NIGERIAN POWER SECTOR REFORMS AND PRIVATISATION. By Bolanle Onagoruwa Director General, Bureau of Public Enterprises

Similar documents
Review of the Reform and Privatization of the Power Sector in Nigeria. Peter Kieran Dar es Salaam January 31, 2014

Executive Summary Federal Government Economic Recovery and Growth Plan Power Sector Reforms Power Sector Constraints and Challenges

Update on the Roadmap for Nigerian Power Sector Reform

The Role of the Bulk Trader in the Transitional Electricity Market and Off-take Security

OPPORTUNITIES IN THE ON-GRID RE SECTOR IN NIGERIA

Nigeria Power Guide. Volume 1, 2012 Edition. Inside this Guide 1. POWER SECTOR OUTLOOK

FEDERAL REPUBLIC OF NIGERIA POWER SECTOR RECOVERY PROGRAMME:

MULTI-YEAR TARIFF ORDER

IPP Project Development

A HIGH LEVEL RED FLAG REVIEW OF THE NIGERIAN ELECTRIC SUPPLY INDUSTRY

AJUMOGOBIA & OKEKE. Nigerian Energy Sector: Legal & Regulatory Overview (2015) Nigerian Energy Sector_155x235.indd 1 02/07/ :18:33

ELECTRICITY REGULATORY COMMISSION

REGULATIONS FOR INVESTMENTS IN ELECTRICITY NETWORKS IN NIGERIA 2015

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

POWER SECTOR RECOVERY PROGRAM

Tgenerating station in the country was built in Lagos.

Meeting Africa s Power Challenges

LIGHT INSIDE THE EXPERIENCE OF INDEPENDENT POWER PRODUCERS IN NIGERIA

Presentation to the Ethiopia Government Delegation to Canada on PPP. Peter Kieran May 15, 2014 Ottawa, Ontario

PROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: PIDC Power Sector Recovery Performance Based Loan

ECONOMIC CONSULTING ASSOCIATES LIMITED 41 Lonsdale Road London NW6 6RA UK tel +44 (0) / fax +44 (0)

TOWARDS A COMPETITIVE ELECTRICITY MARKET: THE BERTHING OF ELIGIBLE CUSTOMERS

Analysis: The Nigeria Energy Sector 2018

Nigeria Power Series - Part 2: Unlocking Financing for Developing Independent Power Projects in Nigeria

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6841. I. Project Context

ROADMAP POWER SECTOR REFORM

ENERGY INVESTMENT FACILITATION: THE EXPERIENCE OF BURKINA FASO. INVEST IN BURKINA FASO Km² of Investment opportunities

Power Sector Reform and Investment Comparing Uganda with Kenya and Tanzania

Electricity (Development of Small Power Projects) GN. No. 77 (contd.) THE ELECTRICITY ACT (CAP.131) RULES. (Made under sections 18(5), 45 and 46))

Nigerian Power Sector Is there light at the end of the tunnel?

IFC Transaction Advisory Services Creating opportunity where it s needed most. From Concept Design to Project Execution

Investment Opportunities in the Nigerian Public Enterprise Reform & Privatisation Programme APRIL 17-20

The Question of Sovereign Guarantee for the Development of Electricity Generation in Ethiopia

Developing the Power Sector through Private Investment in Mongolia. Edgar Saravia Program Manager

KINGDOM OF CAMBODIA NATION RELIGION KING ELECTRICITY AUTHORITY OF CAMBODIA REGULATIONS

Power Sector Reform India The Long Road Ahead

ROADMAP POWER SECTOR REFORM

Regional Power Market Challenges and Opportunities from Nepalese perspective

NERC/NOPR/CN04606 NIGERIAN ELECTRICITY REGULATORY COMMISSION PUBLIC NOTICE

Perspective on Financing Wind Energy Projects. June 16, 2016

POLICY ON DEVELOPMENT OF HYDRO POWER PROJECT. Energy Department Government of Bihar

PPA & REFIT. by Andile Gxasheka, RE Specialist. NERSA South Africa

NIGERIA ON THE RISE, BUT STRUCTURAL CHALLENGES PERSIST

ASIAN DEVELOPMENT BANK

Exhibit 1 Hawaiian Electric Companies Development of the Proposed Final Variable RFPs

Energy newsletter Competitive tender for obtaining public subsidies for new renewable energy plants in Spain

By Dr. David Ige. Gas Aggregation Company Nigeria Limited (GACN) Strategic Aggregator. Roles and Functions In the Nigerian Domestic Gas Market

Overview of the framework

All Source Request for Proposal Bid Conference. October 22, 2008

Public Private Partnerships IFC s Global Experience

Reforming Power Markets: Lessons from Five Developing Countries presented at: World Forum on Energy Regulation Rome, 6 October 2003

Electricity Sector Regulatory Developments, Opportunities and Challenges

LONG TERM FINANCE AND RISK ALLOCATION ENHANCING ENERGY INFRASTRUCTURE AS AN ASSET-CLASS IN BRAZIL

Global Project Finance Alert

Presentation to Investors

Electricity utility reforms in Sub Saharan Africa

The PFA and the Regulations provide the modalities, requirements and thresholds for such investments.

