Analysis of R-APDRP Implementation in Improving the Distribution Efficiency 2

Similar documents
ANALYSIS OF AGGREGATE TECHNICAL AND COMMERCIAL LOSSES OF APCPDCL

Review of APDRP and RAPDRP

Nelson Electricity Ltd Asset Management Plan Update

Shankar R S, Kamaraj N, International Journal of Advance Research, Ideas and Innovations in Technology.

A Review of Losses in Distribution Sector and Minimization Techniques

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION

Network Loss Factor Methodology

System Energy Losses

CONSTRUCTION OF 132/33 KV GIS SUB-STATION AT DINHATA, DISTRICT COOCHBEHAR. (Packge-38)

AN ANALYSIS OF FINANCIAL PERFORMANCE OF POWER SECTOR IN TAMILNADU Dr. AB Angappapillai* 1, P Kandasamy 2. Tamilnadu, India. Tamilnadu, India.

Information Document FAC-008-AB-3 Facility Ratings ID # RS

Interconnection Process for Customer-Owned Generation (QFs)

Restructuring Strategies in the Indian Distribution Sector & NDPL s achievements. R C Kher, GM-Commercial

STANDING COMMITTEE ON ENERGY MINISTRY OF POWER

Determination of Nontechnical Losses via Matlab Environment

PIESA CONFERENCE PRESENTATION

Information Disclosure prepared in accordance with the. Electricity Distribution Information Disclosure Determination 2012

Paschim Gujarat Vij Company Ltd.

JHARKHAND BIJLI VITRAN NIGAM LIMITED. Request for Proposal

ASSESSMENT TECHNICAL LOSSES IN DISTRIBUTION SYSTEM

MainPower New Zealand Limited. Asset Management Plan

SURPLUS ENERGY PROGRAM TERMS AND CONDITIONS

Q4 FY Presentation 26 th May 2016

The Victory Electric Cooperative Association, Inc. Schedule of Tariffs Table of Contents

Rs Billion Short Term Debt Programme. (Series IX & X)

Network Loss Factor Methodology

BRIHANMUMBAI ELECTRIC SUPPLY and TRANSPORT UNDERTAKING (BEST)

CHAPTER I: PRELIMINARY Short title, commencement and interpretation

HOLY CROSS ENERGY November 3, 2015 GENERATOR INTERCONNECT POLICY

Distributed Generation Connection Standard ST B Planning Engineer. Network Planning Manager. General Manager Network

Portland General Electric Company P.U.C. Oregon No. E-18 Original Sheet No. C-1 RULE C CONDITIONS GOVERNING CUSTOMER ATTACHMENT TO FACILITIES

Handbook for Optimised. Deprival Valuation of System Fixed Assets of. Electricity Lines Businesses

Interconnection Process and Guide for Small Power Generation Systems

Connection and Use of System Charge Methodology Statement ("Condition 25 Statement")

EDB Information Disclosure Requirements Information Templates for Schedules 1 10

Information Disclosure Reports prepared according to Part 4 of the Commerce Act 1986

FINANCIAL MANAGEMENT ASSESSMENT AND PROJECTIONS

Section 25 COGENERATION AND SMALL POWER PRODUCTION Effective Date: June 15, 2016

Superseding REVISED Sheet No. 38 REVISED SHEET NO. 38 Effective March 20, 2008 Effective February 6, 2014 RULE NO. 18. Net Energy Metering

ARRANGEMENT OF REGULATIONS

The South African Grid Code. Transmission Tariff Code. Version 9.0

SCHEDULE 72 INTERCONNECTIONS TO NON-UTILITY GENERATION

THE JHARKHAND GAZETTE EXTRAORDINARY PUBLISHED BY AUTHORITY

Q1 FY Presentation. 07 th Aug 2015

Order on. Petition No. 21/2014

By S K Agrawal ED (Commercial) NHPC Ltd.1

IMPLEMENTATION OF DDUGJY

Section 2. ARR and Tariff proposal submitted by the JSEB

CONSTRUCTION OF 220/132 KV GIS SUBSTATION AT EGRA, DISTRICT-PURBA MEDINIPUR (Package-25)

Jefferson Energy Cooperative Policy 124 DISTRIBUTED GENERATION POLICY

REISSUED JUNE 1, 1988

Public Utility District Number 1 of Klickitat County POLICY BULLETIN 21. Customer Service Policy Electric

