Taunton Municipal Lighting Plant. This INTERCONNECTION & NET METERING AGREEMENT 1. CUSTOMER ELECTRIC GENERATING SYSTEM

Similar documents
Public Utility District No. 1 Of Jefferson County

SALEM CITY. NET METERING LICENSE AGREEMENT For Customer-Owned Electric Generating Systems of 100kW or Less

Holden Municipal Light Department Interconnection Agreement for Net Metering Service

Customer Information Packet on Net(B) Metering SYSTEM MUST BE OWNED AND OPERATED BY CUSTOMERS OF WAKEFIELD MUNICIPAL GAS AND LIGHT DEPARTMENT

Mason County PUD No. 1. Net Energy Metering Interconnection Agreement

Tier 1 Net Metering and Renewable Resource Interconnection Agreement. Grantee: Abbreviated Legal Description: Assessor s Tax Parcel Number(s):

Clark Public Utilities

POWER PURCHASE and INTERCONNECTION AGREEMENT FOR SNAP GENERATION

Policy Bulletin No. 25 Net Metering. Public Utility District No. 1 of Klickitat County 1313 South Columbus Goldendale, WA 98620

Interconnection of Electric Generators

SAMPLE INTERCONNECTION AGREEMENT FOR NET ENERGY METERING

INTERCONNECTION AGREEMENT FOR NET BILLING FOR RENEWABLE ELECTRICAL GENERATING FACILITIES OF ONE MEGAWATT OR LESS

NET ENERGY METERING AND INTERCONNECTION AGREEMENT

INTERCONNECTION & NET ENERGY METERING AGREEMENT FOR RESIDENTIAL AND COMMERCIAL ELECTRIC GENERATING FACILITIES

NET-ENERGY METER AGGREGATION INTERCONNECTION AGREEMENT FOR RESIDENTIAL AND COMMERCIAL ELECTRIC CUSTOMERS

INTERCONNECTION GENERATION AND NET METERING POLICY

PHOTOVOLTAIC INTERCONNECTION AGREEMENT FOR ELECTRIC GENERATING FACILITES Customer Owned Generation-Distribution Rate (Schedule G-1)

2. IDENTITY AND LOCATION OF GC

STANDARD GENERATION INTERCONNECTION AGREEMENT BETWEEN CITY OF ANAHEIM AND

ALAMEDA MUNICIPAL POWER INTERCONNECTION AGREEMENT GENERAL CONDITIONS

Renewable Generation (Category 1-20 kw and less):

Renewable Generation (Category 1 20 kw and less):

STANDARD INTERCONNECTION AGREEMENT Fayetteville Public Works Commission

Solar: Wind: Total: (AC Nameplate Rating) x (720 hrs/mo) x (0.15 = solar/ 0.10 = wind) Date(s) of Parallel Operation Rebate Expiration

STANDARD INTERCONNECTION APPLICATION FOR NET METERING FACILITIES

Issued: September 2, 2014 Effective: October 3, 2014 WN U-60 Attachment B to Schedule 150, Page 1

CITY OF UKIAH PHOTOVOLTAIC INTERCONNECTION AGREEMENT FOR NET ENERGY METERING FROM SOLAR ELECTRIC GENERATING FACILITIES OF 1 KW (KILOWATT) TO 100 KW

Parkland Light & Water Company Park Ave Tacoma, WA 98444

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

STANDARD INTERCONNECTION AGREEMENT FOR QUALIFYING FACILITIES (QF) 10 KW OR LESS

MODEL DISTRIBUTION COOPERATIVE AGREEMENT FOR INTERCONNECTION AND PARALLEL OPERATION OF DISTRIBUTED GENERATION LONG FORM CONTRACT

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Town of Highlands Board Approved as of May 17, 2012

