Solvency Assessment and Management Update

Similar documents
UPDATE ON PROGRESS WITH THE SOLVENCY ASSESSMENT AND MANAGEMENT (SAM) PROJECT

UPDATE ON PROGRESS WITH THE SOLVENCY ASSESSMENT AND MANAGEMENT (SAM) PROJECT

Solvency Assessment and Management (SAM) Roadmap

SAIA (011) Issue 3 / 2012

Alternate ILAB Measures

Solvency Assessment and Management: Steering Committee Position Paper 9 1 (v 3) The Communications strategy

SOLVENCY ASSESSMENT AND MANAGEMENT (SAM) THEMATIC REVIEW ON THE METHODOLOGY USED TO SET EXPENSE ASSUMPTIONS

Solvency Assessment and Management. Report on the results of 1 st South African Quantitative Impact Study ( SA QIS1 )

SOLVENCY ASSESSMENT AND MANAGEMENT (SAM) FRAMEWORK

Solvency Assessment and Management. Non-Life Underwriting Risk Data Request 2012 User Manual

SAM NEWS. SA QIS3 The Final Countdown

Solvency Assessment and Management: Steering Committee Position Paper (v 4) Life SCR - Retrenchment Risk

Current status of Solvency II and challenges down the line. Matthew Edwards 11 October 2011

PENSION FUNDS ACT, 1956

FAIS Newsletter. Inside this issue: From the FIC Desk: The journey to FICA compliance. Introduction

Solvency Assessment and Management: Steering Committee Position Paper 73 1 (v 3) Treatment of new business in SCR

SAM QRT Workshop Asset Templates April 2013

1. INTRODUCTION AND PURPOSE

Solvency Assessment and Management: Steering Committee. Position Paper 6 1 (v 1)

Insurance Europe Position Paper on the Solvency II Reporting Package. ECO-SLV Date: 15 May 2012

EIOPA Final Report on Public Consultations No. 13/011 on the Proposal for Guidelines on the Pre!application for Internal Models

Solvency Assessment and Management: Steering Committee Position Paper 68 1 (v 4) SCR: Simplifications for First Party Insurance Structures

1. INTRODUCTION AND PURPOSE

Solvency Assessment and Management: Steering Committee Position Paper (v 3) Loss-absorbing capacity of deferred taxes

1. INTRODUCTION AND PURPOSE 2. DEFINITIONS

Solvency II & Risk assurance

ROADMAP FOR THE IMPLEMENTATION OF BASEL II IN PAKISTAN

SOUTH AFRICA (as of April 2014) Annex I: Banks

1. INTRODUCTION AND PURPOSE

Background information about Guidelines on preparing for Solvency II

Society of Actuaries in Ireland Solvency II for Beginners. Mike Frazer. 19 May 2011

Solvency Assessment and Management: Steering Committee Position Paper 89 1 (v 2) Calculation of SCR on total balance sheet

FS Regulatory Centre of Excellence, 2 December Hot Topic. Solvency II requirements published. 3. Provisional equivalence of third countries.

SAM Reporting for Insurance Groups with Participations in Non-equivalent Jurisdictions

EIOPA-CP-13/ March Cover note for the Consultation on Guidelines on preparing for Solvency II

Draft amendment to Commission. Implementing Regulation (EU) 2015/2452 of 2 December 2015 laying. down implementing technical standards

Regulation and risk The strategic response to insurance regulatory developments Alex Thomson, May 2013

SAIA SAM PSO. Issue 3 / ORSA: meeting the challenge and seeking the value

1. INTRODUCTION AND PURPOSE

EIOPA Proposal for Guidelines on the preparation for Solvency II. October Milliman Solvency II Update

Solvency II Detailed guidance notes for dry run process. March 2010

Head of Actuarial Control

- The review of the IORP Directive from an insurance perspective

D1387D-2012 Brussels, 24 August 2012

Solvency II overview

IAA Fund Seminar in Chinese Taipei

Solvency II Update. Craig McCulloch

Getting to grips with the shake-up

The Society of Actuaries in Ireland

REGULATORS A REGULATORY FRAMEWORK FOR INDUSTRY VALUE

Financial Services Commission. Solvency 2 Self Assessment Feedback Paper

Solvency Assessment and Management: Pillar 2 - Sub Committee ORSA and Use Test Task Group Discussion Document 35 (v 3) Use Test

Solvency Assessment and Management (SAM)

Insurance Summit Mr Raymond Tam Executive Director (Policy and Development) Insurance Authority 21 September 2017

Proposal for the Quality Assurance of the Solvency II capital requirements, own funds and balance sheet

Actuaries and the Regulatory Environment. Role of the Actuary in the Solvency II framework

Solvency II Survey April 2012

Update from the FSA. Current Issues in General Insurance Conference, May 2010 James Orr and Vishal Desai

