Marin Clean Energy 2016 Open Season Procurement Process Procedural Overview & Instructions

Similar documents
MARIN ENERGY AUTHORITY REQUEST FOR PROPOSALS

VALLEY CLEAN ENERGY ALLIANCE. Staff Report Item 12. Mitch Sears, Interim General Manager Gary Lawson, Sacramento Municipal Utility District (SMUD)

Request for Offers. July 17, Subject: PG&E s Request for Offers ( RFO ) for 2014 Resource Adequacy ( RA ) and Import Energy

We Energies. Request for Proposal Renewable Energy Supply 2014

REQUEST FOR PROPOSALS FOR LONG-TERM CONTRACTS FOR RENEWABLE ENERGY PROJECTS

2013 Greenhouse Gas Offset Credit Request for Offers Protocol

D Los Angeles ""VV Department of

Request for Proposals. Renewable Resources (2016R RFP) ISSUED: Monday, April 11, DUE DATE: Friday, May 20, :00 PM PPT

Procurement and Risk Management Update. Presented to RCEA Board of Directors October 16, 2017

PENINSULA CLEAN ENERGY JPA Board Correspondence

Dominion Energy Virginia

H 7991 SUBSTITUTE A ======== LC005162/SUB A/4 ======== S T A T E O F R H O D E I S L A N D

MARIN ENERGY AUTHORITY

April 6, 2016 Advice Letter: 4803-E

RENEWABLE MARKET ADJUSTING TARIFF POWER PURCHASE AGREEMENT

MISSOURI SERVICE AREA

Energy Risk Management Policy

KEEGAN WERLIN LLP. ATTORNEYS AT LAW 99 HIGH STREET, Suite 2900 BOSTON, MASSACHUSETTS 02110

VALLEY CLEAN ENERGY ALLIANCE COMMUNITY CHOICE AGGREGATION IMPLEMENTATION PLAN AND STATEMENT OF INTENT

August 25, Advice Letter 4677-E

Schedule GTSR-CR Sheet 1 GREEN TARIFF SHARED RENEWABLES COMMUNITY RENEWABLES

APPENDIX B: WHOLESALE AND RETAIL PRICE FORECAST

2013 RPS Solicitation Request for Proposals Conference. January 13, 2014

APPENDIX D POWER PURCHASE AGREEMENT COVER SHEET

FEED-IN TARIFF STANDARD FORM POWER PURCHASE AGREEMENT BETWEEN SACRAMENTO MUNICIPAL UTILITY DISTRICT AND

Portland General Electric Company Sheet No SCHEDULE 201 QUALIFYING FACILITY 10 MW or LESS AVOIDED COST POWER PURCHASE INFORMATION

Appendix A. Glossary. For Request For Proposals For Long-Term Developmental and Existing Capacity and Energy Resources

Southern California Edison s Renewable Auction Mechanism (RAM) Program. June 6, 2014 EPRG Workshop on Distributed Generation and Smart Connections

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

83C Questions and Answers

Ceiling Price: The procurement ceiling price of $ per kilowatt-hour ( kwh ), as established in 225 C.M.R (3)(a)4.

Hydroelectric Plant Acquisition Study for Azusa Light & Water

Bioenergy Renewable Auction Mechanism (BioRAM) Request for Offers

BIOENERGY MARKET ADJUSTING TARIFF POWER PURCHASE AGREEMENT

Risk Assessment of Participation in the Marin Clean Energy Community Choice Aggregation Program On Behalf of the City of Benicia

Schedule GTSR-GR Sheet 1 GREEN TARIFF SHARED RENEWABLES GREEN RATE

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA COMMENTS OF THE CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION

November 12, 2015 SPECIFIED STATE AGENCIES AND ELECTRIC DISTRIBUTION COMPANIES IN CONNECTICUT, MASSACHUSETTS AND RHODE ISLAND

Prototype Wind PPA Term Sheet

Memorandum. Jennifer Cregar, Co-Division Chief, Sustainability, County of Santa Barbara

SUBJECT: Submission of the El Cabo Contract for Procurement of Renewable Energy From SCE s 2014 Renewables Portfolio Standard Solicitation

PacifiCorp Utah All Source Request for Proposal 2016 Resource. Issued January 6, 2012 Responses May 9, 2012

