Sub: Unaudited Standalone Financial Results for the Quarter ended December 31, 2017

Similar documents
THE NATIONAL STOCK EXCHANGE OF INDIA LIMITED Exchange Plaza, 5th Floor, Plot No. C/1, G Block Bandra-Kurla Complex, Sandra (East) Mumbai

Pursuant to Regulation 33 of the SEBI (Listing Obligation and Disclosure Requirements) Regulations, 2015, we enclose herewith the following:

K KESORAM. KIL/S1-1/ST.EX/ th August, The Secretary BSE Ltd., Floor 25, P. J. Tower Dalal Street, Mumbai

Tamilnadu Petroproducts Limited

D. DHANDARIA & COMPANY


SHANTHI GEARS LIMITED

INDIA NIPPON ELECTRICALS LIMITED (All Correspondence to be addressed to Registered Office)

Sunilhil'ech) Listing, The Department of Corporate Services. Scrip

GRAPHITE INDIA LIMITED

SUB: Outcome of the Board Meeting REF: Scrip Code *****

ko Denim Sub: Submission of Un-audited Financial Results for the Quarter ended and Limited Review Report for the same period.

Sub: Audited financial results and Audit Report for the financial year ended March 31,

THE RAMARAJU SURGICAL COTTON MILLS LIMITED Manufacturers of Antiseptic Dressings. F.No. MSE1 /2018 November 10, 2018

HEG/SECTI/20l8 31 s1 January, 2018

AMBICA AGARBATHIES AROMA 8&, INDUSTRIES LTD POWERPET, ELURU WGDT. (A.P.) PHONES : , , FAX :

_s_u_p_e_r_s_p_i_n_n_in_g_m_il_ls_l_im_it_e_d. Scrip Code: - SUPERSPIN

To, Corporate Relationship Department National Stock Exchange of India Limited. Exchange Plaza, Plot No.C/1,G Block,

The meeting of Board of Directors commenced at a.m. and concluded at.. l.:?..i f f-1.

SIFL\SECT\KS\18-19\115 September 05, 2018

VOLTAS VOLTAS LIMITED

The Indian Hume Pipe Co. Ltd.

S.N~ SEAMEC LIMITED A member of MMG"' SEAMEC/BSF/SM0/204/18. 13th August, 2018

Unaudited Unaudited Unaudited Unaudited Unaudited Audited

S V GLOBAL MILL LIMITED

REF: RCL:KMS:BSE-243-BM-OUTCOME/18: Date: 26/05/2018

DIANA TEA COMPANY LTD

1. National Stock Exchange of India Limited Exchange Plaza, Bandra Kurla Complex, Bandra (East) Mumbai Scrip Code: CIMMCO

D. DHANDARIA & COMPANY

1. Un-audited Financial Results of the Company for the quarter and half year ended 30th September 2018.

kgenim Sub: Submission of Un-audited Financial Results for the Quarter and Half Year ended and Limited Review Report for the same period.

National Stock Exchange of India Limited Listing Department. Exchange Plaza, Sandra Kurla Complex Bandra (E). Mumbai SCRIP CODE: BBL

waw CIT/\L CHEMFAB ALKALIS LIMITED by the Audit Committee was approved by the Board of Directors of the Company Independent Auditors' Review Report

NEWGEN. To, National Stock Exchange of India Limited. Bandra- Kurla Complex Mumbai Bandra (E), Mumbai

Voltamp Transformers Limited

The same is also available on the website of the Company i.e.

