standard usage of materials for actual production standard labour time for actual production ( ) x 27,500 = 5,500 (A)

Similar documents
Monday 14 June 2004 (morning) EXAMINATION. Time allowed - 3 hours plus 15 minutes reading time

10,000 units x 24 = 240,000, or 5,000 hours x 48 = 240,000. the actual price of materials per kilogram

VARIANCE ANALYSIS: ILLUSTRATION

Standard Costing and Variance Analysis

Examinations for Academic Year 2017 Semester I / Academic Year 2016/2017 Semester II

Preparing and using budgets

Standard Costing and Budgetary Control

state the objectives of variance analysis understand the linkage between individual variances and the difference between budgeted and actual profit

Code No. : Sub. Code : R 3 BA 52/ B 3 BA 52

CS Executive Programme Module - I December Paper - 2 : Cost and Management Accounting

Free of Cost ISBN : CMA (CWA) Inter Gr. II. (Solution upto June & Questions of Dec Included)

Introduction to Finance. 1 March Examination Paper. Time: 3 hours

MANAGEMENT ACCOUNTING 2. Module Code: ACCT08004

UNIT 11: STANDARD COSTING

Write your answers in blue or black ink/ballpoint. Pencil may be used only for graphs, charts, diagrams, etc.

Paper 8- Cost Accounting

B.COM. Part-III (HONS.) Sub. : ADVANCE COST ACCOUNTING MODAL PAPER-I. Time Allowed: 3 Hour Max. Marks: 100

MANAGEMENT INFORMATION

Time allowed : 3 hours Maximum marks : 100. Total number of questions : 8 Total number of printed pages : 12

322 Roll No : 1 : Time allowed : 3 hours Maximum marks : 100

PAPER C01 Fundamentals of Management Accounting Acorn chapters

(AA22) COST ACCOUNTING AND REPORTING

2016 EXAMINATIONS ACCOUNTING TECHNICIAN PROGRAMME PAPER TC9: COSTING AND BUDGETARY CONTROL

YORK UNIVERSITY School of Administrative Studies. AP/ADMS Section A Summer 2013 Mid-Term Examination, Sunday, July 7 th, 12 noon 3 pm

December CS Executive Programme Module - I Paper - 2

Analysing financial performance

CERTIFICATE IN MANAGEMENT ACCOUNTING

Roll No : 1 : Time allowed : 3 hours Maximum marks : 100. Total number of questions : 8 Total number of printed pages : 11

PTP_Intermediate_Syllabus 2008_Jun2015_Set 3

Financial Management. 2 June Marking Scheme

Write your answers in blue or black ink/ballpoint. Pencil may be used only for graphs, charts, diagrams, etc.

PAPER 3 : COST ACCOUNTING AND FINANCIAL MANAGEMENT PART I : COST ACCOUNTING Answer all questions.

In Class #8.1 Coverage of manufacturing overhead, standard cost system Required 1 Solution Exhibit 8-1 shows the computations. Summary details are:

THE PUBLIC ACCOUNTANTS EXAMINATION COUNCIL OF MALAWI 2014 EXAMINATIONS ACCOUNTING TECHNICIAN PROGRAMME PAPER TC9: COSTING AND BUDGETARY CONTROL

EXCEL PROFESSIONAL INSTITUTE. LECTURE 9 Holy & Winfred

MANAGEMENT ACCOUNTING

Accounting Technicians Ireland 2 nd Year Examination: Autumn 2013 Paper: MANAGEMENT ACCOUNTING

Write your answers in blue or black ink/ballpoint. Pencil may be used only for graphs, charts, diagrams, etc.

VARIANCE ANALYSIS; GROSS PROFIT ANALYSIS)

Examinations for Academic Year Semester I / Academic Year 2015 Semester II. 1. This question paper consists of Section A and Section B.

(AA22) COST ACCOUNTING AND REPORTING

Flexible Budgets and Standard Costing Variance Analysis

Flexible Budgets. and Standard Costing Variance Analysis. Static Budgets and Performance Reports. Flexible Budget Performance Report

Cost and Management Accounting

SERIES 4 EXAMINATION 2001 MANAGEMENT ACCOUNTING THIRD LEVEL. (Code No: 3023) TUESDAY 13 NOVEMBER

B.Com II Cost Accounting

Analysing financial performance

Analysing financial performance

2016 EXAMINATIONS ACCOUNTING TECHNICIAN PROGRAMME PAPER TC9: COSTING AND BUDGETARY CONTROL

P1 Performance Operations September 2014 examination

Free of Cost ISBN : Appendix. CMA (CWA) Inter Gr. II (Solution upto Dec & Questions of June 2013 included)

This exam paper is in two sections. You should try to complete all tasks in both sections.