Solvency II Update. Latest developments and industry challenges (Session 10) Réjean Besner

Solvency Assessment and Management: Steering Committee Position Paper 34 1 (v 5) Own Risk and Solvency Assessment

Consultation Paper. ESMA Guidelines on the application of the endorsement regime under Article 4 (3) of the Credit Rating Regulation 1060/2009

Detailed comments and recommendations are provided in the attached spreadsheet. Some more general comments are noted below:

Solvency Assessment and Management Second South African Quantitative Impact Study (SA QIS2) Technical Specifications

10X Investments Retirement Annuity Fund. Terms and Conditions of Membership. Version 2012/01

Twin Peaks. by Ingrid Goodspeed. Governor of the South African Institute of Financial Markets

COVER NOTE TO ACCOMPANY THE DRAFT QIS5 TECHNICAL SPECIFICATIONS

Consultation on Domestic Actuarial Regime and Related Governance Requirements under Solvency II. Consultation Paper CP92

Solvency Assessment and Management Second South African Quantitative Impact Study (SA QIS2) Draft Technical Specifications

Final Report on Public Consultation No. 14/017 on Guidelines on system of governance

Compromise proposal on Omnibus II

Final Report. Public Consultation No. 14/036 on. Guidelines on undertaking-specific. parameters

Cover note for the draft consultation papers on the Guidelines and ITS for Solvency II (set 2)

INTERNATIONAL ASSOCIATION OF INSURANCE SUPERVISORS

Please quote our reference: PFA/FS/ /2015/YVT REGISTERED POST. Dear Sir,

2013 Conference Risk, Recovery & Real Growth" 23rd Annual CAA Conference Secrets Wild Orchid Montego Bay, Jamaica. 4 th to 6 th December 2013

OIC & ORSA. Thanita Anusonadisai Director of Capital and Solvency Standard Department Office of Insurance Commission, Thailand

Council of the European Union Brussels, 16 November 2016 (OR. en)

Client Alert August 2016

Proposal for a DIRECTIVE OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

Capital Markets. What you need to know as a young investor?

Liberty Stable Growth Liberty Stable Growth

COMMISSION IMPLEMENTING REGULATION (EU) /... of XXX

Retirement. Are you ready to retire? Know your retirement rights. It is wise to save from a young age. What is a Retirement Fund?

Solvency II director briefing

EU publications ECON extends scrutiny period of amending Delegated Act Page 3. Reporting ITS published in Official Journal Page 3

slaughter and may The matching premium

Solvency assessment regime for South African medical schemes

Solvency II. New Rules in Europe for the Insurance Industry. Lecture at UConn Law, January 28, 2013

Financial Services. Solvency II. Briefing note

FINANCIAL SERVICES BOARD CLOSING DATE: 8 MAY 2018

REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL

SOLVENCY II BALANCE SHEET MARKET WORKSHOPS

Hot Topic: Understanding the implications of QIS5

EIOPA- CP-14/ November 2014

EIOPA-CP-14/ November 2014

Frequently Asked Questions for The global risk-based Insurance Capital Standard (ICS) Updated 21 July 2017

Solvency projections: what s the point unless you get some value from the results?

TURNBERRY FUNERAL CARE

Solvency II developments in selected European countries Brian Morrissey, KPMG 2004 Life Convention 7-9 November. EICC Edinburgh Scotland

Project Solvency II Rolf Stölting

Transcription:

Solvency Assessment and Management 2012 Update MARCH 2012

CONTACT DETAILS Physical Address: Riverwalk Office Park, Block B 41 Matroosberg Road (Corner Garsfontein and Matroosberg Roads) Ashlea Gardens, Extension 6 Menlo Park Pretoria South Africa 0081 Postal Address: P.O. Box 35655 Menlo Park 0102 Switchboard: +27 12 428 8000 Facsimile: +27 12 347 0221 Email:info@fsb.co.za (for general queries) SAM.2012Update@fsb.co.za (for SAM related queries) Website: www.fsb.co.za

Contents 1. Introduction 4 2. Governance Structure.. 5 3. Timelines 6 4. Quantitative Impact Studies (QIS). 9 5. Internal Model Application Process (IMAP).. 10 6. Pillar II Readiness. 11 7. Transitional Equivalence Arrangements... 12 Annexure: Comparisons with original timelines 13 Figures Figure 1: Revised SAM Governance Structure... 5 Figure 2: Revised SAM Road to Parliament Timeline... 7 Figure 3: Revised SAM High Level Roll-out Timeline... 8 Figure 4: Revised Internal Model Application Process Timeline... 10 SAM 2012 update 3