EDB Information Disclosure Requirements Information Templates for Schedules 1 10

Western Power Distribution (East Midlands) plc Registered in England and Wales No

Orion New Zealand Limited. Information for disclosure for the year ended 31 March 2018

BOON TO RURAL GUJARAT

Handbook for Optimised. Deprival Valuation of System Fixed Assets of. Electricity Lines Businesses

THE NARRAGANSETT ELECTRIC COMPANY LARGE DEMAND RATE (G-32) RETAIL DELIVERY SERVICE

Electric Rate Schedule GS-2 General Service - Demand

Weatherford Municipal Utility System. Distributed Generation Procedures & Guidelines Manual for Customers

[Type text] Power distribution reforms in Gujarat

Annexure V: Tariff Schedule

UNITED COOPERATIVE SERVICES. Distributed Generation Procedures & Guidelines Manual for Members

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B);

EDB Information Disclosure Requirements Information Templates for Schedules 1 10

Table of Contents. Executive Summary Introduction 3

Annexure III: Tariff Schedule GIGAPLEX ESTATE PRIVATE LIMITED. SCHEDULE OF ELECTRICITY TARIFFS (Effective from 1 April, 2018)

TNUoS Tariffs in 10 minutes March 2018

Section 24 COGENERATION AND SMALL POWER PRODUCTION

Steuben Rural Electric Cooperative, Inc. Member-Owned Distributed Generation Interconnection Information Packet


The detailed Tariff Schedule for various consumer categories has been given in this part:

Power Sector Development in Haryana: Progress and Challenges

Indianapolis Power & Light Company I.U.R.C. No. E-17 Original No. 150 One Monument Circle Indianapolis, Indiana

HORIZON ENERGY DISTRIBUTION LIMITED

Draft Consultative Paper on. Captive Generating Plants

Distribution Loss Factor Calculation Methodology

FITCHBURG GAS AND ELECTRIC LIGHT COMPANY GENERAL DELIVERY SERVICE SCHEDULE GD

Orange and Rockland Utilities, Inc. Issued in compliance with Order in Case 15-E-0036 dated 07/20/2015.

AMENDMENT ORDER DATED

MASSDEVELOPMENT UTILITIES DEPARTMENT 33 Andrews Parkway Devens, MA CURRENT TERMS AND CONDITIONS FOR UTILITY SERVICES Revised 5/23/2016

SCHEDULE 1: ANALYTICAL RATIOS

Standard for Interconnecting Small Generation 100 kw or Less with Electric Power Systems (EPS) (Interconnection Standard)

Case No.07/2017 Date of Grievance : Date of Order :

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

Document of The World Bank

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION MUMBAI

Information Disclosure by Aurora Energy Ltd for the year ended 31 March 2008

Consumer Requirements for Distributed Generation Installation and Interconnection

TRANSMISSION CHARGING STATEMENT

Karnataka Electricity Regulatory Commission Tariff Order 2018 HESCOM CHAPTER 5 REVISED ANNUAL REVENUE REQUIREMENT FOR FY19

OFFICE OF THE CHIEF GENERAL MANAGER D I P K A A R E A P.O. Dipka, Distt. Korba (CG)

Executive Summary of Tata Power Generation True up Petition for FY as well as MYT Petition for FY to FY

GENERAL RULES AND REGULATIONS Applicable to Electric Service. Table of Contents RULE SUBJECT SHEET NOS.

Switchboard Rating for Internal Arcing Fault Clearing Time and Peak Current Withstand By: Ver Pangonilo, PEE RPEQ

Waipa Networks Ltd. UNMETERED SUPPLY Daily Fixed Price WAUM c/d c/d c/d

Standard for Interconnecting Small Generation 100 kw or Less with Electric Power Systems (EPS) (Interconnection Standard)

BOARD POLICY NUMBER 38 NET METERING AND COOPERATIVE PURCHASE OF EXCESS MEMBER OWNED GENERATION CAPACITY

XXXXX. Skookum Creek Power Project. Interconnection Facilities Study and Project Plan

No.25/1/2014-APDRP Government of India Ministry of Power (Distribution Division) EFC MEMORANDUM. Proposal for Deendayal Upadhyaya Gram Jyoti Yojana

Transcription:

P P five P International Journal of Scientific Engineering and Applied Science (IJSEAS) - Volume-1, Issue-3, June 2015 Analysis of R-APDRP Implementation in Improving e Distribution Efficiency 2 1 Priyanka AsalwarP P, Prof. Radharaman ShahaP 1 PM-tech student, PAssistant Professor & HOD of Electrical Department, AGPCE, Nagpur. 2 ABSTRACT Power sector in India started from 1991. Where more attention is focused on generation site. Later on it comes into observation at power distribution is e weakest site in entire power sector erefore GOI conducted APDP in 2001-2002. But due to certain limitations APDP was modified as APDRP in 10P year plan (2002-07) as central sector scheme. Whose main aim is to reduce AT&C losses to 15%. Due to some failure in APDRP it is renamed as R-APDRP in year 2008 for improvement. This paper gives e analysis of R-APDRP implementation in reducing e AT&C losses in Kamptee & katol city. INTRODUCTION Economic grow of e country greatly depends upon power sector [4] & power sector is one of e most important aspect in Indian economy, but it was facing some serious problems such as old warn out, poor distribution system, complicated tariff structure, huge transmission & distribution losses due to eft & unmetered supply, high LT/HT line ratio, overloaded DT/ lines, Distribution set up of state electricity board etc. Hence financial condition of state electricity board has becomes matter of great concern where Aggregate losses of country had reached Rs.26000 Cr. during 2000-2001[4]. Hence government of India initiated power sector reform to improve e of power sector [9]. Government took various initiatives in is direction; one of ese is e introduction of APDP. APDP program was initiated in February, 2000[5]. Objectives of APDP are i) Renovation and modernisation, Life extension, upgrading of old ermal & hydro plant ii) Up gradation and strengening of subtransmission and distribution network along wi energy accounting & metering in distribution circle. This program is continued for 2 years but it has several limitations. Therefore in 2002-2003 APDP was renamed as APDRP. It aims at strengening and up gradation of e subtransmission and distribution system in e country wi following objectives. i) Reduce AT&C losses ii) Improving quality of supply of power. iii) Increasing revenue. iv) Improving consumer satisfaction [4, 5]. Reform is taken in e form of increased metering, conversion of unmetered connection to metered connection, addition of fresh connection, billing and commercial [4]. To perform reformation GOI provides fund in e form of grant & loan and after completion of reformation in given period of time loan is converted into grant.the funds under is programme are provided in two components: i) Investment component: Fund= Grant+ Loan 246

P P plan P International Journal of Scientific Engineering and Applied Science (IJSEAS) - Volume-1, Issue-2, May 2015 ii) Incentive component: Fund= Grant+ Loan i.e. 50% grant + 50% loan Limitations of APDRP: i) Lack of experience of state electricity boards. ii) Delay in transfer of APDRP fund by state government to SEBs/ utilities iii) Delay in processing of tendering, evaluation and award of contracts. iv) Non availability of equipments / contractors to execute e work [1]. Hence it is observed at ere is poor response from contractors or suppliers and ere was less utilization of fund. Therefore APDRP could not achieve its goal in desired time so GOI come wi anoer project, during XIP five year Plan it is restructured as R-APDRP whose aim is to reduce AT&C losses to 15% in urban areas. Project under e R-APDRP program shall be taken up in 2 parts, i.e. Part A & part B. Under e part-a IT application is used and under e Part- B regular distribution strengening projects are included. R-APDRP covers urban areas & towns wi population more an 30,000 (10,000 in case of special category states) [4]. This paper gives detailed information about AT&C losses in Umred city before implementation and after implementation of R- APDRP. From which it is observed at before implementation losses are near about 30%.Therefore GOI decided to reduce is losses to 15% by implementing R-APDRP. The main objective of is paper is to study e AT&C losses before & after e implementation of R- APDRP. This paper discusses information about R-APDRP in section II, research objectives in section III, project work in section IV & conclusion in section V. R-APDRP: R-APDRP is considered as central sector scheme during XIP Five year pplan wi e following revised terms and condition: i) The focus of e program shall be on actual, demonstrable performance in terms of sustained loss reduction. ii) It is proposed to cover urban areas, towns & cities wi population more an 30,000 (10,000 in case of special category states). iii) The area which is covered in XP plan should be considered for XIP only after eier completion or short closure of earlier sanction projects. iv) Project under e scheme shall be taken up in two major & one minor component as Part- A, Part- B & Part c respectively [7]. Part-A: Part A of e scheme covers application of IT in distribution side. The scheme shall involve implementation of IT technology for data acquisition, new connections/ disconnections, energy accounting & audit, network analysis. This is aimed to establish Base line Data system for e distribution utilities rough which ey are able to minimize AT&C losses wiout manual intervention and also to plan & implement corrective measures in Part B. Part-B: Scheme covers system strengening, improvement and augmentation of distribution system. This shall involve:-identification of high loss areas Preparation of investment plans for identified areas Implementation of plan Monitoring of Losses Part-C: conducts workshop, conferences etc. To perform activities under different components GOI provides fund in e form of grant & loan. Therefore funding Mechanism under R-APDRP is given below for Part-A, Part- B & Part-C. 247

