Key elements to develop a National Strategic Plan for TB care and prevention

Similar documents
Operational and technical assistance components of the National Strategic Plan for tuberculosis control

Health Sector Strategy. Khyber Pakhtunkhwa

Inventory studies. Philippe Glaziou Bali, September 2014

38th Board Meeting Board Update on Eligibility Policy Revisions

Coordination and Implementation of the National AIDS Response

The WHO planning and budgeting tool for TB control: An introduction

PUNTLAND GOVERNMENT OF SOMALIA MINISTRY OF HEALTH. Health Financing Strategic Plan - DRAFT

Health Planning Cycle

Audit Report. Global Fund Grants to the Republic of Kenya. GF-OIG July 2015 Geneva, Switzerland

Using the OneHealth tool for planning and costing a national disease control programme

Allocation and Catalytic Investment Access to Funding

NEPAD/Spanish Fund for African Women s empowerment

PROJECT CYCLE MANAGEMENT & LOGICAL FRAMEWORK MATRIX TRAINING CYPRIOT CIVIL SOCIETY IN ACTION V INNOVATION AND CHANGES IN EDUCATION VI

Module 3. Setting Up an Integrated NTDP

Strengthening Multisectoral Governance for Nutrition Deborah Ash, Kavita Sethuraman, Hanifa Bachou

E Distribution: GENERAL. Executive Board First Regular Session. Rome, 9 11 February January 2009 ORIGINAL: ENGLISH

Principles for the Design of the International Financing Facility for Education (IFFEd)

Global Plan to End TB THE EXECUTIVE SUMMARY. a partnership hosted by United Nations at

130th session 22 December 2011 Provisional agenda item 5. WHO reform. Report by the Secretariat

Expert meeting 2. Developing SSPARS and Integration into NSDS. Challenges & Best Practices

PROJECT PROPOSAL WRITING (A Tool for Resource Mobilization and Effective Attainment of Organization Objectives) OJI OGBUREKE, PhD November 2011

Domestic Revenue Mobilization for Health ICGFM Conference

Road and Transport Management Project Phase II SAU/10/51658

Thirty-Second Board Meeting Corporate KPIs Narrative

Programme Development and Funding Officer

TB CARE II Case studies on coverage of TB care costs in insurance-based systems

Global Harmonization of Budget and Expenditure Analysis Methods for Nutrition. Results for Development SPRING SUN Movement Secretariat

Programme Budget Matters: Programme Budget

Audit & Compliance Guidance

PEFA Training. Dakar, Senegal January & February 1, #PEFA. PEFA Secretariat

T H E NA I RO B I C A L L TO A C T I O N F O R C L O S I N G T H E I M P L E M E N TA T I O N G A P I N H E A LT H P RO M O T I O N

REPORT Regional Workshop Budgeting for Roma Integration Policies Skopje, March 2017

The Global Fund. Financial Management Handbook for Grant Implementers. December 2017 Geneva, Switzerland

WHO reform: programmes and priority setting

Outline of presentation

Accelerator Discussion Frame Accelerator 1. Sustainable Financing

Year end report (2016 activities, related expected results and objectives)

Internal Audit of the Republic of Albania Country Office January Office of Internal Audit and Investigations (OIAI) Report 2017/24

Introduction to Performance- Based Contracting for Health Services. Health System Innovations Workshop Abuja, Jan , 2010

AFGHANISTAN ALLOCATION GUIDELINES 22 JANUARY 2014

UNDAF Outcome(s)/Indicator(s): Sustainable development, disaster management and energy efficiency

Booklet C.2: Estimating future financial resource needs

Country Case Study GFF Work in Liberia. Shun Mabuchi Country Health Team Leader The World Bank With contribution from MoH team June 20, 2017

Health Security Financing Assessment Tool HSFAT

Brief Introduction. To Completing the Logframe Matrix

GPE OPERATIONAL FRAMEWORK FOR EFFECTIVE SUPPORT IN FRAGILE AND CONFLICT- AFFECTED STATES

REPUBLIC OF ZAMBIA. Ministry of National Development Planning

Tuberculosis Care and Support through the Private Sector in India

METHODOLOGICAL GUIDELINES FOR CONDUCTING SECTORAL ANALYSIS IN WATER SUPPLY AND SANITATION

Background and Introduction

ONE WASH NATIONAL PROGRAMME (OWNP)

