Project Agreement. (WEST AFRICA REGIONAL FISHERIES PROGRAM REPUBLIC OF LIBERIA (Phase I)) between INTERNATIONAL DEVELOPMENT ASSOCIATION.

Similar documents
Project Agreement OFFICIAL DOCUMENTS. Public Disclosure Authorized. Public Disclosure Authorized CREDIT NUMBER 5127-UG

INTERNATIONAL DEVELOPMENT ASSOCIATION

OFFICIAL DOCUMENTS. Project Agreement. Public Disclosure Authorized. GRANT NUMBER D336-GN CREDIT NUMBER 6261-GN Public Disclosure Authorized

Southern African Power Market Program Project Agreement. (Mozambique Component Mozambique-Malawi Transmission Interconnection Project) between

Project Agreement. (Zanzibar Basic Education Improvement Project) between INTERNATIONAL DEVELOPMENT ASSOCIATION. and

OFFICIAL DOCUMENTS. Project Agreement LOAN NUMBER 8655-YF. (Additional Financing for Corridor X Highway Project) between

Project Agreement OFFICIAL DOCUMENTS. Public Disclosure Authorized LOAN NUMBER 8457-CN. Public Disclosure Authorized. (Zhengzhou Urban Rail Project)

(WEST AFRICA REGIONAL FISHERIES PROGRAM

Haiti Education for All Multi-donor Trust Fund Grant Agreement

OFFICIAL MDTF-HRI GRANT NUMBER TF between REPUBLIC OF CAMEROON. and

Multi Donor Trust Fund for the Zimbabwe Reconstruction Fund Project Agreement

Africa Catalytic Growth Fund Grant Agreement

Financing Agreement OFFICIAL DOCUMENTS GRANT NUMBER D004-FM FEDERATED STATES OF MICRONESIA INTERNATIONAL DEVELOPMENT ASSOCIATION

Project Agreement CONFORMED COPY CREDIT NUMBER 4191-TA. (Financial Sector Support Project) between INTERNATIONAL DEVELOPMENT ASSOCIATION.

Project Agreement REPUBLIKA SRPSKA CREDIT NUMBER 4912-BA. (Additional Financing for Health Sector Enhancement Project) between

(Punjab Barrages Improvement Phase-II Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. and PROVINCE OF PUNJAB

Tamil Nadu Project Agreement

Project Agreement OFFICIAL DOCUMENTS LOAN NUMBER 8391-UA. Second Urban Infrastructure Project (Urban Infrastructure Project - 2) between

Project Agreement. (West Beka a Emergency Water Supply Project) between

OFFICIAL DOCUMENTS. Financing Agreement. Public Disclosure Authorized CREDIT NUMBER 6343-RW. Public Disclosure Authorized. (Housing Finance Project)

PAD Project Agreement. (Second Transport Sector Project) between INTERNATIONAL DEVELOPMENT ASSOCIATION. and PORT AUTONOME DE DAKAR. Dated May 13, 1999

Financing Agreement OFFICIM. DOCUMENTS1 CREDIT NUMBER 5283-IN. (Low Income Housing Finance Project) between INDIA. and

Ebola Recovery and Reconstruction Trust Fund Grant Agreement

Project Agreement. (Private Sector Development Support Project) between INTERNATIONAL DEVELOPMENT ASSOCIATION. and

Restated and Amended Project Agreement

Financing Agreement. (Uganda Public Service Performance Enhancement Project) between THE REPUBLIC OF UGANDA. and

Financing Agreement. (Additional Financing for Village Communities Support Program (Phase I)) between REPUBLIC OF GUINEA. and

Project Agreement. (Indonesia Infrastructure Finance Facility Project) among INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT.

(Taunsa Barrage Emergency Rehabilitation and Modernization Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT.

Nile Basin Trust Fund Grant Agreement

Multi-Donor Trust Fund for the Sahel Adaptive Social Protection Program Grant Agreement

Financing Agreement OFFICIAL DOCUMENTS 1. (Amending and Restating the Development Credit Agreement) Public Disclosure Authorized

Republic of Senegal: Advance Agreement for the Preparation of the Proposed Casamance Development Pole Project Project Preparation Advance No.

Financing Agreement,.