OREGON STANDARD AVOIDED COST RATES AVOIDED COST PURCHASES FROM ELIGIBLE QUALIFYING FACILITIES Page 1

PacifiCorp. Transferred Frequency Response Request for Proposals (2017 TFR RFP) ISSUED: Thursday, January 12, 2017 DUE DATE: Tuesday, January 24, 2017

Bidding Rules for the Auctions Under the Competitive Bidding Process of Ohio Power Company

The following words and terms shall have the following meanings when used in this Tariff:

FINANCIAL STATEMENTS. Years Ended March 31, 2017 & 2016 with Report of Independent Auditors. mcecleanenergy.org

Solicitation Protocol

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

DUKE ENERGY OHIO REQUEST FOR PROPOSALS FOR PEAKING/INTERMEDIATE POWER SUPPLY IN RESPONSE TO OHIO SENATE BILL 221

83D Questions and Answers

FINANCIAL STATEMENTS. Years Ended March 31, 2018 & 2017 with Report of Independent Auditors. mcecleanenergy.org

PUBLIC UTILITY DISTRICT OF CLARK COUNTY REQUEST FOR PROPOSAL NO. REC-001

Business Practice Manual For. Generator Management. Version 8

SUBJECT: Submission of Contract for Procurement of Renewable Energy from SCE's 2013 Renewables Portfolio Standard Solicitation

2014 Greenhouse Gas Offset Credit Request for Offers

October 30, Advice 2839-E-A (Pacific Gas and Electric Company U 39 E) Public Utilities Commission of the State of California

Illinois Power Agency. Ameren Illinois Company

PacifiCorp. Request for Proposal. Solar Resources (RFP 2015S) ISSUED: May 27, DUE DATE: July 20, 2015

REQUEST FOR PROPOSALS FOR LONG-TERM CONTRACTS FOR CLEAN ENERGY PROJECTS

SCHEDULE VNM-A-ST Sheet 1

SUBJECT: Submission of Contract for Procurement of Renewable Energy from SCE's 2013 Renewables Portfolio Standard Solicitation

JOSEPH A. HOLTMAN - ELECTRIC. 1 Q. Please state your name, title, employer and business. 4 Electricity Supply for Consolidated Edison Company of

RECOMMENDED PRINCIPLES AND BEST PRACTICES FOR STATE RENEWABLE PORTFOLIO STANDARDS

POWER PURCHASE AND SALE AGREEMENT. between [BUYER S NAME] and [SELLER S NAME] (ID #[Number])

Solicitation Protocol

NEW HAMPSHIRE CODE OF ADMINISTRATIVE RULES. CHAPTER Puc 2000 COMPETITIVE ELECTRIC POWER SUPPLIER AND AGGREGATOR RULES

Smart Grid Compressed Air Energy Storage Demonstration Project Request for Offers

POWER PURCHASE AGREEMENT COVER SHEET

REQUEST FOR PROPOSAL FINANCIAL AUDITING SERVICES

DRAFT REQUEST FOR PROPOSALS BY THE ARIZONA POWER AUTHORITY FOR SCHEDULING SERVICES AND/OR USE OF HOOVER DAM DYNAMIC SIGNAL.

FINANCIAL STATEMENTS. Years Ended March 31, 2016 & 2015 with Independent Auditors' Report

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

SUBJECT: Submission of the Garland Contract for Procurement of Renewable Energy from SCE's 2014 RPS Solicitation

SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY Request for Proposals for Energy Exchange and Energy Marketing/Off-taking Services

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Financing Utility Scale Solar

PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE, d/b/a Eversource Energy REQUEST FOR PROPOSALS FOR POWER SUPPLY FOR ENERGY SERVICE

Comments of Pacific Gas & Electric Company Energy Imbalance Market Draft Tariff Language

Appendix B-2. Term Sheet for Tolling Agreements. for For

To approve and provide input on key start-up activities toward a targeted April 2018 launch for the first phase of San Jose Clean Energy customers.

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

Reverse Request for Proposal for Renewable Energy Credits ( RFP ) PacifiCorp is proposing to sell unbundled and or bundled RECs in this RFP.