The state of the power sector in Africa: Re-assessing regulation, investment and sector performance

US$M): Sector Board : FPD Cofinancing (US$M US$M): (US$M US$M):

USAID-Funded Nepal Hydropower Development Project (NHDP)

Regional Liquidity Support Facility Mitigating risks for private investments in Renewable Energy in Sub-Sahara Africa.

Peter Wright. Renewable Energy Projects in Africa Comparing Procurement Models for Renewable Generation Capacity. Simmons & Simmons March 2015

PPAs and Tariff Design

RESERVOIR CAPITAL CORP. CORPORATE UPDATE October 2018

Portland General Electric

World Bank. The Gas Sector. Oil and Gas Sector Review Workshop December 17-18, Franz Gerner Energy Specialist

PPIAF Assistance in Turkey

Investor presentation

3rd Annual Affordable Housing Africa

GOVERNMENT OF KERALA

Corporate Renewable Energy Procurement

83C Questions and Answers

NEW ERA IN THE TURKISH ENERGY MARKET AND LEGISLATION

Spurring Growth of Renewable Energies in MENA through Private Sector Investment

Project Development Under PPPs

Sector Wide Approach for Planning and Expanding Electricity Access Rwanda case study

Opportunities & Challenges by. Nadeem Babar Orient Power Company Ltd. November 2015

Cat Power Finance. Biogas Projects A Lender s Perspective. Cat Power Finance

The policy and regulatory aspects of a bankable solar power project. Uzbekistan Energy Forum, London 18 April 2018 Louis Skyner Partner

BC Hydro s Clean Power Call

The Role of Risk Allocation in Transaction Design: The Case of Power Distribution

Role of Parliamentarians in Monitoring Climate Finance and Development

Preparing Renewable Energy Power Purchase Agreements in the Middle East and North Africa: Questions to Ask

Role of Power Market and Market Intermediaries in Facilitating Investments in South Asian Region

ENABLING AN APPROPRIATE LEGAL AND REGULATORY FRAMEWORK FOR PETROLEUM INDUSTRY - THE PETROLEUM INDUSTRY BILL (PIB)

Model Concession Agreement for Highways: An Overview

PacifiCorp Utah All Source Request for Proposal 2016 Resource. Issued January 6, 2012 Responses May 9, 2012

2014 Forward Work Programme

GET FIT Programme. Energy Sector Working Group. Maputo, 25 May Julia Crause Infrastructure, Southern Africa KfW Development Bank

KEY ELEMENTS OF THE 2017 NATIONAL PETROLEUM POLICY

CIRCULAR DEBT IMPACT ON POWER SECTOR INVESTMENT

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Feed in Tariff Guidelines

Key Elements of a Wind / Solar PPP. Cathy Oxby Commercial Director Mob:

Electricity Supply to Africa and Developing Economies Challenges and Opportunities. Renewable energy integration

s: and Website:

Trinity International LLP. Ana-Katarina Hajduka

Appendix B-2. Term Sheet for Tolling Agreements. for For

TABLE OF CONTENTS... 2

Support mechanisms for RES-e

Transcription:

NIGERIAN POWER SECTOR REFORMS AND PRIVATISATION By Bolanle Onagoruwa Director General, Bureau of Public Enterprises A Presentation to the West African Power Industry Convention November 2011

Outline Introduction FGN Power Reform Agenda Bulk Trader s Role in the reform Milestones Achieved Privatization Strategy Critical Success Factors Challenges of the Power Sector Reform Transaction Update Conclusion 2

Introduction At the onset of the democratically elected civilian administration in 1999, the Nigerian electric power sector had reached, perhaps, the lowest point in its 100 year history: Of the 79 generation units in the country, only 19 units were operational. Average daily generation was 1,750 MW. No new electric power infrastructure was built between 1989-1999. The newest plant was completed in 1990 and the last transmission line built in 1987. An estimated 90 million people were without access to grid electricity. Accurate and reliable estimates of industry losses were unavailable, but were believed to be in excess of 50%. 3

