DART AND THE T LICENSE PROCEDURES

Similar documents
GENERAL LICENSE PROCESS INSTRUCTIONS

PIPELINE / WIRE LINE PROCESS INSTRUCTIONS

Genesee & Wyoming Railroad Services, Inc.

PROCEDURE FOR REQUESTING A RIGHT-OF-WAY LICENSE AGREEMENT WITH CAPITAL METRO

SPECIAL PROVISION Legal Relations and Responsibilities

Procedure for Requesting a License Agreement with Capital Metro

BETWEEN: CANADIAN NATIONAL RAILWAY COMPANY, a corporation having its head office at 935 de la Gauchetière Street West, Montreal, Quebec H3B 2M9

Genesee & Wyoming Railroad Services, Inc.

ENVIRONMENTAL ACCESS PROCESS INSTRUCTIONS

WASHTENAW COUNTY ROAD COMMISSION Permit Engineering Section 555 N. Zeeb Road Ann Arbor, MI 48103

WASHTENAW COUNTY ROAD COMMISSION Permit Engineering Section 555 N. Zeeb Road Ann Arbor, MI 48103

AMENDMENT OF SOLICITATION REQUEST FOR PROPOSALS (RFP) ADDENDUM No. 1. Issued: May 23, 2016

LICENSE AGREEMENT FOR OCCUPATION OF RAILWAY CORRIDOR

Subcontractor Qualification Statement

Standard Specifications for Work on Railroad Property

OHIO TURNPIKE CROSSING PERMIT REQUEST INFORMATION UNDERGROUND CROSSING

Application Process for Use of RCTC Property

COACHELLA VALLEY WATER DISTRICT INSTRUCTIONS TO APPLICANT PERMANENT ENCROACHMENT PERMIT

NATIONAL RAILROAD PASSENGER CORPORATION DATE EXPIRES: for not longer than one year from date of Amtrak approval)

INGHAM COUNTY ROAD DEPARTMENT NOTICE TO BIDDERS CN/GTW RAILROAD. CON:TNB 1 of

Applying for a Kinder Morgan Canada. Proximity Permit. Design and Construction Guidelines CANADA

A NEW online entry system for applications and submittal of documents will be available in summer of 2018.

Subcontractor Insurance Requirements Certificate Holder VCI Construction, LLC 1921 W. Eleventh Street, Upland CA 91786

COACHELLA VALLEY WATER DISTRICT INSTRUCTIONS TO APPLICANT TEMPORARY ENCROACHMENT PERMIT

January 18, UPRR Folder No.: Folder Number NAME & ADDRESS OF CONTACT. Dear Salutation:

INDEMNITY AGREEMENT THE STATE OF TEXAS KNOW ALL MEN BY THESE PRESENTS COUNTY OF NUECES

MODIFIED REQUEST FOR PROPOSALS. PROFESSIONAL SERVICES FOR FD Training & Logistics Facility Geothermal Test Well Activity ID

CERTIFICATE OF LIABILITY INSURANCE

BOCC MEETING TRANSMITTAL

ARTICLE RIGHT-OF-WAY RULES AND REGULATIONS

CITY OF SOUTH SAN FRANCISCO GRADING PERMIT APPLICATION CHECKLIST

WISCONSIN PUBLIC SERVICE CORPORATION. C4. Standard Rules & Regulations Construction Policy RIIIM

Right-of-Way Construction Permit Application

Right of Entry Permit

CFRC INFORMATION SUMMARY

W.E. O Neil Construction Co. of Arizona c/o (Project Coordinator) 4511 E. Kerby Avenue Phoenix, AZ Fax (480)

REQUEST FOR SEALED BID PROPOSAL

FOR OFFICE USE ONLY CONTRACTOR/DEVELOPER APPLICATION AND PERMIT TO CONSTRUCT, OPERATE, USE AND/OR MAINTAIN WITHIN THE RIGHT-OF-WAY/EASEMENT

ADDENDUM A. Subcontractor Insurance Requirements

REQUEST FOR PROPOSAL (RFP) for PROFESSIONAL CONSULTING SERVICES. to perform an

CURB CUTS SPECIFICATIONS AND STANDARDS

BOND & INSURANCE REQUIREMENTS

KANSAS CITY POWER & LIGHT COMPANY P.S.C. MO. No. 2 Fourth Revised Sheet No Canceling P.S.C. MO. No. 2 Third Revised Sheet No. 1.

