Anticipated Well Cost Guidelines (Third Edition)

Similar documents
PIONEER OIL AND GAS TERMS OF PURCHASE COLEMAN LEASE WASATCH AND DUCHESNE COUNTIES, UTAH

8/28/13: Luchini and Mertz Land Surveying Company staked location. DC: $3,250 TDC: $3,250

DRILLING WELL REVIEWS

Procurement of Works

ENERGY (LOCAL CONTENT) REGULATIONS, 2014

Control of Well or Operators Extra Expense Insurance. Paddy Miller Aon Limited, Energy

OIL & GAS SERVICE CONTRACTOR SUPPLEMENTAL

OIL & GAS SERVICE CONTRACTOR SUPPLEMENTAL

PST-14 Issued: December 1995 Revised: March 26, 2018 INFORMATION FOR OIL AND NATURAL GAS PRODUCERS

Oil Well Potential Test, Completion or Recompletion Report, and Log

MODIFIED REQUEST FOR PROPOSALS. PROFESSIONAL SERVICES FOR FD Training & Logistics Facility Geothermal Test Well Activity ID

Casing Design Workshop: Alternatives and Contingencies. (Last Updated 16 December 2015) COPYRIGHT

Petroleum Rules, 2041 (1985)

Company Announcements Office Australian Securities Exchange By e-lodgement

TORQUE: STRONG & COMMITTED MISSION STATEMENT

NATIONAL OILWELL VARCO REPORTS FIRST QUARTER 2017 RESULTS

DIRECTIONAL DRILLING. BSA AGM Presentation, 13 th October Peter Shannon, Legal Partner

Investor Presentation. August 2013

Navigational Table of Contents

CAPITAL WORKPAPERS TO PREPARED DIRECT TESTIMONY OF PHILLIP E. BAKER ON BEHALF OF SOUTHERN CALIFORNIA GAS COMPANY

NEWS Contact: Loren Singletary (713) NATIONAL OILWELL VARCO REPORTS FOURTH QUARTER AND FULL YEAR 2018 RESULTS

NAFTA a.s., Votrubova 1, Bratislava. Tender Documents. Name of the Commercial Public Tender (hereinafter referred to as "Tender"):

Oil & Gas Supplemental Questionnaire 800 Gessner, Suite 600 Houston, Texas Submissions:

#161. Connecting Garage Door Jambs to Building Framing. Introduction

Oil and Gas Board Chapter STATE OIL AND GAS BOARD OF ALABAMA GOVERNING COALBED METHANE GAS OPERATIONS ADMINISTRATIVE CODE

NATIONAL OILWELL VARCO INC

AADE Symposium 2010 Eagle Ford Shale Overview. Presented by Morgan P. O Brien Drilling Manager Western Region January 20, 2010

Oil & Gas Supplemental Questionnaire

Discovered Small fields

GEOTHERMAL DEVELOPMENT BY PUBLIC PRIVATE PARTNERSHIP- A CASE STUDY OF MENENGAI 105 MW PROJECT

Ellen Cody Sales and Use Tax Senior Manager

NATIONAL OILWELL VARCO INC

Enercom Oil & Gas Conference August 16, Marshall Dodson Senior Vice President & Chief Financial Officer

Risk and Uncertainty Management Best Practices and Misapplications for Cost and Schedule Estimates SPE 97269

American Petroleum Institute Purchasing Guidelines Purchase API Spec 8C online at Table of Contents

Global Geothermal Development Plan

PLANNING OF GEOTHERMAL PROJECTS IN KENYA

CONTENTS. Gold Oil Plc

Applying for a Kinder Morgan Canada. Proximity Permit. Design and Construction Guidelines CANADA

4101: Existing boilers and pressure vessels.