Solar Generator Interconnection Agreement

Net Metering Interconnections Standards

ENTERGY NEW ORLEANS, INC. STANDARD INTERCONNECTION AGREEMENT FOR NET METERING FACILITIES LOCATED IN ORLEANS PARISH

Solar*Rewards REC Purchase Contract Customer-Owned PV Systems Greater than 25 kw DC nameplate capacity

STANDARD INTERCONNECTION AGREEMENT FOR NET METERING FACILITIES

ALAMEDA MUNICIPAL POWER INTERCONNECTION AGREEMENT GENERAL CONDITIONS

ENTERGY LOUISIANA, LLC STANDARD INTERCONNECTION AGREEMENT FOR NET METERING FACILITIES

AGREEMENT FOR INTERCONNECTION AND PARALLEL OPERATION OF DISTRIBUTED GENERATION

Tier 1 Standard Interconnection Agreement Customer-Owned Renewable Generation System

ENTERGY MISSISSIPPI, INC. STANDARD INTERCONNECTION APPLICATION AND AGREEMENT FOR RESIDENTIAL NET METERING FACILITIES (for systems 20 kw or less)

Customer s Name: Address: Contact Person: Telephone Number: Service Point Address: (Name and Address) Signature

WHITBY HYDRO CONNECTION AGREEMENT FOR A GENERATOR WITH MOMENTARY CLOSED TRANSITION OPERATION

WITNESSETH: WHEREAS, This Agreement does not address the sale of electricity to or from Consumers; and

APPLICATION FOR STANDARD CONTRACT BY A QUALIFYING COGENERATOR OR SMALL POWER PRODUCER

Net Metering Interconnection Standards

ENTERGY MISSISSIPPI, INC. STANDARD INTERCONNECTION APPLICATION AND AGREEMENT FOR NON-RESIDENTIAL NET METERING FACILITIES (for kw systems)

STANDARD INTERCONNECTION AGREEMENT FOR RENEWABLE GENERATION SYSTEM

GARLAND POWER & LIGHT. GP&L s Solar Generation Installation Requirements 2018

RECITALS. Now, Therefore, in consideration of the mutual covenants and agreements herein set forth, the Parties do hereby agree as follows:

NET METERING AGREEMENT

KOSCIUSKO REMC AGREEMENT FOR INTERCONNECTION OF DISTRIBUTED GENERATION

Rate Code: L L-16 SOUTH CAROLINA PUBLIC SERVICE AUTHORITY (SANTEE COOPER) LARGE LIGHT AND POWER SCHEDULE L-16

NET METERING CUSTOMER SITED RENEWABLE GENERATION FACILITIES POLICY

Standard Interconnection Agreement for Customer-Owned Renewable Generation System kw

Solar*Rewards REC Purchase Contract Customer-Site PV Systems For Third Party PV Developers

Berkeley Electric Cooperative, Inc. Standard for Interconnecting Distributed Resources Up To 500 KVA with the Cooperative s Electric Systems (CES)

Advice Notice No. 21

INTERCONNECTION AND OPERATING AGREEMENT

PUBLIC SERVICE COMPANY OF NEW MEXICO AGREEMENT NO.

Electricity (Net-Metering) THE ELECTRICITY ACT (CAP.131) RULES. (Made under sections 45 and 46) THE ELECTRICITY (NET-METERING) RULES, 2018

Standard for Interconnecting Small Generation 100 kw or Less with Electric Power Systems (EPS) 1. Overview:

7 th Revision of Sheet No. 150 Canceling 6 th Revision WN U-60 of Sheet No. 150

I. Members Applying for New Interconnection/Submission of Plans/Specifications.

Superseding REVISED Sheet No. 38 REVISED SHEET NO. 38 Effective March 20, 2008 Effective February 6, 2014 RULE NO. 18. Net Energy Metering

Interconnection of Electric Generators

Standard Form of CAWCD Wheeling Contract

Standard Tariff for Electricity Purchases From And Sales to Qualifying Facilities. Applicant: Dated 20

Tampa Electric Company FERC Electric Tariff First Revised Service Agreement No. 5

SolarCurrents Program Agreement

ELECTRIC COOPERATIVE INTERCONNECTION AND PARALLEL OPERATION AGREEMENT FOR DISTRIBUTED GENERATION RATED 2 MW AND LESS

PUBLIC SERVICE COMPANY OF NEW MEXICO ELECTRIC SERVICE AGREEMENT NO.

