For personal use only

Similar documents
For personal use only

Large-Flake Graphite Production and developing Expandable Graphite Manufacturing

For personal use only LARGE FLAKE GRAPHITE PRODUCTION & MARKETS AUSTRALIAN ENERGY & BATTERY MINERALS INVESTOR CONFERENCE MARCH 2018

LARGE STRIKE LENGTH SPODUMENE PEGMATITE DISCOVERED AT MALLINA

For personal use only

Pathway to Production

For personal use only. Opera&ng, op&mising and expanding the Graphmada large flake graphite mine in Madagascar. Investor Presenta,on March 2017

ANNUAL GENERAL PRESENTATION

The challenge of bringing a new mine into production stratminglobal.com

Sourcing the raw materials of the future. Authier Lithium Project JORC Resource Overview ASX: SYA JULY 2016

SOUTH AUSTRALIA EXPLORATION AND MINING CONFERENCE STEVEN MCCLARE IIIII GENERAL MANAGER 28 NOVEMBER 2013

For personal use only

For personal use only

Offtake and Mining FINNISS LITHIUM PROJECT

For personal use only

For personal use only

For personal use only. Accelerating high grade lithium production in Africa Annual General Meeting 2018, 25 May 2018

o Placement and Framework Agreement Sinomine to invest A$10,000,000 via a share placement in Prospect at A$0.05 per share.

Authier Lithium Project Advances to the Definitive Feasibility Stage

BALAMA PROJECT UPDATE

For personal use only

For personal use only

VENUS METALS CORPORATION LIMITED

For personal use only

Investor Presentation. Jindalee Resources Limited (ASX:JRL) 3 August 2018

Developing an Advanced Lithium Project in Quebec, Canada

September Quarterly Report

For personal use only

MAHENGE BEST IN CLASS GRAPHITE PROJECT. 121 Mining Investment Cape Town

For personal use only

Disclaimer. Forward Looking Statements

For personal use only

ALTURA MINING LIMITED ANNUAL GENERAL MEETING

Argentina s next Lithium company. Salta, September 2016

Visible Lithium Mineralisation extended to depth by Diamond Drilling

WODGINA ORE RESERVE COMMENTARY

For personal use only

Lepidico Drilling Update: lithium pegmatites intersected in each of three programs

Bass Metals (BSM) COMPANY REPORT INITIATION OF COVERAGE. Starting small in graphite

Investing in Tin Seminar London 5 th December 2011

Company Presentation ASX:TAW

For personal use only

For personal use only

Dragon Mining A Decade of Nordic Gold Production

PRODUCING AND EXPLORING Q WEBCAST

MINCOR AUDIO BROADCAST VIA BOARDROOM RADIO

FORREST GIMP COPPER-GOLD DISCOVERY UPDATE

Syrah Resources and Graphite Market JP Morgan Clean Energy Conference 17 May Shaun Verner, Managing Director & CEO

Australian Uranium Conference Fremantle July Weidong Xiang Managing Director

INVESTOR PRESENTATION March 2017

FINNISS LITHIUM. PROJECT Sydney Resources Round-Up Conference May ASX code: CXO

PRE FEASIBILITY STUDY FINNISS LITHIUM PROJECT

For personal use only

GALAXY RESOURCES LIMITED

NOT FOR DISSEMINATION IN THE UNITED STATES OF AMERICA

Building a Future Based on the Past

Lithium Sediments. Jindalee Resources Limited(ASX:JRL) 18 June 2018

An alternative coal developer in 2012 & producer in 2013

For personal use only

LATIN SECURES LITHIUM PROJECTS IN SAN LUIS, ARGENTINA

Zinc Market Outlook May 2013 Presented by Jonathan Downes

For personal use only. Drilling at Torrecillas July 2011

Panda Hill Niobium Project. January 2014

For personal use only NT LITHIUM PROJECTS

VITAL METALS ANNUAL GENERAL MEETING

Dragon Energy Limited

For personal use only

Developing First Lithium Resource in NT

INVESTOR PRESENTATION

The Yamarna Gold Belt: Exploration Upside To Be Funded From Production

Emerging Producer in the. Murchison Goldfields

For personal use only

THE 2018 MAVIS LAKE DRILLING PROGRAMME WILL TARGET THE FAIRSERVICE (PEG006) PROSPECT

6 September 2017 AFRICA DOWN UNDER AMENDED PRESENTATION

Creating value from a major goldfield

More Than a One Trick Pony

Company Announcements Office. Subject: Australia Papua New Guinea Business Forum Golpu Project Update

