Project Evaluation and Programming I Project Evaluation

Similar documents
Project Evaluation and Programming II Programming

ST2 Update Benefit-Cost Analysis

I-75 at Overpass Road Interchange

1.133 M.Eng. Concepts of Engineering Practice Fall 2007

Public vs. Private Projects

Draft Environmental Impact Statement. Appendix G Economic Analysis Report

House Bill 20 Implementation. House Select Committee on Transportation Planning Tuesday, August 30, 2016, 1:00 P.M. Capitol Extension E2.

32 nd Street Corridor Improvements

Transportation Economics and Decision Making. Lecture-11

Project Evaluation. Carl D. Martland Senior Research Associate Dept. of Civil & Environmental Engineering

HRTPO TTAC RECOMMENDATIONS ON THE HB2 PRIORITIZATION PROCESS

Economic Impact of Public Transportation Investment 2014 UPDATE

Freight Rail Improvements Oklahoma City to Shawnee TIGER Grant Application Benefit Cost Analysis Technical Memo October 2009

Impact of Next Generation Infrastructure on Australian Cities

INVESTMENT STRATEGIES

Engineering Risk Benefit Analysis

1.011Project Evaluation: Comparing Costs & Benefits

PROJECT CRITERIA: ECONOMIC VIABILITY AND PROJECT ALTERNATIVES

Cost Benefit Analysis Methodology Procedures Manual 3. Principles of Cost Benefit Analysis 3.1. Introduction. 3.2 Project Identification

I-44/US-75 Interchange and Related Improvements on I-44 in Tulsa County

Enterprise Risk Management Integrated Framework

ECONOMIC ANALYSIS. Table 1: Total Cost Estimate (Economic Costs) (CNY million)

DRAFT. Relationship of Asset Condition Rating to Transit System Performance. Prepared for. Transportation Research Board

Session 1.2 Discounting and Project Alternatives. Introductory Course on Economic Analysis of Investment Projects

Impacts of Amtrak Service Expansion in Kansas

Economic Analysis Concepts

APPENDIX E: ATM MODEL TECH MEMORANDUM. Metropolitan Council Parsons Brinckerhoff

Performance-Based Planning and Programming Why Is It Important? Northwest TTAP and BIA Symposium Portland, OR March 17, 2015

Bottom Line Series. Delineates Investment requirements for highways, bridges and transit; prepared for AASHTO and APTA and;

NCHRP Consequences of Delayed Maintenance

2017 UNIFIED TRANSPORTATION PROGRAM AND HB 20 IMPLEMENTATION

Review of Financial Analysis Terms

Highway Engineering-II

2. Basic Concepts In Project Appraisal [DoF Ch. 4; FP Ch. 3, 4, 5]

Chapter 10 Equity and Environmental Justice

PRINCIPLES OF FINANCIAL APPRAISAL

2045 Long Range Transportation

Public Transportation and the Nation s Economy

Cost Benefit Analysis (CBA) Economic Analysis (EA)

MEMORANDUM. June 21, 2018 Boston Region MPO Sandy Johnston, UPWP Manager Proposed Federal Fiscal Year (FFY) 2018 UPWP Amendment 1

What Is a Project? How Do We Justify a Project? 1.011Project Evaluation: Comparing Costs & Benefits Carl D. Martland

Applying COSO s Enterprise Risk Management Integrated Framework. September 29, 2004

Economic Appraisal Objectives

Purpose. 2 Third Crossing Business Plan

Chapter 8: Lifecycle Planning

Benefit-Cost Analysis Guidance for Discretionary Grant Programs

Prioritization and Programming Process. NCDOT Division of Planning and Programming November 16, 2016

A Benefit Cost Analysis of the 45th Street at Calumet Avenue Grade Separation Project. Presented to the Town of Munster

Cost-benefit analysis in the context of EU Cohesion funding - tools, methodology and available support

Strengthening Vermont s Economy by Integrating Transportation and Smart Growth Policy

