Morocco Final Market Readiness Proposal

Similar documents
Chile Final Market Readiness Proposal. Ignacio Fernandez Ministry of Energy March 11, 2013

Socialist Republic of Vietnam. Reporting Period: From 08/20/2017 to 04/03/2018 Report Date: 04/03/2018 Ministry of Natural Resources and Environment

Thailand Final Market Readiness Proposal

PMR Turkey Request for Additional Funding

MODALITY FOR FUNDING ADDITIONAL ACTIVITIES UNDER THE PMR: DRAFT PROPOSAL FOR DISCUSSION. PMR Note PA

Republic of Kazakhstan. Director Climate Change Department. Ministry of Energy

ETS International Cooperation and MRV

PMR PROJECT IMPLEMENTATION STATUS REPORT (ISR)

Strategic Orientation for the Future of the PMR Proposal on Modality for Funding Additional Activities under the PMR

PARTNERSHIP FOR MARKET READINESS (PMR) PRESENTATION OF THE PMR FY17 EXPENSES AND PROPOSAL FOR THE PMR FY18 BUDGET

PMR Governance Framework*

Template for Organizing Framework for Scoping of PMR activities

GLOBALLY NETWORKED CARBON MARKETS

BRAZIL MRP IMPLEMENTATION STATUS REPORT (ISR)

PARTNERSHIP FOR MARKET READINESS (PMR) Eighth Partnership Assembly Meeting Mexico City, March 3-5, Resolution No. PA8/2014-3

Roundtable: Oversight of Carbon Market Services for Turkish Banks

Partnership for Market Readiness (PMR): Technical Work Program: Report on FY15 activities and Proposal for FY16

Translating Viet Nam s INDC into Investment Opportunities

THE WORLD BANK TERMS OF REFERENCE Impact of carbon pricing instruments on national economy and contribution to NDC

PROPOSING MRV SYSTEM FOR NAMAS AND PREPARATION FOR MONITORING OF GHG EMISSION IN VIETNAM

with GIZ for the Kingdom of Thailand 3 July 2015 NDA Strengthening & Country Programming

ADB Support to Thailand on the Development of Emissions Trading; Project synopsis

ICF DECC Annual Review

FOR OFFICIAL USE ONLY INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT PROJECT APPRAISAL DOCUMENT ON A PROPOSED GRANT

Modalities and procedures for the new market-based mechanism

SUBMISSION BY IRELAND AND THE EUROPEAN COMMISSION ON BEHALF OF THE EUROPEAN UNION AND ITS MEMBER STATES

with UNDP for the Republic of Congo 12 May 2016 NDA Strengthening & Country Programming

Republic of Kazakhstan. Director Climate Change Department. Ministry of Energy

Enabling Policy Environments for Climate Finance: Scaling-up national systems to meet the climate finance gap

Supporting carbon pricing policies through crediting and RBCF. Frédéric Gagnon-Lebrun May 2016

The Framework for Various Approaches and New Market Mechanisms (FVA/NMM) in a post- Doha context: IETA s Perspective

regulation approach incentive approach

Mapping of elements related to project or programme eligibility and selection criteria

Mobilizing climate investment: project preparation and financing

Potential and exemplar financial. Makoto Kato

Additional Criteria and Modality for Allocation of. PMR Implementation Funding

NDC IMPLEMENTATION SUPPORT. Dr. Ana Bucher Sr. Climate Change Specialist Climate Analytics and Advisory Services

Evaluation of the Pilot Project of Domestic Emissions Trading Scheme

with GIZ for the Republic of Peru 29 January 2018 NDA Strengthening & Country Programming

Summary and Recommendations by the Standing Committee on Finance on the 2016 Biennial Assessment and Overview of Climate Finance Flows

with the National Rural Support Programme (NRSP) for the Islamic Republic of Pakistan 13 November 2015 NDA Strengthening & Country Programming