Financing Agreement OFFICIAL OCUMENTS. Public Disclosure Authorized CREDIT NUMBER 5152-UZ. Public Disclosure Authorized

Global Environment Facility Grant Agreement

IOFFICIAL. Financing Agreement DOCUMENTS. Public Disclosure Authorized GRANT NUMBER D0470-BI. Public Disclosure Authorized

Project Agreement CREDIT NUMBER 3991 MOZ. (Beira Railway Project) between INTERNATIONAL DEVELOPMENT ASSOCIATION. and

Multi-Donor Trust Fund for the Malawi Public Finance and Economic Management Reform Program Grant Agreement

DOCUMENTS OFFICIAL. Financing Agroement. Public Disclosure Authorized CREDIT NUMBER 6122-GH. Public Disclosure Authorized

Development Credit Agreement

Global Environment Facility Trust Fund Grant Agreement

Project Agreement. (Energy Efficiency Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

OFFICIAL DOCUMENTS. Project Agreement LOAN NUMBER 8715-ID

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Financing Agreement CREDIT NUMBER VN. (Ho Chi Minh City Green Transport Development Project) between SOCIALIST REPUBLIC OF VIETNAM.

Financing Agreement. (Additional Financing for Health Sector Development Project) between REPUBLIC OF DJIBOUTI. and

OFFICIAL DOCUMENTS THE WORLD BANK IBRD* IDA I WORLD BANKGROUP

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY

Tazama Project Agreement

OFFICIAL DOCUMENTS ZW4

Development Financing Agreement

Financing Agreement CONFORMED COPY CREDIT NUMBER 4168-NI. (Rural Telecommunications Project) between REPUBLIC OF NICARAGUA. and

Financing Agreement CONFORMED COPY GRANT NUMBER H732 -AF. (Financial Sector Rapid Response Project) between ISLAMIC REPUBLIC OF AFGHANISTAN.

RS Project Agreement. (Second Local Initiatives (Microfinance) Project) between INTERNATIONAL DEVELOPMENT ASSOCIATION. and REPUBLIKA SRPSKA

OFFICIAL DOCUMENTS. Financing Agreement. Public Disclosure Authorized CREDIT NUMBER 6126-MD. Public Disclosure Authorized

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Financing Agreement. (Environmental and Social Capacity Building for the Energy Sector Project) between THE REPUBLIC OF CAMEROON.

Development Credit Agreement

between Republic of The Gambia and

PROJECT AGREEMENT. (Power Distribution Enhancement Investment Program Tranche 1, Investment Project and Support Project) between

Liaoning Project Agreement

Loan Agreement. (Indonesia Infrastructure Finance Facility Project) between REPUBLIC OF INDONESIA. and

Loan Agreement. (Power System Improvement Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. and ELECTROSTOPANSTVO NA MAKEDONIJA

Loan Agreement. (Institutional Development and Agriculture Strengthening Project) between MONTENEGRO. and

Multi-Donor Health Results Innovation Trust Fund Grant Agreement

Global Environment Facility Trust Fund Grant Agreement

Project Agreement. Public Disclosure Authorized OFFICIAL DOCUMENTS LOAN NUMBER 7792-IN. Public Disclosure Authorized

1. Paragraph (D) of the Preamble to the GEF Grant Agreement is deleted and the succeeding paragraph re-numbered accordingly.

Financing Agreement CONFORMED COPY IDA CREDIT NUMBER 4825-KG IDA GRANT NUMBER H618-KG. (Emergency Recovery Project) between KYRGYZ REPUBLIC.

PEOPLE S REPUBLIC OF CHINA

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY

Global Environment Facility Trust Fund Grant Agreement

OFFMCAL. olrakdocuments,

ECG Project Agreement

Development Credit Agreement

Loan Agreement. (Additional Financing for Laguna de Bay Institutional Strengthening and Community Participation Project) between

Loan Agreement DMIUMTS OFFICIAL LOAN NUMBER 8131-CN PEOPLE'S REPUBLIC OF CHINA INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Financing Agreement. (Energy Community of South East Europe APL 3 Montenegro Project) between THE REPUBLIC OF MONTENEGRO. and

Development Credit Agreement

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY

, Honorable Tendai Biti Minister of Finance Ministry of Finance

Project Agreement CONFORMED COPY LOAN NUMBER CHA. (Hubei Shiman Highway Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Financing Agreement CREDIT NUMBER 5404-PG CREDIT NUMBER 4931-PG INDEPENDENT STATE OF PAPUA NEW GUINEA INTERNATIONAL DEVELOPMENT ASSOCIATION

