POLICY ON DEVELOPMENT OF HYDRO POWER PROJECT. Energy Department Government of Bihar

Similar documents
GOVERNMENT OF KERALA

GOVERNMENT OF MADHYA PRADESH

Compendium of State Government Policies on Renewable Energy Sector in India ARUNACHAL PRADESH

New and Renewable Energy Department Vallabh Bhavan, Bhopal

JAMMU & KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED

Implementation of Solar Based Projects in MP Dated 20 July, 2012

Competitive Bidding Guidelines for procurement of Electricity

Uttar Pradesh Electricity Regulatory Commission

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION

GUJARAT ELECTRICITY REGULATORY COMMISSION. Notification No. 13 of 2005

New and Renewable Energy Department Vallabh Bhavan, Bhopal

BIHAR ELECTRICITY REGULATORY COMMISSION PATNA

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION MUMBAI

UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION. No. UPERC/Secy/Regulation/ Lucknow : Dated, 17 th August, 2010

Electricity (Development of Small Power Projects) GN. No. 77 (contd.) THE ELECTRICITY ACT (CAP.131) RULES. (Made under sections 18(5), 45 and 46))

1.1 These regulations shall extend to whole of the State of Punjab.

M.P. Electricity Regulatory Commission Bhopal

EXTRA ORDINARY 13 SHRAVANA (S) BIHAR ELECTRICITY REGULATORY COMMISSION

BIHAR ELECTRICITY REGULATORY COMMISSION

Chhattisgarh State Electricity Regulatory Commission

Comments on proposed amendments in Electricity Rules (with respect to Captive Power Plants) issued by Ministry of Power on 22 nd May 2018

GOVERNMENT OF PUNJAB DEPARTMENT OF POWER (Power Reforms Wing) NOTIFICATION The 21 st June, 2010

Bhopal: Dated 5 th May 2006

GUIDELINES FOR FORMULATION, APPRAISAL AND APPROVAL OF PUBLIC PRIVATE PARTNERSHIP (PPP) PROJECTS

CHAPTER I: PRELIMINARY Short title, commencement and interpretation

Scheme Financing Infrastructure Projects through the India Infrastructure Finance Company Limited (IIFCL)

Rajasthan Electricity Regulatory Commission

No. 14/1/2016-Trans Government of India Ministry of Power. Office Memorandum

Meghalaya State Electricity Regulatory Commission

SMP-10/2016 M.P. Electricity Regulatory Commission Bhopal

Guidelines for Formulation, Appraisal and Approval of

AGREEMENT FOR SYNCHRONOUS OPERATION OF CAPTIVE POWER PLANTS OF.. WITH JHARKHAND STATE ELECTRICITY BOARD SYSTEM

Procedure for Scheduling

KErala StatE ElECtriCity regulatory CommiSSion (Renewable Energy) Regulations, 2015.

Multi Year Tariff Order For Himachal Pradesh State Electricity Board Limited (HPSEBL) For the period FY to FY

Jawaharlal Nehru National Solar Mission

SOLAR ENERGY CORPORATION OF INDIA LIMITED DRAFT 1000 MW GRID CONNECTED ROOF TOP SOLAR PV SCHEME FOR GOVERNMENT BUILDINGS UNDER CAPEX AND RESCO MODELS

HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION SHIMLA NOTIFICATION. Shimla, the 26 th May, 2010 REGULATIONS

HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION, SHIMLA. (Date of Order: )

GUIDELINES TO BE FOLLOWED BY MAJOR PORT TRUSTS FOR PRIVATE SECTOR PARTICIPATION IN THE MAJOR PORTS

Notified on : 22 January 2010 Bhopal, Dated: 9 th December, 2009

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION, MUMBAI Maharashtra Electricity Regulatory Commission (Fees and Charges) Regulations, 2017

STANDARD IMPLEMENTATION AND SERVICE AGREEMENT FOR DEVELOPMENT AND OPERATION OF INTRA-STATE TRANSMISSION SYSTEM

Overview of the framework

RfS & Rs with compare to other states, there is no such charge

ELECTRICITY ACT, 2005

Regulatory Framework for New Bagasse Based Cogeneration Projects

Draft Consultative Paper on. Captive Generating Plants

1. Risk of regularizing illegal connections

Case No. 52 of Coram. Shri Azeez M. Khan, Member Shri Deepak Lad, Member. Mahati Hydro Power Projects Pvt. Ltd.