Geography of Economic Activity 4

Nigeria on the World Stage Country * Generation Capacity (GW) Watts per capita S. Africa 40.498 826 Egypt 20.46 259 Nigeria 5.96 40 (25 available) Ghana 1.49 62 USA 977.06 3,180 Germany 120.83 1,468 UK 80.42 1,316 Brazil 96.64 486 China 623.56 466 India 143.77 124 Indonesia 24.62 102 Sources: World Fact book - http://www.cia.gov/library/publications/the-world-factbook/index.html * Energy Information Administration www.eia.doe.gov

Effect of Power Outages 6

FGN Power Reform Agenda FG s reform of power sector is predicated mainly on - The need to reduce the cost of doing business in Nigeria in order to attract new investment through provision of quality and dependable power supply to the economy for industrial, commercial and sociodomestic activities; - The growing demand for stable and reliable power requiring heavy investment in sector; and - The desire and need to be up to global standards. - The need for improvement in the efficiency of the distribution, generation and transmission network which is in an unacceptable state. - The need to provide our people with the basic and affordable infrastructure to enable them create employment for themselves. 7

And our vision for its Achievement Through promotion of: - Competition in the generation segment of the industry; - Good corporate governance and financial discipline; - Social accountability and efficient use of resources; and - A sustainable environment for meeting the need/demand. 8

Overriding and Short Term Goals To fully implement the Electricity Power Sector Reform Act of 2005 and transform the ownership and control of the Nigerian Electricity Supply Industry (NESI) Short Term Goal (2011 2012) Our goal is to generate, transmit and distribute 5,000MW of stable and reliable electricity supply by January 2012 and 6,000MW by December 2012. To achieve this we will closely collaborate with the Ministry of Petroleum Resources to provide adequate gas supply and ensure that all stakeholders are motivated to contribute to the development of this strategic sector Prof. Bart Nnaji, Minister of Power - 2011 9

2013 2015: Medium and Long Term Goals To have set the Nigerian power sector on an irreversible path to selfsustaining mode - equivalent to Telecom sector operation today To have available power of up to 8,000MW by 2013 and 13,000MW by 2015 2016 2020: The Nigerian power market to have reached stability for willing-buyer, willing-seller mode To ensure that all aspects and stakeholders of the NESI are working together to deliver quality, reliable and efficient electricity to consumers at reasonable prices Prof. Bart Nnaji, Minister of Power - 2011 10

Design of The Nigerian Electricity Market NIGERIA ADOPTED THE WHOLESALE COMPETION MODEL AS ITS LONG RUN MARKET DESIGN THE NIGERIAN ELECTRICITY MARKET IS EXPECTED TO EVOLVE THROUGH THE FOLLOWING STAGES: PRE TRANSITIONAL STAGE (Where we are today) Characterized by inadequate and unreliable supply of electricity. TRANSITIONAL STAGE (Where we about to move into) Demand remains larger than supply. All trading is made through contracts. Trading at this stage is physical through contracts. Existing power will traded through vesting contracts The conditions and prices of vesting contracts are not freely negotiated. Transparent and competitive mechanisms for entering in the market (new PPAs). 11

Design of The Nigerian Electricity Market MEDIUM TERM STAGE There is competition to enter in the market. There is competition in the market to supply the demand. Contracts can be negotiated freely and power can be traded like a commodity (financial contracts) There is a centralised merit order dispatch (power at least cost is dispatched first) by the System Operator, where Generators must submit the dispatch nomination (availability, constraints, costs / prices) to be used in the security constrained economic (least cost) dispatch. LONG TERM STAGE Similar to the medium term stage but characterized by more competition and greater freedom by eligible consumers to choose their suppliers 12

Bulk Trader s Role in the Transitional Market Negotiate and enter into Power Purchase Agreements (PPAs) with privatised generation companies Assume PHCN obligations under existing PPAs with Independent Power Producers (IPPs) [outstanding liabilities to be transferred to Nigerian Electricity Liability Management Company (NELMCo) power and possible gas portfolio] Negotiate and enter into PPAs with potential IPPs Negotiate and enter into Vesting Contracts with Distribution Companies 13

Transitional Market Trading Arrangement Existing Existing Existing GenCo1 GenCo2 GenCo3 New IPPs GenCo4 GenCo5 GenCo6 IPPs IPPs IPPs POWER PURCHASE AGREEMENTS PPAs BULK TRADER (NBET) Additional Capacity Eligible Customers VESTING CONTRACTS DisCo 1 DisCo 2 DisCo 3 DisCo 4 DisCo 5 DisCo 6 DisCo 7 DisCo 8 DisCo 9 DisCo 10 DisCo 11 14

