Glasgow City centre (Potentially Vulnerable Area 11/16) Local Plan District Local authority Main catchment Clyde and Loch Lomond Glasgow City Council

Similar documents
Clyde south - Port Glasgow to Inchinnan (Potentially Vulnerable Area 11/09) Local Plan District Clyde and Loch Lomond Local authority Inverclyde Counc

Nairn Central (Potentially Vulnerable Area 01/18) Local authority Main catchment The Highland Council Moray coastal Background This Potentially Vulner

Clyde catchment - Motherwell to Lesmahagow (Potentially Vulnerable Area 11/17/2) Local Plan District Clyde and Loch Lomond Local authority North Lanar

Stirling (Raploch and Riverside) (Potentially Vulnerable Area 09/07) Local Plan District Local authority Main catchment Forth Stirling Council Stirlin

Conon Bridge and Muir of Ord (Potentially Vulnerable Area 01/16) Local authority Main catchment The Highland Council River Conon Background This Poten

Oban (Potentially Vulnerable Area 01/31) Local authority Main catchment Argyll and Bute Council Knapdale coastal Background This Potentially Vulnerabl

Coupar Angus (Potentially Vulnerable Area 08/07) Local Plan District Local authority Main catchment Tay Perth and Kinross Council Coupar Burn (River T

Ellon (Potentially Vulnerable Area 06/12) Local Plan District North East Local authority Aberdeenshire Council Main catchment River Ythan, Buchan coas

Fort William (Potentially Vulnerable Area 01/25) Local authority Main catchment The Highland Council Appin coastal Background This Potentially Vulnera

Dornoch (Potentially Vulnerable Area 01/07) Local Plan District Highland and Argyll Local authority The Highland Council Main catchment Dornoch coasta

Turriff (Potentially Vulnerable Area 06/07) Local Plan District Local authority Main catchment North East Aberdeenshire Council River Deveron Backgrou

Newton Stewart (Potentially Vulnerable Area 14/12) Local Plan District Local authority Main catchment Dumfries and Galloway Solway River Cree Council

Stirling (Cornton and Causewayhead) (Potentially Vulnerable Area 09/05) Local Plan District Forth Local authority Clackmannanshire Council, Stirling C

Forres (Potentially Vulnerable Area 05/06) Local Planning District Local authority Main catchment Findhorn, Nairn and Speyside The Moray Council Moray

Caol and Inverlochy (Potentially Vulnerable Area 01/24) Local Plan District Highland and Argyll Local authority The Highland Council Main catchment Fo

Ness, Isle of Lewis (Potentially Vulnerable Area 02/01) Local Plan District Outer Hebrides Local authority Comhairle nan Eilean Siar Main catchment Le

Dunblane and Bridge of Allan (Potentially Vulnerable Area 09/03) Local Plan District Local authority Main catchment Forth Stirling Council Allan Water

Kelso (Potentially Vulnerable Area 13/09) Local Plan District Local authority Main catchment Tweed Scottish Borders Council River Tweed Background Thi

Kirkwall (Potentially Vulnerable Area 03/05) Local Plan District Local authority Main catchment Orkney Orkney Islands Council Orkney coastal Backgroun

Ross of Mull (Potentially Vulnerable Area 01/30) Local authority Main catchment Argyll and Bute Council Island of Mull coastal Background This Potenti

Nairn East and Auldearn (Potentially Vulnerable Area 05/08) Local Planning District Local authority Main catchment Findhorn, Nairn and Speyside The Hi

River Findhorn (Potentially Vulnerable Area 05/07) Local Planning District Local authority Main catchment Findhorn, Nairn and The Highland Council, Ri

Creetown (Potentially Vulnerable Area 14/17) Local Plan District Local authority Main catchment Dumfries and Galloway Solway Moneypool Burn Council Ba

Alyth (Potentially Vulnerable Area 08/04) Local Plan District Local authority Main catchment Tay Perth and Kinross Council Alyth Burn (River Tay) Back

Arbroath (Potentially Vulnerable Area 07/07) Local Plan District Local authority Main catchment Tay Estuary and Montrose Basin Angus Council Brothock

Inverurie and Kintore (Potentially Vulnerable Area 06/13) Local Plan District Local authority Main catchment North East Aberdeenshire Council River Do

