Nonconformance Procedure. Nonconformance Procedure

Similar documents
NON CONFORMITIES CORRECTIVE AND PREVENTIVE ACTIONS

SCM-BFM-001 Buyer Furnished Material (BFM) Management Plan. Revision: 4

Service Manual. Service Policy UNCONTROLLED IF PRINTED 1 PURPOSE

INFORMATION: Audit Report on "Quality Assurance of Black Cells at the Waste Treatment Plant"

MEDICAL DEVICE GUIDANCE

Warranty Service Authorization Policy

The purpose of this regulation is to define the procedures and responsibilities for accepting, reporting, and accounting for gifts and bequests.

Welcome to the topic on goods returns and credit memos in purchasing.

Purchasing Policies and Procedures Handbook

CUYAHOGA COUNTY DEPARTMENT OF INTERNAL AUDITING

Purchasing - Bids and Contracts P

Chennai Metro Rail Limited (A Joint Venture of Govt. of India and Govt. of Tamil Nadu)

Nepal Telecom. Nepal Doorsanchar Company Limited Sealed Quotation No. NDCL/DWT-SQ-02/ For Supply and Delivery Of Optical MODEM November, 2015

SUBCONTRACTOR TOOLING MANUAL

2. Identifying missing property/cash: Account for property disposition (in use, returned to respondent, sold, missing)

Policy Number: FA-PO-1211 Date of Last Review: 9/7/2017. Oversight Department: Facilities Management Next Review Date: 9/1/2020

TYLER INDEPENDENT SCHOOL DISTRICT PURCHASE ORDER TERMS AND CONDITIONS

Southwest Colorado Council of Governments. Purchasing Policies

ANTI-FRAUD CODE CONTENTS INTRODUCTION GOAL CORPORATE REFERENCE FRAMEWORK CONCEPTUAL FRAMEWORK ACTION FRAMEWORK GOVERNANCE STRUCTURE

Administrative Policies And Procedures

LPEFI. Isuzu Warranty Guide

a. Article(s) Goods and/or services described on the face of the Purchase Order

POLICY ON LEAKS UP TO OWNER AND REPLACEMENT OF LEAD WATER SERVICE PIPES I. POLICY STATEMENT 1 II. RESPONSIBILITIES 1

September 21, Panelists: Scott Soukup, Quality Specialist, RCA Inc. Joan M. Ward, Quality Subject Matter Expert, RCA Inc.

TERMS AND CONDITIONS OF SALE (REV. 11/16)

STANDARD TERMS AND CONDITIONS

CITY OF MINNEAPOLIS MOTORIZED VEHICLE AND EQUIPMENT CONTROL PROCEDURE. Table of Contents

5.03 PRE-BID MEETING AND ADDENDA A. Conduct the Pre-Bid Meeting using the A52 Pre-Bid Meeting Agenda provided in Appendix 1.

TERMS OF REFERENCE (TOR) FOR AUDITS OF UN-WOMEN NGO, GOV T, IGO AND GRANT PROJECTS

CITY OF HUTCHINSON BID FORM Page 1 of 2

UL Qualified Firestop Contractor Program and Requirements

REQUEST FOR QUALIFICATIONS (RFQ) FOR DSA INSPECTOR OF RECORD (IOR) SERVICES

77th OREGON LEGISLATIVE ASSEMBLY Regular Session. Enrolled. House Bill 4055

Warranty Claim Procedures. for Warehouse Distributors and Service Distributors

Informal Solicitation #STEM_FURNITURE Fermob

SPECIFICATION NO. TxDOT DATED: DECEMBER 2016 Title: FACILITY MAINTENANCE AND REPAIR SERVICE

Standard Form of Agreement Between OWNER AND CONSTRUCTION MANAGER Construction Manager At-Risk

National Flood Insurance Program. Flood Insurance Claims Handbook

Warranty Service Information

NESS Accounting Policies and Procedures 2017

SPECIFICATIONS FOR ALUMINUM STREET LIGHT POLES FOR THE ELECTRIC DEPARTMENT BROOKINGS MUNICIPAL UTILITIES BROOKINGS, SOUTH DAKOTA SEPTEMBER 2012

ATTACHMENT A CONTRACTOR SUPPLEMENTAL PRICELIST INFORMATION AND TERMS BROCADE COMMUNICATIONS SYSTEMS, INC.