OFFICIAL DOCt HMENTS

OFFICIAL DOCUMENTS. Loan Agreement

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY

INTERNATIONAL DEVELOPMENT ASSOCIATION

PROJECT AGREEMENT. (Sindh Cities Improvement Investment Program Project 1) between ASIAN DEVELOPMENT BANK. and PROVINCE OF SINDH

OFFICIAL DOCUMENTS. Loan Agreement LOAN NUMBER 8734-GD. (OECS Regional Tourism Competitiveness Project) between GRENADA

(Third Integrated Financial Management Technical Assistance Project) between REPUBLIC OF GUATEMALA. and

RECONSTRUCTION AND DEVELOPMENT

HAINAN Project Agreement

Project Agreement. Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 775 SE. Public Disclosure Authorized. Public Disclosure Authorized

(Real Estate Cadastre and Registration Project Additional Financing) between. FORMER YUGOSLAV REPUBLIC OF MACEDONIA (the Borrower) and

PROJECT AGREEMENT. (Greater Dhaka Sustainable Urban Transport Project) between ASIAN DEVELOPMENT BANK. and BANGLADESH BRIDGE AUTHORITY

Development Credit Agreement. (Provincial Health Project) between REPUBLIC OF INDONESIA. and INTERNATIONAL DEVELOPMENT ASSOCIATION

Development Credit Agreement

cocumeasn Loan Agreement OFFICIAL LOAN NUMBER 8095-BR

Loan Agreement. (National Pension Administration Technical Assistance Project) between ARGENTINE REPUBLIC. and

Transcription:

Public Disclosure Authorized CONFORMED COPY Public Disclosure Authorized Project Agreement GRANT NUMBER H524-LR Public Disclosure Authorized (WEST AFRICA REGIONAL FISHERIES PROGRAM REPUBLIC OF LIBERIA (Phase I)) between INTERNATIONAL DEVELOPMENT ASSOCIATION Public Disclosure Authorized and COMMISSION SOUS-RÉGIONALE DES PÊCHES (CSRP) Dated January 12, 2010

GRANT NUMBER H524-LR PROJECT AGREEMENT Agreement dated January 12, 2010, entered into between INTERNATIONAL DEVELOPMENT ASSOCIATION ( Association ) and COMMISSION SOUS-RÉGIONALE DES PÊCHES (variously, CSRP and Project Implementing Entity ) ( Project Agreement ) in connection with the Financing Agreement of same date between the Republic of Liberia ( Recipient ) and the Association. The Association and the Project Implementing Entity hereby agree as follows: ARTICLE I GENERAL CONDITIONS; DEFINITIONS 1.01. The General Conditions (as defined in the Appendix to the Financing Agreement) constitute an integral part of this Agreement. 1.02. Unless the context requires otherwise, the capitalized terms used in this Agreement have the meanings ascribed to them in the Financing Agreement or the General Conditions. ARTICLE II PROJECTS 2.01. The Project Implementing Entity declares its commitment to the objectives of the Project and the Program. To this end, the Project Implementing Entity shall carry out Parts A.1(f), A.3, B.1, B.3, C.2(a), and D.3 of the Project in accordance with the provisions of Article IV of the General Conditions, and shall provide promptly as needed, the funds, facilities, services and other resources required for its Respective Part of the Project. 2.02. Without limitation upon the provisions of Section 2.01 of this Agreement, and except as the Association and the Project Implementing Entity shall otherwise agree, the Project Implementing Entity shall carry out its Respective Part of the Project in accordance with the provisions of the Schedule to this Agreement. ARTICLE III TERMINATION 3.01. For purposes of Section 8.05(c) of the General Conditions, the date on which the provisions of this Agreement shall terminate is twenty years after the date of this Agreement.

-2- ARTICLE IV REPRESENTATIVE; ADDRESSES 4.01. The Project Implementing Entity s Representative is its Permanent Secretary. 4.02. The Association s Address is: International Development Association 1818 H Street, NW Washington, DC 20433 United States of America Cable: Telex: Facsimile: INDEVAS 248423(MCI) 1-202-477-6391 Washington, D.C. 4.03. The Project Implementing Entity s Address is: COMMISSION SOUS-RÉGIONALE DES PÊCHES Villa 4430 Karack Rue ka-38 BP 25485 Dakar, Senegal Facsimile: 221-33-864-0477