10/21 / :56:57 PM PI ERCE COUNTY, WASHINGTON

CFRC INFORMATION SUMMARY

10. CONSTRUCTION PERMITS General Permits Required

PROPOSAL DOCUMENTS FOR JANITORIAL SERVICES CONTRACT

ADVERTISEMENT: REQUEST FOR PROPOSALS FOR GHS SOFTBALL FIELD RENOVATION FOR GAINESVILLE CITY SCHOOLS

AGREEMENT FOR MOVING OVERSIZED LOADS OVER HIGHWAY-RAIL GRADE CROSSINGS SCRRA FORM NO. 4

PUBLIC HIGHWAY AUTHORITY PERMIT MANUAL

Alger Delta Cooperative Electric Association

A G E N D A. FasTracks Monitoring Committee. Tuesday, February 3, 2015 Rooms R, T, & D 5:30 PM Conference Dial-in # Conference ID: 15120

WISCONSIN PUBLIC SERVICE CORPORATION. P.S.C.W. Volume No. 7 3rd Rev. Sheet No. E11.00 Replaces 2nd Rev. Sheet No. E11.00 Amendment 578 Schedule ER

Hennepin County Transportation Department ADDENDUM

REQUEST FOR PROPOSAL FOR ELECTRODE REPLACEMENT AT BLACK MOUNTAIN AND REACH 6 PIPELINE

GENERAL INSTRUCTIONS TO BIDDERS

SPECIAL PROVISION Legal Relations and Responsibilities

ST. TAMMANY PARISH PATRICIA P. BRISTER PARISH PRESIDENT

CHAPTER 2 REQUIREMENTS FOR STATEWIDE ONE-CALL NOTIFICATION CENTER

TRANSFLO MOTOR CARRIER OPERATING PROVISIONS

PUBLIC NOTICE NOTICE OF REQUEST FOR BIDS CITY OF HIGHWOOD, ILLINOIS ROADWAY SNOW REMOVAL AND SALT APPLICATION

OVERSIZE LOADS TYPES OF PERMITS ISSUED

Attachment 14. Due Diligence Right of Entry RIGHT OF ENTRY. (Oakland Army Base City Property)

BNSF Contractor Safety Orientation (2011) Company Name: Course Exam Questions. 1. Can there be unscheduled assessments of any contractor's operations?

EXHIBIT B. Insurance Requirements for Construction Contracts

Certificate of. Insurance Information. Packet

INSURANCE SCHEDULE F

CITY OF LIVERMORE RFP 4006 FOR: WATER, SANITARY, AND STORM DRAIN REPAIRS REQUEST FOR PROPOSALS FOR WATER, SANITARY, AND STORM DRAIN REPAIRS

THE BOARD OF SUPERVISORS OF THE COUNTY OF RIVERSIDE, STATE OF CALIFORNIA, Ordains as follows:

EXHIBIT 1. To Wayside Horn System Agreement LOCATION OF GRADE CROSSINGS

NON-MOTORIZED FACILITIES

REQUEST FOR PROPOSALS For On-Call Surveying Services CITY OF SAN MATEO, CALIFORNIA

Request for Qualifications RFQ # Continuing Services Contracts for Professional Surveying Services

City of Arcata Engineering Department Encroachment Permit Application

Engineering Mechanical Electrical Plumbing Specialty Plumbing and Liquefied Petroleum Gas (LPG) Trades Contractor

SOLICITATION/ADVERTISEMENT

SFPP, L.P. CONNECTION POLICY

MACKINAC COUNTY ROAD COMMISSION PERMIT FEE SCHEDULE Approved Section Type of Permit Fee

MODIFIED REQUEST FOR PROPOSALS. PROFESSIONAL SERVICES FOR FIRE STATION NO. 1 GEOTHERMAL TEST WELL Activity ID

CITY OF DUBUQUE SPECIAL EVENTS APPENDIX A PROMOTIONAL MATERIALS OVER THE STREET RIGHT OF WAY POLICY AND APPLICATION

REQUIRED AT PROPOSAL STAGE:

HILLSBOROUGH COUNTY AVIATION AUTHORITY AMENDMENT NO. 2 TO CARGO BUILDING SPACE RENTAL AGREEMENT (PROVISIONING) SOUTHWEST AIRLINES CO.

ROAD CROSSING AGREEMENT FOR SUB-SURFACE FACILITIES. - and - NAME ADDRESS CITY, POSTAL CODE

GENERAL PROVISIONS I. WORK REQUIREMENTS

REQUEST FOR PROPOSALS For Geotechnical Engineering Services Citywide Failed Streets Geotechnical Studies CITY OF SAN MATEO, CALIFORNIA

INSURANCE REQUIREMENTS Chicago Department of Aviation Certified Service Provider Program ( CSPP )

AN ACT to create (4e) and of the statutes; relating to: limiting

TEMPORARY SERVICE APPLICATION (HYDRANT METERS)

Department of Transportation Mitchell Region Office

Subcontractor Insurance Requirements

SUBCONTRACTOR INSURANCE REQUIREMENTS Version 3/1/2018

SMALL ORDERS TERMS AND CONDITIONS - BLANKET

Construction of the Leased Premises

Summary Description of Rail OCIP Coverage

TRENCH PERMIT. CITY OF SOMERSWORTH NH 18 Lilac Lane - (603) Please Fax at (603) Date: Permit# Dig Safe # Fee = $70.