RESEARCH RESULTS DIGEST March 2001 Number 252

ECONOMIC AND FINANCIAL ANALYSIS

Stephen Gaj Leader, Asset Management Team Office of Asset Management, Pavements, and Construction FHWA

Performance-based Planning and Programming. white paper

Project Appraisal and Selection

Applying COSO s Enterprise Risk Management Integrated Framework

JACKSONVILLE URBAN AREA METROPOLITAN PLANNING ORGANIZATION UNIFIED PLANNING WORK PROGRAM AMENDMENT 1 FISCAL YEAR 2018 TABLE OF CONTENTS

ACTION ELEMENT CONCLUSIONS

ASSEMBLY, No STATE OF NEW JERSEY. 217th LEGISLATURE INTRODUCED FEBRUARY 16, 2016

Chapter 6. Transportation Planning and Programming. Chapter 6

1 Introduction This TAG Unit provides background material on a number of aspects of cost benefit analysis. The topics covered are:

Benefit Cost Analysis for the San Juan Multi-Modal Transportation System: Infrastructure and Safety Improvements

2040 Long Range Transportation Plan. Financial Summary

TRANSPORTATION RESEARCH BOARD. Straight to Recording for All: Resource Allocation among Programs of Work

Overview of the Final New Starts / Small Starts Regulation and Frequently Asked Questions

2017 UNIFIED TRANSPORTATION PROGRAM AND HB 20 IMPLEMENTATION

Title here Briefing on Trans-Sierra Transportation Plan, Transit Connectivity and Statewide Plan Preview Monday, September 15, 2015 Reno, NV

MOVING FROM EVALUATION TO VALUATION

Implementing the MTO s Priority Economic Analysis Tool

Corporate Finance, Module 4: Net Present Value vs Other Valuation Models

Appendix C: Economic Analysis of Natural Hazard Mitigation Projects

Adaptation Assessment: Economic Analysis of Adaptation Measures

Cost Risk Assessment Building Success and Avoiding Surprises Ken L. Smith, PE, CVS

Exam 1 Review Problems

Safety Target Meeting Summary 10/3/2017

Sound Transit 2 Benefit-Cost Analysis Methodology Report. with Analysis Results. Prepared for: Sound Transit. Prepared by: PB Consult

Fire Australia 2017 Quantification of Fire Safety Fire Safety Engineering Stream

National Flood Insurance Program (NFIP)

The Economic Impact of Northern Virginia Transportation Authority Capital Investment

Modal Split. Lecture Notes in Transportation Systems Engineering. Prof. Tom V. Mathew. 1 Overview 1. 2 Mode choice 2

RTI Release. Project Budget Proposal Strategic Transport Planning Transport Planning & Strategy Brisbane Infrastructure

HB2 and HB1887 Update

MEMORANDUM. For the purpose of this analysis, a No Build Alternative and a Build Alternative were under consideration.

I-81 Corridor Improvement Plan. October 2018 Public Meetings

QUESTIONS FOR APPROPRIATORS

Mass Transit Return on Investment

INVESTING STRATEGICALLY

PART A: THE PALESTINIAN ENVIRONMENTAL ASSESSMENT POLICY. A policy to establish an environmental assessment process in Palestine

Life-Cycle Cost Analysis: A Practitioner s Approach

Georgia Department of Audits and Accounts Performance Audit Division

Department of Defense INSTRUCTION

Department of Defense INSTRUCTION

A New Cost-Benefit Methodology for Highway-Railway Grade Crossing Safety Programs

Question: Insurance doesn t have much depreciation or inventory. What accounting methods affect return on book equity for insurance?