SURPLUS ENERGY PURCHASE AGREEMENT PARALLEL CUSTOMER GENERATION CGS 8 WISCONSIN AGGREGATE RENEWABLE CAPACITY OF 20 KILOWATTS OR LESS

EL PASO ELECTRIC COMPANY SCHEDULE NO. DG INTERCONNECTION AND PARALLEL OPERATION OF DISTRIBUTED GENERATION

TRI-COUNTY ELECTRIC COOPERATIVE APPLICATION AND AGREEMENT FOR INTERCONNECTION AND NET METERING OF SYSTEMS WITH CAPACITY OF 100 kw OR LESS

Up Front Incentive Renewable Energy Credit Purchase Agreement (Residential Solar Water Heating)

LEVEL 1: STANDARD APPLICATION FORM AND INTERCONNECTION AGREEMENT

CARROLL WHITE RURAL ELECTRIC MEMBERSHIP CORPORATION Monticello, Indiana

THIS LOCKBOX AND ACCOUNT CONTROL AGREEMENT (this Agreement ) is made as of, 200_, by and among ( Depositor ), ( Bank ) and ( Lender ).

General Purchase Order Terms and Conditions (Pro-buyer)

Recitals: Whereas, Interconnection Customer is the State of Maryland ( State ) or a local governmental entity of the State of Maryland;

Harmony Event Productions SOUND AND LIGHTING AGREEMENT

Please Refer to Attached Sample Form

SCHEDULE SGI : SMALL GENERATOR INTERCONNECTIONS OTHER THAN NET METERING

PARALLEL OPERATION AGREEMENT FOR RENEWABLE GENERATION OPERATING UNDER TVA APPROVED PROGRAMS

STANDARD INTERCONNECTION AGREEMENT FOR TIER 2 RENEWABLE GENERATOR SYSTEMS

Name: City: State: Zip Code: Is the applicant the property owner at the system address? Yes No. City: State: Zip Code: City: State: Zip Code:

STANDARD INTERCONNECTION AGREEMENT FOR INTERCONNECTED CUSTOMER-OWNED BATTERY SUBSYSTEMS 1 KW OR MORE

Standard Interconnection Agreement for Customer-Owned Renewable Generation System

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

HAWAIIAN ELECTRIC COMPANY, INC.

INTERCONNECTION AGREEMENT FOR CUSTOMER-OWNED RENEWABLE GENERATION SYSTEMS

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Original Cal. PUC Sheet No E.


Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Palmetto Electric Cooperative, Inc. Standard for Interconnecting Distributed Resources Less Than 2 MVA With Cooperative s Electric Systems (CES)

RECITALS. Now, Therefore, in consideration of the mutual covenants and agreements herein set forth, the Parties do hereby agree as follows:

Transcription:

Taunton Municipal Lighting Plant INTERCONNECTION & NET METERING AGREEMENT For Customer-Owned, Grid-Connected Electric Generating Systems of 60kW or Less This INTERCONNECTION & NET METERING AGREEMENT ( Agreement) is between ( Customer ) and Taunton Municipal Lighting Plant ( TMLP ). Customer and TMLP may be referred to collectively herein as Parties and individually as Party. 1. CUSTOMER ELECTRIC GENERATING SYSTEM Customer shall provide the following information from the Customer s Net Metering Application and Compliance Form for Installation of Customer-Owned, Grid- Connected Electric Generating System of 60kW or Less: System Location/Address: System Manufacturer: Model (Name and Number): Name Plate Electrical Capacity: Name Plate Data: kw Volts (Single or Three Phase) Energy Source: (Solar or Wind or Fuel Cell or Hydro) Customer has elected to operate, at its own expense, a net metering system using either a fuel cell, solar, wind or hydropower electric generating system, with a generating capacit y of not more than sixty kilowatts aggregated at the service interconnection point, in parallel with the TMLP s electrical distribution system. This generating system is intended to offset either part or all of the Customer s electrical requirements. A separate agreement shall be entered into for each electrical service location of Customer. The electrical Generating system used by the Customer shall be located on the Customer s premises. It shall include all equipment necessary to meet applicable safety, power quality, and interconnection requirements established by the latest revisions of National Electrical Code (Articles 690 and 705), National Electrical Safety Code, the Institute of Electrical and Electronics Engineers, Underwriters Laboratories. The TMLP shall have the sole authority to determine which interconnection requirements set forth herein are applicable to Customer s proposed installation. 1

2. TERMS OF NET METERING BILLING AND ENERGY CREDITING The TMLP shall determine the net electricity produced or consumed by the Customer during each billing period, in accordance with the TMLP s normal metering practices. If the electricity supplied by the TMLP exceeds the electricity generated by the Customer, then the Customer shall be billed for the net electricity supplied by the TMLP, at the rate and with the same customer charge(s) paid by other customers of the TMLP in the same rate class as Customer. If the electricity generated by the Customer exceeds consumption and is distributed back to TMLP during the billing period, then the Customer shall be billed for the same monthly charge(s) as applied to other customers of the TMLP in the same rate class; and shall be credited for the net excess kilowatt-hours generated as applied to the generation and Power Cost Adjustment (PCA) charges during the billing period; with this kilowatt-hour credit appearing on Customer s bill for the following billing period. 3. INTERRUPTION OR REDUCTION OF DELIVERIES The TMLP may require Customer to interrupt or reduce deliveries as follows: (a) when necessary in order to construct, install, maintain, repair, replace, remove, investigate, or inspect any of its equipment or part of its system; or (b) if TMLP determines that curtailment, interruption, or reduction is necessary because of emergencies, or compliance with good electrical practices as determined solely by the TMLP. To the extent reasonably practicable, the TMLP shall give Customer notice of possible interruption or reduction of deliveries. Notwithstanding any other provision of this Agreement, if at any time the TMLP determines that either (a) the facility may endanger TMLP personnel, or (b) the continued operation of Customer s facility may endanger the integrity of the TMLP s electric system, the TMLP shall have the right to disconnect Customer s facilit y from the TMLP s electric system. The TMLP will provide the Customer with as much advance notice as is reasonable under the circumstances prior to disconnecting the Customer s generating system but shall not be required to provide any advance notice if immediate action is necessary: (i) to protect persons, or the TMLP s facilities, or property of others from damage or interference caused by Customer s electric generating facilities, or (ii) because of a lack of properly operating protective devices or an inability to inspect the same. Customer s facility shall remain disconnected until such time as TMLP is 2