Lecture 16 Flexible Budgets and Variance Analysis

Management Accounting

Part 1 Examination Paper 1.2. Section A 10 C 11 C 2 A 13 C 1 B 15 C 6 C 17 B 18 C 9 D 20 C 21 C 22 D 23 D 24 C 25 C

NVQ/SVQ Level 4 in Accounting Contributing to the Planning and Control of Resources (PCR) (2003 standards) EXAMINATION

Introduction and Meaning Concept Advantages & Limitations Objectives of Standard Costing Preliminary Establishment Types of Standard

Engineering Economics and Financial Accounting

ACCA. Paper F2 and FMA. Management Accounting December 2014 to June Interim Assessment Answers

SQA Advanced Unit Specification. General information for centres. Preparing Financial Forecasts. Unit code: HP70 48

SUGGESTED SOLUTION INTERMEDIATE M 19 EXAM

MOCK EXAMINATION PRINCIPLES OF ACCOUNTS A-LEVEL PAPER 2

UNIVERSITY EXAMINATIONS

Ordering costs Any two of the following: Postage, Paperwork, Telephone, Internet, , Purchasing Officer's salary

DO NOT TURN OVER UNTIL TOLD TO BEGIN

Bsc (Hons) Tourism and Hospitality Management. Cohort: BTHM/16A/FT. Examinations for 2016/2017 Semester I. & 2016 Semester II

MTP_Intermediate_Syl2016_June2017_Set 1 Paper 10- Cost & Management Accounting and Financial Management

B.COM II ADVANCED AND COST ACCOUNTING

81178 Seat No. Third Year B. B. A. Examination April / May 2003 Management Accountancy

MARK SCHEME for the October/November 2015 series 9706 ACCOUNTING

SCHOOL OF ACCOUNTING AND BUSINESS BSc. (APPLIED ACCOUNTING) GENERAL / SPECIAL DEGREE PROGRAMME END SEMESTER EXAMINATION JULY 2016

SECTION I 14,000 14,200 19,170 10,000 8,000 10,400 12,400 9,600 8,400 11,200 13,600 18,320

MANAGEMENT ACCOUNTING

Reg. No. :... Code No. : B.B.A. (CBCS) DEGREE EXAMINATION, NOVEMBER Fifth Semester. Business Administration Main

Solution Paper 8 COST AND MANAGEMENT ACCOUNTING June Chapter 2 Material

CERTIFICATE IN MANAGEMENT ACCOUNTING

Definition of Standard Costing

Management Accounting

Cost Accounting. Level 3. Model Answers. Series (Code 3016) 1 ASE /2/06

Contents. Chapter 1 Conceptual Foundation

Paper T7. Planning, Control and Performance Management. Tuesday 8 December Certified Accounting Technician Examination Advanced Level

DO NOT TURN OVER UNTIL TOLD TO BEGIN

Trainee Accountant Webinar. F2 Management Accounting. Variance Analysis

Cost and Management Accounting

SOLUTIONS TO END-OF-CHAPTER QUESTIONS CHAPTER 13

Revision of management accounting

Shree Guru Kripa s Institute of Management

SUGGESTED SOLUTION INTERMEDIATE M 19 EXAM

CLASSIFICATION OF COST

a) It is important to note that Famba will only receive the commission on the ticket price of R (2000 x 12.5% commission = R250)

FOR MORE PAPERS LOGON TO

P1 Performance Operations

(AA22) COST ACCOUNTING AND REPORTING

STANDARD COSTING. Samir K Mahajan

Cost and Management Accounting

MTP_ Inter _Syllabus 2016_ Dec 2017_Set 2 Paper 10 Cost & Management Accounting and Financial Management

Sree Lalitha Academy s Key for CA IPC Costing & FM- Nov 2013

SUGGESTED SOLUTIONS/ ANSWERS WINTER 2018 EXAMINATIONS 1 of 7 MANAGEMENT ACCOUNTING [M5] MANAGERIAL LEVEL-2 MARKS

Monday 29 November 2004 (afternoon) EXAMINATION

Management Accounting

Transcription:

Contributing to the Management of Costs and Enhancement of Value (MCV) (1998 standards) / Management of Performance and Enhancement of Value (PEV) (2003 standards) Suggested Answers SECTION 1 Task 1.1 (a) (i) actual price of materials per kg 143,000 = 5.20 27,500 (ii) standard usage of materials for actual production 900 x 30 = 27,000 kgs (iii) actual labour rate per hour 26,040 = 6.20 4,200 (iv) standard labour time for actual production 900 x 5 = 4,500 hours (v) budgeted production overheads (b) (i) (ii) (iii) 1,000 x 20 = 20,000 the material price variance ( 5.20-5.00) x 27,500 = 5,500 (A) the material usage variance (27,500 kgs - 27,000 kgs) x 5 = 2,500 (A) the labour rate variance ( 6.20-6.00) x 4,200 = 840 (A)