TOWARDS THE FULL OPERATIONALIZATION OF THE GREEN CLIMATE FUND

Discussion: Legal, political and implementation challenges of the Paris Agreement on Climate Change

Investment criteria indicators

Major Economies Business Forum: Green Climate Fund and the Role of Business

Implementation of (I) Nationally Determined Contribution (NDC) & Post Enhanced Transparency Framework

GUYANA FORESTRY COMMISSION

G20 STUDY GROUP ON CLIMATE FINANCE PROGRESS REPORT. (November )

Forest Carbon Partnership Facility (FCPF) Carbon Fund and Bio Carbon Fund (BioCF)

4 th PA PMR. EU ETS and Australian CPM Linking Sydney October 2012

COUNCIL OF THE EUROPEAN UNION. Brussels, 11 May /10 ECOFIN 249 ENV 265 POLGEN 69

UPDATE ON FINANCING CLIMATE MITIGATION IN DEVELOPING COUNTRIES AND THE ROLE OF THE WORLD BANK CARBON FINANCE UNIT

Alberta Presentation to Partnership Assembly Meeting (PA13)

Forest Carbon Partnership Facility (FCPF) Readiness Fund

Annex III. Zero nominal growth scenario

Submission to the UNFCCC on FVA and NMM

Low-carbon Development and Carbon Finance at the IDB Maria Netto Sustainable Energy and Climate Change Unit (ECC)

Evaluation of Budget Support Operations in Morocco. Summary. July Development and Cooperation EuropeAid

July 25, Konrad von Ritter

February 2012 REDD+ FINANCING GAP

with the National Agency on Climate Change for the People's Democratic Republic of Algeria 22 December 2017 NDA Strengthening & Country Programming

Relationship with UNFCCC and External Bodies

CONSULTANCY FOR TRACKING PRIVATE SECTOR FINANCE FLOWS AND INVESTMENT FOR LOW-EMISSION, CLIMATE-RESILIENT DEVELOPMENT IN VIETNAM

CLIMATE-FRIENDLY ECONOMY: REDUCING EMISSIONS AND LIMITING CLIMATE CHANGE

Registration and Issuance Process

Free allocation - lessons learned from the EU

with UNEP for Federative Republic of Brazil 1 November 2017 Strategic Frameworks

Creating Green Bond Markets Insights, Innovations,

GHG EMISSIONS TRADING SYSTEMS RATIONALE AND DESIGN ELEMENTS GRZEGORZ PESZKO, LEAD ECONOMIST, WORLD BANK

TRANSFORMATIONAL NAMAS, CLIMATE FINANCE & TRANSITIONING TO A 2015 AGREEMENT

Benin 27 August 2015

NAMA financing. How to Structure Climate Financing Vehicles. Dr. Sebastian Wienges, Adviser, GIZ. Page 1

GCF Readiness Programme Fiji

with UNDP for the Republic of Ecuador 31 May 2017 NDA Strengthening & Country Programming

Green Banking Legislation, Standards and Implementation Edi Setijawan

with UNDP for the Union of the Comoros 25 June 2015 NDA Strengthening & Country Programming

Green Bond Webinar Questions and Answers

with the Ministry of Finance and Planning for the United Republic of Tanzania 08 November 2015 NDA Strengthening & Country Programming

9719/16 SH/iw 1 DGE 1B

Deep Dive into Policy Instruments Emissions Trading Schemes. Pablo Benitez, PhD World Bank Hanoi, Vietnam March 14, 2014

Initial Structure and Staffing of the Secretariat

Decision 3/CP.17. Launching the Green Climate Fund

The Carbon Partnership Facility

Indicative Minimum Benchmarks

NATIONAL CLIMATE FINANCE INSTITUTIONS. Their challenges and how the Fit for the Funds Programme can respond to them

Summary Document. Low carbon transition in the energy efficiency sector. Vietnam

STRATEGIC PROJECT SUPPORT TO EU ASSISTANCE IN THE CONTEXT OF EU EXTERNAL POLICIES

Ex-Ante Evaluation (for Japanese ODA Loan)