Schlumberger and Cameron

GS500 Instruction manual

( ) Page: 1/6 NOTIFICATION UNDER ARTICLE 12.1(A) OF THE AGREEMENT ON SAFEGUARDS ON INITIATION OF AN INVESTIGATION AND THE REASONS FOR IT

Joint Rig Committee Well Review Guideline

Changing the way clients think about producing energy. INVESTOR PRESENTATION December 2014

13 NCAC is amended with changes as published in 31:09 NCR as follows:

For personal use only

Province of British Columbia. BC-23 APPLICATION FOR GAS COST ALLOWANCE For Reporting Production Periods Prior to October 2018 LAND COSTS INCURRED $

Guidelines for Geothermal Projects The Verification Process for Geothermal Projects

JEFFERIES 2014 ENERGY CONFERENCE. November 12 th, 2014

RST INSTRUMENTS LTD.

Recommended Rules for the Care and Operation of Heating Boilers

REVISED WORKPAPERS TO PREPARED DIRECT TESTIMONY OF NEIL P. NAVIN ON BEHALF OF SOUTHERN CALIFORNIA GAS COMPANY BEFORE THE PUBLIC UTILITIES COMMISSION

North Carolina Rate Bureau

V. LIMITATIONS ON THE USE OF THE INDEXES

Submersible Pump Sizing & Selection. Presented by National Exploration, Wells & Pumps

Modernized Royalty Framework (MRF)

Accounting petroleum practices for tangible and intangible costs and materials transfers under IFRS, US GAAP, Joint Arrangement and Production Sharing

DRILCO OIL & GAS, INC. Managing General Partner. P.O. Box 385 Grantsville, WV Office (304) Fax (304) Cell (304)

Stellar Resources plc. ("STG, the Company ) Interim Results for the six months ended 30 June 2014

March 2018 Quarterly Report & Appendix 5B

December 19, Gross (100 Percent) Reserves Sales Total Sales Total (1) Category (BCF) (MMBBL) (MMBBL) (MMBBL) (BCF) (MMBBL) (MMBBL) (MMBBL)

Archer overview Dag Skindlo Chief Financial Officer. 13 September 2018

UBS GLOBAL OIL & GAS CONFERENCE. May 20 th, 2015

The Oil and Gas Conservation Regulations, 1985

SCOTIA HOWARD WEIL 2018 ENERGY CONFERENCE

Procurement of Services

DUG Operator Spotlight: Pioneer Natural Resources Exceptional Eagle Ford Shale. October 15, 2012

Project Lynx April 26, 2017 AGM Corporate Update

2005 ANNUAL REPORT Directional Plus The Directional Company CAT Downhole Tools Tier One Oil Services Advance Wireline Xtreme Wireline

UBS GLOBAL OIL AND GAS CONFERENCE

For personal use only GAS2GRID LIMITED A.B.N

WELLS FARGO SECURITIES 3 rd ANNUAL WEST COAST ENERGY CONFERENCE

PIPELINE INVESTIGATION REPORT P07H0014 CRUDE OIL PIPELINE RUPTURE

Pareto Oil & Offshore Service Conference. CEO Alf C Thorkildsen September 2010

ML Investments 2-3 and State 1-16

177. PROFILE ON THE PRODUCTION OF METALLIC CONTAINERS

Third Quarter 2018 Update

to the customer, remain so and clarified that those who are working within the well site are vendors as contractor law does not apply.

Tuscany has built a large inventory of horizontal oil locations

Draft Post Oak Savannah Groundwater Conservation District Groundwater Well Assistance Program (GWAP)

FORM F1 STATEMENT OF RESERVES DATA AND OTHER OIL AND GAS INFORMATION. Oil and Gas Reserves and Net Present Value of Future Net Revenue

ASX RELEASE 28 February, Half Year Ended 31 December 2006

DRILLING TO RE-COMMENCE AT FOUR EAGLES GOLD PROJECT

Validation of the Draft Reports for the Review of MPoA, Abuja Call and AU Roadmap and Preparation of the 2014/15 MNCH Status Report.