REQUEST FOR PROPOSAL

SUBJECT: Submission of Contract for Procurement of Renewable Energy from SCE's 2013 Renewables Portfolio Standard Solicitation

15.4 Rate Schedule 4 - Payments for Supplying Operating Reserves

Power Purchase Agreements between National Grid and Cape Wind Associates, LLC D.P.U

AN ACT. Be it enacted by the General Assembly of the State of Ohio:

Schedule NEM-V Sheet 1 VIRTUAL NET ENERGY METERING FOR MULTI-TENANT AND MULTI-METER PROPERTIES

COUNTRY SUPPLEMENT MALAYSIA TO BE READ IN CONJUNCTION WITH GLOBAL TERMS AND CONDITIONS OF PURCHASE

Amended Solicitation Plan for the Purchase and Sale of Connecticut. Class I Renewable Energy Credits. from Low and Zero Emission Projects

California Independent System Operator Corporation

WASN Operations Business Procedure OASIS COVER PAGE

SCHEDULE NEM-V-ST Sheet 1

Southern California Edison Company s Tehachapi Renewable Transmission Project (TRTP) -- Application Appendices. Application Nos.: Exhibit No.

PG&E s Bidders Webinar

Business Practice Manual For. Generator Management. Version Revision Date: August 7September 8, Page i

ELECTRIC SCHEDULE E-CHP Sheet 1 (N) COMBINED HEAT AND POWER PPA

Community Choice Aggregation

Transcription:

1) Introduction: Marin Clean Energy ( MCE ) has made a commitment to procuring increasing amounts of renewable and carbon-free energy for its customers. In fact, MCE s default retail service option, Light Green, provides participating customers with a minimum 50 percent renewable energy ( RE ) content as well as additional carbon-free supply. Beginning in 2016, MCE will increase its annual renewable energy purchases with the goal of supplying Light Green customers with a minimum 80 percent renewable energy by 2025. Over the same ten-year period, MCE will incrementally increase its overall carbon-free energy content to 95 percent of all customer energy deliveries. Also commencing in 2016, MCE s voluntary 100 percent renewable energy service option, Deep Green, which is certified under the Center for Resource Solutions Green-e Energy program, will consist of primarily bundled RE products. As part of its ongoing effort to deliver environmentally responsible, competitively priced retail service options, MCE has established an annual Open Season Procurement Process ( Open Season ). The Open Season provides a competitive, objectively administered opportunity for qualified suppliers of various energy products to fulfill certain portions of MCE s future resource requirements. The specific energy products requested through the Open Season may vary from year to year in consideration of MCE s ongoing integrated resource planning process MCE s annual integrated resource planning cycle, which commences with the development and approval of MCE s Integrated Resource Plan each Fall, quantifies future resource requirements across a broad spectrum of energy products, including shaped energy, resource adequacy capacity, renewable energy and carbon-free energy. Certain of these future requirements are solicited through MCE s Open Season. Because of MCE s near-term need for additional bundled RE products in 2016 through 2018, MCE is advancing the commencement of its current Open Season process, initiating requests for offers in December, 2015 (rather than February, 2016). Conforming offers for requested products must be submitted in consideration of the following schedule: Product Offers Due A. PCC1 ( Bucket 1 ) deliveries commencing in 2016 Monday, January 11, 2016 B. PCC1 ( Bucket 1 ) deliveries commencing in 2018 or later Tuesday, March 1, 2016 C. PCC3 ( Bucket 3 ) deliveries commencing in 2016 Tuesday, March 1, 2016 D. PCC2 ( Bucket 2 ) deliveries commencing in 2016 Monday, May 2, 2016 E. Carbon-Free Energy: deliveries commencing in 2016 Monday, January 11, 2016 By participating in MCE s Open Season process, a respondent acknowledges that it has read, understands, and agrees to the terms and conditions set forth in this. MCE reserves the right to reject any offer that does not comply with the requirements identified herein. Furthermore, MCE may, in its sole discretion and without notice, modify, suspend, or terminate the Open Season without liability to any organization or individual. The Open Season does not constitute an offer to buy or create an obligation for MCE to enter into an agreement with any party, and MCE shall not be bound by the terms of any offer until MCE has entered into a fully executed agreement. Instructions for participating in the 2016 Open Season, including requested products and volumes are described below. 2) Standardized Response Template: All respondents must complete the current Standardized Response Templates ( Templates ) provided by MCE. Unique Templates have been prepared for certain requested

