SCHEDULE 11 INSURANCE REQUIREMENTS SCHEDULE

Similar documents
Section Insurance Conditions Infrastructure Projects 10M to 50M

SCHEDULE 11 INSURANCE REQUIREMENTS SCHEDULE

SCHEDULE 9 PROVINCIAL FUNDING PROGRESS PAYMENTS

Insuring Your Construction Project

SCHEDULE 1 CHANGE ORDERS

EDUCATION AND ADVANCED EDUCATION (PUBLIC SCHOOL DISTRICTS AND PUBLIC POST SECONDARY INSTITUTIONS) OWNER INSURED CONSTRUCTION PROJECTS

2010 INSURANCE MANUAL

OREGON STATE UNIVERSITY

SCHEDULE 9 FORM OF TRI-PARTY AGREEMENT

SCHEDULE 16 SAFETY REQUIREMENTS

TECHNOLOGY XTEND ENDORSEMENT

MANITOBA HOUSING SUPPLEMENTAL CONDITIONS CONTRACT #: XXXX GENERAL

CONSTRUCTION PROJECT - RENOVATIONS OVER $5 MILLION VALUE. CONSTRUCTION MANAGER INSURANCE CHART FOR RFP PURPOSES Updated: November, 2011

CONTRACTORS APPLICATION

CASTAIC LAKE WATER AGENCY STANDARD CONTRACT RISK TRANSFER PROVISIONS, GENERAL CONDITIONS and REQUIRED INSURANCE for

SCHEDULE 10 INDEX FACTOR

SUBCONTRACTOR INSURANCE REQUIREMENTS Version 3/1/2018

Bernards (Project Name) CCIP Insurance Manual

Contractual Risk Transfer in Construction Contracts

COMMERCIAL LIABILITY BROADENING ENDORSEMENT

RENOVATION CONTRACT. Borrower Name(s): Phone #: Phone #:

SCHEDULE 10 INDEX FACTOR

SCHEDULE 10 INDEX FACTOR

GENERAL LIABILITY ELITE EXTENSION LOUISIANA


OCIP Contract Language

Complete Reference Guide. Prime Builder Custom built protection for your construction project A /14

SECTION SUPPLEMENTARY CONDITIONS

ROCHESTER SCHOOLS MODERNIZATION PROJECT PHASE 2b School Without Walls Commencement Academy INSURANCE REQUIREMENTS

AGREEMENT TO DESIGN, BUILD, FINANCE AND OPERATE SOUTHWEST CALGARY RING ROAD

DECORATING AGREEMENT (Effective 10/7/14)

PORT OF OAKLAND STANDARD CONTRACT PROVISIONS

TRENTON AGRI PRODUCTS LLC INSURANCE & INDEMNIFICATION TERMS & CONDITIONS

Exhibit 1 to Part 3 Project-Specific Terms

APPENDIX B WASHINGTON SUBURBAN SANITARY COMMISSION PROCUREMENT OFFICE INSURANCE AND BONDING CONTRACT NO.

Summary Description of Rail OCIP Coverage

ADDENDUM TO STANDARD FORM OF AGREEMENT BETWEEN OWNER AND CONTRACTOR FOR A RESIDENTIAL OR SMALL COMMERCIAL PROJECT AIA DOCUMENT A

COMMERCIAL GENERAL LIABILITY APPLICATION

Required Insurance Language for PRF Construction Contracts

SUPPLEMENTARY CONDITIONS

Rail Owner Controlled Insurance Program Manual

HALIFAX REGIONAL MUNICIPALITY SECTION GENERAL CONDITIONS PAGE 1 OF THE CIVIL WORKS CONTRACT JANUARY 2018

PROFESSIONAL SERVICES and NON-CONSTRUCTION CONRACTS

RICE UNIVERSITY SHORT FORM CONTRACT

Exhibit 1 to Part 3 Project-Specific Terms

INSURANCE EXHIBIT TO CONSTRUCTION AGREEMENT Insurance Requirements Owner Controlled Insurance Program

MINIMUM INSURANCE REQUIREMENTS FOR CLOSING OF VHDA CONSTRUCTION FINANCING

SAMPLE. Insurance Exhibit. Design-Build Subcontractor s Insurance Requirements

SUPPLEMENTARY AND SPECIAL TERMS AND CONDITIONS FOR MINOR PROJECTS

EXHIBIT V INSURANCE COVERAGE REQUIREMENTS FOR DESIGN-BUILD CONTRACTOR AND O&M CONTRACTOR

AMENDMENT OF SOLICITATION REQUEST FOR PROPOSALS (RFP) ADDENDUM No. 1. Issued: May 23, 2016

Donald S. Rector, P.E. January 1, Fairfield County Utilities Department Renewal - Service Line Contractor s License.