satisfied that the condition(s) that caused the problems referenced in (a) or (b) of this section 3.3 have been corrected. 4. INTERCONNECTION Customer shall comply with TMLP s Interconnection Standards For Customer- Owned, Grid-Connected Electric Generating Systems of 60kW or Less ( Interconnection Standards ) and the Net Metering Application and Compliance Form, which are incorporated herein by reference, and shall pay for designing, installing, inspecting, operating, and maintaining the electrical generating system in accordance with all applicable laws and regulations. NOTE: THE DISCONNECT SHALL NOT BE LOCATED MORE THEN FOUR FEET FROM THE UTILITY (REVENUE) METER. THIS MUST BE STATED AND DETAILED ON THE ONE LINE DAIGRAM. 5. MAINTENANCE AND PERMITS Customer shall (i) maintain the electric generating system and interconnection facilities in a safe and prudent manner and in conformance with all applicable laws and regulations including, but not limited to, TMLP s Interconnection Standards, (ii) obtain any governmental authorizations and permits required for the construction and operation of the electric generating system and interconnection facilities, including electrical permit; (iii) reimburse TMLP for any and all losses, damages, claims, penalties, or liability it incurs as a result of Customer s failure to obtain or maintain any governmental authorizations and permits required for construction and operation of Customer s generating system or failure to maintain Customer s facility as required in this Section. If the TMLP or a regulatory agency at any time determines that the facilities are being operated in an illegal, unsafe or unreliable condition, the TMLP shall have the unilateral right to interrupt and discontinue its receipt of energy and generation without any liability or obligation. 6. DAMAGE TO TMLP S FACILITIES If the Customer s generating facilities cause damage to the TMLP s electrical system and/or facilities, customer shall be responsible for all costs associated with the repair and/or replacement of such facilities or equipment. 7. ACCESS TO PREMISES The TMLP may enter Customer s premises or property (i) to inspect with prior notice at all reasonable hours Customer s protective devices and to read meter; and (ii) to disconnect the interconnection facilities at the TMLP s meter or transformer pursuant to Section 3.3. 8. INDEMNITY AND LIABILITY The Customer hereby indemnifies and agrees to hold harmless and release Taunton Municipal Lighting Plant and its elected officials, officers, employees 3

and agents and each of the personal representatives, successors and assigns of any of the foregoing (collectively, the Indemnities ) from and against any and all losses, claims, damages, costs, demands, fines, judgments, penalties, obligations, payments and liabilities, together with any costs and expenses (including without limitation attorneys fees and out-of-pocket expenses and investigation expenses) incurred in connection with any of the foregoing, resulting from, relating to or arising out of or in connection with: (i) any failure or abnormality in the operation of the Customer s generating system or any related equipment; (ii) any failure of the Customer to comply with the standards, specifications, or requirements referenced in this Agreement (including appendices hereto) which results in abnormal voltages or voltage fluctuations, abnormal changes in the harmonic content of the generating facility output, single phasing, or any other abnormality related to the quantity or quality of the power produced by the generating facility; (iii) any failure of the Customer to duly perform or observe any term, provision, covenant, agreement or condition hereunder to be performed by or on behalf of the Customer or (iv) any negligence or intentional misconduct of Customer related to operation of the generating system or any associated equipment or wiring. 9. FORCE MAJEURE Suspension of Obligations. Neither Party shall be liable to the other for, or be considered to be in breach of or default under this Agreement because of, any failure or delay in performance by such Party under this Agreement to the extent such failure or delay is caused by or results from any such cause or condition which is beyond such Party s reasonable control, or which such Party is unable to prevent or overcome by exercise of reasonable diligence (any such cause or condition, a Force Majeure ). Notice; Required Efforts to Resume Performance. Any Party claiming Force Majeure shall give the other Party maximum practicable advance notice of any failure or delay resulting from a Force Majeure, and shall use its reasonable best efforts to overcome the Force Majeure and to resume performance as soon as possible; provided however, that nothing in this Agreement shall be construed to require either Party to settle any labor dispute in which it may be involved. No Excuse of Payment Obligations. Notwithstanding any other provision of this Agreement, in no event shall a Force Majeure excuse a Party s failure or delay to pay any amounts due and owing to the other Party under or pursuant to this Agreement. 10. INDEPENDENT CONTRACTORS 4

