SPECIFIC TERMS OF REFERENCE. Fee-based service contract. TA support to the PFM Working Group Chair

Similar documents
SPECIFIC TERMS OF REFERENCE Country Programme Interim Evaluation (CPiE)

EUROPEAN COMMISSION Job Description Form. Job description version2 (Active) Job no in DEVCO.F.DEL.Afghanistan Valid from 04/01/2018 until

Annex 1. Action Fiche for Solomon Islands

ANNEX. DAC code Sector Economic and Development Planning

Job Description and Requirements Programme Manager State-building and Governance Job no in the EU Delegation to the Republic of Yemen

GLOBAL TERMS OF REFERENCE FRAMEWORK CONTRACT SERVICES FOR THE IMPLEMENTATION OF EXTERNAL AID (SIEA) 2018 EUROPEAID/138778/DH/SER/MULTI CONTENTS

ANNEX. Technical Cooperation Facility - Suriname Total cost 2,300,000 (EC contribution 100%) Aid method / Management mode

SPECIFIC TERMS OF REFERENCE. EU contribution to 2012 Federal PEFA assessment in Pakistan

GUIDELINES 1 FOR THE USE OF THE FRAMEWORK CONTRACT BENEFICIARIES 2013 (FWC BENEF 2013) D e s c r i p t i o n. C o n d i t i o n s o f u s e.

The United Republic of Tanzania Ministry of Finance. Memorandum of Understanding. Between. The Government of the United Republic of Tanzania

REPIM Curriculum Vitae Sharon Hanson-Cooper

CE TEXTE N'EST DISPONIBLE QU'EN VERSION ANGLAISE

This action is funded by the European Union

Programming Aid Instruments

ANNEX Action Fiche for Technical Cooperation Facility II for Palau

III. modus operandi of Tier 2

ANNEX. CRIS number: 2014/37442 Total estimated cost: EUR 5M. DAC-code Sector Public sector policy and administrative management

1.5 Contracting Authority (EC) European Commission, EC Delegation, on behalf of the beneficiary

Terms of Reference for Senior Non-Key Short-Term Expert: e- Commerce Regulatory Issues

COMMISSION DECISION. of on the Annual Action Programme 2016 in favour of Uganda to be financed from the 11 th European Development Fund

«FICHE CONTRADICTOIRE»

Terms of Reference for Junior Non-Key Expert on e-invoicing, e-ordering and the respective framework

SPECIFIC TERMS OF REFERENCE

Bilateral Guideline. EEA and Norwegian Financial Mechanisms

ANNEX: IPA 2010 NATIONAL PROGRAMME PART II - BOSNIA AND HERZEGOVINA. at the latest by 31 December years from the final date for contracting.

CONCORD, the European NGO Confederation for Relief and Development, is seeking a:

SPECIFIC TERMS OF REFERENCE

POLAND. AT A GLANCE: Gross bilateral ODA (unless otherwise shown)

TERMS OF REFERENCE FOR A JUNIOR CONSULTANT TO SUPPORT SOMALIA WORK PROGRAMME

UGANDA PARTNERSHIP POLICY

ANNEX V. Action Document for Conflict Prevention, Peacebuilding and Crisis Preparedness support measures

PEFA Handbook. Volume I: The PEFA Assessment Process Planning, Managing and Using PEFA

Oranjestad, Aruba, 23 February 2017 POLITICAL DECLARATION PREAMBLE

Terms of Reference (ToR) Budget Tracking Officer, Line Ministry Budget Information System (LMBIS)

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE TOR - CONSULTANCY IC/2012/026. Date: 16 April 2012

Structure of EU institutions and Europe Aid proposal: An introduction

TERMS OF REFERENCE FEASIBILITY STUDY FOR ENVIRONMENTAL TRUST FUND

«FICHE CONTRADICTOIRE» Joint Country Level Evaluation of Bangladesh. (*For details on the recommendations please refer to the main report)

