INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

Similar documents
INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE. Energy and Extractive Industries Transparency and Accountability

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Project ID:

INTEGRATED SAFEGUARDS DATA SHEET ADDITIONAL FINANCING

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

6 Report No.: JSDSC1361 1

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC6132. Date ISDS Prepared/Updated: 05/16/2011 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

Financing (In USD Million) Financing Source

INTEGRATED SAFEGUARDS DATA SHEET

INTEGRATED SAFEGUARDS DATA SHEET RESTRUCTURING STAGE Note: This ISDS will be considered effective only upon approval of the project restructuring

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3247. Date ISDS Prepared/Updated: 11/28/2007 I. BASIC INFORMATION. A. Basic Project Data

Report No.: ISDSA13978

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

6 Report No.: JSDSC1O15

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2486. Date ISDS Prepared/Updated: 09/18/2006 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

Public Disclosure Authorized. Loan/Credit amount($m): I IDA: 5.00 Board Date: September 7, 2004 Other financing amounts by source:

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2649. Date ISDS Prepared/Updated: 06/26/2009 I. BASIC INFORMATION. A. Basic Project Data

Integrated Safeguards Data Sheet Identification / Concept Stage (ISDS)

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

Report No.: ISDSA13476

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: 87961

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET ADDITIONAL FINANCING. Parent Project ID:

Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS)

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

AFRICA. Investment Project Financing P Federal Ministry of Finance

INTEGRATED SAFEGUARDS DATA SHEET RESTRUCTURING STAGE Note: This ISDS will be considered effective only upon approval of the project restructuring

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC1616. Date ISDS Prepared/Updated: 10/06/2005 I. BASIC INFORMATION. A. Basic Project Data

Project Information Document/ Identification/Concept Stage (PID)

INTEGRATED SAFEGUARDS DATA SHEET RESTRUCTURING STAGE Note: This ISDS will be considered effective only upon approval of the project restructuring

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

COMBINED PROJECT INFORMATION DOCUMENTS / INTEGRATED SAFEGUARDS DATA SHEET (PID/ISDS) APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

Public Disclosure Authorized. Report No.:AC634. Project ID: P Project: Health Transition Project. TTL: Enis Baris

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6515 Afghanistan New Market Development Project

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

Integrated Safeguards Data Sheet (Updated)

Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS)

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Report No.: ISDSA Date ISDS Prepared/Updated: 12-Jan-2016

InfoShop. Integrated Safeguards Data Sheet (Updated) Date ISDS Prepared/Updated: 09/06/

PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE

Report No.: ISDSA13781

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

IBRD: ($m.) support the development of municipal infrastructure to provide quality local services.

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA9857. Project Name. Parent Project Name. Region. Country

Status: Lending Sector: Banking (100%) Theme: State enterprise/bank restructuring and privatization (P)

INTEGRATED SAFEGUARDS DATA SHEET RESTRUCTURING STAGE Note: This ISDS will be considered effective only upon approval of the project restructuring

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE. I. Basic Information Date prepared/updated: 12/13/2006

Safeguard Policies: A Quick View Tbilisi. The World Bank Europe & Central Asia Region

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC4566. Date ISDS Prepared/Updated: 10/02/2009 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

EAST ASIA AND PACIFIC. Investment Project Financing P People's Republic of China

Decision The decision review meeting, held on November 26, 2012 authorized the team to continue with appraisal and negotiation.

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE. I. Basic Information Date prepared/updated: 05/10/2012 Report No.: Telecom

EAST ASIA AND PACIFIC. Indonesia

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS)

World Bank Safeguard Policies: An Overview

Project Name. Region Sector. Project ID Borrower(s) Implementing Agency. Republic of Madagascar Madagascar

Project Name. Region. Date of Board Approval July 29, 2008

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2890 TIR - Transport Infrastructure Rehabilitation Project

Integrated Safeguards Data Sheet (Initial)

Project Name KIAT GURU: KINERJA DAN AKUNTABILITAS GURU - IMPROVING TEACHER PERFORMANCE AND ACCOUNTABILITY

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

Emergency SME Revitalization and Governance Project. I. Key development issues and rationale for Bank involvement

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA5305. Project Name. Parent Project Name. Region Country Sector(s) Theme(s)

This goal will also be achieved by supporting on-going efforts from donors in the following fields:

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

Project Information Document/ Identification/Concept Stage (PID)

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

Sri Lanka: Crisis Response Small and Medium Enterprises Development Facility Project Region

Table 1 the Road Network of Mozambique (in kilometers)

1. Key development issues and rationale for Bank involvement

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4270 Health Transformation and Social Security Reform Project.