Castle Douglas (Potentially Vulnerable Area 14/11) Local Plan District Local authority Main catchment Dumfries and Galloway Solway River Dee (Solway)

Elgin (Potentially Vulnerable Area 05/05) Local Planning District Local authority Main catchment Findhorn, Nairn and Speyside The Moray Council River

Aberfeldy and Pitlochry (Potentially Vulnerable Area 08/03) Local Plan District Local authority Main catchment Tay Perth and Kinross Council River Tay

Luncarty, Stanley, Bankfoot, Dunkeld and Birnam (Potentially Vulnerable Area 08/08) Local Plan District Local authority Main catchment Tay Perth and K

Isle of Arran (Potentially Vulnerable Area 12/08) Local Plan District Local authority Main catchment Brodick to Kilmory Ayrshire North Ayrshire Counci

Hillfoots Villages (Potentially Vulnerable Area 09/04) Local Plan District Forth Local authority Clackmannanshire Council, Stirling Council Main catch

Flood Risk Management Strategy Orkney Local Plan District This section is the most relevant for individuals, communities and businesses seeking to und

Eddleston, Peebles, Innerleithen, Selkirk, Stow and Galashiels (Potentially Vulnerable Area 13/04) Local Plan District Local authority Main catchment

2.1 Summary of flooding in the Forth Local Plan District The covers an area of 1,609km 2 with a population of approximately 130,000. It contains five

Flood Risk Management Strategy. Shetland

Solway Local Plan District 1 Flood risk management in Scotland 1.1 What is a Flood Risk Management Strategy? Flood Risk Management Strategies have bee

Flood Risk Management (Scotland) Act 2009: DRAFT Local Flood Risk Management Plan Ayrshire Local Plan District

2.1 Summary of flooding in the Forth Estuary Local Plan District The covers an area of 3,256km 2 with a population of approximately 1.4 million. It co

What can be done to minimise future economic and social harm caused by flooding and improve resilience. Flood Warning and Informing

Flood Risk Management Planning in Scotland: Arrangements for February 2012

Indicators and trends

SEPA Update (How can Kemnay become a PVA?)

Social vulnerability and climate change in Flood Risk Management in Scotland

FLOODING INFORMATION SHEET YOUR QUESTIONS ANSWERED

Shropshire Local Flood Risk Management Strategy. Summary for Consultation. July 2014

Indicators and trends

Understanding the risks, empowering communities, building resilience: the national flood and coastal erosion risk management strategy for England

Unique ID: (from PFRA database) Location: Bridgetown, Co. Clare. Stage 1: Desktop Review

RIVER LUGG INTERNAL DRAINAGE BOARD. Statement on Water Level and Flood Risk Management

Indicators and trends

THE RIVER STOUR (KENT) INTERNAL DRAINAGE BOARD. Policy Statement on Water Level and Flood Risk Management

Unique ID: (from PFRA database) Location: Nenagh, Co. Tipperary. Stage 1: Desktop Review

Planning and Flood Risk

eastsussex.gov.uk East Sussex Local Flood Risk Management Strategy

Canada s exposure to flood risk. Who is affected, where are they located, and what is at stake

River Lugg Internal Drainage Board. Policy Statement on Flood Protection and Water Level Management

Enviroment. Flood disadvantage in Scotland: mapping the potential losses in well-being

Review of preliminary flood risk assessments (Flood Risk Regulations 2009): guidance for lead local flood authorities in England

Consider the risks to your own business as well as to your operations

Lowestoft. Summary 2016 FLOOD RISK MANAGEMENT. Mike Page

LOCAL FLOOD RISK STRATEGY EMYR WILLIAMS PEMBROKESHIRE COUNTY COUNCIL

Development and Flood Risk - the Environment Agency s approach to PPS25. scrutinised before planning decisions are made

Resilience to Flooding of Grid and Primary Substations

Working with natural processes to help manage flood risk natural flood management Dr. Heather Forbes. Scottish Environment Protection Agency

RESERVOIR LEGISLATION IN WALES

Annex 1: Glossary. Annual Average Damages (AAD) Benefit cost ratio (BCR) Candidate Potentially Vulnerable Area (PVAc)

IRISH FLOOD PREVENTION PROGRAMME Example of integrating climate change adaptation into projects

Role of the Flood & Water Management Committee & LCC as Lead Local Flood Authority

Protocol for the maintenance of flood and coastal risk management assets (England only) Version 4, 27/01/2014 UNCLASSIFIED

PREPARE FOR FLOODING.