For personal use only

For personal use only

For personal use only

COBRE MONTANA INVESTOR PRESENTATION

OTCQX:CROCF. February. completed % U 3 O 8 Cut Off Grade. contained. repetitions. significant the aim of. Gold retains

For personal use only

For personal use only

RNI INCREASES GROSVENOR GOLD ORE RESERVES TO 523,000oz

PNG Mining & Petroleum Investment Conference Hidden Valley PNG s Newest Mine

For personal use only

RECORD DIAMOND RECOVERIES AT LULO

FUNDING TO COMMENCE PHASE II EXPANSION

LITHIUM PROJECT TRANSACTION AND $3.6M CAPITAL RAISING

Nickel West Reimagining the future. Eduard Haegel, 20 October 2016

Developing NT s First Lithium Resource

GOLD IN SENEGAL. For personal use only. Investor Presentation - July 2012

For personal use only

For personal use only NT LITHIUM PROJECTS. ASX code: CXO

The following is an Inside Briefing interview with Pilbara Minerals CEO, Mr Neil Biddle

PERFORMANCE UPDATE FROM HILLGROVE'S KANMANTOO OPERATION GREG HALL IIIII CEO & MANAGING DIRECTOR 1 MAY 2013

West African Resources awards underground mining contract for M1 South to Byrnecut

For personal use only

MEDUSA MINING LIMITED

Transcription:

GRAPHMADA GRAPHITE MINE OPERATIONAL UPDATE HIGHLIGHTS Stage 1 optimisation program entering final stages of refurbishment at Bass Metals Ltd. s 100% owned Graphmada Large Flake Graphite Mine. As part of the mine s refurbishment, new mining equipment has been order, with delivery in January 2018. A majority of the major processing items have now been installed. Process Plant mechanical and electrical works now proceeding. Modular Dryer System (MDS) construction completed with electrical works proceeding. Material improvement in graphite concentrate pricing continues. Figure 1: Newly purchased 32t excavator for mining at Mahefedok. Post: PO Box 1048, Subiaco WA 6904 Web: www.bassmetals.com.au 1

Bass Metals Limited (ASX: BSM ) (the Company ) is pleased to provide an update on its optimization and refurbishment of the Graphmada Graphite Mine, located in Madagascar. MINE HEALTH AND SAFETY UPDATE Since the last Operational Update, the Company s activities have incurred no Lost Time Injuries. No Lost Time injuries have occurred year to date. The Company continues to mature a safe operating culture at the mine and has recently introduced modern risk management and planning systems to support the growth of this culture. OPTIMISATION & REFURBISHMENT PROGRAM UPDATE Refurbishment works continue as planned. Significant actions undertaken since the last Operational Update include: ü New excavator, loader and dump truck ordered for delivery in January; ü Installation of major processing equipment items; ü Manufacturing of all electrical control boards and cables in progress; ü Extension of existing generator shed complete; ü Floatation cells piping and material flow connection work continues; ü Modular Dryer System (MDS) construction complete; ü Install of MDS electrical systems in progress; ü Dry sorting and screening equipment delivered; ü Mahefadok mine planning continues; and ü Mine Radio Network system ordered and in transit. Post: PO Box 1048, Subiaco WA 6904 Web: www.bassmetals.com.au 2

Figure 2: Newly purchased 5t loader for feeding the refurbished Graphmada Process Plant (without bucket). Figure 3: MDS installation completed, electricals in progress. Post: PO Box 1048, Subiaco WA 6904 Web: www.bassmetals.com.au 3

MARKET UPDATE Prices for graphite concentrates have improved materially in 2017 due to weakening supply out of China. Prices are forecasted to continue to rise due to the forthcoming Chinese winter and New Year holiday which will materially affect supply from China for at least the next 3 months. BASS METALS CEO, MR TIM MCMANUS: The team at Bass is excited to be nearing completion of Stage 1, the first step in our strategic vision to become an industrial minerals company of significance. The Company maintains its guidance of first production in late 2017 from the recommencement of Drying and Packaging operations in December. Once the Drying and Packaging System is fully operational the Process Plant will then be recommissioned in January with the aim to ramp up production over consecutive months to reach 500 tonnes per month of highvalue graphite concentrates (Stage 1: 6000 tpa run-rate). It s important the team stages the recommissioning process so that the Drying and Packaging System is capable of providing consistent high-quality concentrates to our old and new customers alike. The team is very focused on bringing together the Drying and Packaging System and the refurbished Process Plant as the one production system that maximises the mineral resource potential at Graphmada. For more information, please contact: Tim McManus Peter Wright Chief Executive Officer Executive Director Phone: (07) 3203 5894 Phone: (07) 3203 5894 Email: admin@bassmetals.com.au Email: admin@bassmetals.com.au Please visit us at: www.bassmetals.com.au Follow us on Twitter @bassmetals Post: PO Box 1048, Subiaco WA 6904 Web: www.bassmetals.com.au 4