2014 Own Risk and Solvency Assessment (ORSA) Feedback Pilot Project Observations of the Group Solvency Issues (E) Working Group

Section: Major Maintenance and Repair Reserve Fund

Capital Assets Start to Finish. Business & Financial Services Property Management Professional Development Institute 2014

Yellow Book and Single Audit Update Bruce A. Nunnally, CPA, CGMA June 2016

PROCUREMENT POLICY SAN MATEO COUNTY TRANSIT DISTRICT

REQUEST FOR QUALIFICATIONS (RFQ) FOR DSA INSPECTOR OF RECORD (IOR) SERVICES. April 18, 2006

Nepal Telecom. Nepal Doorsanchar Company Limited Sealed Quotation No. NDCL/DWT-SQ 02/ For Supply and Delivery of Optical MODEM.

Terms and conditions: Qoo10 x BankBazaar Exclusive Deal

CITY OF WHITE CLOUD POVERTY EXEMPTION APPLICATION 2015

Scope of Service Financial Management Services - Representative Payee

Government Transaction Dispute Office Guide

one of the factories belonging to the TELE-FONIKA KABLE GROUP TELE-FONIKA KABLE or one of its subsidiaries belonging to the TELE-FONIKA KABLE GROUP.

ATTENTION ALL BIDDERS MANDATORY PRE-BID MEETING TUESDAY FEBRUARY 19, 2:00 P.M.

Chapter 12. Auditing Contract Termination Delay Disruption and Other Price Adjustment Proposals or Claims

New Buildings Program 2.0

Paper F8 (SGP) Audit and Assurance (Singapore) Thursday 6 June Fundamentals Level Skills Module

Returns and Voids. Option 1 When using a Credit Card Keyboard With the Sales Invoice Screen appearing, to Access the Return Function

INVITATION FOR BIDS PRINTING AND PRESORTED MAILING OF ASSESSMENT LISTS

ETTORE ZANON S.p.A. GENERAL CONDITIONS OF PURCHASE

Flood Insurance Claims Handbook

Board of Public Works Interagency Committee on School Construction

ATTENTION ALL BIDDERS MANDATORY PRE-BID MEETING WEDNESDAY, MARCH 8, 10:00 A.M.

COST ACCOUNTING STANDARD ON MATERIAL COST

Atlantis Industries Corporation Terms and Conditions

Warranty Policies and Procedures

Vehicle Maintenance Bulletin

ProTrac Work Orders Repair by your Service People or Repair done by an outside service both handled by ProTrac

Federal Property Management Standards

The American University in Cairo Financial Policies and Procedures

INSTRUCTIONS TO BIDDERS

GENERAL FIXED ASSETS Fixed Assets Administration

PMP (2018) PMBOK 6th Edition PMI. Project Management Professional (PMBOK 6th Edition)

Policy 3-100: University Procurement

Document A133 TM. AGREEMENT made as of the day of in the year Two Thousand and Sixteen. BETWEEN the Owner:

a) Cash ,000 Accounts Receivable... 2,220,000 Sales... 2,960,000 To record sales; 25% x $2,960,000 total sales = cash sales of $740,000.

Chapter #III Internal Procedures

GENERAL TERMS AND CONDITIONS OF PURCHASE. Applegate EDM General Terms and Conditions of Purchase are applicable to all purchase orders;

Multi-Purpose/Multi-Party Account Agreement. Multistate Completion Guide for the MPMP Form Series

THIS APPENDIX CONTAINS ALL the measurements described in Chapters 2

Patient Setup Screen

Business and Noninstuctional Operations

State of California CONTRACT USER INSTRUCTIONS SUPPLEMENT 2 ****NON-MANDATORY****

CITY OF IRVINE IRVINE, CALIFORNIA SINGLE AUDIT OF FEDERAL AND SELECTED STATE ASSISTED GRANT PROGRAMS FOR THE YEAR ENDED JUNE 30, 2017

PURCHASE ORDER PROCEDURES MANUAL

TITLE 70: DEPARTMENT OF FINANCE SUBCHAPTER COST AND PRICE ANALYSIS REGULATIONS

WARRANTY POLICY FOR AGRICULTURAL STRUCTURES AND EQUIPMENT

Highlands County Board of County Commissioners

STATE OF NEVADA OFFICE OF LIEUTENANT GOVERNOR

Instructions to Bidders REF: I 805 North HOV / BRT DB Contract 11-2T2004

Rock Hill Fire Department RFP for HAZMAT Training Suits CITY OF ROCK HILL, SOUTH CAROLINA REQUEST FOR PROPOSAL HAZMAT SUITS