Glossary. Annual Average Damages (AAD) Benefit cost ratio (BCR)

LOW. Overall Flood risk. Flood considerations. Specimen Address, Specimen Town. Rivers and the Sea Low page 4. Historic Flood.

PRESENTATION BY OPW TO JOINT OIREACHTAS COMMITTEE ON CULTURE, HERITAGE, AND THE GAELTACHT

Strategic Flood Risk Assessment

Strategic Flood Risk Assessment

Background to the PFRA European Overview - UC9810.5b

Provision of Flood Risk Information for sites on Duchess Street, Grimsby and Doughty Road, Grimsby.

Lowestoft Flood Risk Management Project

FOR TO THE GAELTACHT LOCAL AREA PLAN MARCH 2013

Flood and Coastal Risk Management - A Risk Based. David Rooke Head of Flood & Coastal Risk Management 20 March 2009

Mapping climate disadvantage Identifying vulnerable groups of people. Aleksandra Kazmierczak Cardiff University

FLOOD SOLUTIONS Residence

Regulations Regarding Preliminary Flood Risk Assessment, Flood Maps and Flood Risk Management Plan

Strategic Flood Risk Assessment. SFRA Report

Local Government Group. Preliminary Framework to assist the development of the Local Strategy for Flood Risk Management.

ABI RESPONSE TO PITT INTERIM REPORT: OVERVIEW

The AIR Inland Flood Model for Great Britian

A GUIDE TO BEST PRACTICE IN FLOOD RISK MANAGEMENT IN AUSTRALIA

33. Government financial support to local authorities

Barry Island and Docks (2)

DRAFT Revised Guide to the National CDEM Plan 2015 July 2015

PLANNING FOR SAFE AND SUSTAINABLE COMMUNITIES

CYNGOR SIR POWYS COUNTY COUNCIL. CABINET EXECUTIVE 18 th September Flood Risk Management Plan (FRMP)

Joint Lincolnshire Flood Risk and Drainage Management Strategy: Draft v.6.0:consultation Draft, : Annexes A-F

Aquidneck Island Resilience Strategy Issue Paper 4. Issue: RESIDENTIAL FLOODING

Comhairle Baile Cheanntair~ Nás na Ríogh

Proposed Neart na Gaoithe Wind Farm: Offshore Cable Landing Flood Risk Assessment Mainstream Renewable Power

STRATEGIC FLOOD RISK ASSESSMENT

Homecheck Flood. Click here. Overall Flood Risk. Insurability. Flood Defences. Individual Flood Risks.

Transcription:

Glasgow City centre (Potentially Vulnerable Area 11/16) Local Plan District Clyde and Loch Lomond Local authority Glasgow City Council Main catchment River Clyde Summary of flooding impacts At risk of flooding 420 residential properties 460 non-residential properties 550,000 Annual Average Damages (damages by flood source shown left) Summary of flooding impacts Summary of objectives to manage flooding Objectives have been set by SEPA and agreed with flood risk management authorities. These are the aims for managing local flood risk. The objectives have been grouped in three main ways: by reducing risk, avoiding increasing risk or accepting risk by maintaining current levels of management. Many organisations, such as Scottish Water and energy companies, actively maintain and manage their own assets including their risk from flooding. Where known, these actions are described here. Scottish Natural Heritage and Historic Environment Scotland work with site owners to manage flooding where appropriate at designated environmental and/or cultural heritage sites. These actions are not detailed further in the Flood Risk Management Strategies. Objectives Summary of actions to manage flooding The actions below have been selected to manage flood risk. Flood scheme/works Flood study Natural flood management works Natural flood management study New flood warning Maintain flood warning Community flood action groups Awareness raising Property level scheme Surface water plan/study Site plans Emergency plans/response Actions Maintain flood scheme Strategic mapping and modelling Flood forecasting Self help Maintenance Planning policies Clyde and Loch Lomond Local Plan District Section 2 248