RISK ASSESSMENT AND RISK MODELLING IN GEOTHERMAL DRILLING

Simmons & Company Energy Conference. March 5 th, 2015

ISAPP field development optimization challenge

SP t2 12oO faah$ffi,4

To Our Shareholders: Outlook

STATEMENT OF RECEIPTS AND EXPENDITURE FOR THE YEAR ENDED 31 DECEMBER 2015 A.W. THOMAS L.P. CHARTERED CERTIFIED ACCOUNTANTS

PAN ORIENT ENERGY CORP. Press Release Third Quarter Financial & Operating Results

Guidance for Notification of Incidents. Part of the Petroleum Safety Framework

Casing Design Workshop: Final Surface Casing Design with Combined Loads Exercise. (Last Updated 16 December 2015) COPYRIGHT

Oil and Gas Incentives: EOR and Marginal Well Credits

Quarterly Report Period ended 30 September 2017

Halliburton, Investor Relations 281/

Capacity Building Workshop on the Role of Capital Markets in Mobilizing Domestic Resources in Africa. Draft Concept Note

Contact: Loren Singletary (713) NATIONAL OILWELL VARCO REPORTS FOURTH QUARTER AND FULL YEAR 2017 RESULTS

Enercom 2018 The Oil & Gas Conference August 22, J. Marshall Dodson Senior Vice President and Chief Financial Officer

Transcription:

AFRICAN UNION UNION AFRICAINE UNIÃO AFRICA Department of Infrastructure and Energy GEOTHERMAL RISK MITIGATION FACILITY FOR EASTERN AFRICA (GRMF) Anticipated Well Cost Guidelines (Third Edition) Project funded by: TECHNICAL CONSULTANT

Third Edition (2015) AWC Guidelines Page 2/13 Contact African Union Commission Roosevelt Street, W21K19; P.O. Box 3243 Addis Ababa, Ethiopia Philippe NIYONGABO Head of Energy Division Infrastructure & Energy Department Phone: +251 11 518 2420 E-mail: grmf@africa-union.org Internet: www.grmf-eastafrica.org

Third Edition (2015) AWC Guidelines Page 3/13 Content 1 BACKGROUND... 4 2 SLIM HOLE WELLS... 5 3 STANDARD SIZE RESERVOIR CONFIRMATION WELLS... 8 4 LARGE DIAMETER RESERVOIR CONFIRMATION WELLS... 11

Third Edition (2015) AWC Guidelines Page 4/13 1 BACKGROUND Applicants shall estimate costs for their proposed drilling programme in line with these Anticipated Well Cost (AWC) Guidelines. The AWC Guidelines specify the cost structure for standard drilling cost items, such as casing, cementing, rig hire, necessary services or consumables (so-called AWC items) for drilling projects applying for funding by the Geothermal Risk Mitigation Facility (GRMF). For each individual AWC item, the maximum percentage of items cost that can be allocated to this item is stated. Different maximum percentages are given for wells of different types, diameters and depth intervals. The AWC Guidelines also outline the maximum total drilling metre costs taking into account the total cost of AWC items A-X. It is however to be noted that rig mobilisation and rig demobilisation are not accounted for in the metre price calculation, as may be seen in the AWC Guideline tables below. metre prices are stated for different types of well, diameters and depths intervals. Only costs directly associated with the drilling are eligible. The AWC Guideline tables exclude a number of eligible, either mandatory or optional goods and services (so-called non-awc items), since as a percentage, the non-awc items will vary significantly depending on how many wells are in the programme and on the specific drilling programme. All costs for these non-awc items must still be clearly justified in the technical Application and stated as separate cost items in the cost estimate. They will be assessed separately. Where an Applicant plans to use its own resources for drilling (for example if it owns the rig), non-awc items are eligible but will be rigorously verified to make sure they are reasonable and in line with market prices. Any exceedance over the indicated maximum percentage or maximum drilling metre cost need to be substantially justified in order to allow for a case to case assessment and an evaluation of their exceptional acceptability. At the same time, Applicants need to justify that the equipment is appropriate for the envisaged drilling plan, diameter, depth, draw capability etc. This shall be done in the technical Application. The following tables are broken down by well diameter (slim hole / standard size / wide diameter), for several depth ranges and for whether they are vertical or directional. For deviated wells, the numbers are given based on a Kickoff Point (KOP) of 450 m and a deviation of 30.

