Table 1 the Road Network of Mozambique (in kilometers)

Similar documents
PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA1417

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2890 TIR - Transport Infrastructure Rehabilitation Project

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

Tanzania Health Sector Development APL II Region

[ ] A [X] B [ ] C [ ] FI [ ] TBD (to be determined) [ ] S 1 [X ] S 2 [ ] S 3 [ ] S F [ ] TBD (to be determined)

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6515 Afghanistan New Market Development Project

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6976 DRC-Multimodal Transp Additional Financing. AFRICA Sector.

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4270 Health Transformation and Social Security Reform Project.

Integrated Safeguards Data Sheet (Updated)

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4283 PH-Social Welfare and Development Reform

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

I Proiect Name I TRANSPORT SECTOR SUPPORT PROJECT 1

Transit Transport Co-ordination Authority

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

AFRICA. Investment Project Financing P Federal Ministry of Finance

PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE

Project Name. Region. Date of Board Approval July 29, 2008

Sector-wide Health System and Social Development Support Project Region

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Second Additional Financing to Road Rehabilitation & Maintenance Project Region

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4291 Project Name. Wenchuan Earthquake Recovery Project Region

1. Key development issues and rationale for Bank involvement

EAST ASIA AND PACIFIC. Investment Project Financing P People's Republic of China

PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE Report No.: PIDC Project Name. Region. Country

Emergency SME Revitalization and Governance Project. I. Key development issues and rationale for Bank involvement

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

Please also refer to the PID of the parent project (Report No.: AB3812) disclosed on 04/29/2008

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. eghana Additional Financing

Project Name. Region Sector. Project ID Borrower(s) Implementing Agency. Republic of Madagascar Madagascar

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB5681 STRENGTHENING HEALTH ACTIVITY FOR THE RURAL POOR PROJECT Region

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: 87961

COMBINED PROJECT INFORMATION DOCUMENTS / INTEGRATED SAFEGUARDS DATA SHEET (PID/ISDS) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name. Region. Country

InfoShop. Integrated Safeguards Data Sheet (Updated) Date ISDS Prepared/Updated: 09/06/

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Second School Access and Improvement

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC6132. Date ISDS Prepared/Updated: 05/16/2011 I. BASIC INFORMATION. A. Basic Project Data

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: Project Name. Railway Infrastructure Rehabilitation Project Region

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA5305. Project Name. Parent Project Name. Region Country Sector(s) Theme(s)

INTEGRATED SAFEGUARDS DATA SHEET RESTRUCTURING STAGE Note: This ISDS will be considered effective only upon approval of the project restructuring

6 Report No.: JSDSC1361 1

Financing (In USD Million) Financing Source

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Project ID:

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA9857. Project Name. Parent Project Name. Region. Country

Project Information Document/ Identification/Concept Stage (PID)

Mozambique -Roads and Bridges Management and Maintenance Program - Phase II (P083325)

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

Government of Peru Peru. PROVIAS Departamental Peru

Non-compulsory pensions and insurance (70%);General water, sanitation and flood protection sector (30%) Lending Instrument

Project Information Document/ Identification/Concept Stage (PID)

Environmental Assessment

IBRD: ($m.) support the development of municipal infrastructure to provide quality local services.

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB6500 Project Name

Project Information Document/ Identification/Concept Stage (PID)

PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE. MA-Second Capital Market Development and SME Finance DPL Region

Updated Project Information Document (PID) Report No: AB793. UGANDA - THIRD PHASE OF THE ROAD DEVELOPMENT PROGRAM Region.

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

Project Name. Region Sector

PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE

Project Information Document/ Identification/Concept Stage (PID)

TURKEY ISTANBUL MUNICIPAL INFRASTRUCTURE PROJECT (RESTRUCTURING) PROJECT PAPER

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB1464 SL Infrastructure Development Project (Transport)

Public Disclosure Authorized. Report No.:AC634. Project ID: P Project: Health Transition Project. TTL: Enis Baris

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB4286 Project Name

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE. Energy and Extractive Industries Transparency and Accountability

Sri Lanka: Crisis Response Small and Medium Enterprises Development Facility Project Region

PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

Project Name KIAT GURU: KINERJA DAN AKUNTABILITAS GURU - IMPROVING TEACHER PERFORMANCE AND ACCOUNTABILITY

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: Health Sector Enhancement Project Additional Financing

Decision The decision review meeting, held on November 26, 2012 authorized the team to continue with appraisal and negotiation.

