MINIMUM BASIC OUTLINE FOR ACCIDENT PREVENTION PLAN

Similar documents
Accident Prevention Plans (APP) Appendix A EM (15 SEPTEMBER 2008 edition)

DATA ITEM DESCRIPTION

835 Gil Harbin Industrial Blvd Valdosta, GA 31601

San Antonio Water System PROJECT CONSTRUCTION PROGRAM HEALTH AND SAFETY PROGRAM

San Antonio Water System Standard Specifications for Construction

835 Gil Harbin Industrial Blvd Valdosta, GA 31601

HULCHER CONTRACTOR SAFETY MANAGEMENT PROCESS

Safety & Health Manual

DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY ATTACHMENT M SAFETY PROVISIONS GOODS AND SERVICES CONTRACTS

POWER CONSTRUCTION COMPANY CCIP PROGRAM SAFETY REQUIREMENTS

ATTACHMENT "I" SUBCONTRACTOR SAFETY, HEALTH, AND ENVIRONMENTAL MINIMUM PERFORMANCE STANDARD (MPS)

Contractor Qualification Statement

CONTRACTOR PRE-QUALIFICATION FORM

TOOLS FOR SAFETY ENFORCEMENT ON CONSTRUCTION AND CONTRACT PROGRAM MANAGEMENT PROCEDURES THAT APPLY TO CONSTRUCTION ALTERATION & REPAIR PROJECTS

Promoting Best Practices in safety and risk management with CDRA member companies CDRA Best Practices in Safety Awards Application

Power Construction Company CCIP Program Safety Requirements

CONTRACTOR S RESPONSIBILITY FOR PROJECT SAFETY [Major Construction Category]

Safety - Introduction

CONTRACTOR S RESPONSIBILITY FOR PROJECT SAFETY [Major Construction Category]

2016 CDM Smith All Rights Reserved July 2016 SECTION SAFETY, HEALTH, AND EMERGENCY RESPONSE

SAFETY POLICY. Office Address 5195 W. 58 th Ave. Unit F Arvada, CO

1042 FORUM DRIVE BROUSSARD, LA PHONE: (337) FAX: (337) Products & Services JANUARY 2015

WORKING WITH CONTRACTORS POLICY AND PROCEDURE

Carson, CA Inland Star Distribution Centers, Inc. PSM/CalARP

Guideline for external contractors working on the premise of MANN+HUMMEL

CONTRACTOR SAFETY QUALIFICATION PACKET

Contractor Safety Management Standard

SUBCONTRACTOR QUALIFICATION STATEMENT

Construction accidents..add $10 billion annually to construction cost

Guidelines for Improving Contractor Safety Performance in the Natural Gas Industry

ENVIRONMENTAL STANDARD OPERATING PROCEDURE 16 BOILER OPERATION

Contractor Health and Safety Code of Practice. Updated June 4, 2018

CORPORATE POLICY MANUAL

Safety Program 1. Is there a formal written Safety Program in effect? 2. Are Regular safety meetings conducted? How Often? 3. Is there a Safety Commit

Instructions to Bidders REF: I 805 North HOV / BRT DB Contract 11-2T2004

Electric Transmission Texas, LLC Supplemental Safety Terms and Conditions

A1) General Safety Guidelines applicable to external employees at all Company workplaces.

SUBCONTRACTOR MANAGEMENT PLAN

1.3 All employees are equally responsible for complying with the Ontario Occupational Health & Safety Act and its Regulations.