THE JHARKHAND GAZETTE EXTRAORDINARY PUBLISHED BY AUTHORITY

Indian Institute of Tropical Meteorology,

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI NOTIFICATION (DRAFT)

Rs Billion Short Term Debt Programme. (Series IX & X)

GMR Chhattisgarh Energy Limited

BRIEF ANALYSIS ON NEW OPEN ACCESS REGULATIONS IN THE STATE OF MAHARASHTRA

KINGDOM OF CAMBODIA NATION RELIGION KING ELECTRICITY AUTHORITY OF CAMBODIA REGULATIONS

Annual Maintenance Contract for Bunkering Stream Equipments in CHP I N D E X

No.21 Rural Electrification 1

TENDER SPECIFICATION. Procurement of Emergency Power for Vedanta Limited, Jharsuguda

KARNATAKA FISHERIES DEVELOPMENT CORPORATION LTD.,

FINANCIAL ANALYSIS: PROJECT 1

PTC INDIA LIMITED NEW DELHI

Role of Power Market and Market Intermediaries in Facilitating Investments in South Asian Region

Operational Guidelines for PRICE STABILISATION FUND (PSF)

Cross Border Electricity Trade

State Policy on Chhattisgarh Special Economic Zone. Government of Chhattisgarh. Department of Commerce and Industries

POWER PURCHASE AGREEMENT

THE HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION SHIMLA. NOTIFICATION Shimla, the 22 nd November, 2018

Distribution Tariff Determination and Rationalization

PPP in Coal: The Next Big Thing!

KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM. PRESENT: Sri.T.M. Manoharan, Chairman

Power Sector Reform India The Long Road Ahead

Law No. (13) Of 2012 Renewable Energy & Energy Efficiency Law

Expression of Interest. Procurement of Renewable Energy Under Short Term basis. Reliance Industries Limited In Gujarat and Maharashtra

B. Whereas the development of infrastructure requires debt of longer maturity to supplement the debt funds presently available; and

SECTION - IB NTPC Tamilnadu Energy Company Limited Vallur Thermal Power Project NOTICE INVITING TENDER (NIT) (Domestic Competitive Bidding)

CENTRAL ELECTRICITY REGULATORY COMMISSION (CERC) 3rd & 4th Floor, Chandralok Building, 36, Janpath, New Delhi : /

NTPC Tamilnadu Energy Company Limited Vallur Thermal Power Project NOTICE INVITING TENDER (NIT) DETAILED (Domestic Competitive Bidding)

BEFORE THE GUJARAT ELECTRICITY REGULATORY COMMISSION AT GANDHINAGAR PETITION NO OF 2016

Chapter 4. Tariff Policy. (Amendments made in the Tariff Policy vide resolution and in corporated)

Response to Bidders Queries for Development of 50 MW of Solar Power Projects in the State of Karnataka. Clause No. Clause Query Response

Maharashtra Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulations, 2018

By S K Agrawal ED (Commercial) NHPC Ltd.1

Uttarakhand Electricity Regulatory Commission

BIHAR ELECTRICITY REGULATORY COMMISSION. Case No. 54 of for BIHAR STATE POWER TRANSMISSION COMPANY LIMITED (BSPTCL)

South Asia Subregional Economic Cooperation Power System Expansion Project (RRP NEP 44219) FINANCIAL ANALYSIS

Dr. Pramod Kumar Anand JS (RC) & DG, NRRDA : : : D.O. # P-10021/1/2010/P-III August 4, 2010

TAMIL NADU ELECTRICITY REGULATORY COMMISSION. Tariff Order No 1 of 2010 dated

DRAFT PRE BID (MoU) (Rev-1) Memorandum of Understanding

Sub: Notice inviting open tender for sale of Blooms 150x150mm, Blooms 200x200 mm - reg

NTPC Tamilnadu Energy Company Limited Vallur Thermal Power Project NOTICE INVITING TENDER (NIT) (Domestic Competitive Bidding)

Corporate Social Responsibility and Sustainability Policy of Indian Railway Finance Corporation Ltd (IRFC)

CENTRAL ELECTRICITY REGULATORY COMMISSION New Delhi NOTIFICATION

Case No. 85 of Coram. Shri Azeez M. Khan, Member Shri Deepak Lad, Member. Maharashtra State Electricity Distribution Co. Ltd.