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2649. Date ISDS Prepared/Updated: 06/26/2009 I. BASIC INFORMATION. A. Basic Project Data

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3202 Project Name. Kenya Nairobi Urban Toll Road PRG Region

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

Mozambique -Roads and Bridges Management and Maintenance Program - Phase II (P083325)

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3247. Date ISDS Prepared/Updated: 11/28/2007 I. BASIC INFORMATION. A. Basic Project Data

PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB1618 Economic Management Capacity Building Project.

Safeguard Policies: A Quick View Tbilisi. The World Bank Europe & Central Asia Region

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS)

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2168 Support for Strategic Local Development and Investment Project

Project Information Document/ Identification/Concept Stage (PID)

Financial Sector Lending Instrument. Government of Sierra Leone Implementing Agency

World Bank Safeguard Policies: An Overview

World Bank Environmental. and Social Policy for Investment Project Financing

Public Disclosure Authorized. Loan/Credit amount($m): I IDA: 5.00 Board Date: September 7, 2004 Other financing amounts by source:

Transcription:

Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2867 Roads and Bridges Management and Maintenance Project Region AFRICA Sector Roads and highways (100%) Project ID P083325 Borrower(s) GOVERNMENT OF MOZAMBIQUE Implementing Agency Environment Category [ ] A [X] B [ ] C [ ] FI [ ] TBD (to be determined) Date PID Prepared February 7, 2007 Date of Appraisal February 26, 2007 Authorization Date of Board Approval May 22, 2007 1. Country and Sector Background Mozambique has made notable progress since the 1992 Peace Accords and has sustained real annual growth of more than 7 percent since 2003. The benefits of growth have been broad-based and can be seen in improvements in both monetary and non-monetary poverty measures. There was an unprecedented overall 16 percent decline in poverty between 1997 and 2003, from 70 percent in 1997 to 54 percent in 2003; rural poverty fell slightly more (by 22 percent) than urban poverty (by 16 percent) but more than 50 percent of the population remains in poverty. Despite the country s economic success, lifting the other half out of poverty will require continued broad-based growth in the economy, together with continued expansion of social and economic services to the poorest. Mozambique s classified road network the national and regional roads consists of 29,349 kilometers of roads, of which 5,814 kilometers (or 20 percent) are paved. No systematic survey exists on the extent and condition of the non-classified road network, but it is estimated that about 3,000 kilometers of urban roads (about 500 kilometers of which are paved) exist, along with 5,000 kilometers of district roads, all unpaved. The total road network length is estimated at about 37,349 kilometers (see Table 1). Table 1 the Road Network of Mozambique (in kilometers) Type of road Paved Unpaved Total Classified roads 5,814 23,535 29,349 Urban unclassified roads (estimate) 500 2,500 3,000 Rural unclassified roads (estimate) - 5,000 5,000 Total 6,314 31,035 37,349 Road density per land area is low at 46 meters per sq. kilometer due to the large size of Mozambique, but quite average, relative to the population, at 423 meters per 1,000 population. Preliminary estimates suggest that the network provides potential access (measured as those living within two kilometers of any road in the network) to around 41 percent of the nation s rural population. Because of the poor condition of the network, the percentage of the rural population that has reliable, all-year access is much smaller