ABOUT THE GRAPHMADA LARGE FLAKE GRAPHITE MINE Bass Metals Ltd. is one of a few publicly listed large flake graphite producers in the world. The Company 100% owns and operates the Graphmada large flake graphite mine, Bass flagship project, located in eastern Madagascar. Madagascar has been a recognized producer and exporter of premium graphite for over 100 years and sets the world standard for product quality and flake size. The Graphmada mine has 40-year mining permits in place, containing four premium quality, large flake, graphite deposits hosted in weathered graphitic gneiss, a soft, easily minable rock that incurs low mining costs. With all associated mining infrastructure and logistics in place, the mine currently produces and sells a range of graphite concentrates into multiple market segments, to customers in Europe and the United States. ABOUT THE MILLIE S REWARD PROJECT Millie s Reward is a highly prospective conventional spodumene hosted Li2O deposit located in Madagascar. A majority of the visable pegmatitic dykes and sills within the permits are over 10 metres in thickness, with swells in areas of up to 40 metres in thickness, while being up to several hundred metres in length. Adjacent to the project area is the Holcim Talc Mine, which has a sealed road for product transport and grid power installed. In addition to the potential access of this infrastructure, Millie s Reward has extensive water supplies, accommodation and an available local workforce. High purity Spodumene crystals discovered at Millie s Reward The Project area has been subjected to very little modern geological assessment, as all the activity performed in the past occurred at an artisanal mining scale, operated by the local miners working for gemstones. Post: PO Box 1048, Subiaco WA 6904 Web: www.bassmetals.com.au 5

DISCLAIMER, STATEMENTS & IMPORTANT INFORMATION DISCLAIMER This document has been prepared by Bass Metals Limited (the Company ). It should not be considered as an invitation or offer to subscribe for or purchase any securities in the Company or as an inducement to make an invitation or offer with respect to those securities. No agreement to subscribe for securities in the Company will be entered into on the basis of this document. This document is provided on the basis that neither the Company nor its officers, shareholders, related bodies corporate, partners, affiliates, employees, representatives and advisers make any representation or warranty (express or implied) as to the accuracy, reliability, relevance or completeness of the material contained in the document and nothing contained in the document is, or may be relied upon as a promise, representation or warranty, whether as to the past or the future. The Company hereby excludes all warranties that can be excluded by law. FORWARD LOOKING STATEMENTS This announcement contains certain forward-looking statements within the meaning of the securities laws of applicable jurisdictions. Forward-looking statements can generally be identified by the use of forward-looking words such as may, should, expect, anticipate, estimate, scheduled or continue or the negative version of them or comparable terminology. Any forecasts or other forward-looking statements contained in this announcement are subject to known and unknown risks and uncertainties and may involve significant elements of subjective judgment and assumptions as to future events which may or may not be correct. There are usually differences between forecast and actual results because events and actual circumstances frequently do not occur as forecast and these differences may be material. Bass Metals does not give any representation, assurance or guarantee that the occurrence of the events expressed or implied in any forward-looking statements in this announcement will actually occur and you are cautioned not to place undue reliance on forward-looking statements. The information in this document does not take into account the objectives, financial situation or particular needs of any person. Nothing contained in this document constitutes investment, legal, tax or other advice. IMPORTANT INFORMATION This announcement does not constitute an offer to sell, or a solicitation of an offer to buy, securities in the United States, or in any other jurisdiction in which such an offer would be illegal. The securities referred to in this document have not been and will not be registered under the United States Securities Act of 1933 (the US Securities Act ), or under the securities laws of any state or other jurisdiction of the United States and may not be offered or sold, directly or indirectly, within the United States, unless the securities have been registered under the US Securities Act or an exemption from the registration requirements of the US Securities Act is available. This document may not be distributed or released in the United States. COMPETENT PERSON STATEMENT The information in this document that relates to Exploration Results is based on information compiled by Tim McManus, a Competent Person who is a member of the Australasian Institute of Mining and Metallurgy and a full-time employee of the Company. Tim McManus has sufficient experience that is relevant to the style of mineralization and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Tim McManus consents to the inclusion of the information in this document in the form and context in which it appears. Post: PO Box 1048, Subiaco WA 6904 Web: www.bassmetals.com.au 6