CSA Staff Notice Report on Climate change-related Disclosure Project

ARIZONA DEPARTMENT OF ADMINISTRATION RISK MANAGEMENT DIVISION FISCAL YEAR 2009 ANNUAL REPORT

Cost Benefit Analysis TAG Unit 3.5.4

Economic Evaluation. Objectives of Economic Evaluation Analysis

Session 3: Construction Finance and Global Financial Market. Professor Fred Moavenzadeh

Job Safety Analysis Preparation And Risk Assessment

Transcription:

Project Evaluation and Programming I Project Evaluation presented to MIT 1.201 Class presented by Lance Neumann Cambridge Systematics, Inc. November 20, 2008 Transportation leadership you can trust. Outline Lecture 1 Project Evaluation Objectives of project evaluation Review of basic concepts Economic evaluation approaches Benefit-cost analysis Other evaluation approaches Project evaluation in the real world Summary 1 1

Outline (continued) Lecture 2 Investment Planning and Programming Objectives of programming Program structure Investment planning/programming framework Condition assessment and needs Levels of analysis Revisit benefit-cost analysis Priority setting and program tradeoffs Investment planning support tools 2 Outline (continued) Lecture 2 (continued) Examples Case Study Conclusions 3 2

Objectives of Project Evaluation Consistent comparison of project costs, benefits, and impacts Provide basis for deciding on the best alternative for a project and choosing among a set of projects Transparency provide understanding of what factors drive project value 4 Basic Questions in Project Evaluation Is the project worthwhile? Are the benefits greater than the cost? Is this the best way to achieve these benefits? Can similar benefits be achieved more efficiently by another option? 5 3

Basic Concepts Project evaluation not done in a vacuum part of broader planning, programming, and budgeting process Types of projects and project tradeoffs can vary widely and require different evaluation methods Project development/design and evaluation typically are iterative not one-shot For public sector projects there are typically many stakeholders and perspectives involved in evaluating project alternatives for large/complex projects 6 Project Evaluation Key Element of Broader Planning Process Project Development Planning/Programming Process Establish Broad Evaluation Criteria Policy Goals and Objectives Mobility, Safety, Environment, Equity Identify Needs and Candidate Projects Evaluate and Select Specific Projects for Funding Fund Project Development Phases Alternative Analysis Design Evaluation/EIS Construction Long-Range System Planning 20-year Horizon Presentation, Operations, Capacity Expansion Programming Project Evaluation and Selection Phases of Project Development Budgeting Project and Program Implementation Stakeholder Input 7 Post Implementation Evaluation System Operations and Monitoring 4

Typical Steps in Project Development Identification of problems and deficiencies Identification of options Design Financial analysis Economic analysis Environmental impact assessment Public hearings 8 5

Types of Projects and Evaluation Methods System preservation most cost effective strategy to maintain pavement condition or fleet availability/reliability Technical/engineering factors dominate Tools asset management systems, least life-cycle cost Improve highway capacity/service in a corridor Mobility, cost, and broader environmental/social impacts Classic case for benefit-cost analysis as one tool Improve multimodal service in corridor Wide range of evaluation tools and impacts 10 Project Economic Evaluation 11 6

Topics for Discussion Economic evaluation versus financial analysis Analysis timeframe and discounting Discount rate versus inflation Typical benefits and costs Economic development benefits Evaluation criteria and incremental B/C analysis Sensitivity analysis Limitations 12 Economic Evaluation versus Financial Analysis Economic evaluation and financial analysis are different Both need to be considered in assessing a project s desirability and feasibility How a public sector project is financed does not affect whether it is a good investment, but will affect whether and when it can be implemented 13 7

Economic Evaluation Key issue Is the project a good investment? Objective Compare economic costs to economic benefits 14 Financial Analysis Key issue How will the project be financed (capital and operating) Objective Assess the financial feasibility of the project Impact on cash flow and revenue streams (varies depending on financing strategy current revenue versus bonding) Eligibility for various funding programs/sources Fiscal impact analysis long-term impact of project on tax revenues 15 8

