Greenstar Ri Regular ErP

Similar documents
Room Thermostat ~ L. Heating Zone Valve CH D. Programmer

Greenstar CDi Classic Regular ErP

Greenstar Si Compact Combi ErP

SERVICE PLANS TERMS & CONDITIONS

HomeServices Terms and Conditions

Boiler Care Products. Terms and Conditions

Port Location. S Side ported. Back Ported

Terms & Conditions Shield Gas Care Products & Shield Electrical Care

Boiler Replacement Scheme Boiler Installer Form

MaxLite Hazardous Location StaxMAX LED High Output Flood Lights

APPENDIX J - Wiring Diagram, FSD

HomeComfort. Terms & Conditions

HeatCare - Central Heating Maintenance Service Contract

Document No Amendment No Approved By Approval Date Review Date

Welcome to your Fixed Price Energy January 2018 tariff

Welcome to your Fixed Price Energy October 2018 tariff

HomeComfort. Terms & Conditions. ScottishPower Energy Retail Limited (company number SC190287), has a place of business

THE NARRAGANSETT ELECTRIC COMPANY TERMS AND CONDITIONS FOR DISTRIBUTION SERVICE

HomeEnergy Plus Boiler Cover Feb 2020 TERMS AND CONDITIONS

SERVICE CLUB BRONZE SILVER GOLD

MaxLite StaxMAX LED Flood Lights

HomeComfort. Terms & Conditions

The Narragansett Electric Company d/b/a National Grid Tariff Advice Filing to Amend R.I.P.U.C. No Docket No.

Glow Care by Glow Green Ltd Terms and Conditions V

Reg. Office Address: 10 Savage Road Lordswood Chatham Kent ME5 8DY Registered in England and Wales Company Registration No

What you need to know. Terms and conditions of a metered water supply

Georgia World Congress Center 285 Andrew Young International Blvd Atlanta, GA Engineering Dept: Fax:

HEATING SAFETY POLICY JANUARY 2006

PROJECT INFORMATION. Catalog No. SHIELDING SHIELDING. DRIVER E Fixed Output ESD Step Dimming 6 ED 0-10V Dimming ED1 0-10V 1% Dimming 6

CITY OF EL SEGUNDO SCHEDULE B-1 BUILDING & SAFETY FEE SCHEDULE BUILDING PERMIT FEES PROPOSED

Hurricane and flood preparation checklist. Preparation and response key to minimizing damage and loss

GAS SAFE REGISTER. Consumer Policy Our Service Explained. October 2017 P001_CON001 V6.1

Account Holder is the customer holding an account with ESB Energy for the supply of gas, electricity or both fuels.

Welcome to Home Wiring Repair Essential. No-cost, no hassle home wiring repairs.

TERMS AND CONDITIONS FOR CARE PLANS FOR BOILERS AND HEATING SYSTEMS (these Terms )

LIGHT DISTRIBUTION FOR BAFFLES AND LOUVERS

Boiler Emergency Cover. Terms and Conditions

More control, less surprises

Spark Energy Utility Services Contract for Domestic Customers

Central Heating Installation & 5 Year Warranty Terms and Conditions

BOILER & HOME HEATING EMERGENCY COVER

Reg. Office Address: 10 Savage Road Lordswood Chatham Kent ME5 8DY Registered in England and Wales Company Registration No

ENGIE Prepayment. A Guide to your prepayment meter

MULTIFAMILY ENERGY-EFFICIENCY REBATES Controller Application Package

British Gas Repair and Care Terms and Conditions

EDF ENERGY BOILER PROTECT CONTRACT OF INSURANCE

ONTARIO REGULATION to be made under the. TECHNICAL STANDARDS AND SAFETY ACT, 2000 Amending O. Reg. 220/01 (BOILERS AND PRESSURE VESSELS)

PAYMENT AUTHORIZATION FORM

Steps/Process. <COOPERATIVE NAME> 10 kw INVERTER PROCESS Page 1

Boiler Emergency Cover. terms and conditions

Mandatory Explanatory Notes

Pay in Advance Energy A Discounted Deal

Nelson Electricity Ltd Asset Management Plan Update

MARKETING SYSTEM. Sustainable Agriculture & Food Enterprises Pty Ltd

TERMS AND CONDITIONS RELATING TO CONNECTION OF DOMESTIC PROPERTIES TO THE PHOENIX NATURAL GAS LIMITED NETWORK

DEALING WITH LEAKS.

