For personal use only. Burkina Faso ASX:MET. The Gold Symposium. Sydney (14-15 November 2011)

Similar documents
For personal use only

Focused On Being A Burkina Faso Producer

For personal use only

For personal use only

High Grade Gold Intercepts Extend Akoko North. New High Grade East Lode Discovered. 12 th January ASX Announcement

>gold >base metals >exploration

FORREST GIMP COPPER-GOLD DISCOVERY UPDATE

Rob Bills, Managing Director & CEO

Annual General Meeting Perth WA. 15 November 2017 Bruce Kay Technical Director

Paulsens Project resource soars 41% to 318,000oz as 2012 surplus cashflow forecast hits $35m

Investor Update - June 2012

DRILLING TO RE-COMMENCE AT FOUR EAGLES GOLD PROJECT

Alicanto Minerals Exhibiting at PDAC 2018 Investor Presentation

DRAGON MINING LIMITED An Established Nordic Gold Producer with an Exciting Future RIU Melbourne Resources Round-up 29 September 2011

20% Increase in T3 Feasibility Study Plant Throughput to 3Mtpa

SEMAFO Reports Cash Flow from Operations of $110 Million in 2018

Building an African Gold Mining Powerhouse

Teranga Gold Reports High-Grade Gold from Phase 2 Drilling at Golden Hill s C-Zone Prospect

RESOURCES ROUND UP CONFERENCE SYDNEY 10 MAY Trangie Johnston. Managing Director. Broken Hill Prospecting (ASX: BPL) Booth #45

For personal use only

SOUTHERNGOLD GOLD PRODUCER. Cannon Mine, Early February 2016 ASX Ticker: SAU

For personal use only

For personal use only

Building a Gold Company in Mali - West Africa. 26 th May 2016 INVESTOR PRESENTATION (ASX: OKU)

MERGER PRESENTATION JULY 2018

GOLD IN SENEGAL. For personal use only. Investor Presentation - July 2012

CASSINI PRESENTS AT RIU RESOURCES INVESTOR ROADSHOW

Building a quality gold business. Mark Clark

Strengthening of board with the appointment of Dr Allan Trench as a Non-executive Director

KBL Mining Limited (ASX: KBL) Investor Presentation October KBL Mining Limited : : Investor Presentation

12,178gpt intersection at Paulsens

ASX Announcements & Media Release. Quarterly Report for the period ended. 30 June 2010

SARAMA RESOURCES ANNOUNCES PRIVATE PLACEMENT

COMPANY PRESENTATION

A New Growth Story in Western Australian Gold

Scoping study (assuming toll milling) estimates $A24M (US$17M) operating surplus

Investing in Tin Seminar London 5 th December 2011

Additional High Grade Copper-Gold Results Confirm Massive Sulphide Mineralisation at Cardross

Quarterly Activities Report

ABN Half-Year Report. 31 December 2010

VITAL METALS ANNUAL GENERAL MEETING

For personal use only

KBL Mining Limited (ASX: KBL) Presentation May 2015 Resources Investment Symposium BROKEN HILL

Aurora Minerals Group of Companies Positioned for Growth (ASX:ARM)

PRESS RELEASE SEMAFO FOR IMMEDIATE RELEASE. SEMAFO: Cash Flow from Operations of $18.4 Million in First Quarter 2018

June 2016 Quarterly Activity Report. Makabingui Gold Project Permit Update. Moura Permit Konkoutou Gold Project. Corporate

For personal use only

ARGENTINA MINING LTD

Gold Road Resources Ltd NEW LARGE SCALE GOLD PROJECT AT GRUYERE - WA

Mining and Exploring for Nickel. Diggers and Dealers, Kalgoorlie, August 2014

For personal use only

BOSS FINALISES EARN IN AGREEMENT WITH GRYPHON MINERALS

Aurora Minerals Group of Companies Positioned for Growth (ASX:ARM)

The Yamarna Gold Belt: A New High-Grade Gold Region. August 2011

For personal use only

For personal use only

UNEARTHING THE FUTURE. THE 28 TH ANNUAL GOLD FORUM The Broadmoor, Colorado Springs, Colorado September 2017

For personal use only

More Than a One Trick Pony

Offtake and Mining FINNISS LITHIUM PROJECT

HIGH GRADE SHALLOW WA GOLD EXPANDING OUR 712,000 OZ RESOURCE BASE

March 2018 Quarterly Activities Report

September 2013 Quarter Activity Report

RIU Resources Roundup Sydney 9 May 2012

MINCOR AUDIO BROADCAST VIA BOARDROOM RADIO

>gold >base metals >exploration

Quarterly Activities Report For the three months ending 30 June 2013 HIGHLIGHTS

The Yamarna Gold Belt: Exploration Upside To Be Funded From Production

INDEPENDENCE GROUP NL

For personal use only

RE: ASX Release Presentation Today at the Resources & Energy Symposium at Broken Hill, May 2012