Part A: Initially 100% funds for e approved projects shall be provided rough loan from government of India on e terms decided by e ministry of finance. The loan will be converted to grant once e required system is achieved and verified by independent agency. No conversion to grant will be made in case part A is not completed wiin 3years from date of sanction of e project. Part B: Initially up to 25% funds for e project shall be provided rough loan from GOI on terms decided by ministry of finance. For special category states, loan from GOI would be 90%. Every state is not eligible for availing APDRP fund. Hence ere are some criteria to decide availing fund. Eligibility criteria for R-APDRP [7]: i) Constitute e state electricity regulatory commission ii) Achieve e following target of AT&C loss reduction at utility level: Utility having AT&C loss above 30%: Reduction by 3% per annum Utility having AT&C loss below 30%: Reduction by 1.5% per annum iii) Submit previous years AT&C loss figure of project area as verified by independent agency appointed by Ministry of power. Guidelines for Part-B: 1. Part B of e R-APDRP covers system improvement 2. The Part-B project should be complete wiin ree years from e its date of sanction. Fund released to e Part-B project should be limited to first ree years, from its date of sanction. 3. The Utility will have to certify and sign e DPRs. 4.'Utility should prepare a plan for R-APDRP implementation [3]. 5. Works which is in progress should not be included in e new schemes under R-APDRP. 6. Utility shall submit DPRs of all Project Areas (Towns) to nodal agency (PFC) for approval of Steering Committee. 7. The Utility shall work out e AT&C loss of e project / town and facilitate wi independent agency. 8. The AT&C loss of e project area should be certified by TPIEA before start of Part-B works, which should be treated as Base Line AT&C loss of e project area for all purposes. 9. In e Project area SCADA system should be implemented. The main aim of R-APDRP is to reduce AT&C losses below 15% especially in urban area. Concept of AT & C Losses: The AT&C Losses comprise of two elements:- 1. Technical Losses: The technical losses primarily take place due to e following factors:- a) Transformation Losses b) High Copper losses on distribution lines: It is due to e inherent resistance & poor power factor in e electrical network. Technical losses vary wi type of conductors used, transformation capacity of transformer & reactive load among oer factors. 2. Commercial Losses: The commercial losses are primarily due to illegal consumption of electrical energy. The factor which are responsible for commercial losses are: a) Meter Reading: Due to zero consumption of electricity because of locked premises, defective meters, temporarily disconnected consumer. b) Metering: Commercial losses rough metering can be in e form of meter tampering in various forms, bypassing of meters, use of magnet to slow down e meter etc. 248

c) Theft by direct: This is most common & visible form of commercial losses where people tap L.T. lines rough direct hooking. d) Collection : When utility is not able to collect complete amount billed by it en ere will be low which gives higher commercial losses [6]. RESEARCH OBJECTIVES: The objectives of is project are as follows: 1. Improving financial viability of State Power Utilities 2. Reduction of AT & C losses to around 15% 3. Improving customer satisfaction 4. Increasing reliability &quality of power [4]. Meodology: Following steps are used to calculate AT & C losses 1. Computation of input energy: Install meters at input points of each of feeders & read em at predefined interval Input energy= Input energy meter- Export energy 2. Computation of sales: across e states ere exists metered & unmetered consumer. For metered consumers billing is done according to e energy recorded by meter & for unmetered consumer billing is done according to norms defined by respective state regulatory commission. 3. Computation of Billing Efficiency: Billing indicates billed for energy supplied to consumer Billing Efficiency = Total Units Sold (kwh)/total Input (kwh) 4. Computation of Collection Efficiency: Collection Efficiency = Revenue Collected (in Rupees)/Billed Amount (in Rupees) 5. Computation of AT&C Losses: AT&C Losses = {1- (Billing Efficiency x Collection Efficiency)} *100 [1, 6]. CASE STUDY: 1. Collection of data 2. Case study of data 3. Comparative analysis Particulars Peak Demand (Met) Peak demand (unrestricted) 4. Result and conclusion 1. Collection of Data: Commercial information Previous Previous Previous FY-1(08- FY-2(07- FY-3(06-09) 08) 07) MW 7.6 7.4 7.1 MW 8.5 7.9 7.5 Energy input MU 23.2 20.1 20.1 Metered MU energy sales 14.32 12.6 12.4 Assessed MU energy 0 0 0 Total energy MU billed 14.32 12.5 12.4 Revenue Rs.lac billed 550 490 478 Revenue Rs.lac collected 518.6 418 398 Billing % 61.72% 62.19% 61.69% Collection % 94.29% 85.31% 83.26% AT&C losses % 41.80% 46.95% 48.63% Data regarding R-APDRP of Kamptee & Katol city which is given below in tabular form: i) Before R-APDRP implementation (Kamptee ): Before e implementation of R-APDRP in kamptee city it is observed at AT&C losses are near about 50%. Which shows at ere is large technical & commercial losses are ere in is city? Billing is continuously 249

