CITY OF RICHMOND DEPARTMENT OF PROCUREMENT SERVICES RICHMOND, VIRGINIA (804) September 7, 2017

Similar documents
CITY OF ANN ABOR ITB 4388 BID TAB STREET TREE PLANTING Fall 2015 B&B Price per Tree Planted Margolis Nursery

CITY OF RICHMOND DEPARTMENT OF PROCUREMENT SERVICES RICHMOND, VIRGINIA (804) May 26, 2017

2017 RESIDENT TREE PLANTING PROGRAM

CITY OF RICHMOND DEPARTMENT OF PROCUREMENT SERVICES RICHMOND, VIRGINIA (804) March 15, 2018

BAREROOT SPRING 2019 ORDER FORM

REQUEST FOR QUOTATION Landscape Nursery Stock (Purch File 19-05) (To be returned no later than 4:30 p.m. on February 22, 2019)

BID PROPOSAL REFORESTATION PROJECT FOR THE VILLAGE OF FRANKFORT

INSTRUCTIONS TO BIDDERS

There will be a pre-bid meeting held at the Park s and Cemetery office located at 429 E 24 th St, Holland, MI on Monday, September 18, 2017 at 10am.

CITY OF RICHMOND DEPARTMENT OF PROCUREMENT SERVICES RICHMOND, VIRGINIA (804) December 2, 2016

REQUEST FOR QUOTATIONS Tree Maintenance Program Bucket Truck and Stump Grinding Contract

CITY OF RICHMOND DEPARTMENT OF PROCUREMENT SERVICES RICHMOND, VIRGINIA (804) October 21, 2016

City of Forest Park Request for Proposals. Landscape Installation, 803 & 785 Forest Parkway, Forest Park Ga

Invitation To Bid. for

REQUEST FOR PROPOSAL

INSTRUCTIONS TO BIDDERS

Invitation To Bid. for

SUPPLY of LED POWER LIGHTS WITH STAND FOR THE GOVERNMENT FILM UNIT

In every contract over $10,000, the provisions in A. and B. below apply: A. During the performance of this contract, the vendor agrees as follows:

PURCHASING DEPARTMENT

Invitation for Bid K Methanol Liquid Chemical

County of Gillespie. Bid Package for COLD MIX LAY ASPHALT. Bid No November 2018

County of Gillespie. Bid Package for GRAVEL. Bid No November 2018

County of Gillespie. Bid Package for FUEL - BOBTAIL DELIVERY. Bid No November 2018

PURCHASING DEPARTMENT

PURCHASING DEPARTMENT

GENERAL SPECIFICATIONS Tree Planting Project SGL 099

CITY OF FORT MITCHELL, KENTUCKY INVITATION TO BID FOR DIXIE HIGHWAY REMOVAL AND REPLACEMENT OF STREET TREES

Availability and Pricing Fall 2017

PURCHASING DEPARTMENT

(SECCRA) SECCRA COMMUNITY LANDFILL LONDON GROVE TOWNSHIP CHESTER COUNTY, PENNSYLVANIA

COUNTY OF COLE JEFFERSON CITY, MISSOURI

INVITATION TO BID ASPHALT SURFACE TREATMENT (TRIPLE TREATMENT TYPE I) IFB:

GENERAL CONDITIONS AND INSTRUCTIONS TO BIDDERS FOR STATEWIDE CONTRACTS FOR SERVICES

CITY OF RICHMOND DEPARTMENT OF PROCUREMENT SERVICES RICHMOND, VIRGINIA (804) April 15, 2016

Request for Proposal RFP # SUBJECT: Ergotron LX

City of Forest Park Request for Proposals Concrete Driveway Replacement Fire Station # Jonesboro Rd., Forest Park, Georgia,

BOROUGH OF HAWTHORNE Office of the Borough Administrator 445 Lafayette Avenue, Hawthorne, New Jersey (TEL) (FAX)

DOING BUSINESS WITH NEWPORT NEWS PUBLIC SCHOOLS... A VENDOR S GUIDE TO UNDERSTANDING NNPS PROCUREMENT PRACTICES

INVITATION FOR BID ATTENTION: This is not an order. Read all instructions, terms and conditions carefully.