(reliable numbers will be available once the 2007 population census has concluded); currently, the Performance Assessment Framework (PAF) puts it at 11 percent. One of the main objectives of this project is to increase the number of rural residents with reliable access to social and economic facilities. The aforementioned number also suggests that in future an additional, much larger, local road network will be required to connect all residents. The government s medium-term development objectives are spelled out in the PARPA II, 2006, the country s poverty reduction strategy, and are supported by the Country Assistance Strategy (CAS) prepared jointly by the government and the Bank. The 2007 11 Road Sector Strategy (RSS), and the Road Sector Policy, support the country s poverty reduction strategy. The strategy is also in line with the Bank s Africa Action Plan, which puts renewed emphasis on adequate infrastructure to support growth and increased access to all-weather roads. During 2006, in close collaboration with road sector Development Partners (DP), GoM developed PRISE, the 2007 2009 Road Sector Program. PRISE is based on the 2007 11 Road Sector Strategy (RSS) and the Road Sector Policy. It was decided that PRISE would be implemented using a sector-wide approach (SWAp). Road Sector Strategy is an update of the 2001 2011 Roads and Bridges Management and Maintenance Program (RBMMP), based on which International Development Association s Adaptable Program Loan (APL) was first developed. A mid-term review of RBMMP1 held in May 2005 resulted in a decision to embark on the update. Road sector expenditures between 2001 and 2006 were about $700 million equivalent or $140 million on average per annum. It has been recognized that past road sector investments were insufficient to support the country s poverty reduction goals. PRISE therefore plans to substantially increase expenditures for both maintenance and investment. Total published sector expenditures planned in PRISE for 2007 09 is $1,043 million, which with a recently confirmed increase in IDA funding will rise to $1,056 million, or about $352 million per annum (about 4.3 percent of GDP). RBMMP2 supports PRISE. It focuses on the continued rehabilitation and upgrade of the main national road N1, and contributes to PRISE through pooled financing. This support will enable the Government of Mozambique (GoM) to carry out a sustainable road maintenance program with particular emphasis on periodic maintenance of paved roads, while at the same time increasing the capacity of the implementing agencies. The third phase of the APL will be contingent on successful implementation of Phase II and on satisfaction of agreed triggers. 2. Objectives The GoM?s Action Plan for the Reduction of Absolute Poverty for 2006?09 (PARPA II) focuses on reducing the incidence of poverty (from 54 percent in 2003 to 45 percent in 2009) through improvements in governance, human capital, and economic development. The proposed second phase of the road sector support program continues its strong support to the government?s development objectives, and addresses the focus areas identified in the CAS. These are (i) improving the investment climate; (ii) expanding service delivery; and (iii) building public sector capacity and accountable structures. The roads program addresses the development of infrastructure, a priority area under PARPA I (2001?2005) and retained as a priority area under PARPA II (2006?2009). Phase II of the program focuses on improvements in management of the sector as well as physical

infrastructure, with the objective of improving connectivity across the country. Improving access opportunities for agroproducers and rural communities to ports and rail heads, as well as social infrastructure, is also included. The indicators to assess the achievement of the PDO are (i) the percentage of classified roads in good and fair condition, and (ii) the percentage of the rural population within 2 kilometers of an all-season road. Intermediate outcomes have been defined as follows: (A) improved road sector management capacity; (B) enhanced execution of the road maintenance program; and (C) timely and costeffective implementation of the IDA financed rehabilitation and upgrading of sections of the N1. 3. Rationale for Bank Involvement An important source of value added by Bank support is its comparative worldwide experience in facilitating preparation and implementation of major roads and transport sector development programs. The Bank has also gained considerable experience in the region from its management of the Sub-Saharan Africa Transport Policy program (SSATP). Within the country, the Bank has experience in the transport sector gained through past and ongoing projects in the roads, rail, and port subsectors (ROCS 1 and 2, RBMMP, Railways and Ports Restructuring, and the Beira Railway Project). There is strong commitment by all road sector Development Partners (DP) to harmonize their approaches in line with the Paris Protocol. Hence it was decided that PRISE would be implemented in a SWAp mode. The World Bank team has been instrumental in the preparation of PRISE and the furthering of donor harmonization. The use of a programmatic approach has been validated by the success of this instrument in many other countries and sectors. Adaptable Program Loans provide greater flexibility in adapting project design and financing in response to evolving client needs. The Bank s participation thus provides continuity for the implementation of the long-term national plan in the roads sector. 4. Description Phase II of RBMMP supports PRISE, the 2007?09 road sector program of GoM. PRISE is being implemented in a sector wide approach (SWAp) mode. PRISE incorporates a coherent GoMowned-and-led roads program in a comprehensive and coordinated manner, with emphasis on planning, finance, implementation monitoring, and evaluation. The SWAp mode will foster stronger country ownership and leadership in the road sector. It will also facilitate a coordinated and open policy dialogue for the entire sector, involving the key GoM agents MoPWH, ANE, Road Fund, and other local stakeholders) and the road sector development partners (DP). PRISE is developed consistent with the priorities and objectives of the GoM road sector policy, the action plan for the reduction of absolute poverty (PARPA), the Medium Term Expenditure Framework (MTEF), and the Road Sector Strategy (RSS). The cost estimate of the three years? PRISE 2007?09 is $1.043 billion comprising $69.6 million (7 percent) for overheads, $263.9 million (25 percent) for maintenance and $709.8 million (68