BOARD AGENDA FACT SHEET

Instructions for Completing TRANSFLO s Motor Carrier Access Agreement

HRSD Interceptor Force Main Tapping Application

REQUEST FOR PROPOSALS (RFP) FOR ON-CALL TRAFFIC SIGNAL SERVICES DETECTOR LOOPS INSTALLATION AND REPLACEMENT PROJECT NO. OM

MCGOUGH STANDARD INSURANCE REQUIREMENTS

Transcription:

DART AND THE T Doing Business As TRINITY RAILWAY EXPRESS (TRE) LICENSE PROCEDURES Dallas Area Rapid Transit (DART) and the Fort Worth Transportation Authority (the T ) own and operate the 34-mile TRE corridor, formerly the Chicago, Rock Island & Pacific (CRI&P) Railroad corridor, and also known as Railtran when owned by the Cities of Dallas and Fort Worth. Through an Interlocal Agreement effective December 27, 1999, the Cities finalized the transfer of the corridor to DART and the T. By agreement, DART s Commuter Rail & Railroad Management staff assumed property management functions of the corridor. The TRE corridor was purchased primarily for public transit uses. Other uses, compatible with current and future transit and freight railroad use, may be allowed depending on the proposed use, the impact on current or future uses, and the income generated. The following information must be submitted for review: 1. A letter from the owner(s) or their representative requesting a license to use the corridor. 2. The attached completed Application Form. Describe Proposed Improvements, and provide written details; See attached drawings is not a description. 3. Engineering plans and plats showing ALL Details Directly on Drawings, including all information on the Plan Data Sheet (attached), the proposed license area with dimensions, profile and tie-ins to physical features on the ground (i.e. centerline of roadway, DART right of way lines, end of a bridge or culvert, etc.). Any proposed utility crossing must meet DART specifications and/or American Railway Engineering and Maintenance of Way Association (AREMA) standards. 4. The DART engineering checklist pertinent to the project type. 5. A $2,500.00 non-refundable engineering review and application fee. 6. If application is approved a License Agreement will be sent to the Applicant. The License includes, but is not limited to, sections that require: A 30-day notice of termination enforceable by either party. An annual payment based on the market value of the license area. Insurance naming DART, The T, Herzog Transit Services, Inc. and Railroads as additional insureds (see attached list of insurance requirements). A Standard Construction Agreement and Contractor s Right of Entry executed by Licensee s contractor prior to any construction activities. Mail application package to: Dallas Area Rapid Transit Attn: Commuter Rail & Railroad Management P. O. Box 660163 Dallas, Texas 75266-7210

STANDARD APPLICATION SECTION I Application Information for a License Agreement 1) LICENSEE S full legal name: Type of Legal Entity: For example: Company, Corporation, Partnership, Individual, Municipality, or Other Specific type of entity and, if applicable, state of incorporation Mailing Address: Physical Address (if different): City: State: Zip: Billing Address (if different from mailing address): Contact Person: Email: Office Phone: Cell Phone: 2) APPLICANT: (if Agent for Licensee) Email: Agent s Firm s Name: Office Phone: Cell Phone: Mailing Address: City: State: Zip: 3) CONTRACTOR, if known: a) Legal Name to appear in Agreement: b) Mailing Address: City: State: Zip: c) Contact Person: Email: Return d) Office Completed Phone: Application to: DART P. O. Box Cell 660163 Phone: Dallas, Texas 75266-7210 Page 1 of 3

SECTION II Proposed Improvements STANDARD APPLICATION Check All Appropriate Boxes: New Existing: Agreement No. Relocation Modification Use: Public Private Within Public ROW: Yes No Crossing tracks: Angle TYPE OF ENCROACHMENT: Paralleling tracks: Distance: Surface use: Describe: Wire line: Electric Telephone Fiber Optic Cable TV Other: Underground Overhead Transmission Distribution No. of Wires/Cables: Voltage: Material: Phase: Size: Vertical clearance above top of rail: (ft.) Pipeline: Transmission Distribution Flammable Non Flammable Size: Contents: Length (encased full width of ROW): Distance below base of rail: Drainage: Open Ditch Buried Pipe Culverts Size: Road Crossing New Upgrade Public Private Other Improvements: Describe: Describe Proposed Improvements: LOCATION OF ENCROACHMENT: Latitude: Longitude: Name of nearest road crossing: D.O.T. No.: Distance to centerline of nearest road crossing: Railroad Mile Post: Is the work to be performed within twenty-five feet (25 ) of the railroad tracks? Yes No Page 2 of 3 Return Completed Application and Fee to: DART Attn: Commuter Rail & Railroad Management P. O. Box 660163 Dallas, Texas 75266-7210

