UNDAF Outcome(s)/Indicator(s): Sustainable development, disaster management and energy efficiency

Similar documents
REQUEST FOR PROJECT PREPARATION GRANT (PPG) PROJECT TYPE: FULL-SIZED PROJECT

UNDP Initiation Plan to programme the project preparation grant received from the GEF. (otherwise called GEF PPG)

Benin 27 August 2015

with the National Rural Support Programme (NRSP) for the Islamic Republic of Pakistan 13 November 2015 NDA Strengthening & Country Programming

REQUIRED DOCUMENT FROM HIRING UNIT

3.3. Accessing resources under the LDCF - PIF, PPG and CEO endorsement processes

REQUIRED DOCUMENT FROM HIRING UNIT

with the Ministry of Finance and Economic Development for the Republic of Mauritius 14 June 2016 NDA Strengthening & Country Programming

UNICEF Moldova. Terms of Reference

with the Ministry of Finance and Planning for the United Republic of Tanzania 08 November 2015 NDA Strengthening & Country Programming

with UNDP for the Republic of Ecuador 31 May 2017 NDA Strengthening & Country Programming

GEF-6 PROJECT IDENTIFICATION FORM (PIF) PROJECT TYPE: MEDIUM SIZE PROJECT TYPE OF TRUST FUND: CAPACITY BUILDING INITIATIVE FOR TRANSPARENCY

TERMS OF REFERENCE FOR INDIVIDUAL CONTRACTORS

Duration of Assignment: Apprx. 150 working days from January to September 2015

Duration of Assignment: Approx. 150 working days from January to September 2015

TERMS OF REFERENCE FEASIBILITY STUDY FOR ENVIRONMENTAL TRUST FUND

Supplementary budget for the implementation of the medium-term strategic and institutional plan

Executive Summary (in one page)

Terms of Reference. External monitoring mission for the Project Mid-Term Review

Strengthening Solid Waste Financing and Cost Recovery Framework in Syria. Terms of Reference for a Financial Analyst

REQUIRED DOCUMENT FROM HIRING UNIT

Road and Transport Management Project Phase II SAU/10/51658

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE

Session 4 Status of Climate Finance in the Philippines

ENHANCED INTEGRATED FRAMEWORK (EIF) GUIDANCE NOTE ON EIF SUSTAINABILTIY SUPPORT PHASE PROCESS

United Nations Environment Programme

REPORT 2016/012 INTERNAL AUDIT DIVISION

Current status of the implementation of the results of TNAs including success stories.

Socialist Republic of Vietnam. Reporting Period: From 08/20/2017 to 04/03/2018 Report Date: 04/03/2018 Ministry of Natural Resources and Environment

Global Call for Proposals SAI Serbia Concept Note

Strategy for Resource Mobilization in Support of the Achievement of the Three Objectives of the Convention on Biological Diversity

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE TOR - CONSULTANCY IC/2012/026. Date: 16 April 2012

TCP Facility COMPONENT DESCRIPTION

Islamic Republic of Afghanistan Ministry of Finance. Terms of Reference. Ministry of Finance, Directorate General Budget

United Nations Development Programme

with the Development Bank of Seychelles for the Republic of Seychelles 18 December 2017 NDA Strengthening & Country Programming

with UNDP for the Republic of Congo 12 May 2016 NDA Strengthening & Country Programming

with GIZ for the Kingdom of Thailand 3 July 2015 NDA Strengthening & Country Programming

with UNDP for the Union of the Comoros 25 June 2015 NDA Strengthening & Country Programming

THE WORLD BANK TERMS OF REFERENCE Impact of carbon pricing instruments on national economy and contribution to NDC

Executive Summary(in one page)

Bangladesh 25 October 2015

III. modus operandi of Tier 2

with Fundación Avina for Republic of Paraguay 11 October 2017 Strategic Frameworks

Toronto Atmospheric Fund

Standard Summary Project Fiche IPA centralised programmes Project Fiche: 18

WSSCC, Global Sanitation Fund (GSF)

Project Document Format for non-cpap Countries or Projects outside a CPAP

Terms of Reference FOR INDIVIDUAL CONSULTANTS/CONTRACTORS (IC)

United Nations Development Programme Iraq

TC Document/ FORMAT AND CONTENT

PIMS Project Title: Technology Transfer and Market Development for Small Hydropower in Tajikistan. Contents

with UNDP for the Republic of India 29 December 2015 NDA Strengthening & Country Programming

Initial Structure and Staffing of the Secretariat

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

Building a Nation: Sint Maarten National Development Plan and Institutional Strengthening. (1st January 31st March 2013) First-Quarter Report

Inception Report. Developing Policy-relevant Capacity for Implementation of the Global Environmental Conventions in Jordan. PIMS no.