decreasing in each year and it is near about 60%. Which shows at ere are large losses are occurring in is city. Hence GOI decided to implement R-APDRP project in distribution site to reduce AT&C losses below 15 %. This program is started in 2009 and its scheduled date of completion is 2014 which is five year period. ii) Before R-APDRP implementation (katol): Commercial information Particulars Previous FY-1(08-09) Previous FY-2(07-08) Previous FY-3(06-07) Peak Demand MW (Met) 6.5 5.85 5.52 Peak demand MW (unrestricted) 0 0 0 Energy input MU 10.86 9.77 9.23 Metered MU energy sales 7.97433 7.17689 6.77818 Assessed MU energy 0 0 0 Total energy MU billed Revenue Rs.lac billed Revenue Rs.lac collected Billing % Collection % AT&C losses % 7.97433 7.17689 6.77818 39.87215 35.88493 33.89132 38.32042 34.48837 32.57235 73.43% 73.46% 73.44% 96.11% 96.11% 96.11% 29.43% 29.40% 29.42% Before e implementation of R-APDRP in katol city it is observed at AT&C losses are near about 30%. From table it is observed at & billing is near about same. There is not improvement in & billing of amount. Which shows at ere are large losses are occurring in is city. Hence GOI decided to implement R- APDRP project in distribution site to reduce AT&C losses below 15 %. This program is started in 2009 and its scheduled date of completion is 2014 which is five year period. 2. Detailed Study of Data: The project covers an area of 15 Sq.Km of Kamptee town under e Nagpur DN I Division. The input Energy to e project area is 24.60 MU and e Energy sale is 15.32 MU. The improvements are proposed for reducing e Technical loss due to overloading of feeders and transformers, aging of conductors, low HT/LT ratio, poor voltage regulation, low power factor etc. The project will reduce e overloading of feeders and transformers and improve in distribution of power for satisfaction of e consumers due to which it improve e system reliability, reduce interruption and reduces e AT&C loss from e current value of 28.09% to 15%. Before e start of is project in Kamptee city major portion of distribution set up was layed before 40 years ago. Hence it consist of loaded feeders and DTC s, inadequate conductor size which results into technical losses. Total project cost is Rs.9.03 cr. Hence R-APDRP is proposed to reduce AT&C losses by improving existing system. b) Katol: The project covers an area of 28Sq.Km under e jurisdiction of Katol Division. The area comes under e jurisdiction of six sections namely Katol U-I and Katol U-II Electrical Operation sections. The input Energy to e project area is 10.86 MUs and e Energy sale is 7.97 MUs. Base AT &C loss is 37.00%. It will improve e system reliability; reduce interruption and bring down e AT&C loss from e current value of 37.00% to 15%. Total project cost is Rs. 4.13 Cr. 3. Analysis of Data: a) Kamptee : i) Before R-APDRP implementation: a) Kamptee: 250