The Parties hereto are independent contractors and shall not be deemed to be partners, employees, franchisees or franchisers, servants or agents of each other for any purpose whatsoever under or in connection with this Agreement. 11. ASSIGNMENT; BINDING AGREEMENT The Customer shall not assign its rights under this Agreement to any other Party without the express written consent of Taunton Municipal Lighting Plant. The TMLP may impose reasonable conditions on any such assignment to ensure that all of Customer s obligations under this Agreement are met and that none of Customer s obligations are transferred to the TMLP as a result of default, bankruptcy, or any other cause. 12. NO THIRD PARTY BENEFICIARIES Except as expressly set forth in this Agreement, none of the provisions of this Agreement shall inure to the benefit of or be enforceable by any third Party. 13. ENTIRE AGREEMENT This Agreement and the Exhibits attached hereto set forth the entire agreement of the Parties and supersede any and all prior agreements with respect to the subject matter of this Agreement. The rights and obligations of the Parties hereunder shall be subject to and governed by this Agreement. 14. GOVERNING LAW; VENUE This Agreement shall be governed by and construed in accordance with the laws of the Commonwealth of Massachusetts (regardless of the laws that might otherwise govern under applicable principals of conflicts of law of such state). Venue for any action arising under or in connection with this Agreement shall be in a court of applicable jurisdiction in Bristol County, Massachusetts. 15. RULES OF CONSTRUCTION; STATUTORY REFERENCES No provision of this Agreement shall be construed in favor of or against either of the Parties hereto by reason of the extent to which any such Party or its counsel participated in the drafting thereof or by reason of the extent to which such provision or any other provision or provisions of this Agreement is or are inconsistent with any prior draft thereof. Any reference to statutes or laws will include all amendments, modifications, or replacements of the specific sections and provisions concerned. 16. AMENDMENT, MODIFICATIONS OR WAIVER Any amendments or modifications to this Agreement shall be in writing and agreed to by both Parties. The failure of any Party at any time or times to require performance of any provision hereof shall in no manner affect the right 5

at a later time to enforce the same. No waiver by any Party of the breach of any term or covenant contained in this Agreement, whether by conduct or otherwise, shall be deemed to be construed as a further or continuing waiver of any such breach or waiver of the breach of any other term or covenant unless such waiver is in writing. 17. NOTICES AND OTHER COMMUNICATIONS All notices, requests, demands and other communications required or permitted to be given under this Agreement shall be given in writing (i) by personal delivery, (ii) by recognized overnight air courier service, (iii) by United States postal service, postage prepaid, registered or certified mail, return receipt requested, or (iv) by facsimile transmission, using facsimile equipment providing written confirmation of successfully completed transmission to the receiving facsimile number. All notices to either Party shall be made to the address set forth below. Any notice shall be deemed to have been given on the date delivered, if delivered personally, by overnight air courier service or by facsimile transmission; or, if mailed, shall be deemed to have been given on the date shown on the return receipt as the date of delivery or the date on which the United States postal service certified that it was unable to deliver, whichever is applicable. TAUNTON MUNICIPAL LIGHT PLANT: CUSTOMER: ATTN:Kenneth Goulart, General Manager P.O. Box 870 Address: Taunton, Massachusetts 02780 City, State, Zip: Telephone: (508) 824-5844 Telephone: FAX: (508) 823-6931 FAX: 18. ATTACHMENTS The Agreement includes the following attached documents, which are incorporated by reference: 1. Net Metering Application and Compliance Form; and 2. TMLP s Interconnection Standards; and 3. TMLP s rates. 19. TERM OF AGREEMENT This Agreement shall be effective on the date written below and shall remain in effect until terminated by either Party on thirty (30) days prior written notice, or the agreement terminates upon termination of the Customer's TMLP account incidental to a sale by Customer to a new owner, without prejudice to the physical system being the subject of an Interconnection & Net Metering Agreement with the new owner to be effective upon termination of the original customer's TMLP account. 6

IN WITNESS WHEREOF, the Parties hereto have caused two originals of this Agreement to be executed by their duly authorized representatives. CUSTOMER: TAUNTON MUNICIPAL LIGHTING PLANT: Signature Signature Print Name Print Name Date Date 7