Value Chain in Power Production and Delivery Gas Supply/ Transport Tariff Wholesale Tariff for Power Wheeling Charge Retail Tariff for Power Gas Supply/ Transport Bill Transmission Bill Bills Gas Payments TuOS Payment Payment of Bills PPA Agreement PPA Payment Drive is to see commercial performance improvement so that each entity can adequately handle: (1) Payment of invoices (2) Salaries (3) O+M and system improvement (4) Reasonable return on investment (ROI) 15

Milestones Achieved To Transform the Electric Power Sector FGN/ BPE took the following steps: The Electricity (Amendment) Decree 1998 and the NEPA (Amendment) Act 1998 were passed, terminating the monopoly status of NEPA and inviting private sector participation. The Electric Power Reform Implementation Committee (EPIC) was inaugurated by NCP and resulted in FEC approving the National Electric Power Policy in September 2001, which recommended: Establishment of a sector regulator. Privatization of the electric power sector A market trading design and new rules, codes and processes 16

Milestones Achieved (Passage of Electric Power Sector Reform) In March 2005 the Federal legislature passed the Electric Power Sector Reform Act. The Act outlined the framework of the reform as follows: Unbundle the state owned power entity (NEPA) into generation, transmission and distribution segments; Provide for the transfer of assets, liabilities and staff of NEPA to PHCN and then to successor generation, transmission and distribution companies Create a competitive market for electricity services in Nigeria Set up an independent regulator 17

Milestones Achieved ( Implementation of EPSR Act) NEPA was transformed into PHCN Plc as a holding company for the assets, liabilities, employees, rights and obligations of NEPA. The process of incorporation of PHCN was concluded on 5 th May 2005; NCP by an Order published in a Federal Gazette gave 1 st July 2005 as the initial transfer date of assets, liabilities and staff of NEPA to PHCN; NERC was inaugurated in October 2005 as the sector regulator 18

Milestones Achieved ( Implementation of EPSR Act) In November 2005, 18 New successor Companies comprising of 6 generation companies, 1 transmission company and 11 distribution companies were incorporated; On 1 st July 2006, the assets, liabilities and staff of PHCN were transferred to the successor companies, thereby granting the latter greater operational autonomy 19

Milestones Achieved ( Implementation of EPSR Act) Relevant market codes (Grid, Distribution, Performance, Metering etc) have been issued ; Companies to carry on the role of bulk trading in transition and liability management have been incorporated as Nigeria Bulk Electricity Trading Co Plc and Nigerian Electricity Liability Management Company (NELMCO) ; The Market Rules to guide the operations in the electricity industry were approved in 2008. 20

Milestones Achieved ( Implementation of EPSR Act) Rural Electrification policy developed by the Bureau was approved in 2006 and the Agency established but operations suspended in 2009; We are working with the Federal Ministry of Power to define the framework for the operations of the Rural Electrification Agency (REA) post-privatization; Liquidation Committee established on April 12, 2011 to wind down the operations of PHCN. 21

Privatization of the PHCN Successor Companies (STRATEGY OVERVIEW) Approved privatisation strategies for the Successor Companies and TCN: - Core investor sale - Asset sale - Management Contract - Concessions DisCos Core Investor Sale (Sale of Equity) TranSysCo Management Contract GenCos Core Investor Sale (Thermal) Concession (Hydro) 22

PRIVATISATION Contd.: DIVESTITURE STRATEGY (DISCOS) Core Investor Sale Method was approved for Distribution Companies (Discos) privatisation. Bidding parameters will primarily be based on: the use of quality of service/efficiency parameters considered against investment proposals made by bidders aimed at reducing Aggregate Technical, Commercial and Collection (ATC&C) losses over an agreed time frame; Other key Characteristics of the strategy: The strategy will be built around the Multi Year Tariff Order (MYTO); MYTO will stipulate the annual investment requirement, allowable operational expenditure, approved rate of return on equity and other allowable expenses for each distribution company; 23

PRIVATISATION Contd.: MERITS OF THE PROPOSED APPROACH (DISCO) Emphasizes technical, financial and managerial competence of operators Loss reduction and investments, are the main parameters for assessing potential bidders; Has the shortest curve for reducing subsidies, guarantees and section payment delinquency The benefits for efficiency improvements will be shared between the operators and consumers through tariff reductions. To the extent that an operator fails to meet the regulatory targets in terms of efficiency improvements, any additional costs will have to be absorbed by the operator Investors have certainty on recovery of investments Government for the first time will begin to earn some return on its remaining equity interest in the Discos and can within a specified time cease financial support altogether. 24