1. Introduction Introduction The Solvency Assessment and Management (SAM) framework is currently being developed to establish a risk-based supervisory regime for the prudential regulation of both long-term and short-term insurers 1 in South Africa. Since the Financial Services Board (FSB) and the industry embarked on the project during 2009, there has been significant progress in the development and implementation of the framework, and accordingly the FSB would like to thank the industry and all other stakeholders for their participation in the project. However, as with any project of this magnitude, it is difficult to accurately estimate the duration of the various inter-linking processes in advance, given the extent of the issues that need to be addressed and the large number of stakeholders involved in the process. Therefore, there have been several revisions of the various timelines that were originally envisaged in the SAM Roadmap as published in November 2010. The purpose of the SAM 2012 Update is to highlight the various revisions to these timelines, as well as changes to some of the structures and processes currently in place. This document should be read in conjunction with the SAM Roadmap, as many of the timelines in the original Roadmap have become out-dated and should be replaced by the equivalent information in this Update. The annexure to this document compares the details of the original SAM Roadmap and IMAP Guide to those that are revised in this SAM 2012 Update. The principal change is that the final date for full implementation of the SAM framework has been changed from 1 January 2014 to 1 January 2015. This means that all insurers are required to fully implement the SAM framework by 1 January 2015, while the SAM framework and the existing regime should run in parallel during 2014. Although the final implementation date has been revised, insurers should not interpret this as an opportunity to relax their implementation efforts. The 2015 implementation deadline remains onerous, as there is still a lot of effort required in relation to the development and implementation of the framework. The FSB expects insurers to be in a position where they are able to calculate and report on the regulatory requirements under the SAM framework from the start of the parallel run in January 2014. 1 Throughout the report any reference to insurers will be to both insurers and reinsurers unless specifically stated otherwise. 4

2. Governance 2. Governance Structure The SAM governance structure was initially set up to provide the FSB with recommendations to best achieve the aims of developing the new SAM regulatory regime. There have been several changes to the governance structure which should better assist in achieving these aims. Firstly, under Pillar II the Internal Control and Risk Management Task Group and the Corporate Governance Task Group have been combined into a single task group, namely the Governance Task Group. These two task groups were combined as there were several overlapping areas between the original task groups. Secondly, the Economic Impact Sub Committee has been removed. It was felt that both the Economic Impact Study Task Group and the Tax Task group could report directly into the SAM Steering Committee. The change was brought about to avoid duplication of discussions leading to a more efficient structure. Finally, the South African Reserve Bank now also participates in the SAM structures and they are represented at the SAM Steering Committee. Figure 1: Revised SAM Governance Structure SAM 2012 update 5

3. Timelines The roll-out of the SAM regime is a consultative process with industry, and SAM is based on Solvency II, which is subject to uncertainties that accompany international negotiations and policymaking. Furthermore, the timelines related to the parliamentary process are uncertain. It is therefore not possible to ascertain the duration of the various processes upfront, and consequently the setting of final deadlines was originally envisioned as an adaptive process. The Road to Parliament The broad policy approach to be adopted by the FSB, in consultation with the National Treasury, is given substance through initial proposals for primary and secondary legislation as a result of the outputs from the various SAM task groups. These initial proposals follow a Road to Parliament, in the course of which a number of drafts of the proposed legislation are produced through an iterative consultation process by the SAM task groups and National Treasury. Only in the final stages once the proposed legal text is nearing completion, will the general public be invited to comment. Revised milestones in the Road to Parliament are illustrated in figure 2 below. It is anticipated that the final draft of the primary legislation will be released for public comment by the end of 2013, as opposed to the beginning of 2013 as had been originally envisaged. Following the completion of the consultative process in relation to the proposed legislation, the draft Bill will be finalised and submitted to Cabinet. A further opportunity for public consultation is thus anticipated during the second half of 2014 through the Parliamentary process, before the legislation is promulgated. Similarly, the final draft of the secondary legislation will be available for public comment by the beginning of 2014. Figure 2 overleaf shows the various changes to the Road to Parliament. SAM 2012 update 6

Figure 2: Revised SAM Road to Parliament Timeline SAM 2012 update 7

SAM Roll-out Due to the revision of the legislative deadlines, the SAM project deadlines in general needed to be revised. The final SAM implementation date for insurers has changed from 1 January 2014 to 1 January 2015. Figure 3 below illustrates the various changes to the SAM roll-out timeline. Figure 3: Revised SAM High Level Roll-out Timeline From the above it can be seen that there will be a parallel run during 2014 for insurers. Insurers will be expected to submit statutory returns on the current basis as well as on the SA QIS 3 basis (with possible further refinements to the basis) using standard formulae during this period. The SA QIS exercises are discussed in more detail in the next section. During the parallel run in 2014, the primary legislation will follow parliamentary processes towards the final promulgation. Interim Measures Interim measures regarding the prescribed requirements for the calculation of the values of the assets, liabilities and capital adequacy requirements of short-term insurers (Board Notice 169 of 2011) have been issued by the FSB. Further interim measures regarding insurance groups, governance, risk management and internal controls for long-term and short-term insurers are expected to take effect from 1 January 2013. It should be noted that this timeline will be subject to the timing of the key stages involved in the promulgation of the Insurance Laws Amendment Bill. SAM 2012 update 8