Emissions Accounting for Post commitments. MJ Mace St Lucia September 18-19, 2013 OECD Climate Change Expert Group, Paris

Tracking Climate Finance

Chad 16 September 2015

Detailed Recommendations 10: Develop Environmental Cost Analysis

Key Messages. Climate negotiations can transform global and national financial landscapes. Climate, finance and development are closely linked

From Readiness to Full Implementation: Financial Support Considerations from a Multilateral Perspective Maria Jose Sanz-Sanchez (UN-REDD/FAO)

2 nd INDEPENDENT EXTERNAL EVALUATION of the EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS (FRA)

with the Ministry of Economic Planning, Sustainable Development, Industry, Labour and Information for Saint Vincent and the Grenadines

Inception Report Verification policies, processes and procedures for land-use climate funds

The Future of Energy Efficiency Finance Workshop background document

Mitigation Actions and Measurement, Reporting and Verification in a Post-2012 Climate Agreement

GLOBALLY NETWORKED CARBON MARKETS COMMON FRAME OF REFERENCE AND APPROACH FOR CLIMATE CHANGE MITIGATION VALUE

Transcription:

Morocco Final Market Readiness Proposal

MRP Objective and Focus Implementation of a scaled-up crediting mechanism in three key sectors of the economy (electricity generation, cement production, and phosphate processing) Development of core technical and institutional readiness components in those sectors: Database management Evaluation of the mitigation potential of each sector Definition of sectoral baselines MRV system design and piloting Capacity building Creation of a regulatory framework needed for mitigation in each sector Analysis of appropriate mitigation instruments and MBI governance for Morocco to support the definition of a national strategy for MBI implementation and to explore possible options for next phase of the market readiness activities, depending on the evolution of the national and international context. 2

MRP review process Feedback Analysis of feedback from PA by Steering Committee and experts Consultations Coordination meetings with representatives of relevant initiatives (LECB, FIRM, 4C), and with representatives of different sectors (ONEE, OCP, APC): in the Ministry of Environment (from 17 to 20 mars 2014) Steering Committee meeting, and coordination meeting with different ministries and organizations at the Ministry of General Affairs and Governance (22 April 2014) Final MRP Reviewed and approved by Steering Committee and representatives of different sectors (ONEE, OCP, APC) 3

Specific feedback from PA8 Questions/Feedback Answer/Revision Clarification about Morocco s funding request Done: The project budget was clarified in the Executive Summary and in Section 6.2. The total budget for the activities to be implemented in the period 2015-2017 is USD 3,710,000. USD 200,000 will come from the Moroccan government, USD 510,000 from other sources of funding, USD 3,000,000 from the PMR, following approval A budget was provided for all activities envisaged for a potential 2 nd tranche of activities. The complete budget is presented in Section 6. 4

Specific feedback from PA8 Questions/Feedback Answer/Revision Clarification about the scope of PMR support Done: Clarified in the proposal MRP implementation establishes the foundation needed for the crediting mechanism in three targeted sectors of the economy. Depending on the evolution of the international context, particularly concerning the demand for carbon credits, Morocco will be ready to advance and implement the next phase of activities to operationalize the mechanism. 5

Specific feedback from PA8 Questions/Feedback Answer/Revision Done: Clarified in Block 2 (2.1.1) in the proposal: Clarification regarding the timeline for MRP implementation All efforts will be made to have the PMR grant disbursement arrangements in place by the end of 2014 (start of MRP implementation brought forward by 3 months). If achieved, the Project Management Unit will be established at the beginning of 2015 and the other activities will start during the second quarter of 2015, once the terms of reference are prepared and the external entities recruited

Specific feedback from PA8 Questions/Feedback Answer/Revision Distinction between vision and action Done: Clarified in Executive summary Block 2 (2.1.1) in the proposal Split of activities between the first tranche (foundation for the sectoral mechanism) and the second tranche (operationalization of the mechanism). Foundation vs. basic infrastructure Operationalization vs. design and operationalization Summary diagram and presentation of the activities in Section 6 were also revised to clarify this split.