Technical Assistance for Support to Mechanism for Monitoring Turkey's Greenhouse Gas Emissions TR2011/ Ankara, 8 April 2015

Chad 16 September 2015

Agenda. GCF/B.08/01/Rev.01 * 14 October Meeting of the Board October 2014 Bridgetown, Barbados Agenda item 2

Definitions. Terms of Reference

How to Develop High-Quality Full Application Writing a Winning Proposal

GEF SECRETARIAT REVIEW FOR FULL/MEDIUM-SIZED PROJECTS* THE GEF/LDCF/SCCF TRUST FUNDS

NEPAD/Spanish Fund for African Women s empowerment

MEMORANDUM OF UNDERSTANDING ON THE IMPLEMENTATION OF THE NORWEGIAN FINANCIAL MECHANISM between THE KINGDOM OF NORWAY,

Capacity building for environmental policy institutions for integration of global environment commitments in investment / development decisions

REPORT 2015/174 INTERNAL AUDIT DIVISION

with the National Agency on Climate Change for the People's Democratic Republic of Algeria 22 December 2017 NDA Strengthening & Country Programming

TERMS OF REFERENCE FOR INDIVIDUAL CONTRACT. Regional Public Financial Management Expert

with the Ministry of Economic Planning, Sustainable Development, Industry, Labour and Information for Saint Vincent and the Grenadines

Ekološki Sklad Republike Slovenije, Javni Sklad Environmental Fund of the Republic of Slovenia, Public Fund

with Caribbean Community Climate Change Centre (5Cs) for Belize 14 December 2016 NDA Strengthening & Country Programming

United Nations Environment Programme

People s Republic of China: Study on Natural Resource Asset Appraisal and Management System for the National Key Ecological Function Zones

United Nations Development Programme

Annex XIV LDCF Timeline: COP guidance and GEF responses

with UNEP for Federative Republic of Brazil 1 November 2017 Strategic Frameworks

with UNDP for the Republic of Haiti 05 June 2017 NDA Strengthening & Country Programming

JORDAN. Terms of Reference

Terms of Reference (ToR)

Page 1 of 5. APPROVED e-requisition

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE

AAU sales and Green Investment Schemes: Towards implementation in Ukraine

with GIZ for the Republic of Peru 29 January 2018 NDA Strengthening & Country Programming

United Nations Development Programme. 9 March, Dear Ms. Lubrani,

TERMS OF REFERENCE. 2. Adaptation and implementation of this new methodological framework at national level

HLCM Procurement Network Procurement Process and Practice Harmonization in Support of Field Operations, Phase II

Z\A REQUEST FOR CEO ENDORSEMENT UNDER THE GEF TRUST FUND. n/a B 500,000. n/a GEF Total 500,000 3,500,000 (provide details in Section b: Cofinancing)

Dear Ms. Evans-Klock,

United Nations Environment Programme

EAF-Nansen Project (GCP/INT/003/NOR)

Semi-Annual Progress Report 2014

Aloysius M. Kamperewera [PhD] Ministry of Environment and Climate Change Managment Director for Environmental Affairs

Informal note by the co-facilitators

ANNEX III OFFEROR S LETTER TO UNDP CONFIRMING INTEREST AND AVAILABILITY FOR THE INDIVIDUAL CONTRACTOR (IC) ASSIGNMENT

Summary of Project/Program. Summary - Project/Program Approval Request. Private: Public: X Mixed: Grant: USD31 Million 1. Loan: USD5 Million Project:

BACKGROUND PAPER ON COUNTRY STRATEGIC PLANS

TERMS OF REFERENCE FOR INDIVIDUAL CONTRACT

TERMS OF REFERENCE FOR INDIVIDUAL CONSULTANT

2 SCOPE OF WORK, RESPONSIBILITIES AND DESCRIPTION OF THE PROPOSED ANALYTICAL WORK

Transcription:

INITIATION PLAN FOR A GEF PROJECT PREPARATION GRANT (PPG) UNDAF Outcome(s)/Indicator(s): Sustainable development, disaster management and energy efficiency Country Islamic Republic of Iran Expected Outcome(s)/Indicator (s): Global environmental concerns and environmentally sensitive development to be integrated in national development frameworks. These are to be implemented through communitybased approaches to sustainable use of natural resources, capacity-building, environmental assessments and the removal of financial, economic, legal, institutional and technological barriers. Expected Output(s)/Indicator(s): Efficient use and management of natural resources, including energy, water, raw materials and solid waste. Programme Period: 2009-2014 Programme Component: Environment and Energy PPG Title: Policy Reforms and Market Transformation of the Energy Efficient Buildings Sector in the I.R. Iran ATLAS Award ID: 00057216 ATLAS Project ID: 00070605 PIMS Project ID: 4018 Duration: 18 months Management Arrangement: NEX Total budget: $190,000 Allocated resources: Government $90,000 GEF $100,000 AGREED BY UNDP RESIDENT REPRESENTATIVE / UNDP DIRECTOR: (Enter Name, Position) Signature Date: (Month, day, year) 1

Brief Description of Initiation Plan The objective of this GEF project is to reduce GHG emissions from Iran's buildings sector through barrier removal and implementation of practical measures in the existing building stock as well as mitigating future emissions in the context of new buildings. This preparatory project will help in identifying and collaborating with all the relevant stakeholders for the preparation of the full-size project. The duration of the PPG is 18 months. International and national consultants will be hired in order to work with the government agencies and prepare the project document. The full-scale project activities will lead to policy interventions and on-the-ground activities for the promotion of building energy efficiency measures and replicable models in the selected cities. GEF PPG approved grant document REQUEST FOR PROJECT PREPARATION GRANT (PPG) PROJECT TYPE: FULL-SIZED PROJECT THE GEF TRUST FUND Submission date: 24 February 2009 GEFSEC PROJECT ID 1 : 3800 GEF AGENCY PROJECT ID: PIMS 4018 COUNTRY(IES): Islamic Republic of Iran PROJECT TITLE: Policy Reforms and Market Transformation of the Energy Efficient Buildings Sector in the I.R. Iran GEF AGENCY(IES): UNDP OTHER EXECUTING PARTNER(S): Iran Fuel Conservation Organization of the Ministry of Petroleum GEF FOCAL AREA(S): Climate Change GEF-4 STRATEGIC PROGRAM(S): SP-1: Promoting energy efficiency in residential and commercial buildings NAME OF PARENT/PROGRAM/UMBRELLA PROJECT: Global Framework for Promoting Low GHG Emission Buildings A. PROJECT PREPARATION TIMEFRAME Start date of PPG June 2009 Completion date of PPG December 2010 B. PAST PROJECT PREPARATION ACTIVITIES ($) 1 Project ID number will be assigned initially by GEFSEC. If PIF has been submitted earlier, use the same ID number as PIF. 2

List of Past Project Preparation Activities N/A Output of the Activities Project Preparation Amount (a) Co-financing (b) Total c = a + b Total Project Preparation Financing C. PROPOSED PROJECT PREPARATION ACTIVITIES ($) Describe the PPG activities and justification: The PPG activities will only focus on those activities that are necessary for the preparation of the full-sized project document. List of Proposed Project Output of the PPG Preparation Activities Activities Project Preparation Amount (a) Co-financing (b) Total c = a + b Collection and analysis of Baseline situation baseline data established 20,000 20,000 40,000 Gap analysis Identification of gaps 15,000 10,000 25,000 Formulation of study Logical framework objectives and key targets developed 15,000 10,000 25,000 Stakeholder engagement and co-financing Key stakeholders engaged and co-financing 25,000 20,000 45,000 Preparation of project implementation and financing plan Preparation of full-sized project document mobilized Yearly and total project budget and work plan finalized 10,000 10,000 20,000 Full-sized project document 15,000 20,000 35,000 Total Project Preparation Financing 100,000 90,000 190,000 D. FINANCING PLAN SUMMARY FOR PROJECT PREPARATION GRANT: ($) Project Preparation Agency Fee GEF financing 100,000 10,000 Co-financing 90,000 Total 190,000 10,000 E. PPG REQUESTED BY AGENCY(IES), FOCAL AREA(S) AND COUNTRY(IES) N/A F. PPG BUDGET REQUEST Cost Items Total Estimated Person Weeks (PW) GEF ($) Co-financing ($) Total ($) Local consultants * 200 45,000 50,000 95,000 International consultants* 26 40,000 25,000 65,000 Travel 15,000 15,000 30,000 Total PPG Budget 100,000 90,000 190,000 3