REVIEW OF MANAGEMENT AND ADMINISTRATION IN THE WORLD METEOROLOGICAL ORGANIZATION (WMO): ADDITIONAL ISSUES

Report of the Programme, Budget and Administration Committee of the Executive Board

Microinsurance Development Strategy for Tanzania

III. modus operandi of Tier 2

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Health Service Delivery Project (HSDP) Region

First Balkan Forum on: Health Care Reform

EAST CENTRAL AND SOUTHERN AFRICA HEALTH COMMUNITY ECSA - HC

IASC Subsidiary Bodies. Report on Sub-Working Group on Humanitarian Financing Activities in 2011

TB Prevalence Survey Procurement & Budgeting

Executive Board Annual Session Rome, May 2015 POLICY ISSUES ENTERPRISE RISK For approval MANAGEMENT POLICY WFP/EB.A/2015/5-B

BACKGROUND PAPER ON COUNTRY STRATEGIC PLANS

Fund for Gender Equality Monitoring and Evaluation Framework Executive Summary

MISSION REPORT TO SOUTH SUDAN CONDUCTED FROM 22 nd 25 TH SEPTEMBER 2009 IN JUBA

Suggested elements for the post-2015 framework for disaster risk reduction

Country level options to improve country Nutrition commodities pipeline

Proposed Working Mechanisms for Joint UN Teams on AIDS at Country Level

Acronyms List. AIDS CCM GFATM/GF HIV HR HSS IP M&E MDG MoH NGO PLHIV/PLH PR SR TA UN UNAIDS UNDP UNESCO UNFPA UNICEF WG WHO NSP NPA MEC

Child Rights Governance, Education, Protection, Health and Nutrition Youth and Livelihood, HIV and AIDS, Emergency and Disaster Management

I Introduction 1. II Core Guiding Principles 2-3. III The APR Processes 3-9. Responsibilities of the Participating Countries 9-14

ADB s New Health Sector. Dr. Susann Roth, Senior Social Development Specialist

TONGA NATIONAL QUALIFICATIONS AND ACCREDITATION BOARD

Views and information on elements to be included in the work programme on loss and damage AWG-LCA 14

AFI SECFAL PLAN RESOURCE MOBILISATION STRATEGY TABLE OF CONTENTS

Background and context of DRR and GIS

Module 4. College of Development Communication

COSTED IMPLEMENTATION PLANS (CIPs) FOR FAMILY PLANNING A BACKGROUND

Program Officer - Nutrition

INTERNATIONAL DISASTER RESPONSE LAWS, RULES & PRINCIPLES (IDRL)

WORLD TRADE ORGANIZATION

Conference of Parties to the International Convention against Doping in Sport. Sixth session Paris, UNESCO Headquarters, Room XI September 2017

Follow-up of the report of the Consultative Expert Working Group on Research and Development: Financing and Coordination

ZIMBABWE_Reporting format for final scoring (Ref. 4)

What are the options for sustaining AIDS, TB and malaria programs after the donors pull out? Reflections from 7 South East Asian countries and China.

Funding mechanisms for long-term drought mitigation and early action: examples and recommendations

FRAMEWORK FOR RESOURCE MOBILIZATION FOR THE GFF

ENHANCED INTEGRATED FRAMEWORK (EIF) GUIDANCE NOTE ON EIF SUSTAINABILTIY SUPPORT PHASE PROCESS

2018 Corporate Work Plan & Budget Narrative

Evaluating and Reporting: Accounting for Performance

Experience in Setting National Nutrition Targets and Commitments to Actions: The Case for Zambia

UNICEF s Strategic Planning Processes

#HealthForAll ichc2017.org

Democratic Republic of Congo: Evaluation of the Bank s Country Strategy and Program Executive Summary. An IDEV Country Strategy Evaluation

Capacity building experiences in least developed countries

PROJECT PREPARATORY TECHNICAL ASSISTANCE

CE TEXTE N'EST DISPONIBLE QU'EN VERSION ANGLAISE

Project Cycle Management and How To Write A Good Proposal. Eng. Suhail and Ayman Sultan Palestine Polytechnic University Ramallah April

JORDAN. Terms of Reference

ENTERPRISE RISK MANAGEMENT POLICY FRAMEWORK

Executive Summary (in one page)

Transcription:

Key elements to develop a National Strategic Plan for TB care and prevention Dr Giuliano Gargioni, Dr Salah Ottmani Technical Support Coordination Global TB Programme, WHO, Geneva, Switzerland Workshop on the development of National Strategic Plans Cepina, Italy, 17-28 November 2013

Rationale for NSP preparation/update The National Strategic Plan (NSP) for TB control is a key instrument for NTP management. It should be based on clear situation analysis of the TB epidemic and of the TB control programme in each country. It should clearly state goal(s) and targets and identify the interventions to achieve them. It is a necessary tool to mobilize resources to implement these interventions.