Instructions to Bidders REF: I 805 North HOV / BRT DB Contract 112T2004

Workplace Safety and Loss Prevention Incentive Program (Safety, Drug and Alcohol Prevention, and Return to Work Incentive Programs)

AECOM - SUBPORT Prequalification Questionnaire. General Information. Organization and Experience. Type of Services:

PUBLIC COMPANY ORLEN LIETUVA OCCUPATIONAL HEALTH AND SAFETY PROCEDURE FOR CONTRACTORS BDS-40 I. GENERAL. Purpose and Scope of Application

CONTRACTOR SAFETY AGREEMENT

Contractor s Environmental Health & Safety Disclosure

CITY STATE ZIP CODE TELEPHONE #

Contractor Guidelines

APPENDIX A TECHNICAL SPECIFICATIONS RFQ PLUMBING SERVICES

EQUIPMENT DEALERS SUPPLEMENTAL APPLICATION

Labor Law Regulation Part 60 Pursuant to Section 134 of the Workers. Compensation Law as amended by Chapter 6 of the Laws of 2007

Alcumus Health and safety assessment standards

Contractor Induction Handbook

Activity Hazard Analysis (AHA) Overall Risk Assessment Code (RAC) (Use highest code) SIGNATURES Activity # AHA #

CONSTRUCTION SUBCONTRACT. (Subcontract No.) EXHIBIT "F" ENVIRONMENT, SAFETY AND HEALTH PROVISIONS. (Date)

Contractor s Statement of Qualifications for (Insert Project Name) (Insert Owners Name Here) (Insert Owners City and State Here)

Contractors Induction Booklet. Contractor s Name:

CONTRACTOR PRE-QUALIFICATION QUESTIONNAIRE

RFP No Attachment No. 1 Company Overview

RFP No Attachment No. 1 Company Overview

Incomplete submissions will be declined

CONTRACTOR PRE QUALIFICATION QUESTIONNAIRE

Subcontractor Partner Prequalification Form. Company Name: DBA (if applicable):

1. MANAGEMENT OF HEALTH, SAFETY, SECURITY AND ENVIRONMENT

Exhibit. Owner Controlled Insurance Program. Insurance Requirements

ARTICLE 8: BASIC SERVICES

Work Health and Safety Conditions

Paying Attention to Contractors. Karl A. Anderson HQ, US Army Corps of Engineers Safety and Occ. Health Office

Contractor Safety!!!

DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES 2.01

AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER PRE-CONSTRUCTION AND CONSTRUCTION SERVICES

BUILDING CLEARANCE CERTIFICATE

AGREEMENT ON OCCUPATIONAL HEALTH AND SAFETY IN TERMS OF SECTION 37(2) OF THE OCCUPATIONAL HEALTH AND SAFETY ACT 85 OF 1993 (AS AMENDED) between

Cooperation with the University s representatives, addressing specific safety issues at the Project.

Crane Operator & Rental Supplemental Application

Tower Contractor Questionnaire

~!'BCdBulldor. A partnering program between the. Associated Builders and Contractors of Minnesota. and the. Occupational Safety and Health Division

OSHA 101 When OSHA Comes to Call!

(a) Implement and maintain this Safety and Health Program. (b) Conduct an aggressive loss prevention program.

Facilities Management

CONTRACTOR/SUPPLIER QUALIFICATION STATEMENT

Terre View Research Facility Relocation Washington State University Pullman, WA Project Manual

The University of North Texas at Dallas Policy Manual Chapter

Contractor Pre-qualification Questionnaire

REQUEST FOR PROPOSALS FOR BID TOWN OF MIDDLESEX, VERMONT TROPICAL STROM IRENE FEDERAL BUYOUT DEMOLITIONS

ADDENDUM TO INSURANCE MANUAL. Safety Standards. Owner Controlled Insurance Program (OCIP)

Appendix I: Safety Orientation Checklist GENERAL Department Safety Program, Crop and Soil Sciences, Washington State University

00810 Vendor Diversity

Subcontractor Prequalification Statement

SUPPLEMENTAL QUESTIONNAIRE Artisan Contractors

DEPARTMENT OF MANAGEMENT SERVICES ADMINISTRATIVE POLICY

WCS4. Auto Owners WCS4 Account / Account Code: Insured: Policy #: Survey Address: Policy Information. General Information

MIRMA LOSS CONTROL PROGRAM EVALUATION RATING FORM MEMBER OFFICIAL REPRESENTATIVE TITLE SAFETY COORDINATOR. I. Management Direction 270 0

DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS DIRECTOR'S OFFICE GENERAL INDUSTRY AND CONSTRUCTION SAFETY AND OCCUPATIONAL HEALTH STANDARD STANDARDS

Title: Environmental, Health and Safety Revision No.: 4 Effective Date: January 1, 2017

Contractors Supplemental Questionnaire

Tri-Cities Academic Building Washington State University Richland, WA Project Manual

MONTANA STATUTES : (1) MONTANA CODE: TITLE 39: LABOR CHAPTER 71: WORKERS COMPENSATION

RFP NO: REQUEST FOR PROPOSAL BUILDING DEMOLITION SERVICES CITY OF SOUTH BAY 335 SW 2ND AVENUE, SOUTH BAY, FLORIDA 33493

Management Commitment. BEST Level 3 Guidance. Actions to Achieve Desired Outcomes

Session no. G I WON A CONSTRUCTION CONTRACT, NOW WHAT DO I DO? (Sequel)

Transcription:

APPENDIX A MINIMUM BASIC OUTLINE FOR ACCIDENT PREVENTION PLAN An APP is, in essence, a safety and health policy and program document. The following areas are typically addressed in an APP, but a plan shall be job-specific and shall also address any unusual or unique aspects of the project or activity for which it is written. The APP shall interface with the employer s overall safety and health program. Any portions of the overall safety and health program that are referenced in the APP shall be included as appropriate. > See 01.A.11 1. SIGNATURE SHEET. Title, signature, and phone number of the following: a. Plan preparer (qualified person such as corporate safety staff person, QC). b. Plan must be approved, by company/corporate officers authorized to obligate the company (e.g., owner, company president, regional vice president, etc.). c. Plan concurrence (e.g., Chief of Operations, Corporate Chief of Safety, Corporate Industrial Hygienist, project manager or superintendent, project safety professional, project QC) (provide concurrence of other applicable corporate and project personnel (Contractor)). 2. BACKGROUND INFORMATION. List the following: a. Contractor; b. Contract number; c. Project name; A-1

d. Brief project description, description of work to be performed, and location (map); e. Contractor accident experience (provide information such as experience modification rate (EMR), OSHA 300 Forms, corporate safety trend analyses); and f. Listing of phases of work and hazardous activities requiring AHA. 3. STATEMENT OF SAFETY AND HEALTH POLICY. Provide a copy of your current corporate/company Safety and Health Policy Statement. NOTE: In addition to the corporate/company policy statement, your corporate/company safety program may provide a significant portion of the information required by the APP. 4. RESPONSIBILITIES AND LINES OF AUTHORITIES. a. Identification and accountability of personnel responsible for safety - at both corporate and project level. (Contracts specifically requiring safety or industrial hygiene personnel should include a copy of their resume. The District Safety and Occupational Health Office will review the qualifications for acceptance.) b. Lines of authority. 5. SUBCONTRACTORS AND SUPPLIERS. Provide the following: a. Identification of subcontractors and suppliers (if known); b. Means for controlling and coordinating subcontractors and suppliers; and c. Safety responsibilities of subcontractors and suppliers. 6. TRAINING. A-2

a. List subjects to be discussed with employees in safety indoctrination. EM 385-1-1 b. List mandatory training and certifications that are applicable to this project (e.g., explosive actuated tools, confined space entry, crane operator, diver, vehicle operator, HAZWOPER training and certification, PPE) and any requirements for periodic retraining/recertification. c. Identify requirements for emergency response training. > See paragraph 12.b. below for a list of requirements that may require emergency response training. d. Outline requirements (who attends, when given, who will conduct, etc.) for supervisory and employee safety meetings. 7. SAFETY AND HEALTH INSPECTIONS. Provide details on: a. Who will conduct safety inspections (e.g., PM, safety professional, QC, supervisors, employees), proof of inspector s training/qualifications, when inspections will be conducted, how the inspections will be recorded, deficiency tracking system, follow-up procedures, etc. The names of competent and/or qualified person(s) and proof of competency/ qualification to meet specific OSHA competent/qualified person(s) requirements must be attached. b. Any external inspections/certifications that may be required (e.g., USCG). 8. SAFETY AND HEALTH EXPECTATIONS, INCENTIVE PROGRAMS, AND COMPLIANCE. a. The company's written safety program goals, objectives, and accident experience goals for this contract should be provided. b. A brief description of the company's safety incentive programs (if any) should be provided. A-3