TERMS OF REFERENCE. Cross-Regional: Provision of research coverage for selected listed SMEs - Preparation of investment research reports

Assignment Name: Workshop on EU Budget Support for civil servants of Macedonia Section 1. Introductory Information

REQUEST FOR TENDERS ANALYSIS OF IMPLICATIONS OF THE PROPOSED ESTABLISHMENT OF A TRIPARTITE FTA BETWEEN COMESA, SADC AND THE EAC ON SACU

2 nd INDEPENDENT EXTERNAL EVALUATION of the EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS (FRA)

Geographic & Thematic Programming of EU aid

Tove Strauss. Research Associate Overseas Development Institute. 203 Blackfriars Road, London, SE1 8NJ, UK

Twinning and Technical assistance Facility in support to the EU- Armenia ENP AP implementation CRIS n ENPI/2008/

European Commission Directorate General for Development and Cooperation - EuropeAid

SURVEY GUIDANCE CONTENTS Survey on Monitoring the Paris Declaration Fourth High Level Forum on Aid Effectiveness

INTRODUCTION INTRODUCTORY COMMENTS

Assignment Name: Workshop on EU Budget Support for civil servants from Montenegro, Trainer 1

Page 1 of 5. APPROVED e-requisition

The Mid-Term Review of the 10 th EDF. Information package for SRHR and Health advocates in the Global South

Terms of Reference (ToR)

L 347/174 Official Journal of the European Union

1. Introduction. Food Security and Environment Protection, Economic Cooperation and Social Development Peace and Security and Humanitarian Affairs

Partner Reporting System on Statistical Development (PRESS) Task Team Developments during July 07-January 08

This action is financed by the European Union

Having regard to the Treaty on the Functioning of the European Union, and in particular Article 291 thereof,

UGANDA DEVELOPMENT PARTNER. Division of Labour Exercise AID INFORMATION MAP. Introduction and Instructions for DP Questionnaire.

Zambia s poverty-reduction strategy paper (PRSP) has been generally accepted

Guidelines for Formulation of the Financing Agreement

COMESA-EAC-SADC TRIPARTITE. REPORT OF THE 1 st MEETING OF THE JOINT COMPETITION AUTHORITY (JCA)

Mongolia: Development of State Audit Capacity

This action is funded by the European Union

CURRICULUM VITAE ENOCK NYOREKWA TWINOBURYO

JORDAN. Terms of Reference

Operating Guidelines

Annex I Action Fiche for West Bank and Gaza Strip/ ENPI

Annex 1. IDENTIFICATION

Terms of Reference (ToR) Earthquake Hazard Assessment and Mapping Specialist

2011 SURVEY ON MONITORING THE PARIS DECLARATION

APG ANNUAL BUSINESS PLAN

EDF SEMINAR - PRAGUE

EAP Task Force. EAP Task

East African Community

1. Title/basic act/ CRIS number

GHANA AID HARMONISATION AND EFFECTIVENESS MATRIX

Pacific Islands Regional Oceanscape Program (PROP) Project Number: P151780

European Commission Directorate-General for Development and Cooperation - EuropeAid DEVCO Companion to financial and contractual procedures

GUIDELINES FOR STRATEGIES IN SWEDISH DEVELOPMENT COOPERATION AND HUMANITARIAN ASSISTANCE

Report on the activities of the Independent Integrity Unit

APG ANNUAL BUSINESS PLAN

Analysis of Donor Support to Public Sector Reform in Africa

Implementation of the Technical Assistance measure Brussels, 14 December 2018

Guidelines on participation in EU External Assistance Programmes

SDG NATIONAL MONITORING, REPORTING AND NATIONAL STRATEGIC IMPLEMENTATION PLANS UGANDA

ENHANCED INTEGRATED FRAMEWORK (EIF) GUIDANCE NOTE ON EIF SUSTAINABILTIY SUPPORT PHASE PROCESS

Economic and Social Council

Ghana Harmonisation and Aid Effectiveness Action Plan 1

EN 1 EN. Annex. Sector Policy Support Programme: Sector budget support (centralised management) DAC-code Sector Trade related adjustments