Purpose of National Strategic Plans To set goals and operational objectives of the NTP. To decide and agree on key strategic interventions. To specify activities to be implemented. To prepare the related budget and identify funds availability and gaps. To establish standards and indicators to monitor and evaluate the strategic interventions. To operationalize the implementation of activities: Where to implement these activities? When to implement these activities? Who will implement these activities? How to monitor their implementation? To identify and plan the technical support needs.

The essential components of a National Strategic Plan 1 Narrative description of the core plan 2 Budget plan 3 Monitoring and evaluation plan 4 Operational plan 5 Technical assistance plan Key principles to guide the NSP development/update: All 5 essential components should be included. The NSP should be in line (e.g. HS structure and operations) with the national health policies and plan. Gaps analysis, objectives, interventions and related budget should all be consistent with each other.

The NSP is a framework for resource mobilization NSP can guide mapping and engagement of available partners and resources and help identifying gaps and priorities (essential tool for GF country dialogue). NSP is a basis for identification and inclusion of new partners in both advocacy and implementation activities. NSP should be used to mobilize resources at national and international levels, through bilateral and multilateral mechanisms (e.g.: Global Fund)

1 st component: the Core Plan Situation analysis: - Health and health system context - Analysis of TB burden - Intervention measures undertaken to date - Outcomes of these intervention measures Strategic (SWOT) analysis: - Strengths - Weaknesses - Opportunities - Threats Identification of gaps

SWOT analysis SWOT analysis is a tool that sets the stage for strategic planning. Data are collected and sorted into four categories: strengths, weaknesses, opportunities, and threats. Strengths and weaknesses stem from factors within the organization (internal environment). Opportunities and threats usually arise from external factors external environment) SWOT analysis aims to inform the decision-making process to determine which strategic element or approach best meets the organization s overall strategic plan.

Gap analysis SWOT analysis also leads to the identification of gaps. Gaps are differences between where the organization currently stands and where it needs to be in terms of performance. These gaps become the focal points that shape the strategic plan. The gap analysis promotes: 1. better understanding of barriers to change, innovation, and the transfer of knowledge into practice; 2. addressing operational problems and improving outcomes; 3. more efficient allocation of resources.

Inappropriate formulation of gap analysis Examples of wrong formulation: 1. The managerial capacity of the NTP should be strengthened : More staff should be recruited at central level. Cars should be purchased for supervision 2. PPM activities should be implemented 3. There is no community DOTS

1 st component: the Core Plan (cont ) Definition of clear goals in line with SMART criteria Specification of operational objectives: They should match with the situation analysis They should be defined following SMART criteria Identification of strategic interventions: Each intervention should: be clearly specified have target(s) defined in SMART criteria match with at least one strategic objective include specific activities

A reminder about thinking SMART Specific: goals/objectives target a specific area for improvement. (questions: What do I want to accomplish? Why? Who is involved? Where? Requirements? Constraints?) Measurable: goals/objectives must be stated in quantifiable terms, or otherwise they re only good intentions. Measurable goals facilitate planning, implementation, M & E. (questions: How much? How many? How do we know it is achieved?) Attainable: goals/objectives must provide a stretch that inspires people to aim higher and they must be achievable, or they re a set-up for failure. (questions: How can the goal be accomplished?) Relevant: goals/objectives that matter, aligned with other goals/objectives and supporting them. (questions: Is this the right time for this? Is it worth?) Time-bound: goals/objectives must include a timeline of when your goals should be accomplished. The time frame helps to focus efforts and plan the necessary actions over time.

2 nd component: the Budget Plan The budget plan is a fundamental component of the NSP. It should refer to each operational objective, each strategic intervention and activity and sub-activity specified in the core plan. It should be established for: each quarter, each year and the whole period covered by the NSP. It must be fully consistent not only with the core plan but also with the monitoring and evaluation plan, the operational plan and the technical assistance plan; to this end, a consistent numbering system needs to be used.