c. Policies and procedures regarding noncompliance with safety requirements (to include disciplinary actions for violation of safety requirements) should be identified. d. Provide written company procedures for holding managers and supervisors accountable for safety. 9. ACCIDENT REPORTING. The Contractor shall identify who, how, and when the following will be completed: a. Exposure data (man-hours worked); b. Accident investigations, reports, and logs; c. Immediate notification of major accidents. 10. MEDICAL SUPPORT. Outline on-site medical support and offsite medical arrangements including rescue and medical duties for those employees who are to perform them, and the name(s) of onsite Contractor personnel trained in first aid and CPR. 11. PERSONAL PROTECTIVE EQUIPMENT. Outline procedures (who, when, how) for conducting hazard assessments and written certifications for use of PPE. Outline procedures to be followed to assure the proper use, selection, and maintenance of personal protective and life saving equipment (e.g., protective footwear, protective gloves, hard hats, safety glasses, hearing protection, body harnesses, lanyards). 12. PLANS (PROGRAMS, PROCEDURES) REQUIRED BY THE SAFETY MANUAL (as applicable). a. Layout plans (04.A.01) b. Emergency response plans: (1) Procedures and tests (01.E.01) A-4

(2) Spill plans (01.E.01, 06.A.02) (3) Firefighting plan (01.E.01, 19.A.04) (4) Posting of emergency telephone numbers (01.E.05) (5) Wild land fire prevention plan (09.K.01) (6) Man overboard/abandon ship (19.A.04) c. Hazard communication program (01.B.06). Provide the location of MSDS, records of Contractor employee training, and inventory of hazardous materials (including approximate quantities and a site map) that will be brought onto Government project by the Contractor and subcontractor. d. Respiratory protection plan (05.E.03) e. Health hazard control program (06.A.02) f. Lead abatement plan (06.B.05 & specifications) g. Asbestos abatement plan (06.B.05 & specifications) h. Abrasive blasting (06.H.01) I. Confined space (06.I) j. Hazardous energy control plan (12.A.07) k. Critical lift procedures (16.C.18) l. Contingency plan for severe weather (19.A.03) m. Access and haul road plan (8.D.1) n. Demolition plan (engineering and asbestos surveys) (23.A.01) A-5

o. Emergency rescue (tunneling) (26.A.05) p. Underground construction fire prevention and protection plan (26.D.01) q. Compressed air plan (26.I.01) r. Formwork and shoring erection and removal plans (27.B.02) s. Jacking plan (lift) slab plans (27.D.01) t. Safety and health plan and SSHP (for HTRW work, an SSHP must be submitted and shall contain all information required by the APP - two documents are not required (28.A.02) u. Blasting plan (29.A.01) v. Diving plan (30.A.13) w. Plan for prevention of alcohol and drug abuse (Defense Federal Acquisition Regulation Supplement (DFARS) Subpart 252.223-7004) x. Fall protection plan (Section 21) y. Steel erection plan (27.E.01) z. Night operations lighting plan (16.C.19.d) aa. Site sanitation plan (Section 02) bb. Fire Prevention Plan (09.A.01) 13. CONTRACTOR INFORMATION. The Contractor shall provide information on how they will meet the requirements of applicable Sections of this manual in the APP. As a minimum, excavations, scaffolding, medical and first-aid requirements, sanitation, PPE, fire prevention, machinery and mechanized equipment, electrical A-6

safety, public safety requirements; and chemical, physical agent, and biological occupational exposure prevention requirements shall be addressed as applicable. 14. SITE-SPECIFIC HAZARDS AND CONTROLS. Detailed sitespecific hazards and controls shall be provided in the AHA for each activity of the operation. A-7

A-8