Tariff Regulation in India

TENDER SPECIFICATION

Draft MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

POWER PURCHASE AGREEMENT BETWEEN

Guidelines For Rajasthan Infrastructure Project Development Fund (RIPDF)

Transcription:

POLICY ON DEVELOPMENT OF HYDRO POWER PROJECT Energy Department Government of Bihar 2012

( 1 ) Table of Content 1. Objective 2. Title and Enforcement 3. Scope and Coverage 4. Nodal Agency 5. Classification of Projects 6. Allocation of Projects 7. Policy Framework 8. Allotment of Land 9. Taxes and Duties 10. Tariff 11. Sale of Power 12. Wheeling /Banking Charges 13. Transmission of Power 14. Despatch 15. Incentive by Central/ State Govt 16. Time limit for executing projects 17. Due Diligence 18. Overriding Condition 19. General Condition Prepared by BHPC

( 2 ) DRAFT Hydro Power Policy - 2012. Power is a critical requirement for socio economic development. Economic growth depends on availability of adequate, reliable and quality power at competitive rate. Bihar is on its path of progress but its sustainable growth is suffering due to nonavailability of adequate power. The per capita power consumption in the state is around 100 units against the all India average of approx. 700 units. The total installed capacity of generation in Bihar is around 600 MW against the average demand of 2500 MW and peak demand of 3000 MW. The state has access to 1846 MW including capacity allocation from central sectors generating stations. The deficit in power which was around 31 % in 2007-08 has increased to 40% in 2009-10. This is leading to rationing of power to different categories of consumers. Govt. of Bihar is making its best effort to increase its generating capacity to bridge the gap. In this process in additional to adding thermal power projects; it endeavours to exploit hydro power potentials of the state through its own agency as well as active participation of the Independent Power Producers (IPP). 1 Objective : Power system in Bihar is predominant by thermal power generation and the contribution of hydro power is only 5%. In order to exploit the available renewal source of energy, Govt. of Bihar is desirous and committed to encourage rapid development of hydro power in the State at the earliest. The key objective of the policy is as under. 1.1 To enhance the over all generation capacity of the state including Hydro power

( 3 ) 1.2 To obtain optimal thermal - hydro generation mix of 60:40 ratio 1.3 To encourage the participation of Independent Power Producers by offering them best policy frame work, and support. In order to achieve the above objective, the Govt, of Bihar had issued a policy guideline for private sector participation for developing non-conventional energy sources in 2003 which included policy for hydro energy. Keeping in view the fast changing scenario of the Power sector and the guiding policies of the Central/State Govt., it is felt necessary to review the earlier policy and bring in new Hydro Power Policy covering projects of all sizes/capacities. 2 Title and Enforcement 2.1 This policy would be known as Bihar State Hydro-power Policy -2012. 2.2 This policy will be effective from the date of its notification. 2.3 The Govt. of Bihar may modify this policy through amendments ( if required). However, subject to such amendments, this policy will remain valid for a period of 5 years. All projects awarded within this period under this policy will be governed by this policy for their entire duration of the project. 3 Scope and Coverage 3.1 The policy will be applicable for development of hydro-power projects from micro to mega capacity. The Govt. of Bihar has already issued a policy framework for development of new and renewable energy sources which includes hydropower projects up to 25 MW vide Resolution dated 24.06.2011. This policy is in line with aforesaid policy for hydropower projects up to 25 MW capacity. However, in case of any ambiguity between the two policies, the provisions of Hydro power policy would prevail upon policy for New and Renewable Energy Source.