100.00% 80.00% 60.00% 40.00% 20.00% 0.00% FY FY FY 08-09 07-08 06-07 ii) After R-APDRP implementation: 100.00% 80.00% 60.00% 40.00% 20.00% 0.00% 2008-2014- 09 15 Work covered under is project: billing AT&C losses billing AT&C losses Renovation of dragon palace sub-station is taken which is 30 year old where Electrical equipment like breakers are old & no. of accidents have been increased, hence renovation & modernization of is sub- station is proposed by replacement of 33kv indoor OCB (oil circuit breaker) by outdoor VCB (vacuum circuit breaker). 1*5 MVA transformers are replaced by 1*10 MVA transformers. New L.T. lines of 6.12 kms is proposed wi aerial bunched cable to protect it from direct hooking. To reduce e commercial losses tamper proof meter boxes wi meters for 1500 consumers are proposed. Three Phase meters are 500 and Single phase meters are 1000. This work covered is shown in figure which is given below. 11 KV YERKHEDA FEEDER FROM 33 KV S/STN. KALAMNA ROAD 11 KV MODI DP SUPPLY 247 GOOD SHED ROAD 0.1 0.12 252 216 SHARDA MANDIR WARISPURA 246 KAMGAR NAGAR GAOLIPURA 234 0.34 PETROL PUMP POLICE STN. WARISPURA 232 GAOLIPURA 254 BHOI LINE 0.1 PETROL PUMP BHOI LINE RAI HOSPITAL 0.03 0.45 0.1 0.15 315 KVA 214 219 218 229 230 0.1 251 NAGPUR NAKA NAYAGODAM CHURTI CHAMPA ASHRAM POLICE LINE POLICE STN. 0.5 2.7 0.33 0.09 0.2 0.24 0.28 0.03 0.09 0.15 0.1 0.2 0.3 0.15 APDRP 0.5 DURGA CHAUK 220 KVA 248 525 KMT. JAISTAMBH CHAUK VACHNALAYA 0.001 0.67 0.09 DOUBLE PT SUPPLY KAMPTEE-2 63 KVA 0.24 0.15 4355203 223 BUCHODI HANUMAN MANDIR 240 235 DURGA CH. RAVI NAGAR 255 SAI SRADDHA 206 242 KALPTARU 0.1 GOYAL T. 0.45 0.24 0.6 228 211 BUNKAR COLONY BAJRANG PARK GOKUL DHAM (B) 208 0.24 LEKHA COLONY 0.3 236 FRIDAY MARKET 209 GOKUL DHAM (A) 224 0.1 0.2 0.3 YERKHEDA ROAD 244 BAJRANG PARK (MASJID) 238 237 GANDHI CHAUK 213 GANDHI CHAUK GOKUL DHAM (D) 0.15 APDRP 0.12 INDEX 210 ASHA HOSPITAL(OLD) 212 1) EXISTING 11KV LINE. GOKUL DHAM (C) 0.01 222 2) EXISTING DTC. KAMTEE ICE PORWAL PARK 217 ASHA HOSPITAL(NEW) 66 KV KANHAN SINGLE LINE DIAGRAM OF 11 KV EXISTING FEEDER KAMPTEE-1 The transformer which is used in sub-station whose specifications are given below in tabular form: Transformer specifications Transformer specification Ref I.S 2026 Guaranteed max. temp rise in oil o 45P Pc Type of cooling (oil) On K 400 VA rating Volt at no load HV- 11kv LV-433v Line ampere HV- 21 LV-533.3 Phases HV-3 LV-3 Frequency(C/S) 50Hz Impendence % 4.9097 Vector Diagram DY11 Maker s serial no. ME/0607/236 Year of manufacture 2006 Core & winding K.G. 815 Weight of oil K.G. 453 Total Weight K.G. 1620 Oil quantity liter 540 b) katol: i) Before R-APDRP implementation 0.18 251