Third Edition (2015) AWC Guidelines Page 5/13 2 SLIM HOLE WELLS Slim hole wells are defined as wells with < 5" diameter of the last casing or liner. A typical slim hole sizes are shown in Table 1. The following two pages give the AWC Guideline values for slim hole vertical and deviated wells. Table 1: Slim Hole Well Sizes. Hole Diameter, OD* Casing Diameter / Casing weight Drilled depth, TD* Cased Depth, TD 17-1/2" 13-3/8" / 68 ppf* 0-100 (150) m 0-100 (150) m 12-1/4" 9-5/8" / 47 ppf 100 (150)-400 (600) m 0-400 (600) m 8-1/2" 7" / 23 ppf 400 (600)-700 (1000) m 0-700 (1000) m 6" 4-1/2" slotted liner 700 (1000)-2500 m 700 (1000)-2500 m *OD: outer diameter; ppf: pounds per foot; TD: total depth

Third Edition (2015) AWC Guidelines Page 6/13 SLIM Hole - VERTICAL Bottom of conductor pipe to 450 m 450 m to 1500 m 1500 m to beyond total percentage to percentage to AWC cost per cost per me- cost Item Description percentage to cost metre drilled cost tre drilled Rig move in 10% A Site Preparation including Conductor Pipe 8% B Consultancy / Management 3% 3% 3% C Cementing 10% 9% 10% D Directional Drilling E Drilling Fluids, Compressors 5% 6% F Drilling Tools Rental G Bits 6% 6% 6% H BOP and Rotating Head 2% 2% 2% I Well Logging 5% 5% 5% J Casing 1 1 1 K Casing Accessories and Liner Adapter 1% 1% 1% L Surface Logging - Mud Logging $650,00 $900,00 M Fuels and Oils 8% 8% 8% N Water Supply Pumps Rental and Water 5% 5% 5% O Wellhead and Valves 2% 2% 2% P Rig Operating Day Rate 30% 30% 30% Q Camp Day Rate including Telecommunication R Welding and X-Ray Services 1% 1% 1% S Pipe Inspection and Hardbanding Services 1% 1% 1% T Support Services, Wellsite Security, Transport of Personnel U Documentation and reports 1% 1% 1% V Contingency on long lead items 5% 5% 5% W Contingency on services 5% 5% 5% X Other contingencies 5% 5% 5% Rig move out maximum 10% cost per metre drilled $1.100,00

Third Edition (2015) AWC Guidelines Page 7/13 SLIM Hole - DEVIATED: KOP=450 m Bottom of conductor pipe to 450 m 450 m to 1500 m 1500 m to beyond total percentage to percentage to AWC cost per cost per me- cost Item Description percentage to cost metre drilled cost tre drilled Rig move in 10% A Site Preparation including Conductor Pipe 8% B Consultancy / Management 3% 3% 3% C Cementing 10% 9% 10% D Directional Drilling E Drilling Fluids, Compressors 5% 6% F Drilling Tools Rental G Bits 6% 6% 6% H BOP and Rotating Head 2% 2% 2% I Well Logging 5% 5% 5% J Casing 1 1 1 K Casing Accessories and Liner Adapter 1% 1% 1% L Surface Logging - Mud Logging $750,00 $1.050,00 M Fuels and Oils 8% 8% 8% N Water Supply Pumps Rental and Water 5% 5% 5% O Wellhead and Valves 2% 2% 2% P Rig Operating Day Rate 30% 30% 30% Q Camp Day Rate including Telecommunication R Welding and X-Ray Services 1% 1% 1% S Pipe Inspection and Hardbanding Services 1% 1% 1% T Support Services, Wellsite Security, Transport of Personnel U Documentation and reports 1% 1% 1% V Contingency on long lead items 5% 5% 5% W Contingency on services 5% 5% 5% X Other contingencies 5% 5% 5% Rig move out 10% cost per metre drilled $1.200,00