Specific feedback from PA8 Questions/Feedback Answer/Revision Interaction between upstream analytical work (choice of MBI) and the focus on sectoral crediting Clarified in Block 3 (3.1.3) of the proposal The focus will be on developing a system that is appropriate for the crediting mechanism while ensuring flexibility to allow the adaptation of the system based on the evolution of the national and international context. 8

Specific feedback from PA8 Questions/Feedback Answer/Revision Difference between B3 and B4 Clarified in Block 3 (introduction) and block 4 Block 3 explores the status of different core components in the preparation of a Moroccan carbon market (data management and MRV systems, targets/objectives, a registry, and a suitable institutional and regulatory framework) and proposes activities that will facilitate the establishment of these key elements. These activities will lay the necessary foundation for the operationalization of MBIs discussed in Building Block 4. 9

Specific feedback from PA8 Questions/Feedback Answer/Revision Keep the focus on no-regret measures for market instruments and market readiness, which might differ from more general MRV measures. Done: Clarified in Executive summary and Block 2 (2.1.1) in the proposal The general approach presented in the Executive Summary and in Section 2.1.1 was revised to highlight the focus on no-regret measures for market instruments and market readiness as opposed to general noregret measures. Activity 3 (activity objectives) was also revised to highlight this point. The type of MRV system will depend on the applied mitigation instrument. The focus will be on developing a system that is appropriate for the crediting mechanism while ensuring flexibility to allow the adaptation of the system based on the evolution of the national and international context.

Specific feedback from PA8 Questions/Feedback Answer/Revision Clarification about sectoral baselines Clarified in Block 3 (3.2.2) of the proposal The aim of activity 7 is to set baselines in each of the three sectors covered by the MRP. It will build on data collected during the pilot phase of the monitoring and reporting system, on works carried out during the development of TNC, on the efforts of the PMR working group on the subject, as well as on the experience and data of relevant initiatives. MRP now highlights that options for ensuring net mitigation will be assessed during crediting threshold determination. 11

Specific feedback from PA8 Questions/Feedback Answer/Revision Cement sector: collaborate with initiative such as the Cement Sustainability Initiative and synergy across MRPs with other countries working on the same sector, namely Indonesia and Tunisia Clarified in Block 2, 3 and 4 of the proposal : Section 2.1.1, Section 2.2.2, Section 3.1.1 (Subactivity group 2), Section 3.2.2 (Activity 7), Section 4.3.2 (Activity 11): Other countries under the PMR are exploring similar topics (e.g. MRV in Turkey, Thailand and Indonesia) and/or working in similar sectors (e.g. cement in Tunisia and Indonesia). Morocco will seek to maximize the synergies and experience sharing with such initiatives, and also with CSI. 12

Specific feedback from PA8 Questions/Feedback Answer/Revision Consideration of potential interaction between the proposed MBIs and selected instruments in place or planned domestically and internationally (e.g., the CDM, the EU ETS, the NMM), including carbon leakage risks and potential synergies Clarified in the proposal Block 2 ( activity 1) et block 4 (activities 11 et 12): Assessment of the interaction of such mitigation instruments with selected instruments in place or planned domestically and internationally (e.g.,the CDM, the EU ETS, the NMM), including carbon leakage risks and potential synergies. 13

Specific feedback from PA8 Questions/Feedback Answer/Revision The treatment of indirect emissions was explicitly included in Block 3 (activity 3) and Block 4 (activity 7) Question about indirect emissions in the targets sectors Activity 3: will look at cross-sectoral topics, such as the treatment of indirect emissions due to electricity use. Activity 7: The PMU will ensure consistency and complementarity in the approach used in the different sectors, notably in the treatment of indirect emissions. 14