120.00% 100.00% 80.00% 60.00% 40.00% 20.00% 0.00% FY 08-09 FY 07-08 FY 06-07 billing AT&C losses additional DTC s are proposed to bifurcate e load of existing DTC s. Total no. of New Transformers is 20 No. As most of e load is residential and commercial e power factor is mostly lagging 0.8. To improve e same, it is proposed to establish pole mounted capacitors bank (4x0.66 MVAR) at new 33/11KV Katol substation. ii) After R-APDRP implementation 120.00% 100.00% 80.00% 60.00% 40.00% 20.00% 0.00% billing AT&C losses The present Distribution system in Katol town is having major part layed 40 years ago by e Licensee. Hence consists of loaded feeders and DTC's, inadequate conductor sizes resulting in technical losses. These are proposed to be reduced by 2 to 3 % by implementation of is scheme. At present Katol urban area is being fed at 11kV level from existing 132 KV Katol S/S. There are two feeders namely Katol U-I & Katol U-II. These two feeders are having lengs of 17.5 and 12.67 Km respectively. The technical losses are very high. Hence new 33kV feeder 2 Km in leng is proposed from existing 132kV Katol Sub-station. The existing Katol U-I feeder is 17.5 Km long. Similarly e 11KV Katol U-II feeder is 12.67Km is long so reducing e leng of feeders we intend to minimize e conductor losses. This will also help to improve performance indices. Installation of New Transformers is necessary as most of e existing DTC s are loaded more an 80 %. New This will improve system power factor reducing e losses ereby. In Katol town e residents in e area put hooks on L.T. line. Due to ere is high loss of energy. To arrest ese activities proposed 3 KM of A.B cable.to reduce e commercial losses tamper proof meter boxes wi Single Phase meters for 2000 consumers are proposed. Transformer specifications used in e sub-station is given below in tabular form. Transformer specifications Transformer specification Ref I.S 2026 Guaranteed max. temp rise in oil o 45P Pc Type of cooling (oil) On KVA rating 400 Volt at no load HV- 11kv LV-433v Line ampere HV- 21 LV-533.3 Phases HV-3 LV-3 Frequency(C/S) 50Hz Impendence % 4.9097 Vector Diagram DY11 Maker s serial no. ME/0607/236 Year of manufacture 2006 Core & winding K.G. 815 Weight of oil K.G. 453 Total Weight K.G. 1620 Oil quantity liter 540 4. Result: After e implementation of R-APDRP in Kamptee & katol city what is e effect on AT&C losses is shown in tabular form which is given below: 252

In Kamptee city before e implementation of is project base line AT&C losses were 47.47% which is very high & after e implementation it is reduces to 28.39%. Losses were not reduced below e 15% but it is observed at before e implementation losses were very high & after e implementation losses were reduced by near about 20%. This project will be continuing in is city to achieve its goal. In Katol city base line AT&C losses were 21.8% & after e implementation it is reduces to 12.6%.Hence is project is successful in is city. CONCLUSION is paper it is concluded at in Kamptee city AT&C losses are near about 50% which is very high & in Katol city AT&C losses were near about 25%. In 2009 GOI restructured electricity board and implemented R-APDRP in India due to which ey are able to minimize AT&C losses below 15% as decided by e government of India. So is project is also started in Kamptee & Katol city in year 2009 & its sanctioned date of completion is year 2014. From above case study it is observed at AT&C losses are reduced to 28.39% in Kamptee & 12.6% in Katol city. Hence we can conclude at AT&C losses can be reduced by implementing R-APDRP. Wi e reduction of AT&C losses below 15% we can say at ere is large savings of natural resources which is depleting day by day due to which ere is saving in electricity at each stage i.e. generation, transmission & distribution. Hence, is project should be implement at each city where population is above 30,000 (10,000 in special category states) and obtain renovation by reducing e losses. Hence is project is Sr.n o. Town Base line % AT&C losses successful in ese cities and also in various parts of is country. ACKNOWLEDGEMENT: I gratefully acknowledge to our HOD and my guide Prof. R. Shaha for supporting me and providing his useful knowledge for carrying out my project successfully. I also want to acknowledge Mrs. Vaishali Meshram, Junior Engineer in MSEB office of Nagpur for giving her timely support in terms of data of Kamptee & katol and providing her support and helping me each time. REFERENCE Date of go live 1. Kamp 47.47 26/4/ tee 13 2. Katol 21.8 22/1/ 13 % % billing efficienc y % AT&C loss 93 77 28.39 % 95% 92% 12.6 % [1]. The impact of IP Sets for establishment of Baseline data in Power Distribution of Electric Utilities under RAPDRP 978-1-4577-1510- 5/11/$26.00 IEEE. [2]. Privatization of Power Distribution Utility in India rough Restructuring and Reformation 978-1-4244-6551-4/10/$26.00 2010 IEEE [3] MSEB Office of Nagpur [4] Review of APDRP & R-APDRP [5] Status of distribution sector in e country & introduction to accelerated power development & reform programme [6] Meodology for establishing baseline AT&C losses [7] R-APDRP during 11P P plan 253

[8] Restructured accelerated power development & reform program of India: Proposed model for state [9] Assessment of Indian power sector reform rough productivity analysis: pre and post electricity act, 2003 978-1-4244-6547- 7/10/$26.00 2010 IEEE 254