University Identity Theft and Detection Program

PART 2.7 DEPARTMENT OF HEALTH AND COMMUNITY SERVICES MEDICAL EQUIPMENT

RESOLUTION NO

STANDARDS OF THE GEORGIA LEMON LAW Motor Vehicle Warranty Rights Act

~ Lff. Property and Assets Management. Section 1. Purpose

CLIMAGUARD Air-To-Air Indoor Heat Exchangers. All Models INSTRUCTION MANUAL nvent Rev. H P/N

2018 Medicare Part D Transition Policy

Return to Credit - Reference Guide

Transcription:

Nonconformance Procedure Original Release Date: Revision Level: 05-03-2016 C Revision Date: 01-18-2018 SpecSys Inc. Granite Falls, MN New Ulm, MN Watertown, SD Prentice, WI 1 of 7

Nonconformance Procedure 1.0 Purpose The purpose of this procedure is to define a systemic approach for identifying, documenting, containing, and evaluating nonconforming product. 2.0 Scope To control all nonconforming product, equipment, process or condition by ensuring that all nonconformance s are identified and corrected in a formalized and controlled manner. This procedure applies to all SpecSys, Inc. personnel in the manufacturing setting where they observe situations that do not meet the minimum requirements of the applicable print, standard, code or specification. This procedure is to provide the framework for: Alert, notice or recognition of a nonconformance Documenting nonconformance Ensuring corrective action is administered to prevent recurrence or contain a known defect Follow up and close out of the NCR (Nonconformance Report) 3.0 Responsibilities It is the responsibility of: Any SpecSys, Inc. employee to notify their immediate superior in the event a deficient condition has been identified. The Lead Person, Supervisor, Manager, or appointed personnel to dutifully initiate a formal NCR whenever the deficient condition is deemed nonconforming. The Plant Manager / Quality Department / Project Management to review the NCR, determine the course of action by defining the rework or containment instructions via going through the correct channels for disposition. Quality Department / Plant Manager / Project Manager to oversee the action(s) administered for all nonconformance issues, ensure follow up is completed, and the NCR is closed out. 4.0 Identification of a Nonconforming Condition The majority of the nonconforming conditions will be identified during the manufacturing process. However, any employee may identify a nonconformance situation during their normal working activities. A nonconformance condition identified: Within the department s processes (mid-work, pre-closed quality checks, etc.) when the nonconformance is easily repairable and does not require assistance from other departments, an NCR is not required. I.e. Weld department finds the weld department s nonconformance prior to leaving weld. o Discovered inside of department, but unclear how to move forward, an NCR is needed. Outside the department responsible for the nonconformance, must have a formal NCR generated according to the requirements in Section 5 of this procedure. o Rule of Labor Prudence: If rework for the nonconformance will take less than six minutes to completion of rework an NCR is not warranted (if found outside of the department that caused it). Greater than six minutes of rework requires an NCR. 2 of 7

5.0 Nonconformance Report (NCR) Documentation The Nonconformance Report (NCR) is a multi-copy form (QA-20) consisting of a white and yellow copy for distribution and resolution, and a hard-card red copy (red tag) to attach to the part for rejection identification. All parts deemed nonconforming must be identified using an NCR with the following information in the Identification section: Part Number Print Number and/or Item Number of the product found to be nonconforming. Description Of the part number(s) as described on the print. Date NCR was generated. Qty Quantity found to be nonconforming. WO Number Work Order Number assigned by SpecSys, Inc. Facility/Supplier SpecSys Manufacturing Facility or Supplier who manufactured or supplied the nonconforming product. Description of Nonconformance Give a brief description as to the reason the product does not meet the applicable requirement(s). When writing the description of the nonconformance, always begin the statement by associating to the print feature that is nonconforming, i.e.: o The 5.250 in. dimension is 4.250. o ½ fillet weld for Item #3 measures ¼. o 2.375 +/-0.010 Dia. Bore measures 2.355. The person who fills out the nonconformance shall write his/her Name and enter the appropriate Date. ** Any employee capable of filling out the NCR form can do so. The department s Lead should be made aware of the NCR if they are not directly involved in identifying the issue and filling out the NCR ** 6.0 Nonconformance Report (NCR) Red Tagging and NCR Delivery: Upon completion of the Identification section of the form, the originator will: Remove the red tag from the back of the form and attach it to the nonconforming product using a tag wire. Isolate the product(s) apart from usable product until final disposition has been determined. Provide the NCR for disposition using option 1 if available, or otherwise option 2: 1. Deliver the white and yellow copy of the NCR to the applicable Plant Manager, Quality Employee, or Project Manager (whichever is physically on-site). 2. If Plant Manager, Quality Employee and Project Manager are not present on site, scan and email the NCR to the Quality Department (quality@ritalka.com) Note: All completed NCR s (white, yellow and red copy) must be provided to the quality department via physical hand-off, interoffice mail or email to quality@ritalka.com for final closure. 3 of 7