percent) for investments. Total DP contribution to PRISE is $709 million or 68 percent of the total. Out of this, $114 million will be provided as pooled funding and the balance of $595 million through traditionally dedicated funding. The IDA support of $100 million to PRISE, is planned to be appropriated as follows: (a) $35 million contribution to the pooled fund for overhead and maintenance expenditures; and (b) $ 65 million dedicated funding for the rehabilitation and upgrading of three sections of the N1. 5. Financing Source: ($m.) BORROWER/RECIPIENT 0 International Development Association (IDA) 100 Total 100 6. Implementation As mentioned previously, this project is a partnership between GoM and 19 DPs. It is to be implemented in SWAp mode. It entails a jointly developed and agreed sector policy, strategy, and investment plan, common financing arrangements (for the overhead and maintenance component only), common financial management and procurement procedures, as well as a common reporting and monitoring system. It will also include joint supervision missions by the DPs and joint audit arrangements. (a) (b) (c) Program Coordination and Oversight. The overall program coordination and oversight will be the responsibility of the Road Fund Board, the legally autonomous entity for managing the collection and disbursement of road sector funds. Policy guidance and oversight will be provided by the Ministry of Public Works and Housing (MoPWH) and its advisory unit (GAS); Executing Agency. Implementation of the program will be the responsibility of ANE, the National Roads Administration responsible for the management of national (classified) roads in Mozambique. ANE headquarters will manage large contracts while the management of smaller contracts will be delegated to the provincial offices of ANE (the threshold for such delegation is defined in the procurement manual for PRISE.); Procurement Arrangements. Responsibility for procurement of most of the contracts financed under PRISE will be with ANE. Those contracts financed under earmarked funding will have to follow the procurement rules of the various DPs, including IDA. Contracts that are funded under the Pooled Fund will be procured following national procurement procedures as described in the Procurement Manual. The technical and financial audit of all funding under the Common Fund will include a procurement audit; (d) Financial Management and Auditing. The overall responsibility for financial management is with the Road Fund. The RF will manage a pooled fund with funding from road user charges and DP s contribution (including IDA). In addition, the RF will manage the IDA designated account, a GoM investment account, and will oversee all other funding from DP for PRISE. The RF will procure the services of an external auditor to conduct financial, technical, and procurement audits of PRISE.