Glasgow City centre (Potentially Vulnerable Area 11/16) Local Plan District Local authority Main catchment Clyde and Loch Lomond Glasgow City Council River Clyde Background This Potentially Vulnerable Area is located in Glasgow City centre along the north of the River Clyde between Glasgow Bridge in the east and the riverside museum to the west (shown below). The area incorporates Yorkhill, Glasgow Central railway station, Townhead and is approximately 4km 2. The area has a risk of river, surface water and coastal flooding. The majority of damages are caused by surface water flooding. There are approximately 420 residential properties and 460 non-residential properties at risk of flooding. The Annual Average Damages are approximately 550,000. Figure 1: Annual Average Damages by flood source Crown copyright. SEPA licence number 100016991 (2015). All rights reserved. Summary of flooding impacts Surface water flooding in the area impacts residential properties and there is also the potential for flooding to restrict access to many others. The areas at highest risk from surface water flooding will require the preparation of surface water management plans. Scottish Water and local authorities have completed a number of studies in the area. These have included strategic and detailed assessments of surface water risk and its interaction with river flooding, as well as considering mitigation actions. Many of these studies have been helped by the partnership working developed within the Metropolitan Glasgow Strategic Drainage Partnership. This has led to the implementation of schemes and works to protect properties from river and surface water flooding. The southern boundary of the Potentially Vulnerable Area fronts onto the River Clyde which is tidal over this entire reach. Coastal flooding is predicted to affect approximately 170 residential and 20 non-residential properties as well as sections of the road and rail network. Coastal flood risk is centred on the mouth of the River 249 Section 2 Clyde and Loch Lomond Local Plan District

Kelvin, in the vicinity of the Scottish Exhibition and Conference Centre, and sections of Lancefield and Anderston Quay as far as the Kingston (M8) Bridge. The assessment of coastal flooding does not include local surge and wave impacts which have the potential to increase coastal flood risk. Severe weather conditions to the south and west of the Firth of Clyde can cause a surge that will run up the Firth as far as Glasgow. If a surge coincided with a high tide, the water level could rise above the quay walls in the city centre, increasing the identified risk. The risk of flooding to people and property, as well as to community facilities, utilities, the transport network, designated sites and agricultural land is summarised in Table 1. The damages associated with floods of different likelihood are shown in Figure 2. Non-residential properties affected by surface water flooding experience the highest economic impact at approximately 40% of the damages. Within this Potentially Vulnerable Area it is estimated that climate change will increase the number of residential properties at risk of flooding from approximately 420 to 680 and the number of non-residential properties from approximately 460 to 830. The location of the impacts of flooding is shown in Figure 3. The M8 and M74 are at risk of flooding within this Potentially Vulnerable Area. History of flooding There is a long history of flooding within this area. Many of the river floods which caused damages to properties and people occurred prior to the Clyde being canalised and widened to the south (1700's and 1800's), however the city was very different at this time. Between 10-12 December 1994 major flooding occurred in rivers and urban watercourses across Glasgow and surrounding areas. A slow-moving weather system delivered persistent rain over a 48 hour period across a wide geographical area. Previously recorded peak river flows were exceeded in all major catchments in the region. The River Clyde is thought to have reached its highest level in 150 years, and the total cost of the damage reached in the region of 100 million. This flood had a magnitude of 50-100 year return period. There were 700 homes and many businesses affected in Strathclyde. This flood severely affected Glasgow City and completely inundated the grounds of the Scottish Exhibition and Conference Centre. On 8 of August 1948 surface water flooding resulted in two deaths and transport disruption. Some homes were isolated by the flood waters and a telephone communication was affected. There have been no coastal floods recorded within this Potentially Vulnerable Area; however, it is likely that many of the early river flood events could be attributed to tidal surges from the Clyde. Clyde and Loch Lomond Local Plan District Section 2 250

Residential properties (total 10,000) Non-residential properties (total 10,000) 1 in 10 1 in 200 1 in 1000 High likelihood Medium likelihood Low likelihood <10 420 720 40 460 820 People <10 920 1,600 Community facilities 0 <10 Includes: educational buildings and healthcare facilities 10 Includes: educational buildings, emergency services and healthcare facilities Utilities assets <10 <10 <10 Transport linksroads (km) 0.7 (of which 0.3 is motorway) 2.4 (of which 0.6 is motorway) Transport linksrail (km) 0.4 1.2 1.7 Designated cultural heritage 0 20 39 sites Table 1: Summary of flooding impacts 1 3.7 (of which 0.6 is motorway) Figure 2: Damages by flood likelihood 1 Some receptors are counted more than once if flooded from multiple sources 251 Section 2 Clyde and Loch Lomond Local Plan District