Specific feedback from PA8 Questions/Feedback Answer/Revision Phosphate sector: did not work under the CDM due to the lack of financial additionality. This barrier can be overcome within a sectoral crediting approach Clarified in Block 4 (4.3.1) of the proposal The targeted sectors have had some experience with the CDM, ranging from successful validations and registrations of projects to issues with additionality. Such experience will be analysed and built upon in the design of the sectoral crediting mechanism. The phosphates sector faced issues with financial additionality under the CDM. It is impacted by non-financial barriers to mitigation. 15

Summary of Building Block 1 Big Picture: Policy Context This Building Block outlines the big picture and existing relevant policies on climate change in Morocco. It provide in particular information about: Historic and projected GHG emissions trends. With an average of 2,8 tco2/year/capita, Morocco has a low level of GHG emissions. Generating over half of the total emissions, the energy sector is the main source of GHG emissions. Morocco s low emissions development strategies and its GHG mitigation policies. Carbon market experience including CDM, NAMAs and NMM. No activities are proposed in this section of the MRP. 16

Summary of Building Block 2: Preparatory work to support and inform policy decisions on market instruments In view of the country s economic context and the international situation of the carbon market, the Moroccan government plans to evaluate the implementation of a crediting mechanism in the three targets sectors (electricity generation, cement production, and phosphates processing). Morocco has decided to use the PMR to establish the foundation needed for the sectoral crediting mechanism including activities on : MBI Governance Data Management and MRV Sectoral piloting Capacity development Provided national and international signals are positive, particularly concerning the demand for carbon credits, the government will be ready to advance in the process and in particular to design and operationalize the mechanism 17

Summary of Building Block 2: Preparatory work to support and inform policy decisions on market instruments Activity 1: Activity Activities objectives Duration Analysis of appropriate mitigation instruments and MBI governance for Morocco Activity 2: Mid-term review Block 2 to assist the Moroccan government in evaluating different mitigation instruments, including MBIs, in order to help make an informed decision on which instruments should be applied in Morocco. The objective of this activity is to review the progress of Morocco s preparation for MBIs in general and the implementation of a sectoral crediting mechanism in particular, as well as to prepare a second request for a PMR grant. 1 year 6 months 3 months Start date End date Budget (USD) 1 st tranche 2 nd tranche Q3 2015 Q4 2016 600,000 - Q2 2016 Q2 2016 150,000-18

Summary of Building Block 3: Preparatory work to support and inform policy decisions on market instruments This Building Block explores the status of different core components in the preparation of a Moroccan carbon market: suitable institutional and regulatory framework targets/objectives data management and MRV systems IT Platform and registry Building Block 3 proposes activities that will facilitate the establishment of these key elements. These activities will lay the necessary foundation for the operationalization of MBIs discussed in the next Building Block 19

Summary of Building Block 3: Preparatory work to support and inform policy decisions on market instruments Activity Activities objectives Duration Activity 3: Design of a MRV system, and piloting of the MR in the three sectors covered by the MRP (electricity, cement and phosphates) Building Block 3 This activity will design an institutional framework for the monitoring and reporting of emissions, and its transposition into operational requirements for the monitoring and reporting of emissions at the level of industrial installations. This activity will allow the piloting of this framework in the three sectors covered by the MRP. This activity will also prepare the design of the verification and accreditation system.. This activity will therefore focus on planning the verification and accreditation system and its integration in international systems. 1 year 9 months Start date End date 1 st tranche Budget (USD) 2 nd tranche Q4 2015 Q2 2017 1,200,000-20