The Bank has reviewed the financial management arrangements of the current RBMMP1 project on several occasions as part of the implementation support of ongoing projects in Mozambique. The most recent review was carried out in May 2006. This followed a previous assessment in February 2006 aimed at evaluating the continuing appropriateness of the financial management arrangements in place. The proposed RBMMP2 has shifted the coordination responsibilities to the Road Fund, and has introduced the concept of sector-wide approach (SWAp) as well as pooling arrangements with other cooperating partners. Further due diligence work will therefore need to be carried out during appraisal to ensure that financial management arrangements are robust enough to support such an undertaking. This work, including a review of the agreed MOU, would need to be carried out in collaboration with other development partners expected to subscribe to the SWAp. The overall conclusion of the financial management assessment is that in order to establish an acceptable control environment and mitigate the financial management risk, measures outlined in the Financial Management Action Plan should be taken. 7. Sustainability Critical to the sustainability of the road sector program is improvement of maintenance performance. Sufficient increased resources for maintenance have been allocated in PRISE ($88 million on average per annum). Since maintenance works will largely be implemented by the provincial offices of ANE, ensuring their strong performance will be crucial to sustainability of the program. Clearly, the planned overall spending under PRISE (4.4 percent of GDP) will not be sustainable in the long run, but is considered necessary in the short run to cover the huge backlog and achieve the country s poverty goals. In the medium term, however, overall resource allocation relative to GDP will decrease, and the share of maintenance compared to investments will increase. During this phase a great deal of emphasis has been placed on development of appropriate annual periodic maintenance programs on paved roads, for which a large portion of the pooled funding is intended. 8. Lessons Learned from Past Operations in the Country/Sector Phase one of the APL experienced serious implementation delays mainly due to bureaucratic approval procedures related to procurement and insufficient project management capacity of. ANE. Due to these delays and general inflation, costs for the phase one sub-projects increased and only 778 kilometers of rehabilitation and upgrading could be carried out as against the 1250 kilometers planned. The sections not covered under phase one are now being financed under phase 2. As a consequence, under phase 2, that no approvals for procurement decisions be required outside ANE is proposed as a Board condition. This matter will be taken up with GoM as a priority during the joint appraisal (with the other DP) planned in February 2007. Cost increases were also experienced due to inappropriate designs not taking into account availability of local materials and experience within phase one (supported by APL1). During phase 2, ANE plans to develop appropriate Road Design Standards and Technical Specifications based on the past experience. The updating of the design for the sections that were meant to be

financed under phase one but have now been moved to phase 2 also takes into account lower cost options using locally available materials and knowledge. During phase one implementation ANE s responsibility extended only to the management of large contracts on the primary and secondary road network (about 10,000 km) and technical advice to the provincial road agencies under the provincial governments. In November 2005 GoM decided that ANE will be made responsible for the entire classified road system (29,348 km). As a consequence ANE needs to be restructured both at Headquarters and in the Provinces. An appropriate organogram, in line with modern road management principles, has been agreed for ANE HQ and its provincial offices. The recruitment process for its key staff is currently ongoing. It is proposed that it will be a condition of effectiveness for this credit that the new ANE is in place. This will be discussed as a matter of priority during appraisal. 9. Safeguard Policies (including public consultation) Safeguard Policies Triggered by the Project Yes No Environmental Assessment (OP/BP/GP 4.01) [X ] [ ] Natural Habitats (OP/BP 4.04) [ ] [X] Pest Management (OP 4.09) [ ] [X ] Cultural Property (OPN 11.03, being revised as OP 4.11) [ ] [ X] Involuntary Resettlement (OP/BP 4.12) [X ] [ ] Indigenous Peoples (OD 4.20, being revised as OP 4.10) [ ] [X ] Forests (OP/BP 4.36) [ ] [X ] Safety of Dams (OP/BP 4.37) [ ] [ X] Projects in Disputed Areas (OP/BP/GP 7.60) * [ ] [ X] Projects on International Waterways (OP/BP/GP 7.50) [ ] [X ] 10. List of Factual Technical Documents 11. Contact point Contact: Dieter E. Schelling Title: Lead Transport Specialist Tel: 5355+3273 Fax: Email: Dschelling@worldbank.org Location: Dar Es Salaam, Tanzania (IBRD) 12. For more information contact: * By supporting the proposed project, the Bank does not intend to prejudice the final determination of the parties claims on the disputed areas

The InfoShop The World Bank 1818 H Street, NW Washington, D.C. 20433 Telephone: (202) 458-4500 Fax: (202) 522-1500 Email: pic@worldbank.org Web: http://www.worldbank.org/infoshop