products, and respondents should carefully review available Template options to ensure submittal of conforming responses. MCE will post the Templates on its website (http://mcecleanenergy.org/energyprocurement/) and will require respondents to independently access and download the Templates prior to response preparation. An unmodified version of the appropriate Template must be completed in its entirety based on instructions provided in the Template. MCE may update the Templates from time to time, so respondents are encouraged to periodically visit MCE s website to determine if any changes have been incorporated in the Templates. Only submittals of the currently applicable Templates will be reviewed. 3) Request for Renewable Energy: Based on MCE s most recent planning process, the following renewable energy product requirements have been identified 1 : Marin Clean Energy Resource Balance Dec-15 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Energy Requirements (GWh) Retail Load 1,857 1,870 1,884 1,897 1,911 1,924 1,938 1,951 1,965 1,969 Renewables Open Position (GWh) Portfolio Content Category 1 45 31 44 425 473 515 563 610 658 705 Portfolio Content Category 2 188 254 268 283 299 314 328 343 357 371 Portfolio Content Category 3 58 58 58 58 58 58 58 58 58 58 Total Renewables Open Position (GWh) 290 342 370 766 829 887 949 1,011 1,072 1,134 * All volumes are presented as gigawatt hours/year. RPS open positions are based on MCE s internal renewable procurement targets, which exceed state-wide mandates. All proposed generating resources must be certified by the California Energy Commission ( CEC or Commission ) as Eligible Renewable Energy Resources (or must receive CEC certification prior to the commencement of any energy deliveries proposed in the appropriate response Template), as set forth in applicable sections of the California Public Utilities Code ( Code ), which may be amended or supplemented from time to time. Each respondent shall be responsible for certification of the proposed resource through the applicable process administered by the CEC and shall be responsible for maintaining such certification throughout the contract term. With regard to MCE s requested Portfolio Content Category 1 ( Bucket 1 ) volumes, the following specifications will apply: 1 MCE may have energy requirements that extend beyond the forecast period presented in this table. Respondents are encouraged to follow Open Season guidelines when proposing contract term lengths.

A. Bucket 1-Eligible Renewable Energy (deliveries commencing in 2016): i. Resource Location: The point of physical interconnection for any eligible generator must be within the area generally termed NP15, as defined by the CAISO. Evaluative preference will be given to any resource located within 100 miles of MCE s service territory. ii. Product: Electric energy, Green Attributes/Renewable Energy Credits and Capacity Attributes (if available). iii. Resource Eligibility: All deliveries shall meet minimum specifications for the PCC1 as described in the Code and applicable regulations. iv. Generating Capacity: Minimum one (1) megawatt ( MW ), AC. v. Annual Delivery Specifications: Delivered energy volumes shall be limited to the noted annual open position for Bucket 1 resources. Maximum annual deliveries for proposed deliveries after the 2025 calendar year may not exceed specified volumes for Bucket 1 resources identified for the 2025 calendar year (705 GWh, shown in the above table). vi. Initial Date of Delivery: No sooner than January 1, 2016. vii. Term of Agreement: Not less than one (1) years and not more than twenty five (25) years, commencing on the Initial Date of Delivery. viii. Proposed Pricing: Each response must include product pricing under option a below but may include pricing under option b: a. Index Plus REC Premium A single fixed REC premium for each MWh of electric energy delivered from the proposed resource plus the hourly day-ahead market clearing price per MWh. The REC premium price shall remain constant throughout the entire contract term and shall not be adjusted by periodic escalators or time of delivery adjustments. Respondents may propose alternative pricing options so long as both aforementioned pricing requirements have been satisfied. b. Fixed Price - A single, flat price for each MWh of electric energy delivered from the proposed resource. This energy price shall remain constant throughout the entire contract term and shall not be adjusted by periodic escalators or time of delivery adjustments. This energy price shall include procurement of the energy commodity, all Green Attributes/Renewable Energy Credits related thereto, Capacity Attributes (if available), transmission charges to the delivery point, including but not limited to CAISO imbalance costs, fees and penalties as well as scheduling fees associated with delivered energy volumes. Alternative pricing options may be proposed so long as the aforementioned single flat pricing requirement has been satisfied. ix. Point of Delivery: Respondents may propose product delivery under one of the following options:

a. Respondent shall be financially and operationally responsible for delivery of all electric energy to the NP15 trading hub, as defined by the CAISO [TH_NP15_GEN- APND]. Respondent shall serve as its own scheduling coordinator or make arrangements for a third party scheduling coordinator at no cost to MCE. b. Respondent shall be financially and operationally responsible for delivery of all electric energy to the generator s applicable production node. MCE shall serve as its own scheduling coordinator, or make arrangements for a third party scheduling coordinator at MCE s sole expense, scheduling all electric energy from the generator s applicable production node. x. Minimum Development Progress: To the extent that a proposed generating resource is not yet commercially operational, documentation substantiating achievement of the following development milestones must be provided by the respondent for each eligible generator, including: 1) evidence of site control; and 2) evidence that respondent has submitted a generator interconnection application to the appropriate jurisdictional entity; provided, however, that if respondent has completed interconnection studies or executed an interconnection agreement, as applicable, respondent should provide copies of such materials, including applicable appendices. Such documentation must be provided to MCE at the time of Template submittal. B. Bucket 1-Eligible Renewable Energy (deliveries commencing in 2018 or later): i. Resource Location: The point of physical interconnection for any eligible generator must be within the area generally termed NP15, as defined by the CAISO. Evaluative preference will be given to any resource located within 100 miles of MCE s service territory. ii. Product: Electric energy, Green Attributes/Renewable Energy Credits and Capacity Attributes (if available). iii. Resource Eligibility: All deliveries shall meet minimum specifications for the PCC1 as described in the Code and applicable regulations. iv. Generating Capacity: Minimum one (1) megawatt ( MW ), AC. v. Annual Delivery Specifications: Delivered energy volumes shall be limited to the noted annual open position for Bucket 1 resources. Maximum annual deliveries for proposed deliveries after the 2025 calendar year may not exceed specified volumes for Bucket 1 resources identified for the 2025 calendar year (705 GWh, shown in the above table). vi. Initial Date of Delivery: No sooner than January 1, 2018. vii. Term of Agreement: Not less than two (2) years; and not more than twenty five (25) years, commencing on the Initial Date of Delivery.

viii. Proposed Pricing: Each response must propose a single, flat price for each MWh of electric energy delivered from the proposed resource. This energy price shall remain constant throughout the entire contract term and shall not be adjusted by periodic escalators or time of delivery adjustments. This energy price shall include procurement of the energy commodity, all Green Attributes/Renewable Energy Credits related thereto, Capacity Attributes (if available), transmission charges to the delivery point, including but not limited to CAISO imbalance costs, fees and penalties as well as scheduling fees associated with delivered energy volumes. Alternative pricing options may be proposed so long as the aforementioned single flat pricing requirement has been satisfied. ix. Point of Delivery: Respondents may propose product delivery under one of the following options: a. Respondent shall be financially and operationally responsible for delivery of all electric energy to the NP15 trading hub, as defined by the CAISO [TH_NP15_GEN- APND]. Respondent shall serve as its own scheduling coordinator or make arrangements for a third party scheduling coordinator at no cost to MCE. b. Respondent shall be financially and operationally responsible for delivery of all electric energy to the generator s applicable production node. MCE shall serve as its own scheduling coordinator, or make arrangements for a third party scheduling coordinator at MCE s sole expense, scheduling all electric energy from the generator s applicable production node. x. Minimum Development Progress: To the extent that a proposed generating resource is not yet commercially operational, documentation substantiating achievement of the following development milestones must be provided by the respondent for each eligible generator, including: 1) evidence of site control; and 2) evidence that respondent has submitted a generator interconnection application to the appropriate jurisdictional entity; provided, however, that if respondent has completed interconnection studies or executed an interconnection agreement, as applicable, respondent should provide copies of such materials, including applicable appendices. Such documentation must be provided to MCE at the time of Template submittal. With regard to MCE s requested Portfolio Content Category 3 ( Bucket 3 ) volumes, the following specifications will apply: C. Bucket 3-Eligible Renewable Energy: i. Resource Location: Within the Western Electricity Coordinating Council ( WECC ). Preference shall be given to resources located in close proximity to California. ii. Product: Green Attributes/Renewable Energy Credits. Product must meet minimum specifications for Bucket 3 resources, which are described in the Code and applicable regulations.