Atul Ltd. Atul , Gujarat, India lalit_ I Website: Telephone: ( ) J 3261

KOPRAN LIMITED STATEMENT OF CONSOLIDATED AND STANDALONE UNAUDITED FINANCIAL RESULTS FOR QUARTER AND SIX MONTHS ENDED 30th SEPTEMBER, 2018

H31? Kavitm WW PM. Thanking you Yours faithfully For HBL Power Systems Limited. Exchange Plaza, Bandra Kurla Complex 001 Bandra (East) Mumbai

jorientbell d tiles Orient Bell Limited

ZODIAC. Sub: Outcome of the Board Meeting of the Company held on 14th February,

Registered Office Hindustan Motors limited Birla Building, 10th Floor 9/1, R. N. Mukher]ee Road Kolkata

atillcl ~~lil ~~e~ (~ mifir 'lit~) ~ ~: c.;;~41"'1", 3ffi1f

National Stock Exchange of India Limited. Symbol: EQUIT AS

August 31,2017. National Stock Exchange of India Limited(NSE) Scrip: KCP BandraKurla Complex, Bandra (E) Mumbai

IIIMEEt. Date : 13/08/2018

tz.t` Nitesh A. Mhatre Company Secretary

Phiroze Jeejeebhoy Towers, Sandra Kurla Complex, Sandra (East),

FGPLIMITED. February 6, BSE Limited Corporate Service Department, 1 st Floor, P.J. Towers, Dalal Street, Mumbai Security Code:

LIMITED. Company Code: Sub: Unaudited Financial Results for the Quarter and half year ended September

CORAL INDIA FINANCE AND HOUSING LIMITED

National Stock Exchange of India Limited The Bombay Stock Exchange Limited Exchange Plaza, 5 th Floor. Phiroze Jeejeebhoy Towers

ESSEL PROPACK LIMITED. CIN: L74950MH1982PLCO28947 Regd. Office : P.O. Vasind, Taluka Shahapur, Dist. Thane, Maharashtra

~ Bank ~ IDFCFIRST p.m. I D FCF I RSTBAN K/SD /SE/ 145/ February OS, 2019

Sub: Unaudited Financial Results for Quarter and Half Year ended September 30, 2018

Goodluck India Limited (Formerly GOOD LUCK STEEl TUBES LIMITED) Corp. Office: "GOODLUCK HOUSE" Nehru Nagar,

****** We wish to inform you that the Board of Directors at its meeting held today has approved the financial

A copy of the Limited Review Report of the Auditors of the Company in respect of the said Results is also enclosed.

C Eggma MARIS SPINNERS LIMITED MARIS /12 : Thhphone: Fax :

Kindly notify about the same to the Members of your esteemed Stock Exchange.

(--. m-r--.._;) IMP POWERS LTD. Corporate Of11ce: 35 :: P a v a R a de Fax g E-ma C L PLC000232


VOLTAS LIMITED VOL TAS LIMITED


Ahmedabad Stock Exchange Limited, Phiroze Jijibhoy Tower,

(: (~ November 2, 2018 To, DCS, National Stock Exchange of India Limited Phiroze Jeejeebhoy Towers, Exchange Plaza, C-1, Block G, Dalal Street,

37,in. PSP Projects Ltd : 2008, : 2004 BSOHSAS : 2007 Certified Company

Fax : (+91 11)

Subject: Standalone unaudited Financial results for the quarter ended June 30,2018

Attn: Listing Dept. Compliance as required under Regulation 47 of the Listing Regulations will be complied. CIN: L32202KA1949PLC032923

SAlGLOBAL. gay-ms Srikanth Shenoy Chief Financial 0 L, TRITON VALVES LTD. Challenging Excellence

The same is enclosed for your reference with the Limited Review Report given by Apaji Amin & Co. LLP, statutory auditors attached thereto.

, Stock Code-( )

LGB FORGE LIMITED Ganapathy, Coimbatore Tamil Nadu, India Tel : (0422) Fax : (0422)

SUB: OUTCOME OF THE BOARD MEETING OF THE BOMBAY DYEING AND MANUFACTURING COMPANY LIMITED HELD ON 7 TH AUGUST, 2018.

h1ndware f CU'!,J (Paya) M. Puri) Company Secretary Name: Address: Membership No. Encl: As above NEAPS/BSE ONLINE 29 th October, 2018

BALRAMPUR CHINI MILLS LIMITED

By E-filing. Listing Department, National Stock Exchange of India Ltd., IstFloor, New Trading Ring,

ZODIAC. Sub: Outcome of the Board Meeting of the Company held on 14th November, 2018

DANGI JAIN & COMPANY CHARTERED ACCOUNTANTS

We hope you will find it in order and request you to take the same on your records.