Compensation Policy. 1 Introduction. Executive Management Team Approval Date: 24 TH October Review date: October

Robert Monk s Foxton Charity. Health and Safety Policy

EDF ENERGY BOILER PROTECT CONTRACT OF INSURANCE

REQUEST FOR PROPOSAL(S) FOR THE CITY OF MT. JULIET, TN

MaxLite L-Form Series

MILLSIDE CARE OPTIONS

TERMS AND CONDITIONS RELATING TO CONNECTION OF INDUSTRIAL PROPERTIES AND COMMERCIAL PROPERTIES TO THE PHOENIX NATURAL GAS LIMITED NETWORK

HOLY CROSS ENERGY November 3, 2015 GENERATOR INTERCONNECT POLICY

TERMS AND CONDITIONS RELATING TO THE INSTALLATION OF CENTRAL HEATING EQUIPMENT

Thursday, February 25, 2000 YOUR NUMBER: (5 pt.) 1. Draw and label a market with a perfectly elastic demand and a perfectly inelastic supply.

REACTIVE MAINTENANCE POLICY 2015

Five Simple Steps to Managing your Energy Bills. Helping you afford to keep warm

Considerations for Planning and Scheduling Part 3 Blending the Planned Maintenance Program and Reactive Maintenance Plan

BANK OF SLOVENIA June - July, 2000 Vol. 9 No. 6-7

Managing CPM s. Generic CPMs cannot be edited. They need to be kept unaffected to derive new CPMs. Tutorial

TRANSACTIONAL CHARGES FOR SERVICES PROVIDED BY NORTHERN IRELAND ELECTRICITY (NIE) IN SUPPORT OF THE COMPETITIVE RETAIL MARKET

Welcome to our standard terms and conditions for your British Gas Commercial Installation and 5 Year Warranty

BANK OF SLOVENIA February, 2001 Vol. 10 No. 2

ENERGY PLUS PROTECTION SEPT 2019 TERMS AND CONDITIONS

Interconnection of Electric Generators

Fix your Energy Prices until the end of June 2019


Boiler Care Maintenance & Support

One and two family residences... $ Mobile Homes... $73.73 Commercial Building... $ All other miscellaneous applications... $44.

Contract means the agreement between the company and the customer either verbally or written.

CITY OF CHINO ENGINEERING COST ESTIMATE. Quantity Unit Item Unit Total Cost Price Per Item. LS Traffic Control (5% of construction cost) 5% $

Endorsements Library

Heating Policy Document

BID TABULATION REPORT ABRAM STREET (SH CITY LIMITS) PROJECT No. PWST09016 BID OPENED : April 22, 2014 at 1:30 p.m.

Evidence of Coverage:

COOS-CURRY ELECTRIC COOPERATIVE, INC. RULES AND REGULATIONS. August 24, 2017

BANK OF SLOVENIA October, 2001 Vol. 10 No. 10

ACTIVE EVACUATION SYSTEM (AES) OPERATIONS MANUAL

Diagram practice Book

DOVER DISTRICT COUNCIL. Private Sector Housing Assistance Policy and Conditions 2012*

Boiler Repair. It helps if it s Bord Gáis Energy bordgaisenergy.ie BGE/BR/ BGE Boiler Repair V4.indd 1 04/12/ :04

Prepayment Meters all you need to know

Occupational Accident Insurance Policy Group Master Application (the Application )

3 OUR INSTALLERS 4 OUR RESPONSIBILITY

Maersk STS Mode 33 Genset Equipment General Remarks First figure in the 4 digit code system is used for identification of the unit type.

Prashant Yadav Georgia Tech Humanitarian Conference Feb 19-20, 2009 Atlanta, GA

Code of Practice on Pay As You Go Metering

Fort Valley Utility Commission 500 Anthoine Street PO Box 1529 Fort Valley GA 31030

Queensland Government Solar Hot Water Rebate Guideline and application form

Transcription:

Greenstar Ri Regular rp Frost Protection (including Zoned Pipework) 1H-R--FZ IV UTRA ARTH egend: z z s s R H HW = ive = eutral = ive upply = eutral upply = ive Return = arth = ommon = atisfied = emand = entral emand = Hot Water emand P P R entre xternal H We recommend that the Frost is installed at the coldest location. Frost to be set on at 5 and the Pipe to be off at 15. ouble Pole Fused pur xternal Frost Return Pipe All electrical work should be carried out by a registered engineer. must comply with the latest IT wiring regulations. Whilst it is always our intention to fully assist, it is essential to recognise that all information given by the company is provided in good faith and based upon the information available. onnection labels may not match those of the products installed on site. We recommend that advice should always be checked with your installer, electrician or the manufacturer of the product in question. onsequently, the WG Ri-R-1H-R--FZ a (2016/12)