iii. Resource Eligibility: Product shall meet minimum specifications for the PCC3 as described in the Code and applicable regulations. iv. Annual Delivery Specifications: Product volumes shall be limited to the noted annual open position for Bucket 3 resources. Maximum annual product volumes for proposed deliveries extending beyond the 2025 calendar year may not exceed the specified volume for Bucket 3 resources identified for the 2025 calendar year (58 GWh, shown in the above table). v. Initial Date of Delivery: No sooner than January 1, 2016. vi. Term of Agreement: Not less than one (1) year, commencing on the Initial Date of Delivery; not more than three (3) years, commencing on the Initial Date of Delivery. vii. Proposed Pricing: Each respondent shall propose a single, flat price for each megawatt-hour of electric energy produced by the proposed resource. This price shall remain constant throughout the entire contract term and shall not be adjusted by periodic escalators or time of delivery adjustments. This price shall include procurement of all Green Attributes/Renewable Energy Credits. Respondents may propose alternative pricing options so long as the aforementioned pricing requirement has been satisfied. viii. Minimum Development Progress: The project must be on line prior to contract execution. With regard to MCE s requested Portfolio Content Category 2 ( Bucket 2 ) volumes, the following specifications will apply: D. Bucket 2-Eligible Renewable Energy: i. Resource Location: Within the Western Electricity Coordinating Council ( WECC ). Preference shall be given to resources located in close proximity to California. ii. Product: Electric Energy and associated Green Attributes (inclusive of Renewable Energy Credits ( RECs )) produced on or after the Trade Date and delivered, if needed, with Substitute Energy to Seller from the Project(s) to Buyer at the Delivery Point. All deliveries must meet minimum specifications for Bucket 2 resources, which are described in the Code and applicable regulations. iii. Resource Eligibility and E-Tag Requirements: Product shall meet minimum specifications for the PCC2 as described in the Code and applicable regulations. Additionally, any supplier of Bucket 2 product volumes shall ensure that any e-tags associated with Substitute Energy deliveries (energy delivered to a point of interconnection within California) do not reflect a generating resource that uses coal or nuclear fuels to produce electric power.

iv. Generating Capacity: Minimum one (1) MW, AC. v. Annual Delivery Specifications: Delivered energy volumes shall be limited to the noted, annual open position for Bucket 2 resources. Maximum annual deliveries for proposed deliveries extending beyond the 2025 calendar year may not exceed the specified volume for Bucket 2 resources identified for the 2025 calendar year (371 GWh, shown in the above table). vi. Initial Date of Delivery: No sooner than January 1, 2016. vii. Term of Agreement: Not less than one (1) year, commencing on the Initial Date of Delivery; not more than three (3) years, commencing on the Initial Date of Delivery. viii. Proposed Pricing: Each respondent must include product pricing under option a below but may include pricing under option b: a. Index Plus REC Premium A single fixed REC premium for each MWh of electric energy delivered from the proposed resource plus the hourly day-ahead market clearing price per MWh of Energy delivered by Seller at NP15 (currently referred to by CAISO as TH_NP15_GEN-APND. The REC premium price shall remain constant throughout the entire contract term and shall not be adjusted by periodic escalators or time of delivery adjustments. Respondents may propose alternative pricing options so long as both aforementioned pricing requirements have been satisfied. b. Fixed Price - A single, flat price for each megawatt-hour of electric energy produced by the proposed resource. This price shall remain constant throughout the entire contract term and shall not be adjusted by periodic escalators or time of delivery adjustments. This price shall include procurement of the energy commodity, all Green Attributes/Renewable Energy Credits, transmission charges to the delivery point, including but not limited to CAISO imbalance costs, fees and penalties as well as scheduling fees associated with delivered energy volumes. Respondents may propose alternative pricing options so long as both the aforementioned pricing requirements have been satisfied. ix. Point of Delivery: Each respondent shall be financially and operationally responsible for delivery of all electric energy to the NP15 trading hub, as defined by the CAISO [TH_NP15_GEN-APND]. Each respondent shall serve as its own scheduling coordinator or make arrangements for a third party scheduling coordinator at no cost to MCE. x. Minimum Development Progress: To the extent that a proposed generating resource is not yet commercially operational, documentation substantiating achievement of the following development milestones must be provided by the respondent for each eligible generator, including: 1) evidence of site control; and 2) evidence of a completed generator interconnection application, including the date of intended (or actual) submittal to the