Figure 3: Impacts of flooding Clyde and Loch Lomond Local Plan District Section 2 252

Objectives to manage flooding in Potentially Vulnerable Area 11/16 Objectives provide a common goal and shared ambition for managing floods. These objectives have been set by SEPA and agreed with flood risk management authorities following consultation. They were identified through an assessment of the underlying evidence of the causes and impacts of flooding. Target areas have been set to focus actions; they do not necessarily correspond to areas at risk in SEPA s flood map. The objectives below have been set for Glasgow City centre Potentially Vulnerable Area. Reduce the risk of coastal flooding to non-residential properties in the Exhibition Centre Quarter Indicators: Target area: 10 non-residential properties 18,000 Annual Average Damages Image found and displayed. Objective ID: 11023 Crown copyright. All rights reserved. SEPA lic.no. 100016991 (2015) 253 Section 2 Clyde and Loch Lomond Local Plan District

Target area Objective ID Indicators within PVA Glasgow Reduce the economic damages and number of people at risk of surface water flooding in Glasgow City 11007 * See note below Applies across Clyde and Loch Lomond Local Plan District Avoid an overall increase in flood risk 11127 420 residential properties 550,000 Annual Average Damages Applies across Clyde and Loch Lomond Local Plan District Applies across Clyde and Loch Lomond Local Plan District Reduce overall flood risk Organisations such as Scottish Water, energy companies and Historic Environment Scotland actively maintain and manage their own assets, including the risk of flooding. These actions are not detailed further in the Flood Risk Management Strategies. 11132 420 residential properties 550,000 Annual Average Damages * This objective will be monitored using surface water flood risk across the Potentially Vulnerable Area. For 11/16 there are 240 residential properties at risk and Annual Average Damages of 370,000. Clyde and Loch Lomond Local Plan District Section 2 254

Actions to manage flooding in Potentially Vulnerable Area 11/16 Actions describe where and how flood risk will be managed. These actions have been set by SEPA and agreed with flood risk management authorities following consultation. Selection of actions to deliver the agreed objectives was based on a detailed assessment and comparison of economic, social and environmental criteria. The actions shaded and then described below have been selected as the most appropriate for Glasgow City centre Potentially Vulnerable Area. Selected actions Flood scheme/works Natural flood management works New flood warning Community flood action groups Property level scheme Site plans Flood study Natural flood management study Maintain flood warning Awareness raising Surface water plan/study Emergency plans/response Maintain flood scheme Strategic mapping and modelling Flood forecasting Self help Maintenance Planning policies Action (ID): FLOOD PROTECTION SCHEME/WORKS (110230006) Economic: Social: Environmental: Reduce the economic damages and number of people at risk of surface water flooding in Glasgow City (11007) Scottish Water Under development Indicative delivery: 2016-2021 Scottish Water have proposed a large combined sewer overflow interceptor for Yorkhill adjacent to the Heliport which will remove combined sewer spills from the River Kelvin. This will not reduce the risk of coastal flooding to the Exhibition Quarter. Potential impacts This project is not principally designed to protect against flooding however it may help to reduce the impact of flooding in the local areas. As a consequence the flooding benefits have not been assessed. A reduction in flood risk would have a positive benefit to the health and wellbeing of the community. Flood works can have both positive and negative impacts on the ecological quality of the environment depending on how they are designed. Action (ID): SURFACE WATER PLAN/STUDY (110070018) Reduce the economic damages and number of people at risk of surface water flooding in Glasgow City (11007) Glasgow City Council 255 Section 2 Clyde and Loch Lomond Local Plan District