CITY OF ROCK HILL, SOUTH CAROLINA REQUEST FOR PROPOSAL KNOWLEDGE PARK TRAFFIC CIRCLE LANDSCAPING. MANDATORY PRE-BID MEETING March 30, 2017 at 10:00 AM

Total Cost per Unit and Wall Mount including Installation Total Cost per Unit and Wall Mount not including Installation

MANDATORY GENERAL TERMS AND CONDITIONS:

CITY OF UNIVERSITY HEIGHTS TREE PRUNING & REMOVAL CONTRACTOR SPECIFICATIONS

REQUEST FOR SEALED BID PROPOSAL

CITY OF GAINESVILLE INVITATION TO BID

County of Gillespie. Bid Package for CONCRETE. Bid No November 2018

INSTRUCTIONS TO BIDDERS

Evaluation Criteria. Proposals for Armored Car Services will be evaluated for: 1. Ability to meet specifications 2. References 3.

PURCHASING DEPARTMENT

Front Porch Roof Replacement Scope of Work

INSTRUCTIONS TO BIDDERS

Request for Quotation

INSTRUCTIONS TO BIDDERS

NOTICE TO BIDDERS SOLICITATION IFB #: SA-1815 SANITARY SEWER MAIN LINING (CIPP)

City of Newnan, Georgia

INVITATION TO BID (ITB)

June 2017 BIDDING PROCEDURES No. 90

Company: Legal Status: Sole Proprietor Non-Profit Corp. Profit Corp. Partnership Gov. Ordering Address: Phone: Remit Address:

Non-Professional Services

REQUEST FOR SEALED BID PROPOSAL

FRIENDSHIP PUBLIC CHARTER SCHOOL REQUEST FOR PROPOSALS FOR RFP COMPENSATION DESIGN CONSULTANT SERVICES

construction plans must be approved for construction by the City PBZ department.

Administered by UNIVERSITY OF MAINE SYSTEM Office of Strategic Procurement REQUEST FOR BIDS TRASH CAN LINERS UNIVERSITY OF MAINE RFB # 09-08

Informal Solicitation #STEM_FURNITURE Fermob

Date: Telephone: Company Name: Address: City: State: Zip Code: Contact Person: Title: Cell Phone: Authorized Signature:

Sand Purchase for Golf Course Bunker Renovation. Hoffman Estates Park District

Connecticut Lottery Corporation 777 Brook Street Rocky Hill, CT INVITATION TO BID

Champaign Park District: Request for Bids for Playground Surfacing Mulch

PROPOSAL REQUIREMENTS AND CONDITIONS

City of Forest Park Request for Proposals. Concrete Slab and Footings 5977 Lake Dr. Community Building

PURCHASE ORDER TERMS & CONDITIONS

COUNTY OF WISE, VIRGINIA REQUEST FOR QUALIFICATIONS FOR PROFESSIONAL CONSULTING SERVICES BROWNFIELDS GRANT. Date of Issue: September 25, 2017

THE CITY OF FOREST PARK PLANNING, BUILDING AND ZONING DEPARTMENT JONATHAN JONES, DIRECTOR 785 Forest Parkway Forest Park, GA 30297

INVITATION FOR BID. Furnish: Installation of One (1) Security Cage for a Rooftop Heating and Air Conditioning Unit. Company Name:

Deluxe Corporation Purchase Terms and Conditions

REQUEST FOR PROPOSAL for Legal Services for the HIGH PLAINS LIBRARY DISTRICT Greeley, CO

Request for Bid/Proposal

Document A701 TM. Instructions to Bidders

REPUBLIC OF KENYA LAKE VICTORIA SOUTH WATER SERVICES BOARD LAKE VICTORIA WATER SUPPLY AND SANITATION PROGRAM PHASE TWO (LVWATSAN II)