The Nexus Dialogues The EU programme Paolo Ciccarelli 26th October 2016 Head of Unit DEVCO C.5

Definitions. Terms of Reference

TERMS OF REFERENCE FOR INTERNATIONAL CONSULTANT

11. The project funding can be utilized for the following purposes, amongst others:

European Commission United Nations Development Programme International IDEA

Liberia Reconstruction Trust Fund Implementation Manual

MULTI-COUNTRY. Support to Western Balkans Infrastructure Investment Projects for 2014 INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II)

GUIDE THROUGH THE PROCESS OF PROGRAMMING AND MONITORING OF IMPLEMENTATION OF IPA II IN THE REPUBLIC OF SERBIA FOR MEMBERS OF SECO MECHANISM

Terms of Reference. International Consultant to MTR of the 5 year implementation of the National Nutrition Strategy,

STANDARD SUMMARY PROJECT FICHE

INTEGRATED SAFEGUARDS DATA SHEET

Transcription:

SPECIFIC TERMS OF REFERENCE Fee-based service contract TA support to the PFM Working Group Chair FWC BENEFICIARIES 2013 - LOT 11: Macro Economy, Statistics, Public Finance Management EuropeAid/132633/C/SER/multi TABLE OF CONTENTS 1 Background... 3 2 Description of the Assignment... 4 2.1 Global objective... 4 2.2 Specific objective(s)... 4 2.3 Requested services... 5 2.4 Required outputs... 6 2.5 Language of the specific contract... 6 2.6 Subcontracting... 6 3 Experts Profile and Expertise Required... 6 3.1 Number of requested experts per category and number of man-days per expert or per category... 6 3.2 Profile per expert or expertise required:... 6 4 Location and Duration... 8 5 Reporting... 9 6 Incidental expenditure... 9 7 Monitoring and evaluation... 10 Page 1 of 10

LIST OF ACRONYMS ACP African, Carribean, Pacific CSO Civil Society Organisation CSP Country Strategy Paper DP Development Partner DST Deputy Secretary to the Treasury EAC East African Community EC European Commission EDF European Development Fund EU European Union FINMAP Financial Management and Accountability Programme GAPR Government Annual Performance Report GoU Government of Uganda IFMS Integrated Financial Management System IMF International Monetary Fund JAF Joint Assessment Framework JBSF Joint Budget Support Framework M&E Monitoring and Evaluation MDA Ministry, Department and Agency MIP Multiannual Indicative Programme MoFPED Ministry of Finance, Planning, and Economic Development MSU Management Support Unit NAO National Authorising Officer NBFP National Budget Framework Paper NDP National Development Plan NIP National Indicative Programme NPA National Planning Authority OAG Office of the Auditor General ODA Official Development Assistance OPM Office of the Prime Minister PAC Public Accounts Committee PEMCOM Public Expenditure Management Committee PPDA Public Procurement and Disposal of Public Assets Act PCM Project Cycle Management PFM Public Financial Management PMU Project Management Unit PS/ST Permanent Secretary/Secretary to the Treasury PTC Programme Technical Committee SGER Support to Government Economic Reforms TA Technical Assistance TAF Technical Assistance Facility TCF Technical Cooperation Facility TL Team Leader ToR Terms of Reference UFY Uganda Fiscal Year WG Working Group Page 2 of 10