Numbering system to ensure consistency across the NSP Example: Goal: To decrease TB mortality to one death per 100,000 population by 2020. Objective 1: To increase TB cure rate from 50% to 90% by 2017 onwards. 1.1. Improving and strengthening the managerial capacities at district level 1.1.1. Clear definition of the role of the managerial unit for TB control at district level 1.1.2. Reassignment and recruitment or of the appropriate staff according to the post descriptions in the Central Unit 1.1.3. Appropriate training of the managerial staff at district level 1.1.4. Organization of supervision activities from the district level 1.1.5. Organization of training activities for health workers at district level 1.2. Implementation of TB drug treatment services in health facilities and community 1.2.1. Appropriate drug supply and management 1.2.2. Involvement of local community volunteer in treatment supervision 1.2.3. Enablers for the patient to come to the health facility for monitoring and after hospitalization 1.2.4. Provision of mobility means to the PHC workers to find identified defaulters

2 nd component: the Budget Plan (cont ) The budget plan must establish the cost for: - each activity and sub-activity; - each strategic intervention; - each operational objective; - each goal; - for the whole plan. Distribution of the costing can be made by quarter (ideally for the 1 st and 2 nd year) and by year for the other 2-3 years. The WHO Planning and Budgeting Tool has been designed to help in the budgeting exercise: http://www.who.int/tb/dots/planning_budgeting_tool/en/index.html

2 nd component: the Budget Plan (cont ) Calculating the budget for a given activity requires the following steps: 1. The unit cost of the activity needs to be specified. For instance, if the activity is training, the unit cost of training is the cost of one training session. 2. The quantity of units required to implement the activity for each year of the NSP needs to established. Example: number of training sessions. 3. The quantities of units by quarter for the first 2 (or 3) years need to be established. For the remaining years, the annual quantities will be specified. 4. The total amount of money requested for funding for each year for each activity, will be calculated multiplying the quantities by the unit cost of the activity.

2 nd component: the Budget Plan (cont ) The budget plan should identify: the funding contribution: - of the government - of each partner - for every year - for the overall period covered by the plan the activities and the strategic interventions that are not covered by any funding; the funding gap for: - every year - the overall period covered by the plan.

3 rd component: Monitoring & Evaluation Plan Monitoring and evaluation are essential managerial functions in every health plan. The M&E plan is essential in order: - to monitor the progress made in the implementation of planned activities and delivery of services (this is an ongoing, continuous process) - to evaluate the progress made to achieve the intended objectives and targets (this is usually a periodical process)

3 rd component: Monitoring & Evaluation Plan (cont ) The M&E plan should clearly identify and define indicators; the indicators are the key instruments for monitoring and evaluation. An indicator provides an assessment of the achievements or helps evaluate the level of some health condition in a given population. An indicator can be expressed as: - an absolute number (e.g.: number of notified TB cases) - a rate (e.g.: notified TB incidence) - a proportion (e.g.: prevalence of MDR in new TB cases) - a ratio (e.g.: number of MDR cases managed per Health Facility) - an index (e.g.: body mass index of TB patients: Kg / m²)

3 rd component: Monitoring & Evaluation Plan (cont ) There are 4 categories of indicators: Impact indicators: focus on goals (e.g.: mortality, prevalence, incidence) Outcome indicators: focus on operational objectives (e.g.: number of cases detected, cure rate) Output indicators: focus on strategic interventions (e.g.: number of MDR-TB cases managed) Process indicators: focus on activities and sub-activities (e.g.: number of health workers trained) Others may be considered: Input indicator: e.g.: budget allocated annually.

3 rd component: Monitoring & Evaluation Plan (cont ) The M&E plan must be consistent with the other components of the NSP and use the same numbering system. For each indicator, the following elements must be specified: - purpose of the indicator (impact, outcome, output, process, input); - how it will be calculated (absolute figure, proportion, ratio, rate, index, others); - source(s) of information that will be used; if it is a rate, ratio or proportion, sources of information for the numerator and denominator should be clearly identified; - how often the information will be collected (periodicity/timeliness); - who will collect it; - at which level(s) it will be collected, compiled and analyzed; - to whom the information should be disseminated; - values of the indicator at the baseline and expected values within the timeframe covered by the NSP.