appropriate jurisdictional entity. Such documentation must be provided to MCE at the time of Template submittal. Prospective respondents should make every effort to align proposed transaction volumes and delivery timing with the specifications reflected in this table. For example, in consideration of MCE s current open position, MCE has minimal need for additional Bucket 1 renewable energy supply prior to January 1, 2019. Note: MCE periodically updates this forecast in consideration of ongoing procurement efforts, resource planning initiatives and/or related policies adopted by MCE s governing board. Such updates may not be reflected in posted Open Season materials but may impact MCE s planning and procurement decisions as well as the evaluation of offers submitted in response to this Open Season process. 4) Request for Carbon-Free Energy: MCE typically procures additional carbon-free energy supply (above MCE s RE purchases) from non-rps eligible hydroelectric generators located within California and throughout the Pacific Northwest. Based on MCE s most recent planning process, the following carbon-free energy requirements have been identified (all volumes are presented as gigawatt hours/year). Marin Clean Energy Resource Balance Dec-15 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Energy Requirements (GWh) Retail Load 1,857 1,870 1,884 1,897 1,911 1,924 1,938 1,951 1,965 1,969 Additional Carbon Free Open Position (GWh 80 51 206 215 223 232 240 249 257 264 With regard to MCE s requested carbon-free energy volumes, the following specifications will apply: E. Carbon-Free Energy: i. Resource Location: Within the Western Electricity Coordinating Council ( WECC ). ii. Product: Electric energy produced by a generating facility that does not produce greenhouse gas emissions during electric energy production. Any energy delivered by carbon-free generators located outside of California should be accompanied by an equivalent quantity of e-tags associated with such deliveries to ensure that MCE can defensibly include such carbon-free volumes when preparing applicable power source disclosure reports, including MCE s annual power content label. iii. Minimum Annual Delivery Requirement: 10,000 MWh/year. iv. Initial Date of Delivery: No sooner than January 2016.

v. Term of Agreement: Not more than twenty five (25) years, commencing on the Initial Date of Delivery. vi. Proposed Pricing: Each respondent shall propose a single, flat price for each megawatthour of electric energy delivered to MCE. This energy price shall remain constant throughout the entire contract term and shall not be adjusted by periodic escalators or time of delivery adjustments. Respondents may propose alternative pricing options, including index-based pricing options, so long as the aforementioned pricing requirement has been satisfied. To the extent that an index will form the basis for any alternative price proposal, the respondent shall specify the index to be used in determining the applicable energy price. vii. Point of Delivery: Each respondent shall be financially and operationally responsible for delivery of all electric energy to the NP15 trading hub, as defined by the CAISO [TH_NP15_GEN-APND]. Each respondent shall serve as its own scheduling coordinator or make arrangements for a third party scheduling coordinator at no cost to MCE. 5) Transfer of Environmental Attributes/Renewable Energy Certificates: As part of the proposed transaction associated with any renewable energy product, all Environmental Attributes/Renewable Energy Certificates must be tendered and transferred to MCE via the Western Renewable Energy Generation Information System ( WREGIS ), or its successor, without any additional costs or conditions to MCE. As appropriate, any e-tags associated with delivered product volumes shall be matched to associated renewable energy certificates within the WREGIS system before transferring such certificates to MCE. 6) Acceptance of MCE s Standard Contract Terms: Each respondent shall review the terms and conditions included in MCE s standard power purchase agreement for RE (the PPA ). Any requested changes to the PPA must be included electronically, in redline form, as an attachment to the response. Respondents should be aware that MCE will not accept or discuss substantive changes to its credit requirements, as reflected in MCE s PPA, nor will MCE consider credit requirements that impose any obligations on its member municipalities. If no changes are requested, respondent must include a statement indicating acceptance of MCE s standard contract terms. Note: PPA changes submitted after the response deadline may result in disqualification of the respondent. MCE will post its PPA on the MCE website (http://mcecleanenergy.org/energy-procurement/) and will require respondents to independently access and download this document prior to response preparation. 7) Open Season Schedule: The Open Season will be administered based on the following schedule: a. Deadline for response submittal: only electronic submittals will be accepted; such submittals must be received by MCE no later than 5:00 P.M. Pacific Prevailing Time on each of the product-specific response delivery dates set forth in Section 1 of this. a. All responses should be submitted to Greg Brehm at procurement@mcecleanenergy.org and must include the following subject line: Response to MCE 2015 Open Season. b. Supplier interviews/q&a: As necessary, MCE may submit clarifying questions to certain respondents or conduct interviews, based on information provided in the Templates. MCE shall