( 4 ) 3.2 The policy covers aspects and process of inviting proposal in terms of Tender/Expression Of Interest from prospective Developers, guidelines for its evaluation, project approvals, award process and project implementation. 3.3 The policy will be applicable for new projects proposed after its notification. 3.4 The policy will be applicable for following categories of Developer desirous to develop Hydro Power stations in the State. 3.4.1 National / international organizations, 3.4.2 Central / State Govt. undertakings, 3.4.3 Private Industries/ institutions, partnership firms/ consortium 3.4.4 Panchayati Raj Institutions/ Urban local bodies/ Co-operative and Registered societies. desirous of install, and generate hydropower in state. 4. Nodal Agency At present Bihar State Hydroelectric Power Corporation (BHPC), (A Govt. of Bihar Enterprise), registered under Company Act 1956 is responsible for development of hydro power projects in the state. Under Bihar State Hydro-Power Policy -2012, BHPC will be the Nodal Agency on behalf of, Govt. of Bihar for notifying hydropower locations, inviting proposals, examining the techno-commercial feasibility of projects (under the purview of the State), its processing, conveying govt. approvals, approving technical proposals and monitoring physical progress of the work. The technical appraisal for the projects under the purview of Central Govt. will he done by the Central Electricity Authority (CEA) as per provision of Indian Electricity Act. 2003.

( 5 ) The approval for investment proposals for projects under the purview of State Govt will be given by BHPC and for projects under the purview of Central Govt. will be given by an Inter-Departmental committee of the Govt. of Bihar (to be notified separately). The list of hydro power projects for development by Independent Power Producer (IPP) will be notified by BHPC from time to time in its website. However, the Developers will have option to identify/ select site at its own. In case of new sites, Pre- feasibility reports / DPR will be prepared by the developer and same will be submitted to BHPC for its techno-commercial appraisal/ approvals before award of sites. 5. Classification of Projects Depending upon installed capacity, the hydro projects are classified as under: 5.1 Micro Hydro projects with installed capacity below 3 MW 5.2 Mini hydro projects with installed capacity from 3 MW to 25MW 5.3 Medium hydro projects with installed capacity above 25MW and upto 100 MW and 5.4 Big hydro projects with installed capacity beyond 100 MW. 6. Allocation of projects 6.1 All the identified potential project/sites shall be advertised through Notice Inviting Proposals in various news papers for global invitation of bids from eligible bidders as per the policy framework. 6.2 The projects upto 3 MW will be allocated on input cost basis and preference will be given to developers within the states. In case of self identified projects upto 25 MW input based cost may be allowed to the developers.

( 6 ) 6.3 Allotment of identified Projects greater than 3 MW will be based on tariff based bidding process as per guidelines issued by GoI. 6.4 Successful Bidders shall pay fixed upfront charges to Nodal Agency/Govt. of Bihar as defined below: Sl No. Capacity in MW Upfront payment (lakh)/mw 1 <3 MW 5 2 3-25 MW 10 3 Between 25 and 100 MW 10 ( Max.5 crore) 4 >100 MW 10 crore (fixed) 6.5 The cost of Detailed Projects Reports and Project development charge shall be recovered from the successful bidders. 6.6 Acceptance of offer: Government shall have power to accept or reject the offer considering the financial viability and other parameters at its discretion. 6.7 The Developer shall have the option for setting up the project under a Special Purpose Vehicle (SPV) as defined in the Electricity Rules under EA 2003. 7 Policy Framework 7.1 Once approved, the developer will not be allowed to change its core structure including equity holding and transfer its right to others entity / interested party till the completion of the project. However, in post completion period change in Company structure may be allowed with prior written approval from Nodal Agency / Govt. of Bihar. 7.2 After allocation of site/ project, the developer need to sign an implementation agreement (IA) within three months from the date of allocation with

( 7 ) mutually agreed milestone including financial closure for implementation of the project. 7.3 The project will be allotted on the basis of tentative installed capacity as mentioned in the notice inviting proposal and on self identified basis. The nodal agency shall ensure that the self identified projects do not interfere with other existing / identified projects. 7.4 In case the capacity of awarded project increases / decreases by 20%, the award conditions will not change. But in case of higher deviation in declared capacity i.e. beyond 20%, the developer shall be required to sign a fresh/revised MOU/IA with the Govt. of Bihar. 7.5 The scope of work would include all aspect from concept to commissioning and operation thereafter. The transmission system for evacuation of power shall form part of the project cost and it will be finalised in consultation with power distribution Company and nodal agency and this will be applicable for micro and small hydro power projects also. 7.6 The project developed by private developers on Build own operate transfer (BOOT) model would have a validity period of 40 years from the date of commissioning of the project and the same would revert back to the Govt. of Bihar after the expiry of this time i.e. 40 years free of cost with all encumbrance. 7.7 By virtue of its presence in the area, the developer company will have no right on other proposed / identified project sites in upstream and downstream of the water stream. 7.8 The developer shall provide 12% free power to the state as royalty. Out of above 12%, 2% free power will be provided to the surrounding areas /villages in the radius of 1 km from the project site as social obligation and