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA1417

Project Information Document/ Identification/Concept Stage (PID)

The World Bank MW: Mining Governance and Growth Support Project (P120825)

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA3619. Project Name. Parent Project Name. Region. Country.

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

Project Information Document/ Identification/Concept Stage (PID)

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

SOUTH ASIA. Bangladesh

Transcription:

Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 02-Sep-2014 Date ISDS Approved/Disclosed: 11-Sep-2014 I. BASIC INFORMATION A. Basic Project Data Report.: ISDSC7756 Country: Togo Project ID: P149277 Project Name: Togo: Mining Governance and Development Project Preparation - Phase I (P149277) Task Team Brigitte Marie Khadidja B Leader: Estimated Appraisal Date: 27-Oct-2014 Estimated Board Date: 11-Mar-2015 Managing Unit: GEEDR Lending Instrument: Investment Project Financing Sector(s): Other Mining and Extractive Industries (100%) Theme(s): Other environment and natural resources management (40%), Managing for development results (35%), Other public sector governance (20 %), Export development and competitiveness (5%) Financing (In USD Million) Total Project Cost: 10.00 Total Bank Financing: 10.00 Financing Gap: 0.00 Financing Source Amount BORROWER/RECIPIENT 0.00 International Development Association (IDA) 10.00 Total 10.00 Environmental B - Partial Assessment Category: Is this a Yes Repeater project? B. Project Objectives To strengthen the capacity of key institutions to manage the minerals sector, improve the conditions for increased investments in and revenues from mining, and facilitate an effective and efficient spending of mining revenues.

The specific development objectives and activities of a possible second project would be defined on the basis of the experiences and lessons learned from the implementation of this Project. C. Project Description The proposed project is consistent with the overall objective of developing the mining sector in a context of transparency and good governance. The implementation of the project will contribute ultimately to a major overhaul of the mining sector in its quest to be one of the main pillars on which the government intends to use to achieve the objectives of boosting growth on a sustainable basis. A. Component 1: Ensure access to resources. This component of the EITI value chain is the fundamental barriers to access to resources and to promotion of mining activities in Togo. The project will focus on (i) developing an infrastructure of geological and mining data and on evaluation of the country s mineral resources and their potential value, and in ( ii) developing a modern mining cadastre. B. Component 2: Building Sector Management Capacity. This component will address the limited capacity of the current Government's sector management, monitoring its performance and enforcement of rules of law. In this regards, the project aims at: (i) building capacity in key oversight institutions, (ii) strengthening the capacity to negotiate contracts and manage portfolio, and (iii) developing human resources in the mining sector. Particularly regarding human resources capacity, the project will build on the existing Earth Sciences Faculty at the University of Lomé as regards its academic training program and plans to equip the faculty program of an additional new Center for training in technical mine professions. C. Component 3. Improve Transparency and Accountability. The Project will support activities aimed at: (i) improving and promoting transparency and setting-up sound monitoring mechanisms in commercial transactions, sector and revenue management (eg. the EITI process), (ii) strengthening awareness of the tax administration system and tax collection systems, (iii) establishing a broad platform for dialogue and accountability involving various stakeholders in the mining sector, (iv) helping to create community development committees; and (v) developing effective tools for modern management of the mining sector of Togo. D. Component 4. Sustainable Development and the Development of Side stream Activities around mining activities. The project will: (i) define and develop business to promote the creation of national SMEs capable of producing inputs to be used by the local mining industry and hence generating a more significant macroeconomic impact of the mining industry. Similarly, the component will support: (ii) the management of social and environmental issues in the mining sector, (iii) artisanal and small-scale mining, and (vi) full integration of the mining sector into broader national development efforts. E. Component 5. Coordination and Project Management. This component will support the Project Implementation Unit, based in the Ministry of Mines, in the management of fiduciary activities, project monitoring and evaluation and the implementation of activities. Issues and recommendations of the project will be used by the government in the development of global or sectoral policies to improve the management of mineral resources of the country and contribute to job creation and the improvement of the conditions of livelihoods of rural people. D. Project location and salient physical characteristics relevant to the safeguard