Analysis Timeframe and Discounting Need to select an analysis timeframe that captures significant benefits and costs (typically 20-30 years) Benefits and costs after 25 years are heavily discounted and can be captured in a residual value Need to define the time stream of all benefits and costs of the base case (no-build) and the proposed improvement Benefit and cost time streams need to be discounted to the present to provide fair basis for comparison 16 Time Stream of Benefits and Costs of a Typical Transportation Project Millions of Dollars 50 40 30 20 10 0-10 -20-30 -40 Year 17 9

Evaluating Time Stream of Benefits and Costs Key concepts Time value of money Net present value Discount rate 18 Time Value of Money $1 today is worth more than $1 next year because it can be invested. How much more it is worth depends upon the available investment opportunities Invested at i% per year interest, $1 will be worth (1+i) t after t years Similarly, $1 at the end of t years is equivalent to having $1/(1+i) t today and investing it at i% 19 10

Net Present Value Present Value (PV) of future amount (A) at time t: PV = A (1+i) t Net Present Value (NPV) is present value of all future costs and benefits NPV = B(t)-C(t) t (1+i) t NPV > 0 Project provides better return than an investment at i% for life of project NPV < 0 Project not economically justified at i% 20 NPV of $1 Received at Time t 5 yrs 10 yrs 20 yrs 50 yrs 100 yrs 1% 0.95 0.91 0.82 0.61 0.37 5% 0.78 0.61 0.38 0.088 0.0076 10% 0.62 0.038 0.15 0.0085 0.000072 20% 0.40 0.16 0.026 0.00011 0.00000001 Nigel H.M. Wilson 21 11

Discount Rate Discount rate represents the time value of money Opportunity cost of using funds for a project versus other competing investment opportunities For public sector projects it reflects opportunity costs of taking funds out of the private economy Selecting a discount rate is key assumption for benefitcost analysis Higher the rate the tougher it is for a project to be economically justified since costs typically are incurred in early years (and less heavily discounted) while benefits occur over longer timeframe 22 Discount Rate (continued) Low rates favor large projects with long-term benefits. High rates require quicker payback Greater project risks (costs, benefits, timing, etc.) require higher discount rates Project owners/sponsors can be very sensitive to selection of a discount rate Real discount rates (applied to benefits and costs in constant dollars) in 4-10% range typical. U.S. OMB recommends 7% for public projects 23 12

Discount Rate versus Inflation Discount rate represents time value of money Inflation rate is the decrease in buying power over time Easiest way to avoid confusion is to express costs and benefits in constant dollars (inflation doesn t enter analysis in this case) and use a real discount rate If benefits and costs expressed in year of expenditure terms then nominal discount rate must be used. Nominal rate is higher than real rate by approximately the annual rate of inflation 24 Evaluating Benefits and Costs Willingness to pay/consumer surplus Impact of pricing Typical benefits and costs 25 13

Consumer Surplus/Willingness to Pay Generalized Price P 1 = Current Price P 2 = Price with New Project P C = Congestion Price A + B = Consumer Surplus at Price P 2 P 1 P 1 A B P 2 V 1 V C V 2 Volume 26 Capacity Expansion and Congestion Pricing Small/Verhoef discuss impact of pricing on the demand for, and economic benefits of, new capacity Congestion price may decrease induced demand or shift time of travel etc. Congestion price may also impact operating capacity or vehicle thru put Theoretical impact of pricing assumes efficient pricing on entire network- a condition not likely to be present in most cases 27 14

Typical Benefits and Costs 28 Costs Initial capital costs Periodic rehabilitation/repair Ongoing maintenance and operating Benefits Travel time savings Vehicle operating cost savings Accident cost savings Selected externalities Residual value (if relevant) Benefit Valuation Travel time value of time varies by Trip purpose Trip segment (walk, wait, in-vehicle, etc.) Auto versus truck Socioeconomic group Relative time savings (5-minute saving for 20-minute trip versus 1-hour trip) Accident cost (property damage, personal injury, fatality) Externalities (air pollution, noise, etc.) Obvious limitation on what impacts can be included in economic benefit-cost analysis 29 15