Third Edition (2015) AWC Guidelines Page 8/13 3 STANDARD SIZE WELLS Standard size wells are defined as wells with 5" but < 9-5/8" diameter of the last casing or liner. Typical standard sized well sizes are shown in Table 2. The following two pages give the AWC Guideline values for standard size vertical and deviated wells. Table 2: Standard Size Well Sizes. Hole Diameter, OD* Casing Diameter / Casing weight Drilled depth, TD* Cased Depth, TD 26" 20" / 94 ppf* 0-100 (150) m 0-100 (150) m 17-1/2" 13-3/8" / 68 ppf 100 (150)-400 (600) m 0-400 (600) m 12-1/4" 9-5/8" / 47 ppf 400 (600)-700 (1000) m 0-700 (1000) m 8-1/2" 7" / 23 ppf slotted liner 700 (1000)-2500 m 700 (1000) m 2500 m *OD: outer diameter; ppf: pounds per foot; TD: total depth

Thrid Edition (2015) AWC Guidelines Page 9/13 Standard Size - VERTICAL Bottom of conductor pipe to 450 m 450 m to 1500 m 1500 m to beyond percentage to percentage to cost per metre cost per me- cost Item Description percentage to cost drilled cost tre drilled Rig move in 11% A Site Preparation including Conductor Pipe 10% B Consultancy / Management 3% 3% 3% C Cementing 10% 9% 10% D Directional Drilling E Drilling Fluids, Compressors 5% 6% F Drilling Tools Rental G Bits 6% 6% 6% H BOP and Rotating Head 2% 2% 2% I Well Logging 5% 5% 5% J Casing 1 1 1 K Casing Accessories and Liner Adapter 1% 1% 1% L Surface Logging - Mud Logging $1.250,00 $1.400,00 M Fuels and Oils 8% 8% 8% N Water Supply Pumps Rental and Water 5% 5% 5% O Wellhead and Valves 2% 2% 2% P Rig Operating Day Rate 32% 32% 32% Q Camp Day Rate including Telecommunication R Welding and X-Ray Services 1% 1% 1% S Pipe Inspection and Hardbanding Services 1% 1% 1% T Support Services, Wellsite Security, Transport of Personnel U Documentation and reports 1% 1% 1% V Contingency on long lead items 5% 5% 5% W Contingency on services 5% 5% 5% X Other contingencies 5% 5% 5% Rig move out 11% cost per metre drilled $1.700,00

Thrid Edition (2015) AWC Guidelines Page 10/13 Standard Size - DEVIATED: KOP=450 m Bottom of conductor pipe to 450 m 450 m to 1500 m 1500 m to beyond percentage to percentage to cost per metre cost per me- cost Item Description percentage to cost drilled cost tre drilled Rig move in 11% A Site Preparation including Conductor Pipe 10% B Consultancy / Management 3% 3% 3% C Cementing 10% 9% 10% D Directional Drilling E Drilling Fluids, Compressors 5% 6% F Drilling Tools Rental G Bits 6% 6% 6% H BOP and Rotating Head 2% 2% 2% I Well Logging 5% 5% 5% J Casing 1 1 1 K Casing Accessories and Liner Adapter 1% 1% 1% L Surface Logging - Mud Logging $1.250,00 $1.800,00 M Fuels and Oils 8% 8% 8% N Water Supply Pumps Rental and Water 5% 5% 5% O Wellhead and Valves 2% 2% 2% P Rig Operating Day Rate 32% 32% 32% Q Camp Day Rate including Telecommunication R Welding and X-Ray Services 1% 1% 1% S Pipe Inspection and Hardbanding Services 1% 1% 1% T Support Services, Wellsite Security, Transport of Personnel U Documentation and reports 1% 1% 1% V Contingency on long lead items 5% 5% 5% W Contingency on services 5% 5% 5% X Other contingencies 5% 5% 5% Rig move out 11% cost per metre drilled $2.100,00