PRIVATISATION Contd.: TRANSMISSION COMPANY 25

Privatisation Cont : Strategy For Transmission Company 5-Year Management Contract is proposed. Management Contractor to oversee the entire TCN operations including Market Operations, System Operations and Transmission System Provider. Management Contract will bring required expertise to transform TCN into a world class company. Skills necessary to manage System and Market Operations in a liberalized market to be provided by the Management Contractor. Technical loss reduction and network improvement criteria to be adopted in selecting the Management Contractor. Transmission network investment to be funded through bonds issued by TCN Plc. The bond issued by TCN Plc to be retired from revenues accruing from consumer tariffs at no extra cost to government. 26

GENCO Privatisation Strategies: Thermal 27

PRIVATISATION STRATEGIES: (GENCOS) Contd. Generation Generation projections can be achieved by privatization 4 Thermal Gencos up for privatisation : Core Investor Sale Thermal stations Geregu Power Plc Kogi State installed capacity, 414 MW on stream Dec 2007 Ughelli Power Plc Delta State built between 1966 and 1975 installed capacity, 900 MW Sapele Power Plc Delta State Installed Capacity 1020 MW Built 1978 Afam Power Plc Comprising of Afam I-V Rivers State Installed Capacity 987.2 MW Built 1963, 2001 28

PRIVATISATION STRATEGIES: (GENCOS) Contd. Generation 2 Hydro Gencos up for privatisation : Concession Hydro stations Kainji HydroElectric Plc (Comprising Kainji & Jebba Plants) first hydro power station, established on the River Niger total installed capacity, 1344 MW Shiroro Hydro Electric Plc on the Shiroro Gorge on the River Kaduna newest Hydro Station established in 1990 installed capacity, 600 MW 29

Critical Success Factors Completion of Privatization of DisCos and FGN GenCos Cost reflective tariff Resolution of labour issues Providing comfort/guarantees along the value chain FGN policy consistency and commitment 30

Challenges in the Power Sector Reform 1 A NEW MULTI-YEAR-TARIFF-ORDER A new tariff regime which will ensure that consumers are charged cost reflective tariffs is currently being developed. It is expected that the tariff will be operational be January 1, 2012. 2 PROVISION OF SUBSIDY TO AVOID RATE SHOCK To ensure that the government cushions the effect of moving from the current tariff to a cost reflective tariff over a three-year period, there is a need to provide subsidy (FGN through the Ministry of Finance has committed to providing N100 billion in first year and proposes another N100 billion the second year and N50 billion in the third year) 31

Challenges in the Power Sector Reform 3 RESOLUTION OF LABOUR ISSUES The Federal Government of Nigeria, has commenced negotiations with representatives of the labor unions in the electric power sector. Alhaji Hassan Sunmonu was engaged as the negotiator/conciliator for resolution of labor issues. The first and second rounds of negotiations were held in May and July 2011 respectively. Some agreements were reached during the first round of negotiations Payment of 50% salary increase Regularization of casual staff Holding of labor Workshop Final negotiations to hold on November 30, 2011 to discuss pensions and severances 32

Transaction Update 33

Bid Timeline Bid Timeline Draft Industry Agreements Posted August 15, 2011 Deadline to confirm intention to bid, $20,000 fee due for purchase of RFP documents August 26, 2011 Issuance of RFP, Information Memorandum Documents September 01, 2011 Access to virtual Data Room September 01, 2011 Pre-Due Diligence Conference October 14, 2011 Opening of Physical Data Rooms October 24, 2011 Bidders Site Visits Nov 14- January 30, 2011 Transaction and Industry Review Conference November 28 and 29, 2011 Distribution of Final Bid Documents December 14, 2011 Generation Company Bids to be Submitted January 30, 2012 Distribution Company Bids to be Submitted February 13, 2012 Complete Bid Evaluation Process- Generation March 2, 2012 Complete Bid Evaluation Process- Distribution March 12, 2012 34

Transaction Timeline Successfully hosted the due diligence conference on October 14, 2011 The Physical data room opened in 17 locations on 24 October 2011 The site visits commenced on 14 November 2011 and it is still on going in some locations The electric power transaction conference is currently on going( 28& 29 November 2011) 35

Conclusion The privatization of the successor companies of PHCN is on going. The FGN is committed towards concluding the transaction as clearly indicated by vigorous implementation of the transaction timeline 36