1 BACKGROUND The multi-donor funded Financial Management and Accountability Programme (FINMAP) is the main vehicle for implementation of Uganda's PFM reform strategy, aimed at strengthening budgeting, financial management, audit and procurement systems at all levels of government to ensure efficient, effective and accountable use of public resources as a basis for improved service delivery. FINMAP II was jointly financed by the Government of Uganda (GoU), seven 1 development partners through a basket fund, and the World Bank. Implementation started in January 2007 under FINMAP I, and the second phase, ran from July 2011 to June 2014. A new four year phase, FINMAP III, runs from July 2014 to June 2018. Other PFM reform activities are supported by GoU directly and other, bilateral and multilateral partners. In the area of PFM, donor coordination is structured around the Development Partner PFM group (PFM WG) while dialogue with GoU is facilitated by the Public Expenditure Management Committee (PEMCOM). The Committee, chaired by the PS/ST, provides a high level forum meeting quarterly to discuss policy reforms and review progress in PFM reforms. A Programme Technical Committee (PTC) meets prior to PEMCOM, providing a mechanism to ensure that the FINMAP programme activities are appropriately implemented and coordinated with related reform activities. It will be chaired by the Deputy Secretary to the Treasury (DST)/Task Manager and have membership from all programme components and representation from DPs. The European Union (EU) will chair the PFM WG in UFY 2014/15, replacing Germany (KfW). The DP PFM group aims to provide analytical support and aid coordination in the area of PFM to GoU and to the Development Partners (including Heads of Mission). Overall FINMAP programme coordination is under the responsibility of the Ministry of Finance, Planning and Economic Development (MoFPED), with the Deputy Secretary to the Treasury as Task Manager. Government is supported by a FINMAP Secretariat/MSU for the implementation of the programme. In order to make sure that this role is implemented in full liaison with the NAO, the FINMAP Secretariat and other stakeholders in the GoU, the need for a Senior (Cat. I) and Junior (Cat. III) Technical Assistant has been identified. This Technical Assistance (TA) is in line with the Financing Agreement of the Technical Cooperation Facility (TCF) IV signed on 17 October 2012: "The proposed programme aims at facilitating and supporting the cooperation between the EU and Uganda, and notably the implementation of the of the CSP [Country Strategy Paper]. It will provide: a) TAF - Technical Assistance Facility - a facility for the engagement of short to medium-term consultants to assist in the main stages of the project cycle to ensure the effective implementation of the National Indicative Programme (NIP) and other EC [European Commission] programmes in favour of the country s development strategy, in keeping with the objectives of the ACP-EU [African, Caribbean, Pacific -European Union] Partnership Agreement". One of the programmes under the 10 th European Development Fund (EDF) is the EU's support to FINMAP through the Support to Government Economic Reforms (SGER) decision. Future support to FINMAP III under the 11 th EDF is under consideration. The proposed TA will support the implementation of FINMAP and other PFM reforms, and its synergies with the PFM WG and GoU main stakeholders for the benefit of the GoU. 1 Denmark, Germany (KfW), European Union, Ireland, Norway, Sweden, United Kingdom (DFID). Page 3 of 10

