley Stamm Investor Relations & Communications Manager 360 Bay Street, Suite 500 Toronto, ON M5H 2V6 kstamm@roxgold.com www.roxgold.com 416 203 6401 21