-3- AGREED at Monrovia, Republic of Liberia, as of the day and year first above written. INTERNATIONAL DEVELOPMENT ASSOCIATION By: /s/ Mr. Richard Scobey Authorized Representative AGREED at Dakar, Republic of Senegal, as of the day and year first above written. COMMISSION SOUS-RÉGIONALE DES PÊCHES (CSRP) By: /s/ Kane Ciré Amadou Authorized Representative

-4- SCHEDULE Execution of the Project Implementing Entity s Respective Part of the Project Section I. Implementation Arrangements A. Institutional Arrangements 1. The Project Implementing Entity shall, by no later than three months after the Effective Date or such later date as may be agreed upon by the Project Implementing Entity and the Association in writing, establish and thereafter maintain throughout Project implementation, a Regional Coordination Unit ( RCU ), with composition, functions and resources satisfactory to the Association. 2. The RCU shall be staffed with qualified and experienced personnel in adequate numbers, including, inter alia, a regional coordinator, an accountant and a procurement specialist, all with qualifications, experience, and terms of reference satisfactory to the Association. To this end, the Project Implementing Entity shall, not later than four months after the Effective Date or such later date as may be agreed upon by the Association and the Project Implementing Entity, recruit an accountant assistant for the RCU, in accordance with the provisions of Section III of this Schedule, with qualifications and experience and under terms of reference satisfactory to the Association. 3. The RCU shall be responsible for the day-to-day coordination and implementation of the Project Implementing Entity s Respective Part of the Project, including: (a) (c) (d) (e) preparing proposed Regional Annual Work Plans for inclusion in its Respective Part of the Project, and updating the Procurement Plan and related budgets regarding its Respective Part of the Project to be furnished to the Regional Steering Committee for review, and following such review, to the Association for approval; consolidating the Annual Work Plans and the updates to the Procurement Plans and related budgets prepared by each of the Participating Countries to be submitted to the Association for approval; carrying out financial management and procurement activities for the Program in collaboration with the Participating Countries; monitoring and evaluating the Program and preparing consolidated Program reports to be submitted to the Regional Steering Committee and the Association by January 15 of each year; implementing ongoing communication activities to raise awareness about the Program and its implementation; and

-5- (f) providing Training and support to each of the Participating Countries in connection with data collection and procurement activities. 4. The Project Implementing Entity understands and agrees that: (a) its Regional Annual Work Plans, updates to the Procurement Plan and related budgets of the RCU shall be subject to review by the Regional Steering Committee, as described in Section I.A.2(a) of Schedule 2 to the Financing Agreement; and the overall performance of the RCU shall be subject to the oversight by the Regional Steering Committee. B. Anti-Corruption The Project Implementing Entity shall ensure that its Respective Part of the Project is carried out in accordance with the provisions of the Anti-Corruption Guidelines. C. Manuals 1. The Project Implementing Entity shall, not later than three months after the Effective Date or such later date as may be agreed upon by the Project Implementing Entity and the Association in writing, prepare under terms of reference acceptable to the Association, and furnish to the Association the following manuals: (a) a regional operational manual, setting forth the detailed arrangements and procedures for: (i) institutional coordination and day-to-day execution of the Project Implementing Entity s Respective Part of the Project; (ii) environmental and social safeguards management; (iii) monitoring, evaluation, reporting and communication; and (iv) such other technical and organizational arrangements and procedures as shall be required for the Project Implementing Entity s Respective Part of the Project; and a regional administrative and financial manual setting out the administrative, procurement, and financial management arrangements for the Project Implementing Entity s Respective Part of the Project. 2. The Project Implementing Entity shall afford the Association a reasonable opportunity to exchange views with the Project Implementing Entity on both such manuals, and thereafter shall adopt and carry out its Respective Part of the Project in accordance with such regional operational manual and regional administrative and financial manual as shall have been found satisfactory to the Association. 3. The Project Implementing Entity shall not amend, abrogate, repeal, suspend, waive, or otherwise fail to enforce, or permit to be amended, abrogated, repealed, suspended or waived, the Regional Operational Manual or the Regional Administrative and Financial Manual, or any provision thereof. In case of inconsistency between this Agreement, on the one hand, and the Regional Operational Manual and/or the Regional Administrative and Financial Manual, on the other hand, the terms of this Agreement shall prevail.