Modifications and Additions to the Master Municipal Construction Documents

EXHIBIT C CONSULTANT INSURANCE REQUIREMENTS SACRAMENTO AREA FLOOD CONTROL AGENCY

SCHEDULE 16 SAFETY REQUIREMENTS

EXHIBIT G. Insurance Requirements. [with CCIP]

CITY AND COUNTY OF SAN FRANCISCO Port of San Francisco. Contract No Pier 23 Roof Repair. ADDENDUM No. 1 Issued: December 16, 2016

Name of Entity Description of Operation Location Years in Business. Name of Entity Estimated Gross Revenue Estimated Payroll No.

CCIP ADDENDUM. Blasting or any blasting operations;

Document A141 TM Exhibit B. Insurance and Bonds. for the following PROJECT: (Name and location or address)

DEMOLITION 535 Fraser Street

ADDENDUM TO AGCC3. Unless otherwise stated, the contract price includes all taxes.

W.E. O Neil Construction Co. of Arizona c/o (Project Coordinator) 4511 E. Kerby Avenue Phoenix, AZ Fax (480)

SAMPLE DOCUMENT SUBCONTRACT AGREEMENT

Contractor for any and all liability, costs, expenses, fines, penalties, and attorney s fees resulting from its failure to perform such duties.

SAMPLE. Insurance Exhibit. Design-Builder s Insurance Requirements

INSURANCE AND INDEMNIFICATION MANUAL. Supplement to Policy 560 i

DEVELOPMENT PERMIT APPLICATION CHECKLIST New: Commercial Industrial Institutional - Multiple Family Residential

Environmental Insurance for Consulting & Construction Projects Empower Results

Exhibit. Owner Controlled Insurance Program. Insurance Requirements

GENERAL CONTRACTORS GENERAL LIABILITY SUPPLEMENTAL

Commercial Business Application

SCHEDULE 1 CHANGE ORDERS

MASTER SUBCONTRACT AGREEMENT

Environmental Insurance

Sample Integrated Liability Clauses

AVIATION OWNER CONTROLLED INSURANCE PROGRAM MANUAL

AGREEMENT FOR PRELIMINARY CONSTRUCTION SERVICES FOR THE DEVELOPMENT OF (INSERT PROJECT NAME HERE)

INSURANCE SCHEDULE F

1.3 All employees are equally responsible for complying with the Ontario Occupational Health & Safety Act and its Regulations.

SMALL ORDERS TERMS AND CONDITIONS - BLANKET

CITY OF TACOMA Water Supply

Cosmos Projects - Standard Terms and Conditions of Sub-Contract

The Role of the Certificate

WESTERN RIVERSIDE COUNCIL OF GOVERNMENTS EQUIPMENT PURCHASE AGREEMENT

4. The Division shall receive tenders at a location specified by the Secretary-Treasurer up to the time and date specified on the tender documents.

Standard Form of Agreement Between Owner and Contractor for a Residential or Small Commercial Project

EXHIBIT A SUPPLEMENTAL TERMS AND CONDITIONS TO SIERRA AUCTION BUYER S TERMS AND CONDITIONS 1. AIRCRAFT PASSENGER BOARDING BRIDGES SALE AND CONDITION

BETWEEN name. address. AND name (hereinafter called the Subcontractor ) address

Application for Economic Development Grants

GENERAL CONDITIONS UNIT PRICE CONTRACT

"P" INSURANCE CONDITIONS CONSULTING AND PROFESSIONAL SERVICES

Construction of the Leased Premises

Not operate above a maximum speed of 10 miles per hour; Have a gross weight of less than 80 pounds, excluding cargo;