* Annex A for Consultant cost details should be prepared first before completing this table. See notes on Annex A for the required detailed information. This table is the sum of all local and international consultants presented in Annex A. G. GEF AGENCY(IES) CERTIFICATION This request has been prepared in accordance with GEF policies and procedures and meets the GEF criteria for project identification and preparation. John Hough Deputy Executive Coordinator UNDP-GEF Faris Khader Project Contact Person Regional Technical Specialist for Climate Change Date: 23 February 2009 Tel. +66 2288 2756 E-mail: faris.khader@undp.org 4

Annex A Consultants Financed by the Project Preparation Grant (PPG) Position / Titles Local National Project Manager $/ Person Week Estimated PWs Tasks to be performed 700 50 The NPM, who will report directly to the CTA, will supervise and coordinate the inputs of various national consultants and assume responsibility for providing technical advice and facilitating meetings with key government organizations. The NPM will carry out the following duties: 1. Ensure smooth implementation of the PPG in accordance with the work plan and UNDP s procedures; 2. Systematically keep PPG records including financial; 3. Work with the CTA to prepare terms of reference for consultants and sub-contractors; 4. Help in drafting monthly progress reports (in Farsi with English summary); 5. Identify stakeholders and their roles in the project; 6. Assist in collecting and analyzing baseline data; 7. In close collaboration with the CTA, prepare a detailed work plan for all project inputs and project activities; 8. Organize and act as facilitator at meetings with government organizations and private sector institutions; 9. Provide ongoing technical support to the project team; 10. Help mobilise cost-sharing/cofunding to the project from Iranian Government and the private sector; 11. Help draft sections of the project document. Building Energy 600 25 The Building Energy Efficiency 5

Efficiency Expert Expert will be tasked with the following responsibilities: 1. Assist in baseline and stakeholder analysis; 2. Provide input to workshops; 3. Help design the component on piloting the installation of solar water heaters and improving the heating system in 424 government buildings in Tehran; 4. Foster and establish links with other relevant GEF programs; 5. Provide technical input to project activities. Policy Analyst 600 25 The Policy Analyst will conduct a detailed review of baseline policy, legislative and regulatory frameworks that impact building energy efficiency in Iran and prepare a gap analysis. Based on this review and assessment, the Analyst will help design the component on the development of a Cross-sectoral Strategy and Action Plan (CSSAP). Project Advisor 600 50 The Project Advisor will be responsible for collecting data, conducting research and providing ongoing technical support to the project team. International Chief Technical Advisor Capacity Development Expert/Trainer 2,500 24 The CTA will monitor and support the implementation of all PPG activities, by means of 3-4 visits to Tehran. This in-country support will be supplemented by periodic homebased support, which will include responding to technical queries, commenting on technical reports, and drafting the full-sized project document. 2,500 2 The Capacity Development Expert will help design the training and capacity development component of the project. In particular, the Expert will identify the target stakeholders for this training, in close consultation with the building energy efficiency expert, prepare a detailed e-learning course outline, and will provide advice on how to structure and 6

organize the awareness raising campaign. Atlas Total Budget and Work Plan Award ID: 00057216 Award Title: PIMS 4018 Iran Energy Efficient Buildings Project Business Unit: IRN10 Project ID: 00070605 Project Title: PIMS 4018 Iran Energy Efficient Buildings Project Implementing Partner (Executing Agency) Iran Fuel Conservation Organization, Ministry of Petroleum GEF Outcome/Atlas Activity OUTCOME 1 Develop full-size project document Responsible Party/ Implementing Agent Fund ID Donor Name NEX 62000 GEF Atlas Budgetary Account Code ATLAS Budget Description Amount (USD) Total (USD) 71200 International Consultant 40,000 40,000 71300 National Consultant 45,000 45,000 71600 Travel 15,000 15,000 Total GEF Budget 100,000 100,000 Summary of Funds: 2 GEF 100,000 100,000 Donor 2 - UNDP Donor 3 in-kind/cash 90,000 90,000 Donor 4 in-kind/cash TOTAL 190,000 190,000 2 Summary table should include all financing of all kinds: GEF financing, co-financing, cash, in-kind, etc. etc 7