-6- D. Regional Annual Work Plans 1. The Project Implementing Entity shall prepare, under terms of reference satisfactory to the Association, and furnish to the Association not later than January 15 in each calendar year, for the Association s consideration, a proposed work plan of activities to be included in the Project Implementing Entity s Respective Part of the Project for the following calendar year, such plan to include an implementation schedule and budget and financing plan therefor. If any activities proposed for inclusion in the Project Implementing Entity s Respective Part of the Project would, pursuant to the Social and Environmental Safeguard Frameworks, require one or more Supplemental Social and Environmental Safeguard Instruments, the Project Implementing Entity shall prepare and furnish, together with such proposed work plan, a draft of each such Supplemental Social and Environmental Safeguard Instrument. 2. The Project Implementing Entity shall afford the Association a reasonable opportunity to review and exchange views with the Project Implementing Entity on such proposed plan and any such instruments, and thereafter, shall implement such work plan and such instruments as shall have been approved by the Association, with due diligence. E. Safeguards 1. The Project Implementing Entity shall ensure that its Respective Part of the Project is implemented in accordance with the provisions of the Social and Environmental Safeguard Frameworks and each of the Supplemental Social and Environmental Safeguard Instruments in a manner satisfactory to the Association, and the Project Implementing Entity shall not amend or waive any provision of the aforementioned without the prior written agreement of the Association. 2. Without limitation upon its other reporting obligations under this Agreement, the Project Implementing Entity shall collect, compile and furnish to the Association on a quarterly basis reports on the status of compliance with the Social and Environmental Safeguard Frameworks and Supplemental Social and Environmental Safeguard Instruments, giving details of: (a) (c) measures taken in furtherance of such frameworks and instruments; conditions, if any, which interfere or threaten to interfere with the smooth implementation of such frameworks and instruments; and remedial measures taken or required to be taken to address such conditions. 3. The Project Implementing Entity shall promptly take all remedial measures referred to in paragraph 2 of this Section as shall have been agreed by the Association.

-7- Section II. Project Monitoring, Reporting and Evaluation A. Project Reports 1. (a) The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth below in sub-paragraph of this paragraph. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Recipient not later than 30 days after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Report. The performance indicators referred to above in sub-paragraph (a) consist of the following, namely: (i) the Project Implementing Entity has established a regional database and dashboard of key environmental, economic and social fisheries statistics. 2. The Project Implementing Entity shall provide to the Recipient not later than three months after the Closing Date, for incorporation in the report referred to in Section 4.08 (c) of the General Conditions all such information as the Recipient or the Association shall reasonably request for the purposes of such Section. B. Financial Management, Financial Reports and Audits 1. The Project Implementing Entity shall maintain a financial management system and prepare financial statements in accordance with consistently applied accounting standards acceptable to the Association, both in a manner adequate to reflect the operations and financial condition of the Project Implementing Entity, including the operations, resources and expenditures related to its Respective Part of the Project. 2. The Project Implementing Entity shall have its financial statements referred to above audited by independent auditors acceptable to the Association, in accordance with consistently applied auditing standards acceptable to the Association. Each audit of these financial statements shall cover the period of one fiscal year of the Project Implementing Entity. The audited financial statements for each period shall be furnished to the Association not later than six months after the end of the period. Section III. Procurement All goods and services required for the Project Implementing Entity s Respective Part of the Project and to be financed out of the proceeds of the Financing shall be procured in accordance with the provisions of Section III of Schedule 2 to the Financing Agreement.

-8- Section IV. Other Undertakings 1. The Project Implementing Entity shall: (a) By no later than four months after the Effective Date or such later date as may be agreed upon by the Recipients and the Association in writing, recruit, in order to facilitate the audits required pursuant to Section II.B of this Schedule, an external auditor with qualifications and experience and pursuant to terms of reference satisfactory to the Association, in accordance with the provisions of Section III of the Schedule to this Agreement. in furtherance of the provisions of Section II B of this Schedule, and not later than four months after the Effective Date, or such later date as may be agreed upon by the Recipient and the Association in writing, update the financial management information system for its Respective Part of the Project, in form and substance satisfactory to the Association. 2. The Project Implementing Entity shall, by not later than 20 months after the Effective Date or such later date as may be agreed upon by the Recipients and the Association in writing, recruit an independent panel of experts, under terms of reference satisfactory to the Association and in accordance with the provisions of Section III of this Schedule, to be responsible for carrying out the audits of the activities implemented under Part B of the Project. The audits carried out by such experts shall be completed and furnished to the Association, respectively, not later than 24, 36 and 60 months after the Effective Date.