Activity Activities objectives Duration Start date End date 1 st tranche Budget (USD) 2 nd tranche Building Block 3 Activity 4: Design of a verification and accreditation system, and piloting in the three sectors covered by the MRP (electricity, cement and phosphates) Activity 3 will result in a roadmap for a verification and accreditation system for Morocco. It will recommend, among other things, the development of a national system or the integration in an international system. Activity 4 aims to implement this roadmap. 1 year 9 months Q2 2017 Q4 2018 600,000 Activity 5: Design of an IT platform for data management and MRV, and its piloting in the three sectors covered by the MRP This activity will consist in the development of a general data management module, specific modules for MRV, and cross-cutting modules. 2 years Q2 2017 Q1 2019 1,325,000 21

Activity Activities objectives Duratio n Start date End date Budget (USD) 1 st tranche 2 nd tranche Building Block 3 Activity 6: Preparation for expansion of the MRV system to other economic sectors in Morocco Once the MRV system is in place in the three sectors covered by the MRP, the government will be able to expand this system to other economic sectors, such as the built environment and transport sectors considered in the early phases of the MRP. 2 years Q3 2019 Q2 2020 Initial estimate for 3 sectors (buildings, transport and waste): 900,000 Activity 7: Establishing a baseline for each of the three sectors covered by the MRP (electricity, cement and phosphates) The aim of this activity is to set baselines in each of the three sectors covered by the MRP. It will build on data collected during the pilot phase of the monitoring and reporting system, on works carried out during the development of TNC, on the efforts of the PMR working group on the subject, as well as on the experience and data of relevant initiatives. 1 year Q4 2015 Q3 2016 390,000 22

Activity Activities objectives Duration Start date Activity 8: Evaluation of mitigation potential in the three sectors covered by the MRP (electricity, cement, phosphates) Building Block 3 The aims of this activity include an external evaluation of the existing mitigation potential estimates in the electricity generation and phosphates sector, and an independent expert assessment of the mitigation potential in the Moroccan cement sector. End date 1 st tranche 1 year Q4 2015 Q3 2016 150,000 Budget (USD) 2 nd tranche Activity 9: Design and pilot of a national registry This activity entails the design and piloting of a national registry, include the Development of the institutional, legal and regulatory framework, and the operational requirements, for a national registry > 1 year >Q3 2019 > 750,000 Activity 10: Support for the establishment of a regulatory framework for mitigation measures in the three sectors covered by the MRP) This activity aims to support the definition and the establishment of a regulatory framework to promote the implementation of mitigation measures in the three sectors covered. 2 years Q2 2015 Q1 2017 120,000 23

Summary of Building Block 4 : Planning for a Market-based Instrument Building Block 4 describes different types of MBI, and present a preliminary evaluation of the possible MBIs in Morocco; The assessment done in the MRP and the result of the consultation process with concerned stakeholders have shown, at this stage, a sectoral crediting mechanism is the most promising option. This Building Block also proposes activities to operationalize such a mechanism. 24

Summary of Building Block 4 : Planning for a Market-based Instrument Budget (USD) Activity Deliverable(s) Duration Start date End date Building Block 4: To be implemented after 2017, as part of a second tranche of activities 1 st tranche 2 nd tranche Activity 11: Design of a sectoral crediting mechanism for the three sectors covered by the MRP (electricity, cement and phosphates) The aim of this activity is to establish a clear roadmap for the implementation of a sectoral crediting mechanism and to set out the main building blocks of the mechanism, then to implement such roadmap and pilot the mechanism in the three sectors covered by the MRP. 1 year Q1 2017 Q4 2017 1,150,000 Activity 12 Evaluation of the pilot crediting mechanism and expansion of the scheme to other sectors of the Moroccan economy The aim of this activity is to evaluate the pilot, in the three MRP sectors is suggested in order to capture the lessons learned in the first months of operation and to establish the roadmap and pilot the expansion of the mechanism. > 1 year >Q1 2019 1,100,000 25

Summary of Building Block 5 : Organization, Communication, Consultation and Engagement This block defines the organization structure of implementation phase, (Steering Committee, Project Management Unit, Implementation and monitoring Technical Committee, Implementation partners, and Expert Group(s)); and describes stakeholders capacity building activities during the MRP preparation phase 26