INSURANCE REQUIREMENTS

ARTICLE V Indemnification; Insurance

REQUEST FOR QUALIFICATIONS

Exhibit. Owner Controlled Insurance Program. Insurance Requirements

ST. TAMMANY PARISH PATRICIA P. BRISTER PARISH PRESIDENT

EXHIBIT B ADDITIONAL TERMS AND CONDITIONS ADDENDUM

Transcription:

SCHEDULE 11 SCHEDULE 11 DBFO AGREEMENT INSURANCE REQUIREMENTS SCHEDULE 1. GENERAL 1.1 Capitalized Terms Capitalized terms used in this Schedule have the definitions as set out in the Agreement to Design, Build, Finance and Operate Southwest Calgary Ring Road (the DBFO Agreement ) between Her Majesty the Queen in right of Alberta and the Contractor, as defined therein, unless expressed otherwise. 1.2 DBFO Agreement Reference This Schedule is referenced in sections 1.3, 11.1, 11.2, 11.4, 11.6 and 11.9 of the DBFO Agreement. 2. GENERAL INSURANCE REQUIREMENTS 2.1 Insurance Act All insurance policies must comply with the Insurance Act (Alberta). 2.2 No Limit on Obligations The insurance forms and limits listed below are presented as minimum requirements that the Contractor must provide, without in any way limiting the Contractor s obligations or liabilities under the DBFO Agreement. 2.3 Actual Form and Substance All insurance must be in forms and with terms and conditions acceptable to the Province, acting reasonably and acting in a reasonably timely manner. The Province shall be deemed to be acting unreasonably if the effect of not finding certain forms or terms and conditions acceptable is to impose on the Contractor (or its subcontractors) insurance requirements additional to the insurance requirements set out in the DBFO Agreement, including this Schedule 11. The purpose of this Section 2.3 is to give the Province the right to have modified or deleted from the actual insurance policies, terms and conditions that the Province becomes aware of, including becomes aware of only after receiving the certified copies of the insurance policies, that are clearly contrary to the express intent or the spirit of the insurance requirements in the DBFO Agreement, including this Schedule 11. Sch 11-1 SWCRR - Schedule 11 - - Aug 24-16.docx

3. THE INSURANCE DURING THE CONSTRUCTION PERIOD 3.1 Required Construction Period Insurance The Contractor shall purchase and maintain or cause to be purchased and maintained in full force at all times, from the Execution of the DBFO Agreement through to Construction Completion: (a) project specific general liability wrap-up insurance in an amount not less than $50,000,000 inclusive per occurrence (excepting in the aggregate with respect to products and completed operations), insuring against bodily injury, personal injury and property damage, including loss of use thereof. A general aggregate limit is not permitted. The required liability limit can be achieved through primary or umbrella liability insurance. Any professional exclusion for supervisory or inspection activities shall be limited to services provided by architects, engineers, surveyors or design professionals. Such coverage shall cover all operations related to the Project whether onsite or offsite. Furthermore, such coverage shall cover the Contractor s supervision and management of the carrying out of any operations and maintenance activities during the Construction Period by its subcontractors. The named insureds on the policy shall be the Province and the Contractor. Other insureds on the policy shall include all consultants, subconsultants and subcontractors of every tier whether named or unnamed in the policy. The Province as a named insured must have the right to make a claim under the policy directly to the insurer. Such insurance shall not contain any coverage-limiting policy warranties, including but not limited to those related to burning, welding or cutting, hot work, open flame, refuse, waste and debris removal or burning, fencing, fire extinguisher or fire-fighting, or requirements that subcontractors maintain specific insurance or limits. Such insurance shall include but not be limited to: Products and completed operations liability; the completed operations liability coverage shall remain in effect for a period of 24 months after Construction Completion; Owner's and contractor's protective liability; Blanket written contractual liability; Contingent employer's liability; Non-owned automobile liability; Cross liability and severability of interests; Employees as additional insureds; Broad form property damage endorsement; Forest fire fighting expenses; Operation of attached machinery; and Sudden and accidental pollution as per IBC 2313 or similar wording, and where such further risk exists: Sch 11-2