7.0 Plant Manager / Quality Department / Project Manager will review the nonconformance and direct the NCR through the appropriate channels. The individual that develops the disposition will complete the Disposition and Rework Instructions sections and write their name and the date in the Rework Instructions section (write all on White copy and rip off Yellow copy). Then for: Rework o The Plant Manager, Quality Employee, or Project Manager will notify the appropriate Lead Person to complete the rework as noted on the NCR. When physically in the same location they will deliver the Yellow copy to the Lead that has the rework instructions on it. When not on location the instructions will be emailed appropriately. It is the Lead s responsibility to verify that the rework was performed and found to be acceptable, fill out and sign/date the Description of Corrective / Preventive Actions section on the Yellow copy, and return it to the Plant Manager, Quality, or Project Manager. Plant Manager, Quality, or Project Manager will verify the work and take the red tag to be submitted with the closed NCR documents. Plant Manager, Quality, or Project Manager will then sign and date the Approved By section on the White copy. Once the Quality Department has all of the forms back and work has been completed they will sign and date the Nonconformance Closure section Note: The Plant Manager or Project Manager is responsible for forwarding the White and Yellow copy NCR and red tag to the Quality Department for final close out if it is them that gathered the documents. Use-As-Is o Check the appropriate box. o Sign and date in the Approved By space provided. o Notify the applicable department Lead. The Plant Manager or Project Manager is responsible for getting the NCR to the Quality Department for close out if it is them that disposition it. Scrap o The Plant Manager, Quality member, or Project Manager will notify the appropriate Lead Person to scrap as noted on the NCR. o The Lead must notify the one who dispositioned the NCR when completed. The one who dispositions the NCR is responsible for providing the NCR to the Quality Department for close out. Inventory will need to be adjusted in GSS. Procurement actions to follow as needed. Customer Deviation Request o Contact the appropriate client rep pertaining to the situation. o If approved check the appropriate box. o Sign and date in the Approved By space provided. 4 of 7

Approved : attach a copy of the customer s acceptance to the NCR and provide to the Quality Department. Disapproved : attach a copy of the customer s disapproval, document the Work Order Number for part replacement and forward to the Project Manager so they can initiate the steps forward that they deem appropriate. If the deviation request results in an accepted rework plan, follow Rework instructions above. The Project Manager must be notified of the deviation request results. 8.0 Supply Chain Manager / Purchasing Agent will review the nonconformance when the course of action is noted as Return to Supplier. It is the responsibility of the Supply Chain Manager and/or Purchasing Agent to notify the applicable supplier of the deficiency and agree on a course of action to: Return To Supplier o Check the appropriate box. o Sign and date in the Approved By space provided. o Document the RMA #, replacement PO Number, or returned credit agreement in the Description of Corrective/Preventive Action section. o Forward completed NCR documents to the Quality Department for closure Rework at SpecSys: o Check the appropriate box. o Documented rework instructions from the supplier must be attached to the NCR. o Sign and date in the Rework Instructions space provided. o Provide to Plant Manager / Quality / Project Manager who will then follow the Rework protocol laid out above. Scrap at SpecSys: o Notify Plant Manager / Quality / Project Manager who will then follow Scrap protocol listed above. Inventory will need to be adjusted in GSS. The NCR documents are provided to the Quality Department for close out. **Appendix A: Flowchart on next page** 5 of 7

Appendix A: NCR Flowchart 6 of 7

DATE REVISION CHANGES APPROVAL 5-03-2016 A Initial Release Doug Schrader 9-15-2016 B Added Flowchart & SpecSys locations Pam Schmid 1-18-2018 C Revised verbiage & flowchart Riley Wald 7 of 7