3flll (it iif%iii fcl fll e\s

JMC Projects (India) Ltd.

$91? Compliance. murugappa. July 27, Exchange Plaza, 5th Floor, Plot No.C/1

The above information are also available on Company's website

Ref: Regulation 33 read with Regulation 47 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 20 15

PTL ENTERPRISES LIMITED

asianpaints : APUSEC/15/ nd January, 2018

[.nr? - &! cc: The Corporate Relationship Department BSE Limited 1't Floor, New Trading Ring, Rotunda Building,

OUTCOME OF BOARD MEETING HELD ON APPROVAL OF AUDITED ACCOUNTS FOR THE FINANCIAL YEAR ENDED 31 st MARCH 2018

This is to inform that the Board meeting commenced at A.M and concluded at 2.15 P.M.

POLYOlS LIMITED. Subject: Outcome of Board Meeting held on 3rd August, 2018

~-~ T. Rajagopalan. Company Secretary. Dear Sir, May 03,2018

CENTRAL DEPOSITORY SERVICES (INDIA) LIMITED CIN: U67120MH1997PLC112443

GRAPHITE INDIA LIMITED

~~f5l2li 1 ~[-4JHAL. Mumbai BSE Scrip Code: , NSE Symbol: HAL ***

Sub: Audited Financial Results for the quarter and year ended Ref. Scrip Code No

The Dept. of Corporate Services, The Calcutta Stock Exchange Ltd.,

Ref. NO.SH/13/ st July, 2018

21 May, The Secretary BSE Ltd. Phiroze Jeejeebhoy Towers Dalal Street Mumbai

Transcription:

BeSec/2018 February 07, 2018 BGR ENERGY SYSTEMS LIMITED 443 ANNA SALAI, TEYNAMPET, CHENNAI 600018 INDIA TEL: 91 44 24301000 FAX: 91 44 24360576 E-mail: compliance@bgrenergy.com Web site: w w w.bgrcorp.com Listing Department National Stock Exchange of India Limited Exchange Plaza, Bandra Kurla Complex, Bandra (E), Mumbai 400051 NSE Symbol : BGRENERGY Department of Corporate Services BSE Limited P.J. Towers, Dalal Street, Mumbai 400001 BSE Scrip Code 532930 Dear Sirs, Sub: Unaudited Standalone Financial Results for the Quarter ended December 31, 2017 Pursuant to Regulation 33 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015, we are pleased to forward the following: a) Unaudited Standalone Financial Results for the Quarter ended December 31, 2017 and b) Limited Review Report issued by the Statutory Auditors. The meeting of the Board of Directors commenced at 3.00 p.m. and concluded at 5.00 p.m. We request you to take the same on record. Thanking you, Yours truly, for BGR Energy Systems Limited R. Ramesh Kumar President Corporate & Secretary Encl: a.a. REGISTERED OFFICE: A-5 PANNAMGADU INDUSTRIAL ESTATE, RAMAPURAM POST, SULURPET TALUK, NELLORE DISTRICT, ANDHRA PRADESH 524401 INDIA. TEL: 91 44 27948249 Corporate Identity Number : L40106AP1985PLC005318