( 8 ) the distribution infrastructure required has to be develop by the project developer in consultation with distribution company and nodal agency. In case of projects upto 3 MW the quantum of free power will be 2% for social welfare. 7.9 The developer company will meet all statutory rules and regulation likes labour laws, safety norms, environmental laws and all norms imposed by other local authorities from time to time. 7.10 The nodal agency or any other regulatory body of central / state Govt. will have right to inspect the generating stations and its allied structures at reasonable interval and time to ensure security and safety of the installations. The regulating instructions in respect of operation of project as well as its safety and security of the system will be binding on the operating company failing to which the Govt. will have right to take over the project with due compensation to developer. 7.11 In case of storage type projects, minimum quantity of water as decided by the state Govt. shall be released in the down stream even during lean discharge period and at the cost of generation. 8 Allotment of land 8.1 Once the project site is awarded to developer, the developer will acquire land from its owner as per norms defined by thee government. If required, the nodal agency will extend help in coordinating activity with Govt. departments. 9 Taxes & Duties: 9.1 All entry tax and electricity tax will he exempted for projects upto 25 MW. 9.2 All other taxes and duties as applicable from time to time by State Government/local bodies shall be paid by the developers.

( 9 ) 10 Tariff 10.1 The tariff for sale of energy from the project shall be decided by Bihar State Regulatory Commission through tariff based bidding in case of identified projects >3 MW or on the basis of actual project cost in case of self identified projects upto 25 MW and identified projects upto 3 MW. In case any government subsidy is provided in development of project, such component of project cost shall be excluded for determination of tariff. 10.2 In case of sale of energy to any particular bulk consumer or the definite group of people/cooperative/society(having load requirement of 1MW and above) the mutually agreed tariff rate between the developer company and consumer unit shall be allowed. BSEB suggested its deletion 11 Sale of Power : 11.1 For Micro projects upto 3 MW capacity, the developer company will have option to consume power in the local vicinity in the capacity of decentralised distributed generator. He will have option to feed a surplus power for any of the local grid of Distribution Company at the rate of tariff notified by Regulatory Commission. 11.2 For Mini hydroelectric project i.e. upto 25 MW the developer company will have to make agreement with Distribution Company for use of its distribution network on mutually agreed terms & conditions or they have to construct suitable sub transmission facility to deliver the power to the nearest GSS/PSS of the distribution company. The applicable tariff for such power shall be as per approved rate by BERC. 11.3 The project developer may sell to third party/utilize generated power at the place of generation or at any other place for the captive use, through BSEB network on payment of applicable Open Access charges surcharges &

( 10 ) additional surcharge and any other charges as approved/notified by Bihar Electricity Regulatory commission (BERC) and as per BERC (Terms & Conditions for Open Access) Regulation, 2006 as amended from time to time. 11.4 A separate Power Purchase agreement in this respect shall be signed by the IPP and Distribution Company as per provisions contained in Electricity Act, 2003 and subsequent amendment/ notifications issued by CERC/ BERC from time to time. 11.5 For Hydro power projects above 3 MW, the BSEB shall contract to take off minimum 60% of the total power for sale at the rate notified by Regulatory Commission. The Developer will have the option to sell the remaining 40% of the total power to any HT consumer. 12. Wheeling/ Banking Charges: 12.1 The infrastructure and facilities of BSEB/DISCOMs, as may be available, will be made available to all IPPs for wheeling the generated on chargeable basis. 12.2 Wheeling charges for wheeling the generated energy to bulk purchaser/third party consumers inside or outside the State will be as determined by the Bihar Electricity Regulatory Commission (BERC). 12.3 No wheeling charges are applicable in cases of sales to the BSEB/Successor Company in case power is supplied directly to BSEB. 13 Transmission of Power 13.1 For projects above 25 MW capacity the detailed project for power evacuation system will be indicated in the DPR and the total evacuation system shall either be constructed by the developer company at its own