2 DESCRIPTION OF THE ASSIGNMENT 2.1 Global objective The global objective is to ensure the provision of efficient, effective and quality support to Ministry of Finance, Planning and Economic Development (MoFPED) and the development partners in the area of public financial management, and specifically to the Chair of the PFM DP working group who also acts as PEMCOM co-chair. 2.2 Specific objective(s) The specific objectives for this assignment are specified as follows: (1) To support in technical and administrative tasks related to the PFM DP WG Chair, including: The primary objective of the PFM DP WG is to co-ordinate, analyse and share information on PFM performance, challenges and reforms, including reviewing progress in the implementation of the FINMAP reform Programme, and informing policy dialogue with GoU and DPs. Supporting the PFM DP chair and/or chairing PFM WG meetings ad interim, including coordination and follow up on agreed tasks. Provide administrative and logistical support, including drafting minutes of the PFM DP WG meetings and reviewing minutes of PTC/PEMCOM/JBSF meetings. Presenting PFM DP positions or statements at PFM related events, and draft speaking points, presentations and speeches as required. Provide research and analysis of PFM technical reports and review GoU/donor PFM reporting. This includes amongst others (i) summarizing the key issues arising from the FINMAP quarterly progress reports, annual performance and audit reports; (ii) the Office of the Auditor General's annual report and special reports; (iii) relevant reports from Internal Audit, PPDA, PAC or any other relevant PFM institution (iii) analysis of the National Budget (NBFP, Budget Speech, etc.) from a PFM perspective; (iv) assist in drafting the EU Delegation's annual PFM monitoring report. Provide strategic and technical advice to development partners, including Heads of Mission and JBSF budget support partners, on PFM and macro-fiscal issues. Sharing information and encourage joint technical work as much as possible between the NAO/MoFPED, EU Delegation, FINMAP DPs, and international institutions (IMF) supporting PFM reforms. (2) To establish and reinforce links and communication between the PFM DP WG and the FINMAP Task Manager and Management Support Unit (MSU): Provide support in the analysis and monitoring of the PFM strategy, FINMAP III work plans, procurement plan and other related FINMAP documents and, if applicable, to other related programmes. Actively monitor and review the performance of the FINMAP II/III programme. Maintain close working relations with the GoU FINMAP Task Manager, FINMAP Programme Coordinator/Management Support Unit (MSU), and FINMAP component managers. Facilitate timely submission of documents ahead of, and successful implementation of the FINMAP reform programme at PTC and PEMCOM meetings. Page 4 of 10

Preparing and/or supporting the preparation of Programme Technical Committee (PTC) and PEMCOM meetings as and when required. This includes but is not limited to preparing position papers, statements and process documents (together with other FINMAP members. External representation of FINMAP DPs as and when required. Communicating, where necessary and agreed, with GoU on behalf of the FINMAP/PFM/JBSF DPs. (3) To support the Chair in horizontal tasks related to PFM, including: Support the PFM DP WG's sector leadership role in the joint assessment, verification and identification of PFM related indicators and performance data in the JBSF Joint Assessment Framework (JAF) or any other future partnership framework agreed with Government of Uganda. Participate in relevant annual sector reviews, GAPR and JBSF DP meetings, when required, and encourage the holding of these at the appropriate time of the year. Supporting the GoU in its capacity to programme jointly with the EU Delegation the next PFM support programme under the 11 th EDF. Facilitating agreement on ToRs and selection of appropriate consultants for any technical work necessary to support the design, monitoring and evaluation phases of FINMAP. Provide analytical support to DPs on the fiduciary risks associated with donor engagement in PFM-reform and the use of country systems, and how the fiduciary risks are being managed. Suggest possible control measures, management or accounts arrangements that could reduce risks and facilitate effective delivery and donor coordination modalities in the future 2.3 Requested services The objectives will be achieved through the various activities, most importantly: Programming Management Assisting the NAO and PFM DP WG Chair in the joint programming of related PFM activities under the 11 th EDF, with a particular focus on FINMAP III and sector budget support. Participating at all PEMCOM/PTC meetings to support the joint co-ordination and implementation by GoU and DPs of the FINMAP III programme and other related PFM activities. Active preparation, support and steering of the PFM DP WG Chair. Facilitate policy dialogue with relevant stakeholders as and when required. Providing regular, at least bi-monthly updates to the NAO and EU Delegation. Monitoring/Review of Gou PFM policies and actions Support administrative and technical tasks of the PFM DP WG, including analysis, coordination and preparation of relevant meetings. Prepare input and follow-up of PTC/PEMCOM meetings. Actively monitor and follow-up the implementation of the FINMAP programme (strategy, work/procurement plans, etc.), together with GoU. Page 5 of 10