Blasting, demolition, pile driving, caisson work or tunnelling, as applicable; Elevator and hoist liability; and Towing/on hook coverage, unless this risk is covered by the policy in Section 3.1(c); (b) (c) automobile liability on all vehicles owned, operated or licensed in the name of the Contractor in an amount not less than $5,000,000; course of construction insurance in the form of an all risks builder s risk policy covering bridge structures, bridge culverts, and any other similar structures (including without limitation large sign structures) forming part of the Project (collectively, the Bridge Component ). The course of construction policy shall insure the Project to a minimum of the full value of the Bridge Component of the Project. The named insureds on the policy shall be the Contractor and the Province. Other insureds under the policy shall include any Lender (as defined in Schedule 6 to the DBFO Agreement), all consultants, subconsultants, subcontractors of every tier, whether named or unnamed in the policy and all others having an insurable interest in the Project. The Province as a named insured must have the right to make a claim under the policy directly to the insurer. Such insurance shall not contain any coverage-limiting policy warranties, including but not limited to those related to burning, welding or cutting, hot work, open flame, refuse, waste and debris removal or burning, fencing, fire extinguisher or fire-fighting, or requirements that subcontractors maintain specific insurance or limits. The course of construction insurance shall not: (i) itself create or contemplate an insurance trustee, nor modify or endorse the Basis of Loss Settlement Clause in terms of the insertion of an insurance trustee, unless such insurance trustee has been approved by the Province acting reasonably and has entered into an agreement among the Province, the Contractor, and the Lender, satisfactory to the Province acting reasonably (the Approved ITA ); (ii) contain any endorsements in favour of the Lender that may be prejudicial to the Province in terms of directing insurance proceeds contrary to the DBFO Agreement or adversely impacting the use of the insurance proceeds to repair all damage to the New Infrastructure during the Construction Period (the obligation to repair being as required under the DBFO Agreement); nor (iii) modify or endorse the Standard Mortgage Clause unless to factor in the use of an approved insurance trustee and with the approval of the Province acting reasonably. The Approved ITA shall: (iv) provide that the Contractor pay for all fees and expenses of the insurance trustee; (v) provide that the insurance trustee hold any insurance proceeds it may receive in trust for the Province, the Lender, and the Contractor in accordance with their respective interests, and only disburse or otherwise deal with such insurance proceeds in accordance with the provisions of the Approved ITA; (vi) have terms and conditions which are consistent with the provisions of the DBFO Agreement, including without limitation, provisions dealing with insurance proceeds; and (vii) provide that Sch 11-3

unless otherwise agreed to by the Province and the Lender, insurance proceeds shall be used to repair all damage to the New Infrastructure during the Construction Period (the obligation to repair being as required under the DBFO Agreement); and (d) if the Contractor does or is to perform any design work for the Project, the Contractor shall maintain $5,000,000 per claim and in the aggregate errors and omissions insurance from the Execution of the DBFO Agreement until twelve months following Construction Completion. 4. THE INSURANCE DURING THE PNI OPERATING PERIOD AND THE OPERATING PERIOD 4.1 Required PNI Operating Period and the Operating Period Insurance The Contractor shall purchase and maintain in full force at all times, from PNI Traffic Availability with respect to the Priority New Infrastructure and from RNI Traffic Availability with respect to the Remaining New Infrastructure, in each case through to the end of the Term: (a) general liability insurance in an amount not less than $10,000,000 inclusive per occurrence (excepting in the aggregate with respect to products and completed operations) against bodily injury, personal injury and property damage, including loss of use thereof. Annual general aggregate limit, if any, must not be less than $20,000,000. The required liability limit can be achieved through primary or umbrella liability insurance. Defense costs must be in addition to the limits of insurance. Any professional exclusion for supervisory or inspection activities shall be limited to services provided by architects, engineers, surveyors or design professionals. Such insurance shall include but not be limited to: Products and completed operations liability; Owner's and contractor's protective liability; Blanket written contractual liability; Contingent employer's liability; Non-owned automobile liability; Cross liability and severability of interests; Employees as additional insureds; Broad form property damage endorsement; Forest fire fighting expenses; Operation of attached machinery; and Sudden and accidental pollution as per IBC 2313 or similar wording, and where such further risk exists: Sch 11-4

Blasting, demolition, pile driving, caisson work or tunnelling, as applicable; Elevator and hoist liability; and Towing/on hook coverage; and (b) automobile liability on all vehicles owned, operated or licensed in the name of the Contractor in an amount not less than $5,000,000. Sch 11-5