(iv) the labour efficiency variance (4,500-4,200) x 6 = 1,800 (F) (v) the fixed overhead expenditure variance 23,000-20,000 = 3,000 (A) (vi) the fixed overhead volume variance (5,000-4,500) x 4 = 2,000 (A) (vii) the fixed overhead capacity variance (5,000-4,200) x 4 = 3,200 (A) (viii) the fixed overhead efficiency variance (4,500-4,200) x 4 = 1,200 (F) (c) Standard absorption cost of actual production 180,000 Favourable Adverse Material price variance 5,500 Material usage variance 2,500 Labour rate variance 840 Labour efficiency variance 1,800 Fixed overhead expenditure variance 3,000 Fixed overhead capacity variance 3,200 Fixed overhead efficiency variance 1,200 3,000 15,040 12,040 Actual absorption cost of actual production 192,040

(d) To: Sam Thomas Subject: Operating statement The operating statement set out above provides management with an explanation of why actual costs differ from standard costs. It is important that this report is used to ascertain the reasons for each of the variances so that action may be taken to eliminate future inefficiencies or for altering future plans to reflect changing circumstances. The operating statement will have a greater value if it is supplemented with explanations of the causes for each significant variance. In addition, some variances may be beyond the control of management. It would be helpful to distinguish between controllable and noncontrollable variances with explanations of any remedial action that can be taken to eliminate any controllable variances. Task 1.2 (a) Average prices in the period January to March were: 5.05 + 5.02 + 5.08 = 15.15 = 5.05 3 3 Average prices in the period February to April were: 5.02 + 5.08 + 5.11 = 15.21 = 5.07 3 3 Average prices in the period March to May were: 5.08 + 5.11 + 5.20 = 15.39 = 5.13 3 3

(b) To: Sam Thomas Subject: Material prices Trend in material prices The moving average series demonstrates there is an upward trend in material prices. This is more noticeable from the moving average series than from the original series of actual monthly prices. For example, the actual monthly data showed a price reduction in February. Standard for material prices The upward trend can be used to forecast a trend line. This trend line can be used to forecast future prices. This process is known as extrapolation. Other information Two further sources of information are as follows. 1. Customer demand for desks Once the demand for desks has been established, it will be possible to estimate the demand for materials. The greater the demand, the greater will be the need for materials since they are a variable input. Increased material purchases may enable the company to take advantage of quantity discounts which would have the result of reducing standard costs. 2. Product specification The standard cost for direct materials is computed from two elements - the price of materials and the quantity to be used. If would be significant, therefore, to ensure that the bill of materials for the executive desk is to remain unchanged, otherwise there are likely to be cost consequences in setting the standard material cost.

SECTION 2 Task 2.1 (a) Actual Budget Gross profit margin 16.7% 20.0% Operating profit margin 4.2% 8.0% Return on capital employed 10.7% 20.0% Stock turnover (in months) 1.2 1.0 Labour capacity ratio 97.0% 100.0% Labour efficiency ratio 96.2% 100.0% (b) To: Sam Thomas Subject: Performance indicators (i) Gross profit margin An increase in the selling price of a desk will result in an increase in the gross margin. At present, however, the company is achieving the budgeted price of 250 per desk and it may not be possible to increase the price. If this is the case, efforts should be made to reduce the cost of production of a desk. (ii) Net operating margin The net operating margin will increase if the company is able to reduce its distribution and administration costs. It would appear from the actual results that a reduction has already taken place since distribution and administration costs are 15,000 below budget. (iii) Return on capital employed The return on capital employed will improve if operating profits improve with no increase in capital employed. The measures detailed above will, therefore, have the effect of improving the return. An alternative, however, would be to examine whether all the assets employed are required for use in the business. If not, an asset disposal programme could be implemented and the proceeds distributed to shareholders. This would have the effect of reducing capital employed and improving the return on capital employed. (iv) Average age of stock The current stock of desks represents 1.2 months production. An increase in sales volumes may lead to a reduction in the number of desks held in stock and will consequently improve this indicator.

(v) Labour capacity ratio The labour capacity ratio is below budget and probably results from a lower than anticipated demand for desks. Increased sales will again improve this ratio. (vi) Labour efficiency ratio The efficiency ratio is below budget and indicates inefficiencies within the direct labour workforce. Workplace training and increased supervision are likely to lead to improvements in this indicator. Task 2.2 To: Sam Thomas Subject: Value Engineering Production cost of an executive desk The cost of producing an executive desk may be examined using the technique of value engineering. It is clear from the actual results for November that, although the budgeted sales price has been achieved, the gross margin has not. Value engineering may be employed to examine ways in which production costs may be reduced. Value engineering is the process of driving down costs by examining: the product design ways of eliminating unnecessary functions which increase the product cost. Value engineering requires the use of functional analysis which involves the identification of the attributes of the executive desk. Once these are established, a price can be determined for each attribute. Functional analysis may lead to a change in design and a reduction in the materials required for production. Also, if the product design is simplified, assembly time may be reduced and this will lead to lower labour costs. Production overheads may also be reduced if a simplified design leads to lower rework costs.