Summary of Building Block 5 : Organization, Communication, Consultation and Engagement Activity Activities objectives Duration Start date End date Budget (USD) 1 st 2 nd tranche tranche Building Block 5 To be implemented in the period 2015-2017, as part of a first tranche of PMR funding Activity 13: Establishment and Operation of a Project Management Unit The aim of this activity is the establishment and operation of the PMU, which will be in charge of the management, coordination and realization of MRP activities. 3 years Q1 2015 Q4 2017 600,000 Activity 14: Capacity building in both the private sector and in government This activity aims to strengthen the capacity of Moroccan stakeholders in the key areas of the MRP. These stakeholders include not only representatives from various Ministries and government agencies, but also members of the PMU, industry sector associations and operational personnel from industrial facilities. 6 years Q1 2015 Q4 2020 500,000 500,000 27

Summary of Proposed Activities (graph) Capacity building (sectors, institutions) Project Management Unit (PMU) Market-based Instruments Governance Review Analysis mitigation instruments + governance MBI Design + piloting crediting mechanism (3 sectors) Evaluation + scaling-up (other sectors) Design and piloting of other instruments (e.g. tax, emissions trading scheme, non-market based instrument) Design MRV system+ piloting (3 sectors) Design verification/ accreditation system + piloting (3 sectors) Central axis on data management - MRV Scaling-up MRV system (other sectors) MBIs in Morocco Design IT platform for data management et MRV + piloting (3 sectors) National registry Baselines (3 sectors) Legend Mitigation potential (3 sectors) Crediting thresholds (3 sectors) Baselines and crediting thresholds (other sectors e.g. transport) Foundation for MBIs Activities part of the 1 st tranche of PMR funding Implementation regulatory framework (3 sectors) 2015 2016 2017 2018 2019 2020 Design and operation of MBIs Activities envisaged for a 2 nd tranche 28

Summary of Proposed activities (timeline) N o Activity 2015 2016 2017 2018 2019 2020 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 13 Establishment and operation of a Project Management Team 14 Capacity building in both the private sector and in government 10 1 3 7 8 Support for the establishment of a regulatory framework for mitigation in the three sectors covered by the MRP Analysis of appropriate mitigation instruments and MBI governance Design of a MRV system, and piloting of the MR in the three sectors covered by the MRP Establishing a baseline for each of the three sectors covered by the MRP Evaluation of mitigation potential in the three sectors covered by the MRP 2 Mid-term review 11 4 5 6 12 Design of a sectoral crediting mechanism for the three sectors covered by the MRP + piloting Design of a verification and accreditation system + piloting in the three sectors covered by the MRP Design of an IT platform for data management and MRV + piloting in the three sectors covered by the MRP Preparation for expansion of the MRV system to other economic sector Evaluation of the pilot crediting mechanism and expansion of the scheme to other sectors of the Moroccan economy 9 Design of a national registry + piloting Activities part of the 1st tranche of PMR funding Activities envisaged for a 2nd tranche of PMR funding 29

Summary of Proposed Budget Activity Building Block 2 Budget (USD) Activity 1 Analysis of appropriate mitigation instruments and MBI governance for Morocco 600,000 Activity 2 Mid-term review 150,000 Building Block 3 Activity 3 Design of a MRV system, and piloting of the MR in the three sectors covered by the MRP 1,200,000 Activity 7 Establishing a baseline for each of the three sectors covered by the MRP 390,000 Activity 8 Evaluation of mitigation potential in the three sectors covered by the MRP 150,000 Activity 10 Support for the establishment of a regulatory framework for mitigation measures in the three sectors covered by the MRP Building Block 5 120,000 Activity 13 Establishment and Operation of a Project Management Unit 600,000 Activity 14 Capacity building in both the private sector and in government (2015 2018) Sources of funding (USD) 500,000 Total 3,710,000 PMR funding 3,000,000 request Moroccan 200,000 government Other 510,000