f) BGR ENERGY BGR ENERGY SYSTEMS LIMITED Reg.off: A-5 Pannamgadu Industrial Estate, Ramapuram Post, Sullurpet Taluk, Nell ore District, Andhra Pradesh 52440 I Corp.Off: 443, Anna Salai, Teynampet, Chennai 600018 Ph: +91 44 24301000, Fax: +91 44 24360576 Corporate Identity Number: L40 I 06API985PLC005318 Email: compliance@bgrenegy.com website: www.bgrcorp.com STATEMENT OF UNAUDITED STANDALONE FINANCIAL RESULTS FOR THE QUARTER AND NINE MONTHS ENDED DECEMBER 31, 2017 ~ in lakhs) Particulars Quarter Ended Nine Months Ended Year Ended 31.12.2017 30.09.2017 31.12.2016 31.12.2017 31.12.2016 31.03.2017 (Unaudited) (Unaudited) (Unaudited) (Unaudited) (Unaudited) (Audited) 1 2 3 4 5 6 7 8 9 10 11 12 Income (a) Revenue from operations 70760 51739 64798 212356 233683 344794 (b) Other income (149) 39 (3) 17 2 1 Total I nco me 70611 51778 64795 212373 233685 344795 Expenses a) Cost of raw materials and components consumed 32792 29275 33602 105844 131834 195281 b) Cost of manufacturing and construction 17393 6405 16229 43630 45994 76836 c) other direct cost 1784 1426 2099 4935 4844 6959 d) Changes in inventories of finished goods, stock in trade and work in progress 2479 1459 (393) 1735 (499) (2317) e) Excise Duty on sale of goods - - 205 37 556 990 f) Employee benefits expense 5187 4939 5043 15436 13550 18614 g) Depreciation and amortization expense 628 606 635 1862 1817 2396 h) Finance costs 7190 6971 6424 21032 19589 26268 i) Other expenses 2703 523 1409 15726 13498 15010 Total expenses 70156 51604 65253 210237 231183 340037 Profit I (Loss) before exceptional items and tax 455 174 (458) 2136 2502 4758 Exceptional items (1119) - 2043 (1119) 2043 2043 Profit I (Loss) from ordinary activites before tax (3+4) (664) 174 1585 1017 4545 6801 Tax expense (230) 61 565 352 1589 2386 Profit I (Loss) for the period (434) 113 1020 665 2956 4415 Other Comprehensive Income (OCI) 27 10 28 31 94 64 Total Comprehensive I nco me for the period (7 + 8) (407) 123 1048 696 3050 4479 Paid - up equity share capital (Face value of the share~ 10 each) 7216 7216 7216 7216 7216 7216 Other Equity - - 130549 Earnings per Share (EPS) (in~) (not annualised) a) Basic (0.60) 0.16 1.41 0.92 4.10 6.12 b) Diluted (0.60) 0.16 1.41 0.92 4.10 6.12 1 2 3 4 SEGMENTWISE REVENUE, RESULTS, ASSETS AND LIABILITIES Segment Revenue a) Capital Goods 9406 6038 5145 19053 13699 27226 b) Construction and EPC Contracts 61354 45701 59653 193303 219984 317568 c) Unallocated Total 70760 51739 64798 212356 233683 344794 Less: Inter Segment Revenue Net Sales I Income from Operations 70760 51739 64798 212356 233683 344794 Segment Results Profit(+) I (loss)( ) before tax and interest a) Capital Goods (234) (215) 460 (838) 426 2049 b) Construction and EPC Contracts 6909 7321 7552 22870 23706 31019 c) Unallocated (149) 39 (3) 17 2 1 Total 6526 7145 8009 22049 24134 33069 Less: Interest 7190 6971 6424 21032 19589 26268 Total Profit I (Loss) Before Tax (664) 174 1585 1017 4545 6801 Segment Assets a) Capital Goods 48074 48001 32287 48074 32287 41042 b) Construction and EPC Contracts 556133 584846 552815 556133 552815 580630 Total 604207 632847 585102 604207 585102 621672 Segment Liabilities a) Capital Goods 21485 19903 10951 21485 10951 18150 b) Construction and EPC Conlr<lcls 444260 474075 437815 444260 437815 465757 Total 465745 493978 448766 465745 448766 483907