Third Edition (2015) AWC Guidelines Page 11/13 4 WIDE DIAMETER WELLS Wide diameter wells are defined as wells with 9-5/8" diameter of the last casing or liner. Typical large diameter well sizes are shown in Table 3. The following two pages give the AWC Guideline values for wide diameter vertical and deviated wells. Table 3: Wide Diameter Well Sizes. Hole Diameter, OD* Casing Diameter / Casing weight Drilled depth, TD* Cased Depth, TD 32" 26-1/2" WT* 100 m 0-100 m 24" 18-5/8" / 87.5 ppf* 100-350 m 0-350 m 17-1/2" 13-3/8" / 68 ppf 350-1000 m 0-1000 m 12-1/4" 9-5/8" / 47 ppf slotted liner 1000-2500 m 1000-2500 m *OD: outer diameter; WT: welded tube; ppf: pounds per foot; TD: total depth

Third Edition (2015) AWC Guidelines Page 12/13 LARGE Diameter - VERTICAL Bottom of conductor pipe to 450 m 450 m to 1500 m 1500 m to beyond percentage to cost Item Description percentage to total AWC cost total AWC cost per metre drilled percentage to total AWC cost total AWC cost per metre drilled Rig move in 11% A Site Preparation including Conductor Pipe 10% B Consultancy / Management 3% 3% 3% C Cementing 10% 9% 10% D Directional Drilling E Drilling Fluids, Compressors 5% 6% F Drilling Tools Rental G Bits 6% 6% 6% H BOP and Rotating Head 2% 2% 2% I Well Logging 5% 5% 5% J Casing 1 1 1 K Casing Accessories and Liner Adapter 1% 1% 1% L Surface Logging - Mud Logging $1.500,00 $1.800,00 M Fuels and Oils 8% 8% 8% N Water Supply Pumps Rental and Water 5% 5% 5% O Wellhead and Valves 2% 2% 2% P Rig Operating Day Rate 32% 32% 32% Q Camp Day Rate including Telecommunication R Welding and X-Ray Services 1% 1% 1% S Pipe Inspection and Hardbanding Services 1% 1% 1% T Support Services, Wellsite Security, Transport of Personnel U Documentation and reports 1% 1% 1% V Contingency on long lead items 5% 5% 5% W Contingency on services 5% 5% 5% X Other contingencies 5% 5% 5% Rig move out 11% cost per metre drilled $2.200,00

Third Edition (2015) AWC Guidelines Page 13/13 LARGE Diameter - DEVIATED: KOP=450 m Bottom of conductor pipe to 450 m 450 m to 1500 m 1500 m to beyond percentage to cost Item Description percentage to total AWC cost total AWC cost per metre drilled percentage to total AWC cost total AWC cost per metre drilled Rig move in 11% A Site Preparation including Conductor Pipe 10% B Consultancy / Management 3% 3% 3% C Cementing 10% 9% 10% D Directional Drilling E Drilling Fluids, Compressors 5% 6% F Drilling Tools Rental G Bits 6% 6% 6% H BOP and Rotating Head 2% 2% 2% I Well Logging 5% 5% 5% J Casing 1 1 1 K Casing Accessories and Liner Adapter 1% 1% 1% L Surface Logging - Mud Logging $1.500,00 $2.200,00 M Fuels and Oils 8% 8% 8% N Water Supply Pumps Rental and Water 5% 5% 5% O Wellhead and Valves 2% 2% 2% P Rig Operating Day Rate 32% 32% 32% Q Camp Day Rate including Telecommunication R Welding and X-Ray Services 1% 1% 1% S Pipe Inspection and Hardbanding Services 1% 1% 1% T Support Services, Wellsite Security, Transport of Personnel U Documentation and reports 1% 1% 1% V Contingency on long lead items 5% 5% 5% W Contingency on services 5% 5% 5% X Other contingencies 5% 5% 5% Rig move out 11% cost per metre drilled $2.500,00