retain the right, in its sole discretion, to request information without notifying other respondents. MCE shall establish due dates for responses at the time of each request. c. Response evaluation and supplier notification: Following its review of proposed responses and clarifying materials as well as any interview(s) that may be conducted during this process, MCE will notify all selected suppliers of its intent to pursue contract negotiations. Those suppliers not selected during this process will be notified accordingly. d. Contract approval and execution: no later than November 30 th of each calendar year. 8) Evaluation of Responses: MCE will evaluate responses against a common set of criteria that will include various factors. A partial list of factors to be considered during MCE s evaluative process is included below. This list may be revised at MCE s sole discretion. a. Overall quality of response, including general completeness and conformance with Open Season instructions b. Project location & local benefits (Including local hiring and prevailing wage consideration) c. Interconnection status, including queue position, full deliverability of RA capacity, and related study completion, if applicable d. Siting, zoning, permitting status, if applicable e. Price f. Qualifications of project team g. Ownership structure h. Environmental impacts and related mitigation requirements i. Financing plan & financial stability of project owner/developer j. Acceptance of MCE s standard contract terms k. Development milestone schedule, if applicable 9) MCE Local Hire and Prevailing Wages: Consistent with the California Public Utilities Commission policy objectives of Decision 10-04-052, Marin Clean Energy wishes to collect information from respondents regarding past, current and/or planned efforts by project developers and their contractors to: a. Employ C-10 licensed contractors and certified electricians. b. Pay the prevailing wage for electricians pursuant to the Labor Code. c. Utilize local apprentices during construction and maintenance. d. Pay workers the correct prevailing wage rates for each craft, classification and type of work performed. e. Utilize Project Labor Agreements on the proposed project or prior project developments. f. Display a poster at jobsites informing workers of prevailing wage requirements. g. Provide workers compensation coverage. This information will be used to evaluate potential workforce impacts of proposed projects with the goal of promoting fair worker treatment and support of the existing wage base in local communities where contracted projects will be located.

10) MCE Legal Obligations: MCE is required to comply with the Public Records Act as it relates to the treatment of any information marked confidential. MCE is not obligated to respond to any offer submitted as part of the Open Season. 11) Shortlist Deposit: Following supplier notification (i.e., shortlist selection), the selected respondent(s) will be required to submit a Shortlist Deposit of $3.00 per kilowatt of proposed project capacity for each shortlisted generating project(s) within 10 business days of such notification. The Shortlist Deposit requirement shall not apply to PCC2, PCC3 or carbon-free energy offers, which conform to the specifications described above in Section 3 and 4. The Shortlist Deposit is generally intended to secure the obligations of any shortlisted respondent(s) during the negotiating period and to insure that each offer has been carefully considered. The Shortlist Deposit must be in the form of either a cash deposit or a Letter of Credit. Letter of Credit means an irrevocable standby letter of credit, in a form reasonably acceptable to MCE, issued either by (i) a U.S. commercial bank, or (ii) a U.S. branch of a foreign commercial bank that meets the following conditions: (A) it has sufficient assets in the U.S. as determined by MCE, and (B) it is acceptable to MCE in its sole discretion. The issuing bank must have a Credit Rating of at least A- from S&P or A3 from Moody s, with a stable outlook designation. In the event the issuer is rated by both rating agencies and the ratings are not equivalent then the lower rating will apply. All costs of the Letter of Credit shall be borne by respondent. The Letter of Credit should be sent by overnight delivery to: MCE Marin Clean Energy 1125 Tamalpais Avenue San Rafael, CA 94901 The Shortlist Deposit will be returned to respondent under one or more of the following conditions: 1) following execution of a PPA and posting of required collateral; 2) MCE s rejection of the respondent s offer following shortlist selection; 3) failure of MCE and the shortlisted respondent to agree on terms of the offer or PPA; or 4) MCE s termination of the Open Season process. Respondent will forfeit its deposit if: 1) material misrepresentations of information related to respondent s offer are identified during the negotiating process; 2) respondent fails to comply with the terms and conditions of this Open Season process; 3) respondent unilaterally withdraws the offer or attempts to materially modify the terms of its offer during the ninety-day (90-day) period immediately following supplier s acceptance of shortlist status. In addition, MCE shall be able to retain any Letter of Credit provided as a Shortlist Deposit as security under any executed PPA resulting from the Open Season process in the event that respondent fails to provide required security in accordance with the terms of such PPA.