Drafting analysis/reports, speeches and position papers together with other PFM DP WG/JBSF members, as and when requested. 2.4 Required outputs Key expected outputs of the senior expert include: a) An inception report not exceeding 10 pages, outlining the proposed work programme and priorities, to be submitted to the EU Delegation approximately after the first week of the in-country assignment. b) Bi-monthly progress updates (maximum 5 pages), highlighting progress of the objectives and identifying any impediments to the successful completion of the assignment, within seven calendar days of the end of the respective month. c) A final report (maximum 20 pages), two weeks prior to the end of his/her assignment. The work should describe the achievements in line with the objectives as specified in these Terms of Reference, as well as the challenges experienced and proposed recommendations. The report will be submitted to both the EU Delegation and the NAO before the above stated timeline, who will in return have two weeks to provide comments (if any), to be incorporated into the final document. d) Furthermore, outputs to which the TA is expected to contribute are: FINMAP III project implementation documents (work plan, procurement plan, annual progress report, M&E framework, etc.); PFM DP WG meeting documents and minutes; analysis and presentations; PEMCOM/PTC speeches and speaking points; JAF identification and appraisal documents. 2.5 Language of the specific contract The language of the specific contract is English. 2.6 Subcontracting Subcontracting is not foreseen. 3 EXPERTS PROFILE AND EXPERTISE REQUIRED 3.1 Number of requested experts per category and number of man-days per expert or per category This assignment requires two (2) experts (category I and III) for a duration of 12 months (156 man-days). 3.2 Profile per expert or expertise required: Category and duration of equivalent experience: one (1) senior expert with a minimum of 12 years experience as detailed below: Page 6 of 10

3.2.1 Senior Governance/PFM expert Senior governance/public policy/public finance management expert with proven expertise in budget support operations of the EU (team leader). Relevant experience in Uganda and working with Government of Uganda would be an asset. Education: Should be qualified at least to master's degree level in Economics, Public Finance Management, Public Policy or a related field. Experience: The consultant must cover the expertise, skills and experience required to deliver quality results and outputs as defined above: A minimum of 12 years experience in PFM, macroeconomics, compliance, budget transparency, oversight and accountability, domestic revenue mobilisation, and budget support in developing countries, preferably in Sub-Saharan Africa; Experience with EU aid modalities and procedures (EDF, PCM, and budget support, with up-to-date guidelines) including for example joint Government-Development Partner programmes, basket funds, cooperation with CSOs, among others, particularly in the accountability sector and Public Finance Management; Experience in leading consultations with stakeholders and facilitating round table discussions, workshops or seminars; Excellent management and communication skills; strong drafting ability for reports, notes, and synopses. Language skills: Excellent written and spoken English. The team leader will have the overall responsibility of the assignment. He/she will supervise and coordinate the work, and ensure the timely quality of the deliverables. In particular, the team leader will be responsible for assigning, if necessary, specific parts of the requested services between him/herself and the other team member. Management team member presence required for briefing and/or debriefing: Head of Section for Economic and Social Sectors (EU Delegation). 3.2.2 Junior PFM expert Junior public finance management expert, preferably with relevant experience and knowledge of the PFM and Accountability sector in Uganda and the wider EAC region. Education: Should be qualified at least to bachelor degree level in Economics, Public Finance Management or a related field. Experience: The consultant must cover the expertise, skills and experience required to deliver quality results and outputs as defined above: A minimum of 3 years experience in PFM, macroeconomics, compliance, budget transparency, oversight and accountability, domestic revenue mobilisation, and budget support in developing countries, preferably in Sub-Saharan Africa; Experience with joint aid modalities and procedures including for example joint Government-Development Partner programmes, basket funds, cooperation with CSOs, among others, particularly in the accountability sector and Public Finance Management. Familiarity with EU aid modalities and procedures (EDF, PCM, budget support) would be an asset; Page 7 of 10