Economic Development Benefits Analysis methods have been developed to translate user cost savings for trucks/freight movements into broader economic benefits using regional economic models Freight user cost savings are translated into a change in the cost of doing business for industries affected Business cost savings are input to regional economic model to generate regional impacts on gross regional product, income etc. Either direct user benefits OR regional economic benefits can be incorporated into benefit-cost analysis but NOT both. Using both would be double counting 30 Evaluation Criteria Net present value: discounted benefits discounted costs Benefit cost ratio: discounted benefits/discounted costs Internal rate of return: discount rate that makes discounted benefits = discounted costs (higher the rate the better) Payback period: number of years for benefits to equal costs (more relevant for private sector projects) 31 16

Incremental Benefit-Cost Analysis If W,X,Y,Z are independent projects Benefits B=C - W,X,Y economically justified B/C >1 - Z not justified B/C <1 ΔY B ΔX B W X Y Z If W,X,Y,Z are alternatives for the same project - W,X,Y justified - X is best W B / W c >1 B/C ratio W B ΔX B / ΔX C >1 incremental B/C ratio moving from option W to X W C ΔX C ΔY C Costs ΔY B / ΔY C <1 incremental B/C ratio moving from option X to Y 32 Sensitivity Analysis It s always good practice to test the sensitivity of benefitcost results to various assumptions and inputs including Cost factors Benefit factors or rates (e.g., value of time, etc.) Discount rate Analysis timeframe including residual value assumptions If varying assumptions over a reasonable range doesn t make B/C<1 or change the rank order of the alternatives being considered, you can have confidence in the results 33 17

Limitations of Benefit-Cost Analysis All impacts of many transportation projects cannot be reduced to dollar terms Incidence of benefits and costs on different socioeconomic groups or geographic areas not addressed (it is possible to summarize some benefits and costs by market segment) Results sensitive to key assumptions and can be easily manipulated Bottom line benefit-cost analysis is a useful tool but is only one element of a comprehensive evaluation for most projects 34 Other Evaluation Approaches 35 In real world evaluation of large complex transportation projects involves a messy mix of information including Transportation impacts and benefits Costs Full range of impacts Safety Natural environment (air, noise, wetlands, etc.) Social and community impacts Land-use and economic development Equity and incidence of impacts Stakeholder views and degree of consensus Financial feasibility 18

Other Evaluation Approaches (continued) A full summary of project impacts likely to include quantitative and qualitative information. Some of the quantitative information can be included in a benefit-cost analysis Challenge how to display and communicate key project impacts to decision-makers and other stakeholders Visualization and simulation tools providing new capabilities to describe and communicate project impacts 36 Legal and Regulatory Environment for Project Evaluation Many project evaluation requirements are defined in statute and regulation in U.S. These include Environmental impact statement (NEPA and state law) Clean air Historic preservation Endangered species Parkland protection (Section 4(f)) Access for disabled Civil rights (environmental justice related to distribution of impacts) 37 19

Legal/Regulatory (continued) Notably, in most cases, benefit-cost analysis is not required in U.S. with some exceptions (FTA New Starts). Next Federal reauthorization may address this issue Use of benefit-cost analysis much more common internationally and in developing country environments where projects funded by international aid/funding organizations Post project evaluation (to confirm whether predicted impacts actually occurred) seldom done in U.S. though not uncommon in some countries (Japan, Australia) 38 Conclusions Rigorous project evaluation is a key component of the decision-making process Objective is to provide comprehensive summary of all key project impacts Many tools and approaches available to support project evaluation including benefit-cost analysis Challenge is summarizing key differences among project alternatives in an effective manner While decision informed by good technical information, choices are fundamentally policy and political in nature 39 20

MIT OpenCourseWare http://ocw.mit.edu 1.201J / 11.545J / ESD.210J Transportation Systems Analysis: Demand and Economics Fall 2008 For information about citing these materials or our Terms of Use, visit: http://ocw.mit.edu/terms.