Not started Indicative delivery: 2028-2033 The area must be covered by a strategy to manage and reduce surface water flood risk and identify the most sustainable actions to achieve the objectives. This strategy has been developed by the Metropolitan Glasgow Strategic Drainage Partnership. The detailed objectives and actions to manage and reduce surface water flood risk will be set out in the area specific surface water management plans described below. Action (ID): STRATEGIC MAPPING AND MODELLING (111320019) Scottish Water Not started Indicative delivery: 2016-2021 Scottish Water will review the assessment of flood risk within the highest risk sewer catchments to improve knowledge and understanding of surface water flood risk. Action (ID): MAINTAIN FLOOD PROTECTION SCHEME (110230017) Reduce the risk of coastal flooding to non-residential properties in the Exhibition Centre Quarter (11023) Glasgow City Council There are a number of sections of flood defence along the River Clyde which offer to properties in the area. These defences will be maintained, and will continue to manage flooding according to the design standard at the time of construction. Levels of flood risk are likely to increase over time as a consequence of climate change. Action (ID): MAINTAIN FLOOD WARNING (111320030) SEPA Continue to maintain the Glasgow Quay Walls flood warning area which is part of the Firth of Clyde coastal flood warning scheme. Clyde and Loch Lomond Local Plan District Section 2 256

Action (ID): FLOOD FORECASTING (111320009) SEPA The Scottish Flood Forecasting Service is a joint initiative between SEPA and the Met Office that produces daily, national flood guidance statements which are issued to Category 1 and 2 Responders. The service also provides information which allows SEPA to issue flood warnings, giving people a better chance of reducing the impact of flooding on their home or business. For more information please visit SEPA s website. Action (ID): SELF HELP (111320011) Everyone is responsible for protecting themselves and their property from flooding. Property and business owners can take simple steps to reduce damage and disruption to their homes and businesses should flooding happen. This includes preparing a flood plan and flood kit, installing property level, signing up to Floodline and Resilient Communities initiatives, and ensuring that properties and businesses are insured against flood damage. Action (ID): AWARENESS RAISING (111320013) Responsible authorities SEPA and the responsible authorities have a duty to raise public awareness of flood risk. Improved awareness of flood risk and actions that prepare individuals, homes and businesses for flooding can reduce the overall impact. From 2016 SEPA will engage with the community through local participation in national initiatives, including partnership working with Neighbourhood Watch Scotland. In addition, SEPA will engage with local authorities and community resilience groups where possible. Local authorities will be undertaking additional awareness raising activities. Further details will be set out in the Local FRM Plan. 257 Section 2 Clyde and Loch Lomond Local Plan District

Action (ID): MAINTENANCE (111320007) Glasgow City Council, asset / land managers Local authorities have a duty to assess watercourses and carry out clearance and repair works where such works would substantially reduce flood risk. They produce schedules of clearance and repair works and make these available for public inspection. Scottish Water undertake inspection and repair on the public sewer network. Asset owners and riparian landowners are responsible for the maintenance and management of their own assets including those which help to reduce flood risk. Action (ID): SITE PROTECTION PLANS (110230015) Reduce the risk of coastal flooding to non-residential properties in the Exhibition Centre Quarter (11023) Glasgow City Council Not started Indicative delivery: 2016-2021 Site plans are developed to identify whether normal operation of a facility can be maintained during a flood. This may be due to existing or resilience of the facility or the network. A site plan for the Exhibition Centre should be developed; the multiple operators in the Centre should be involved in the process. Action (ID): EMERGENCY PLANS/RESPONSE (111320014) Category 1 and 2 Responders Providing an emergency response to flooding is the responsibility of many organisations, including local authorities, the emergency services and SEPA. Effective management of an emergency response relies on emergency plans that are prepared under the Civil Contingencies Act 2004 by Category 1 and 2 Responders. The emergency response by these organisations is co-ordinated through regional and local resilience partnerships. This response may be supported by the work of voluntary organisations. Clyde and Loch Lomond Local Plan District Section 2 258

Action (ID): PLANNING POLICIES (111270001) Avoid an overall increase in flood risk (11127) Planning authority Scottish Planning Policy and accompanying Planning Advice Notes set out Scottish Ministers priorities for the operation of the planning system and for the development and use of land. In terms of flood risk management, the policy supports a catchment-scale approach to sustainable flood risk management and aims to build the resilience of our cities and towns, encourage sustainable land management in our rural areas, and to address the long-term vulnerability of parts of our coasts and islands. Under this approach, new development in areas with medium to high likelihood of flooding should be avoided. For further information on the application of national planning policies see Annex 2. 259 Section 2 Clyde and Loch Lomond Local Plan District