Examples of indicators Type Indicator Baseline Target (2017) Source/responsibility Impact TB mortality 30/100,000 (WHO est.) 20/100,000 WHO estimates Outcome MDR Treatment success rate 50% (2009, NTP) 85% will be successfully treated by 2017 NTP report Output Number and % of MDR-TB cases managed in line with the national policy Process Number of health facilities insuring MDR- TB care services 300 (2009, NTP) 5% (2009, NTP) 6,000 (100%) by 2017 18 health facilities 300 health facilities NTP report NTP data

3 rd component: Monitoring & Evaluation Plan (cont ) The number of indicators should be limited to the most essential ones. The indicators for which the source of information is not available or not accessible should not be considered; it is important to consider indicators for which there are appropriate sources of information. Indicators for the goals (impact), for the operational objectives (outcome) and for all the strategic interventions (output), as defined in the core plan, should be included in the M&E plan. The process indicators need to be considered only for the key activities (most of the process indicators are considered in the operational plan). Including too many indicators in the plan may be onerous and result in collection of low quality information.

4 th component: the Operational Plan It should clearly identify the activities (and sub-activities) that should be implemented for each strategic intervention. It should clearly refer to the operational objectives associated with these strategic interventions (and activities) It should be consistent with the strategic core plan, the budgeting plan and the monitoring and evaluation plan: activities, strategic interventions and operational objectives highlighted in the operational plan must be the same as those identified in the strategic core plan and the budget plan.

4 th component: the Operational Plan (cont ) The operational plan should be prepared covering in details 1 or 2 years of the overall period covered by the NSP. The timeframe for the implementation of activities should be organized on a quarterly basis. Details about the implementation of activities for the remaining years of the NSP don't need to be included at this time.

4 th component: the Operational Plan (cont ) The operational plan should provide, for each activity, the following information: - Clear specification of the activity (unit) - When will it be implemented? - Where will it be implemented? - Who will be the implementer? - How much will the implementation cost? - What is the source of funding for the implementation of this activity? - How is the implementation going to be monitored and evaluated? (usually through process indicator, possible output indicator, or other) - Other relevant details, depending on the activity; e.g.: need for technical assistance.

4 th component: the Operational Plan (cont ), EXAMPLE Objective 1. i) to improve TB notification by 20% in 2013 and by 40% in 2014 in comparison to the year 2011 and ii) to increase TB cure rate by at least 10% in 2013 and 20% by 2014 in comparison to 2011 January - March 2012 Strategic intervention 1.1. Improvement of health workers skills to identify and manage TB cases Unit Quantity Date Location Implementer Cost In US$ 1.1.1.Training 1.1.1.1. Development of training material 1.1.1.2. Printing the training material 1.1.1.3. Training of health workers 1.1.2.Supervision 1.1.2.1... 1.1.2.2.. Set of training material Set of training material Doctor Nurse 1 set of training material January 2012 10,000 1-15 February 2012 50 100 20 24 February 2012 1 15 March Sputumovich Casino 6,000 Source of funding Indicator Tubercoland NTP 10,000 MOH Set of training material developed Teebeegrad NTP 5,000 MOH Number of sets of training material printed Smearville Bingo 3,000 USAID Number of doctors trained GF Number of nurses trained Other Need for international technical assistance Need for local technical assistance (details in TA plan)

5 th component: the Technical Assistance Plan The technical assistance plan should be consistent with the other components of the NSP, using the same numbering system. Most importantly, it must be closely linked to the operational plan, on which it should be based. It provides detailed information on the technical assistance required to implement strategic interventions and activities highlighted in the operational plan. It should cover needs identified for the initial 1-2 years of the NSP.

5 th component: the Technical Assistance Plan (cont ) The following information must be specified for each strategic intervention or activity that requires technical assistance: A brief description of the terms of reference of the TA needed. A brief description of the profile of the expert who will provide the TA. The identification of the institution/department responsible for implementing the activities that require TA. The timeframe to carry out the technical assistance. The estimated cost of the technical assistance. The confirmation of the funding source, if available. The identification of the funding gap, if there are no funds to cover the cost of the technical assistance.

6 th component: Emergency Preparedness plan This 6 th component should be seriously considered in countries with a fragile security situation or prone to natural disasters. The preparedness plan should be prepared for the acute phase of any complex emergency, when health service delivery can be disrupted. The plan should focus on ensuring the availability and access to TB treatment for the patients who were on treatment for TB before the crisis (Appendix 11, TB care and control in refugee and displaced populations, http://www.who.int/tb/publications/2007/en/index.html)

Conclusion Country ownership. Clear vision about priorities in TB care and prevention and inherent interventions. Budget and costing of all interventions is essential. NSP as a framework for resource mobilization from government and local and international partners/donors. Involvement and contribution of GF and other donors in the implementation of the NSP. Establishment of a sound TA plan based on the operational plan.