AZUMAH MINING LEASES GRANTED

Activities Report December 2018 Quarter

DRAGON MINING LIMITED An Established Nordic Gold Producer with an Exciting Future Fennoscandian Exploration and Mining Conference 3 November 2011

Investor Presentation. Jindalee Resources Limited (ASX:JRL) 3 August 2018

A Regional Scale Gold Project Guyana South America Investor Presentation - May 2016

ABN Half-Year Report. 31 December 2011

QUARTERLY ACTIVITIES REPORT QUARTER ENDED 30 JUNE 2018

Kilmain Project Collaborative opportunities in Queensland for exploration, resource development and investment with JOGMEC Presentation Colin

SIGNIFICANT GOLD INTERCEPTS AT PIGIBO PROSPECT

UNEARTHING THE FUTURE

Doug Grewar Managing Director

SARAMA RESOURCES ACQUIRES THE BONDI GOLD DEPOSIT IN BURKINA FASO FROM OREZONE GOLD

PMI Targets Maiden Gold Resource for Dynamite Hill After Further High Grade Hits

For personal use only

Metro Toronto Convention Centre March 6 March 9, 2016 Toronto, Canada Booth 2724

For personal use only

PAYDIRT AUSTRALIAN NICKEL CONFERENCE OCTOBER 2016

Celebrating 21 years of African gold mining. Presentation by Lee-Anne de Bruin, Chief Financial Officer Mining Indaba 2018, Cape Town

For personal use only

HIGHLIGHTS DETAILS. Commenting on the new discovery, Hugh Stuart, President and Director of Orca Gold, said Our aim in Côte 1 O r c a G o l d I n c.

For personal use only

For personal use only

For personal use only

ADVANCING THE NEXT BIG GOLD DISCOVERY IN GHANA

BUREY GOLD LIMITED (ASX:BYR)

For personal use only

Shareholder Presentation. Michael Mulroney - Managing Director July 2012

INDEPENDENCE GROUP NL

ASX ANNOUNCEMENT QUARTERLY REPORT PERIOD ENDED 30 SEPTEMBER 2017 SUMMARY. 31 October ASX Code: HOR. Management

Transcription:

Burkina Faso ASX:MET The Gold Symposium Sydney (14-15 November 2011)

Important Information Disclaimer This presentation may contain certain statements and projections provided by or on behalf of Mt Isa Metals Limited (MET) with respect to the anticipated future undertakings. These forward looking statements reflect various assumptions by or on behalf of MET. Accordingly, these statements are subject to significant business, economic and competitive uncertainties and contingencies associated with exploration and/or mining which may be beyond the control of MET which could cause actual results or trends to differ materially, including but not limited to price fluctuations, exploration results, reserve and resource estimation, environmental risks, physical risks, legislative and regulatory changes, political risks, project delay or advancement, ability to meet funding requirements, factors relating to property title, native title and aboriginal heritage issues, dependence on key personnel, share price volatility, approvals and cost estimates. Accordingly, there can be no assurance that such statements and projections will be realised. MET makes no representations as to the accuracy or completeness of any such statement of projections or that any forecasts will be achieved. Additionally, MET makes no representation or warranty, express or implied, in relation to, and no responsibility or liability (whether for negligence, under statute or otherwise) is or will be accepted by MET or by any of their respective officers, directors, shareholders, partners, employees, or advisers as to or in relation to the accuracy or completeness of the information, statements, opinions or matters (express or implied) arising out of, contained in or derived from this presentation or any omission from this presentation or of any other written or oral information or opinions provided now or in the future to any interested party or its advisers. In furnishing this presentation, MET undertakes no obligation to provide any additional or updated information whether as a result of new information, future events or results or otherwise. Nothing in this material should be construed as either an offer to sell or a solicitation of an offer to buy or sell securities. It does not include all available information and should not be used in isolation as a basis to invest in Mt Isa Metals Ltd. Competent Persons Statement The information in this report that relates to Exploration Results is based on information compiled by Mr Peter Spiers B.Sc (Hons) Geol., who is a Member of The Australasian Institute of Mining and Metallurgy. Mr Spiers is a full time employee of the company. Mr Spiers has sufficient experience which is relevant to the styles of mineralisation and types of deposits under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Spiers consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. 2