Experience in leading consultations with stakeholders and facilitating round table discussions, workshops or seminars; Excellent communication skills; strong drafting ability for reports, notes, and synopses. Language skills: Excellent written and spoken English. Management team member presence required for briefing and/or debriefing: Head of Section for Economic and Social Sectors (EU Delegation). 4 LOCATION AND DURATION Starting period: The consultants are expected to commence their work by 1 November 2014. Foreseen finishing period or duration: For the purpose of executing this assignment, the foreseen duration is twelve (12) months or 156 man days. The foreseen end date is 30 October 2015. Location(s) of assignment: The location of this assignment is Kampala, Uganda. The consultants will keep close contact with the National Authorising Authority, in particular the task force designated for the preparation for the 11th EDF programme; the FINMAP task manager and MSU; and the Economic and Social Sectors Section at the EU Delegation. The timetable below is indicative and may change during the assignment based on needs arising. Nevertheless, it provides an estimate of workload across the three specific objectives under this assignment. Objective/Task Man-days Outputs (1) To support in technical and administrative tasks related to the PFM DP WG Chair (2) To establish and reinforce links and communication between the PFM DP WG and the FINMAP task manager and Management Support Unit (MSU) (3) To support the Chair in horizontal tasks related to PFM. 75 days 51 days 30 days Work plan, progress report, bimonthly progress updates, and a final report. In addition, contribution to (i) PFM DP WG and FINMAP PTC/PEMCOM meeting preparation and minutes; (ii) FINMAP related outputs (work plan,, annual progress report, etc.); (iii) JAF identification and appraisal documents. Page 8 of 10

Indicative distribution of man-days: Senior Cat. I Expert (Team Leader) Junior Cat. III Expert (1) Support in technical and administrative tasks related to the PFM DP WG Chair 25 40 (2) To establish and reinforce links and communication between the PFM DP WG and the FINMAP task manager and Management Support Unit (MSU) 18 35 (3) To support the Chair in horizontal tasks related to PFM 15 20 Report writing 2 1 Total 60 96 5 REPORTING Content: see detailed description above under point 2.4. Language: English. Submission/comments timing: See required outputs 2.4 and timeline above under point 4. Number of report(s) copies: Hard copies (2 each) of all reports will be submitted to the Delegation of the European Union and the NAO. 6 INCIDENTAL EXPENDITURE Other limitatively identified reimbursable costs, with their details: The contractor shall provide its staff with appropriate premises, sufficiently equipped (including communications, stationary, etc.), as well as the necessary backstopping and support staff (administration, secretariat, etc.) needed so that the experts can perform their assignment. National Travel: the per diems include intra-city travel. Inter-city travels are to be included under local travel costs. An indicative provision of maximum EUR 1,000 should be included under reimbursables for inter-city travel. International travel: in economy class is foreseen to be included under reimbursables. An indicative provision of maximum EUR 5,000 should be included under reimbursables for up to 3 workshops to be organised for approximately 30 participants each, organised dependent on the needs and activities of the PFM DP WG. The contractor will be responsible for all costs related to the organisation of the workshop (incl. rental of conference facilities, travel costs, lunch and refreshments, telecommunications and other administrative costs including secretarial support if required). Per diems will be paid for the duration of the stay in Uganda, excluding any leave days, at the rate applicable at the time of request (see EuropeAid website). The Page 9 of 10

experts may work six days per week, when requested by the TL and agreed by the Delegation. For national experts, per diems will only be paid for missions outside the usual place of residence and/or work. The local taxes upon eligible incidental expenditure incurred under the Specific Contract shall be reimbursed in full. 7 MONITORING AND EVALUATION The assignment covered under these Terms of Reference is deemed clear in terms of expected results and outputs. Definition of indicators 1. Timely submission of inception report in line with the requirements as detailed above (point 2.4). 2. Number of stakeholder consultations (PEMCOM, PTC, PFM DP WG) held and documented. 3. Timely submission and quality 2 of bi-monthly progress reports and final project report in line with the requirements as detailed above (point 2.4). 4. Qualitative input to FINMAP III project implementation documents, JAF identification and appraisal documents, and other as outlined above (point 2.4). 2 "Quality" as per DEVCO internal quality control criteria, to be shared and agreed at the inception meeting. Page 10 of 10