Notes: 1 The above results were reviewed by the Audit Committee and approved by the Board of Directors at the respective meetings held on February 07, 2018. 2 The financial results for the quarter and nine months ended December 31, 2017 of the Company on standalone basis have been subjected to "Limited Review" by the Statutory Auditors of the Company. 3 Post app licability of Goods and Services Tax (GST) with effect from July 01, 2017 1 evenue from operations for the three months and nine months ended December 31, 2017 is net of GST. Therefore, the corresponding figures of previous periods are not comparable. 4 Exceptional item represents net write off of~ 1119 Lakhs, being the amount of~ 8010 Lakhs paid, towards BG encashment by a client, after adjusting available provision of~ 6891 Lakhs. However, the Company is seeking legal advise to assert Its right under the contract and for recovery of the amounts paid to the client. 5 The figures for the previous period have been regrouped I rearranged wherever necessary to conform to the current period of presentation. For BGR ENERGY SYSTEMS LIMITED Place : Chennai Date : February 07, 2018 ARJUN GOVIND RAGHUPATHY Deputy Managing Director & Chief Operating Officer

(CA) N.R.Doraiswami & Co Head Office : Manchlllu", No. 48, Race Course Colmbatore- 641 018. Phone: 0422-2223780 (3 Lines) MoUld : admln@srlnrd.ln audlt@srlnrd.ln Independent Auditors' Limited Review Report To The Board of Directors of BGR Energy Systems Limited I. We have reviewed the accompanying Statement of Standalone Unaudited Financial Results ofbgr Energy Systems Limited ("the Company") for the quarter and nine months ended December 31, 2017 ("the Statement"), being submitted by the Company pursuant to the requirement of Regulation 33 of the SEBI (Listing Obligations and Disclosure Requirements) Regulation, 2015, as modified by Circular no. CIR/CFD/F AC/62/20 16 dated July 5, 2016. 2. This Statement, which is the responsibility of the Company's Management and approved by the Board of Directors, has been prepared in accordance with the recognition and measurement principles laid down in Indian Accounting Standard 34 "Interim Financial Reporting" ("IND AS 34"), prescribed under Section 133 of the Companies Act, 2013 read with relevant rules issued thereunder and other accounting principles generally accepted in India. Our responsibility is to issue report on the Statement based on our review. 3. We conducted our review of the Statement in accordance with the Standard on Review Engagement (SRE) 2410, "Review of Interim Financial Information Performed by the Independent Auditor of the Entity' issued by the Institute of of India. This standard requires that we plan and perform the review to obtain moderate assurance as to whether the Statement is free of material misstatements. A review is limited primarily to inquiries of Company personnel and analytical procedures applied to financial data and thus provide less assurance than an audit. We have not performed an audit and, accordingly, we do not express an audit opinion. Chennal Branch: No. 75 (3H), Third Floor, Prince Arcade New No. 29, Old No. 22-A, Cathedral Road, Chennal - 600 086.

(C<\) N. R~Doraiswami & Co Head Office : Manchlllu", No. 48, Race Course Colmbatore 641 018. Phone: 0422 2223780 (3 Lines) Mallld : admln@srlnrd.ln audlt@srlnrd.ln 4. Based on our review conducted as stated above, nothing has come to our attention that causes us to believe that the accompanying Statement, prepared in accordance with the aforesaid Indian Accounting Standard and other accounting principles generally accepted in India, has not disclosed the information required to be disclosed in terms of Regulation 33 of the SEBI (Listing Obligation and Disclosure Requirements) Regulations, 2015 as modified by Circular No. CIR/CFD/FAC/62/2016 dated July 5, 2016, including the manner in which it is to be disclosed, or that it contains any material misstatement. Place: Chennai Date: February 7, 2018 For N.R. DORAISWAMI & CO Firm Registration No. :000771S SUGUNARAVJC~ Nl_ Partner Membership No. : 207893 Chennal Branch: No. 75 (3H), Third Floor, Prince Arcade New No. 29, Old No. 22-A. Cathedral Road, Chennal 600 086.