( 11 ) cost or it may be developed by the Distribution Company of the area on its behalf on deposit basis. 13.2 BSEB will determine the specifications of the evacuation facilities required, including the interconnection point and voltage and the same would be specified in the project information document (PFR/DPR). 13.3 Construction and maintenance of transmission facilities up to the nearest interconnection point as directed by the Board shall be such that interfacing with the State grid/bseb grid is done as per the latter's specifications & requirements/indian Electricity Grid Code/ Bihar Grid Code as applicable and amended from time to time. 14 Despatch 14.1 In order to promote use of renewable sources, priority will be accorded for hydro projects over other source of energy during preparation of generation schedule. This point will be ensured by State Load Despatch Centre. 15 Incentives by Central/State Government 15.1 The financial/fiscal incentives for small hydropower development available from Ministry of Non Conventional Energy Sources, Govt. of India shall be facilitated/extended to IPPs 16 Time Limit for Executing the Project 16.1 The IPPs shall make necessary applications for obtaining the statutory clearances of the project and approvals of the concerned authorities shall be responsible for completeness of all submissions within 6 months from the date of allotment or any other period deem fit by the GOB. Failure to

( 12 ) do so within the stipulated time frame shall be treated as non-compliance with the requirement stipulated in this paragraph. 16.2 Nodal Agency shall accord the approval of the DPR/ application within 3 months from its submission. IPP shall enter into an implementation agreement with the nodal agency within one month from the date of approval of the project or three months from issue of letter of intent as the case may be. 16.3 The IPP/Users society shall achieve the financial closure within 12 months from the date of receipt of all statutory approvals and clearances given by the State and Central Governments or signing of the Implementation Agreement. Financial closure would imply firm commitments for financing the entire project, with all pre-disbursement conditions having been fulfilled and the loan documentation being complete. 16.4 The project should be made operational within 24 to 60 months (depending on the capacity of the project and as specified in the IA) from the date of Financial Closure. 16.5 The failure to reach the milestone mentioned in 16.1 above will result in automatic cancellation of the allotment of the site and forfeiture of upfront premium amounts. No compensation would be payable to the IPPs/Users society in such instance. 16.6 The failure to reach to milestone as in 16.2 above would result in a liability to pay penalty by the IPP to the GOB, computed at the equivalent royalty revenue that would have been payable to the GOB had the project met the milestone. In case the project enjoys an exemption from royalty in the initial years, the duration of royalty exemption would be reduced by the period of delay.

( 13 ) 16.7 The IPP may surrender the allotment back to GOB if on completion of the DPR, within the stipulated time frame, if it has grounds to establish that the project is not techno-economically viable. On such surrender, the GOB would refund any premium amount paid by the IPP till the date of surrender. 17 Due Diligences 17.1 The applicant/ipp shall be responsible for carrying out due diligence with regard to his compliance responsibilities under various applicable Central/State/other laws, rules and regulations, and ensure compliance with the same. 18 Over riding condition : 18.1 Government of Bihar reserve the right to withdraw award of project/stopped operation of project in case the pattern of use of water changes in the locality due to municipal/irrigational /environmental reasons etc. 18.2 The Government or its authorised representative will have right to inspect the power stations to ensure implementation of statutory norms like labour rules/safety/operation norms etc.. 18.3 The project developer will have no right for consumptive use of water unless it is specifically mentioned in the contract or separately allowed by competent authority. 18.4 In case situation arises leading to any of the above condition, the State Government will have right to takeover the power projects for operation by Government Agency or renegotiate the terms with the Developer after due compensation.

( 14 ) 19. General Condition : This policy supersedes all the policy guideline instructions issued in past including earlier hydro energy policy, 2003. Notwithstanding anything contained in the forgoing sections the Government of Bihar reserves the right to modify/amend/relax/issue clarifications in this policy guideline. The interpretation by Govt. of Bihar on any clause/matter contained in this policy documents shall be final and binding to all concern. By order of the Governor of Bihar, Principal Secretary (Energy) Govt. of Bihar