4. Quantitative Impact Studies (QIS) 4. Quantitative Impact Studies (QIS) Throughout the development of the SAM framework and legislation, quantitative impact studies will be conducted by the FSB to help inform the debates underlying the development. Given the revision in the timelines, it is now envisaged that there will be 3 quantitative impact studies in total. SA QIS 1 SA QIS 2 SA QIS 3 The first quantitative impact study - SA QIS 1 - was conducted during 2011 with a tremendous participation rate covering over 90% of the South African insurance industry by premium volume. The FSB released a report on the results and findings of SA QIS 1 during December 2011, entitled Report on the results of the 1 st South African Impact Study and this document is available on the FSB website. SA QIS 2 will be conducted during 2012, with the FSB releasing the technical specification for SA QIS 2 by the end of May 2012. Insurers who elect to participate in the exercise will be required to submit their QIS returns to the FSB in September 2012. It is anticipated that participation in SA QIS 2 will be greater than that of SA QIS 1, given that most SA QIS 1 participants are expected to participate in SA QIS 2 as well. A report on the results and findings of SA QIS 2 will be released at the end of 2012. SA QIS 3 will be conducted during 2013, and insurer participation in the exercise will be compulsory. The FSB will issue the technical specification by the end of May 2013, and all participants will be required to submit their SA QIS 3 returns in September 2013. A report on the results and findings of SA QIS 3 will be issued at the end of 2013. SAM 2012 update 9

5. Internal Model Approval Process (IMAP) 5. Internal Model Application Process (IMAP) Due to the final SAM implementation date being revised to 1 January 2015, the timeline for the approval of internal models has also been revised. The second window where insurers have the opportunity to submit their Pre-Application Qualifying Criteria (PAQC) to the FSB will be open from 1 August 2012 to 31 October 2012. Once all PAQCs have been received, the FSB will communicate decisions back to the insurers by 30 November 2012. The openended PAQC window 3 will start 1 January 2014. The key changes to the IMAP dates have been illustrated in figure 4 below. Figure 4: Revised Internal Model Approval Process Timeline SAM 2012 update 10

6. Pillar 6. II II Readiness Whereas there has been a lot of activity from both the FSB and the industry in the implementation efforts relating to Pillar I through SA QIS 1 and the IMAP process, not much work has been done yet by the FSB on ascertaining the development work being done by insurers to prepare themselves for Pillar II of the SAM framework. The FSB regards Pillar II as a fundamental part of the SAM framework and as such will be conducting a compulsory Pillar II readiness exercise during the course of 2012. The exact detail of the exercise is still being developed, but it is envisaged that the exercise will consist of a survey, followed up by targeted interviews at the insurers to understand what developments are taking place at the insurers and how they are preparing themselves for Pillar II. The results of the survey and the interviews will be treated as confidential, but a report on the general findings of the Pillar II Readiness exercise will be released by the FSB towards the end of 2012. SAM 2012 update 11

7. T 8. 7. Transitional Equivalence Arrangements When discussing the objectives of the SAM framework, the SAM roadmap stated that an overarching principle is that the recommendations arising from the SAM project should meet the requirements of a 3 rd country equivalence assessment, as established by the European Union. The Solvency II regime is still being developed, and the requirements for 3 rd country equivalence are not yet finalised. In addition, the European Commission may not be able to make decisions on whether all of the respective 3 rd countries would be equivalent before the implementation of Solvency II in 2014, due to the limited time available. However, the European Commission is considering transitional arrangements whereby countries may be deemed equivalent for a set period of time from Solvency II implementation. The European Commission has identified South Africa as one of seven countries where they have asked EIOPA to carry out a technical analysis on the regulatory regime for insurers. This technical analysis will assist the European Commission in making a decision on whether South Africa should qualify for the transitional arrangements. The FSB is currently working with EIOPA on this analysis, and it is expected that the European Commission will make a decision on which countries qualify for the transitional arrangements in 2013. SAM 2012 update 12

Annexure: Comparisons with original timelines Annexure: Comparisons with original SAM Roadmap Revised SAM Governance Structure SAM Governance Structure according to the original SAM Roadmap SAM 2012 update 13

Revised SAM Road to Parliament Road to Parliament according to the original SAM Roadmap SAM 2012 update 14

Revised SAM High Level Roll-out Timeline SAM High Level Roll-out Timeline according to the original SAM Roadmap SAM 2012 update 15

Revised Internal Model Application Process Timeline Internal Model Application Process Timeline according to the IMAP Guide SAM 2012 update 16