analysis (if known) To be determined at a later stage E. Borrowers Institutional Capacity for Safeguard Policies Togo is currently significantly challenged in the environmental and social management of the mining sector because of the inadequately staffed and/or trained personnel in key ministries, including the Ministry of Mines and the Ministry of Environment. The safeguards team (including both social and environment) will work closely not only with the Ministry of Mines and the Ministry of Environment Task team on mining issues, but also with civil society and communities at the vicinity of mines. The current IDA will also install an ombudsman so that any potential grievances can be identified and mitigated early on. The ongoing revision of the Mining legislation puts special emphasis on environmental issues. As such, the capacity of the relevant institutions will be deemed appropriate to handle the new project once the new Mining Law is passed. Meanwhile the project will conduct a detailed assessment of existing tools in place to monitor environmental issues related to mining. In sum, the project is designed to assist the Government of the Republic of Togo (i) to put in place the appropriate legal, regulatory and fiscal frameworks, as well as updated social, environmental and other relevant standards and guides; (ii) to build capacity to increase oversight for technical, economic, environmental, health and safety compliance of the sector; (iii) to promote transparency and build accountability mechanisms; and (iv) to stimulate further socio-economic benefits. F. Environmental and Social Safeguards Specialists on the Team Paivi Koskinen-Lewis (GURDR) Abdoulaye Gadiere (GENDR) II. SAFEGUARD POLICIES THAT MIGHT APPLY Safeguard Policies Triggered? Explanation (Optional) Environmental Assessment OP/ BP 4.01 Yes The proposed project is Technical Assistance (TA) aimed at strengthening the legal, regulatory and institutional framework, as well as at improving capacity, governance, and planning in the mining sector. The project does not involve civil works or land acquisition. However, future mining development activities are expected to build on the TA activities and will have environmental and social adverse impacts that would be regulated under the strengthened legal and institutional framework. The terms of reference for a Sectoral Environmental and Social Assessment (SESA) will be developed, but the sectoral assessment itself will be carried out as part of the project implementation. This approach has been used

Natural Habitats OP/BP 4.04 for similar technical assessment projects, and the TOR will be disclosed for consultation both in the country and Infoshop prior to Appraisal. The SESA will examine the current situation in the sector in terms of environmental and social management and describe potential environmental and social impacts in the sector, including site-specific and cumulative impacts, pollution, health and safety, and social issues (e. g inclusion, gender, vulnerable groups, land administration/management, labor issues, conflict, etc.). This assessment will draw on extensive consultations with stakeholders and include discussions on community participation in the sector, governance, transparency and conflict resolution. Forests OP/BP 4.36 Pest Management OP 4.09 Physical Cultural Resources OP/ BP 4.11 Indigenous Peoples OP/BP 4.10 III. Involuntary Resettlement OP/BP 4.12 Safety of Dams OP/BP 4.37 Projects on International Waterways OP/BP 7.50 Projects in Disputed Areas OP/BP 7.60 SAFEGUARD PREPARATION PLAN A. Tentative target date for preparing the PAD Stage ISDS: 05-Sep-2014 B. Time frame for launching and completing the safeguard-related studies that may be needed. The specific studies and their timing 1 should be specified in the PAD-stage ISDS: The specified studies and their timing will be specified in the PAD-stage ISDS. The terms of reference related to the Sectoral Environmental and Social Assessment (SESA) will be prepared, consulted upon and disclosed both in in-country and Infoshop prior to Appraisal. IV. APPROVALS Task Team Leader: Name: Brigitte Marie Khadidja B Approved By: 1 Reminder: The Bank's Disclosure Policy requires that safeguard-related documents be disclosed before appraisal (i) at the InfoShop and (ii) in country, at publicly accessible locations and in a form and language that are accessible to potentially affected persons.

Regional Safeguards Name: Johanna van Tilburg (RSA) Date: 02-Sep-2014 Coordinator: Sector Manager: Name: Christopher Gilbert Sheldon (SM) Date: 11-Sep-2014