MET holds strategic land positions in two world class mineral provinces our focus is gold exploration in West Africa 3

Shareholder / Financial Overview ( Funded for an ongoing and aggressive gold exploration program in West Africa) ASX Code: MET Shares (ordinary): 163.7m Options (unlisted): 14.3m Share Price: 32.0 cents (1) Market Capitalisation: A$52m Cash: A$13.1m (2) $1.00 $0.80 $0.60 $0.40 MET Share Price Major shareholders: - D Aguilar Gold Ltd - National Nominees - Tenstar Trading Ltd 32% 9% rounded 6% $0.20 IPO $0.00 Aug-08 Oct-08 Dec-08 Feb-09 Apr-09 Jun-09 Aug-09 Oct-09 Dec-09 Feb-10 Apr-10 Jun-10 Aug-10 Oct-10 For personal use only Nabanga Discovery Bantou Drill Results Prospect delineation BF Portfolio Established Dec-10 Feb-11 Apr-11 Jun-11 Aug-11 Oct-11 (1) As at 11 th November 2011 (2) As at 30 th September 2011 (unaudited) 4

West Africa A World Class Gold Province ( Host to more than fifty +1Moz gold deposits MET projects are in Burkina Faso ) 5

MET Exploration Permits Burkina Faso ( ~4,000km 2 permit area * Multiple advanced gold prospects) * Permits held under 3 year option agreements to purchase 100% interest, 1 permit held 100% by MET. 6

Nabanga A New Gold Discovery For personal use only 7

Nabanga Prospect Introduction ( Shallow artisanal gold workings developed along multiple quartz lodes ) 8

Nabanga 3.6km Strike Length ( Three high grade zones defined in RC drilling average drill intersection 3.9m @ 6.98g/t Au ) 9

Nabanga High Grades Continue at Depth ( Section 24 High grade gold mineralisation to 65m depth base of oxidation typically 20 30m ) 5m @ 5.44g/t Au (incl. 2m @ 11.83g/t Au) 5m @ 4.33g/t Au (incl. 2m @ 6.62g/t Au) 4m @ 8.52g/t Au (incl. 2m @ 16.05g/t Au) 3m @ 24.62g/t Au (incl. 1m @ 71.40g/t Au) Section 24 Average intersection 4.25m @ 9.22g/t Au 10

Nabanga Resource Drilling Underway Central Zone South Zone Nabanga North North Zone Completed drill holes Vein projection 200m +30,000m RC drilling program commenced targeting 3x high grade gold zones maiden resource estimate March 2012 11

Bantou Prospect ( One kilometre long gold mineralised quartz lode system high grade RC drill assays received ) 12

Bantou Prospect Introduction ( Multiple mineralised quartz lodes exposed in artisanal mining activity over a 1km strike length ) 13

Bantou Prospect New Drill Assay Results ( Phase two drilling completed hangingwall structure confirmed strike extensions to be tested ) 14

Bantou Regional Gold Targets ( High resolution geophysics flown in 2011 has identified additional structural targets ) Zone of additional structural targets Bantou Vein 15

Boungou Prospect ( Recent soil sampling has defined widespread high order / +50ppb gold in soil anomalies ) 16

Boungou Prospect ( Greenstone host rocks, structural geophysical targets and shallow artisanal gold workings ) Pambourou (new permit) 17

Boungou Prospect high grade gold grab sample results multiple structures evident in satellite imagery 18

Boungou Prospect extensive gold in soil anomalism 6.6km x up to 3.7km maximum width (20ppb Au) multiple gold trends (Boungou vs. Cross Trend) anomalism open in multiple directions includes significant zones of +50ppb gold Maiden RC drilling Nov / Dec 2011 20ppb Au contour 19

Boungou Prospect Detail ( Large areas of +50ppb Au anomalism Natougou Zone is open to east ) 20

the prospects reviewed today cover less than 0.8% of MET s Total permit area * Permits held under 3 year option agreements to purchase 100% interest, 1 permit held 100% by MET. 21

Project Pipeline eg: Mogu Prospect ( High grade gold assays, residual topographic ridge, flat lying vein system ) 22

Investment Summary Large project portfolio in a world class gold province Multiple prospects with demonstrated potential for major gold discoveries RC drilling of multiple gold targets underway Nabanga maiden resource estimate by March 2012 Cash balance A$13.1m * ASX MET * as at 30 September 2011 (un-audited) 23

Contact Peter Spiers Managing Director +61 (0) 7 3303 0624 +61 (0) 409 407 265 pspiers@mtisametals.com.au www.mtisametals.com.au