Fill out only if applicable PLAN DATA INFORMATION TO BE INCLUDED ON DRAWINGS For Underground Pipelines CARRIER PIPE CASING PIPE Contents to be handled Outside diameter Pipe Material Specifications and grade Wall thickness Actual working pressure Type of joint Coating Method of installation Vents: Number Size: Height above ground: Seals: Both ends: One end: Type: Bury: Base of rail to top of casing: ft. in. Bury: (Not beneath tracks) ft. in. Bury: (Roadway ditches) ft. in. Type, size and spacing of insulators or supports: Distance C.L. track to face of jacking/receiving pits ft. in. Bury: Base of rail to bottom jacking/receiving pits: ft. in. Cathodic protection: Yes No Cathodic Protection Procedure: SPECS: DART and/or AREMA (American Railway Engineering and Maintenance of Way Association) specifications must be met. Attach Engineering Drawings that include Project Plan and Profile, North Arrow, Right-of-Way Lines of Railroad corridor, and Public or Private streets. Identify location with nearest street crossing the rail corridor and distance from center of street to the project. Provide a location map, surveys, mile post, etc., as needed to identify location. Page 3 of 3

CONTRACTOR S INSURANCE REQUIREMENTS Prior to the start of work or occupancy of premises under a License, Licensee s contractor agrees to procure and maintain at its sole cost and expense, the following types and amounts of insurance with an insurer or unsurers and form satisfactory to Licensor who is herein defined to be TRINITY RAILWAY EXPRESS. Where applicable, the operating railroad will be named as an additional insured. The railroads include the following: BURLINGTON NORTHERN SANTA FE RAILWAY COMPANY (BNSF), UNION PACIFIC RAILROAD COMPANY (UP), and DALLAS GARLAND & NORTHEASTERN RAILROAD (DGNO). Other additional insureds include: Dallas Area Rapid Transit, Fort Worth Transportation Authority and Herzog Transit Services, Inc. Licensee s contractor shall furnish an original Certificate of Insurance along with all endorsements for review and approval by DART s Risk Management Department with the following insurance as a minimum standard: 1) Comprehensive General Liability with Contractual Liability Endorsement Combined single limit of at least $2,000,000. Licensor and Railroad are named as additional insureds (Endorsement for ongoing operations CG 2010 or equivalent and for completed operations CG 2037 or equivalent) without any qualifications or restrictions. Contractual liability endorsement must have exclusions for operations within 50 feet of railroad (Endorsement 2417 or equivalent) and for XCU hazards deleted. Waiver of subrogation (Endorsement CG 2404 or equivalent). Licensor must have 30 days notice of cancellation or modification. 2) Comprehensive Automobile Liability Policy Combined single limit of at least $2,000,000. Licensor and Railroad are named as additional insureds (Endorsement CA 0403 or equivalent) without any qualifications or restrictions. Waiver of subrogation (Endorsement CA 2089 or equivalent). Licensor must have 30 days notice of cancellation or modification. 3) Workers Compensation Insurance Providing Statutory Benefits under the Worker s Compensation Act of the State of Texas and/or any other State or Federal Law or Laws applicable to the Contractor s employees performing the work under this agreement. Employer s Liability Insurance with limits of liability of not less that $500,000 each accident, $500,000 each employee for disease and $500,000 policy limit for disease. Endorsed with a Waiver of Subrogation (Endorsement WC 42 03 04 or equivalent), waiving the carrier s right of recovery under subrogation or otherwise from Licensor. 4) Railroad Protective Coverage The Railroad, not DART, is to be listed as the insured on the certificate. The coverage is not required if the contractor s general liability limits are $2,000,000 per occurrence and $6,000,000 aggregate or higher and the contractor provides the Contractual Liability Endorsement CG 2417. 5) Licensee agrees to furnish Licensor with Certificates of Insurance (or, as and when Licensor may direct, copies of the actual insurance policies) as evidence of the coverages outline in 1), 2) and 3) above. 6) All coverage described in a License shall be in a form and content satisfactory to Licensor. No party, subject to the provisions of a License agreement, shall violate or knowingly permit to be violated any of the provisions of the policies of insurance described therein. All insurance should be provided by insurance companies with a Best s Rating of B+ or better.