Greenstar Ri Regular rp 2 Zones 2H-R- IV UTRA ARTH egend: z z s s R H HW = ive = eutral = ive upply = eutral upply = ive Return = arth = ommon = atisfied = emand = entral emand = Hot Water emand Zone 1 Zone 2 Zone 1 Valve Zone 2 Valve P P R entre H1 H2 xternal ouble Pole Fused pur All electrical work should be carried out by a registered engineer. must comply with the latest IT wiring regulations. Whilst it is always our intention to fully assist, it is essential to recognise that all information given by the company is provided in good faith and based upon the information available. onnection labels may not match those of the products installed on site. We recommend that advice should always be checked with your installer, electrician or the manufacturer of the product in question. onsequently, the WG Ri-R-2H-R- a (2016/12)

Greenstar Ri Regular rp ascade Boilers with ow oss Header ------H IV UTRA ARTH egend: z z s s R O H HW = ive = eutral = ive upply = eutral upply = ive Return = arth = ormally Open = ormally losed = ommon = atisfied = emand = entral emand = Hot Water emand Junction Box / entre s From Zone/s ontrols Header imit IPORTAT OT: The Relay should be mounted within a suitable electrically safe housing. O oil ive O oil eutral xample relay shown is a double Pole ains Relay. This disables the boilers electrically in case of a fault condition. 230V A ouble Pole Relay P P R P P R xternal ouble Pole Fused pur xternal All electrical work should be carried out by a registered engineer. must comply with the latest IT wiring regulations. Whilst it is always our intention to fully assist, it is essential to recognise that all information given by the company is provided in good faith and based upon the information available. onnection labels may not match those of the products installed on site. We recommend that advice should always be checked with your installer, electrician or the manufacturer of the product in question. onsequently, the WG Ri-R-------H a (2016/12)

Plan Plus Greenstar Ri Regular rp P-R- IV UTRA ARTH egend: z z s s R H HW = ive = eutral = ive upply = eutral upply = ive Return = arth = ommon = atisfied = emand = entral emand = Hot Water emand Zone 1 ylinder Zone 1 Valve ylinder P P R Zone 2 entre H1 HW H2 xternal ouble Pole Fused pur 3 hannel Zone 2 Valve All electrical work should be carried out by a registered engineer. must comply with the latest IT wiring regulations. Whilst it is always our intention to fully assist, it is essential to recognise that all information given by the company is provided in good faith and based upon the information available. onnection labels may not match those of the products installed on site. We recommend that advice should always be checked with your installer, electrician or the manufacturer of the product in question. onsequently, the WG Ri-R-P-R- a (2016/12)

Greenstar Ri Regular rp Plan Plus (Underfloor ) P-U- IV UTRA ARTH egend: z z s s R H HW = ive = eutral = ive upply = eutral upply = ive Return = arth = ommon = atisfied = emand = entral emand = Hot Water emand ylinder ylinder P P R entre H HW xternal UFH ouble Pole Fused pur Timer emand Underfloor entre All electrical work should be carried out by a registered engineer. must comply with the latest IT wiring regulations. Whilst it is always our intention to fully assist, it is essential to recognise that all information given by the company is provided in good faith and based upon the information available. onnection labels may not match those of the products installed on site. We recommend that advice should always be checked with your installer, electrician or the manufacturer of the product in question. onsequently, the WG Ri-R-P-U- a (2016/12)

Greenstar Ri Regular rp Y Plan (id Position Valve) Y-R- IV UTRA ARTH egend: z z s s = ive = eutral = ive upply = eutral upply R = ive Return = arth = ommon = atisfied = emand H = entral emand HW = Hot Water emand HW O ylinder = Hot Water Off id Position Valve White = H Grey = Orange = P P R entre H HW HW O xternal ouble Pole Fused pur All electrical work should be carried out by a registered engineer. must comply with the latest IT wiring regulations. Whilst it is always our intention to fully assist, it is essential to recognise that all information given by the company is provided in good faith and based upon the information available. onnection labels may not match those of the products installed on site. We recommend that advice should always be checked with your installer, electrician or the manufacturer of the product in question. onsequently, the WG Ri-R-Y-R- a (2016/12)