REQUEST FOR QUOTE # 16471

FRIENDSHIP PUBLIC CHARTER SCHOOL REQUEST FOR PROPOSALS FOR RFP TEMPORARY STAFFING

OKEECHOBEE COUNTY ROAD STRIPING AND MARKING SERVICES

INSTRUCTIONS TO BIDDERS

REQUEST FOR SEALED BID PROPOSAL

NOTICE INVITING SEALED BIDS FOR THE SR-91 EASTBOUND ON- AND OFF-RAMPS AT BELLFLOWER BOULEVARD PHASE 2 LANDSCAPE IMPROVEMENTS

AIA Document A701 TM 1997

Invitation to Bid BOE. Diesel Exhaust Fluid

REQUEST FOR FORMAL BID

B. The Bid is made in compliance with the Bidding Documents.

PRIORITY TREE REPORT

Request for Proposal RFP SUBJECT: EXECUTIVE SEARCH CONSULTANT FOR A VICE PRESIDENT ACADEMIC & PROVOST

SPECIFICATIONS AND BIDDING DOCUMENTS USED ASPHALT PAVER

In accordance with 61 O.S. 108 and 115, a sworn statement shall accompany any competitive bid submitted for a public construction contract.

STANDARD BIDDING DOCUMENTS UNDER JAPANESE ODA LOANS

City of New Rochelle New York

REQUIRED BID FORMS SECTION

Request for Proposals RFP#8-012 FLEET MANAGEMENT SERVICES

CITY OF BRENHAM, TEXAS. Invitation for Bid. Purchase and Installation of Forty (40) Ton Air Conditioning Unit

TOWN OF MANCHESTER-BY-THE-SEA, MASSACHUSETTS

Transcription:

CITY OF RICHMOND DEPARTMENT OF PROCUREMENT SERVICES RICHMOND, VIRGINIA (804) 646-5716 September 7, 2017 Invitation for Bid E170015755 Trees and Planting Trees 1 ½ Caliper or Larger Due Date: September 20, 2017 / Time: 11:00 A.M. Opening Date: September 20, 2017 / Time: 11:00 A.M. Receipt Location: City Hall, 900 East Broad Street, 11 th floor, Room 1104 Invitation for Bids Prepared by: Name: Elizabeth K. Jackson Title: Contract Specialist Telephone: (804) 646-5799 Fax: (804) 646-5989 Email: Elizabeth.jackson@richmondgov.com City of Richmond, Department of Procurement Services 900 East Broad Street, Room 1104, Richmond, VA 23219 http://www.richmondgov.com/procurement/bidsproposals.aspx Formal IFB Form dated 1-12-2017

SIGNATURE SHEET This signature sheet must be included as part of the bidder s bid, or the City will not consider the bid. The bidder s signature below certifies that this bid as submitted complies with, and the bidder agrees to be legally bound by, all terms and conditions set forth in Invitation for Bids No. E170015755 for Trees and Planting Trees1 ½ Caliper or Larger. The undersigned hereby represents and warrants that the undersigned is duly authorized to sign and submit this bid on behalf of the bidder. Complete Legal Name of Bidder Firm: Order from Address: Remit to Address: Federal EIN / SSN: Authorized Signature: Printed Name of Signatory: Title of Signatory: Telephone Number with Area Code: Fax Number with Area Code: E-Mail Address: Date:

STATEMENT OF NO OFFER Bidders not submitting an offer for the commodity or service requested must fax this form to the Department of Procurement Services at (804) 646-5989 prior to the solicitation due date. Questions concerning requirements must be brought to the attention of the Contracting Officer responsible for this solicitation at least ten business days prior to the solicitation closing date. IFB No.: Service: The undersigned firm declines to submit an offer on the IFB for the following reasons: Unable to meet statement of needs Requirements are unclear or restrictive (explain in remarks) Unable to meet required delivery or performance date Unable to meet insurance requirements Insufficient time to respond to the solicitation Remarks: Do not offer requested commodity or service, please remove our name from the City of Richmond s bidder s list for this commodity or service only. Other (explain in remarks) A firm s failure to return completed form may result in the removal from the City of Richmond bidder s list for the commodity or service requested above. Firm Name: Authorized Representative: Signature: Telephone: Date:

STATE CORPORATION COMMISSION FORM Complete Legal Name of Bidder Firm: Virginia State Corporation Commission registration information. The bidder: is a corporation or other business entity with the following State Corporation Commission identification number: -OR- is not a corporation, limited liability company, limited partnership, registered limited liability partnership, or business trust -OR- is an out-of-state business entity that does not regularly and continuously maintain as part of its ordinary and customary business any employees, agents, offices, facilities, or inventories in Virginia (not counting any employees or agents in Virginia who merely solicit orders that require acceptance outside Virginia before they become contracts, and not counting any incidental presence of the bidder in Virginia that is needed in order to assemble, maintain, and repair goods in accordance with the contracts by which such goods were sold and shipped into Virginia from bidder s out-of-state location) -OR- is an out-of-state business entity that is including with this bid an opinion of legal counsel which accurately and completely discloses the undersigned bidder s current contacts with Virginia and describes why those contacts do not constitute the transaction of business in Virginia within the meaning of section 13.1-757 or other similar provisions in Titles 13.1 or 50 of the Code of Virginia -OR- has not completed any of the foregoing options but currently has pending before the State Corporation Commission an application for authority to transact business in the Commonwealth of Virginia and wishes to be considered for a waiver to allow the bidder to submit the State Corporation Commission identification number after the due date for bids. The bidder shall promptly provide any information the City requires to enable the City to properly evaluate the bidder s request for such a waiver. The City reserves the right to determine in its sole discretion whether to allow such a waiver.

TREE TYPES Item No. Common Name Latin Name 1 Trident maple Acer buergeranum 2 Hedge Maple Acer campestre 3 Amur Maple Acer ginnala 4 Paperbark Maple Acer griseum 5 Japanese Maple Acer palmatum 6 Norway maple Acer platanoides 'Columnare', 'Crimson Sentry', 'Easy Street', 'Olmstead' 7 Globe Norway maple Acer platanoides 'Globosum' 8 Red maple Acer rubrum 'Armstrong', 'Bowhall' 9 Sugar maple Acer saccharum 'legacy', 'green mountain' 10 Horsechestnut Aesculus hippocastanum 11 Alder Alnus glutinosa 12 Shadblow Serviceberry Amelanchier Canadensis 13 River birch Betula nigra 14 European Hornbeam Carpinus betulus 15 American Hornbeam Carpinus caroliniana 16 Pignut Hickory Carya glabra 17 Mockernut Hickory Carya tomentosa 18 Catalpa Catalpa speciosa 19 Hackberry Celtis occidentalis 20 Katsuratree Cercidiplyllum japonicum 21 Eastern Redbud Cercis Canadensis Texas White, Forest Pansy, alba 22 American Yellowwood Cladrastis lutea 23 Pagoda dogwood Cornus alternifolia 24 Flowering Dogwood Cornus florida 25 Stellar dogwood Cornus x rutgerinensis 26 American Smoketree Cotinus obovata 27 American Beech Fagus sp. 28 European Beech Fagus sp. 29 Ginkgo Ginkgo biloba 30 Ginkgo (columnar) Ginkgo biloba 'Fairmount','Fastigiata', 'Princeton Sentry' 31 Honey Locust (fruitless) Gleditsia triacanthos inermis

32 Kentucky Coffee Tree Gymnocladus dioicus 33 Cratageus sp. Hawthorne species 34 Goldenraintree Koelreuteria paniculata 35 Lagerstroemia indica 'Natchez','Muskogee','Tuskegee','Co manche','osage', 36 Yellow-poplar Liriodendron tulipifera 37 Fruitless Sweetgum Liquidamber styraciflua rotundiloba 38 Cucumber Tree Magnolia acuminata 39 Little Gem magnolia* Magnolia grandiflora 'Little Gem' 40 Sweetbay Magnolia Magnolia virginiana 41 Galaxy magnolia Magnolia x 'Galaxy' 42 Flowering crabapple Malus spp. 43 Dawn Redwood Metasequoia glyptostroboides 44 Black Gum Nyssa sylvatica 45 American Hophornbeam Ostrya virginiana 46 Sourwood Oxydendrum arboreum 47 Persian Parrotia Parrotia persica 48 Chinese Pistache Pistacia chinensis 49 London Planetree Platanus acerifolia 50 American Sycamore Platanus occidentalis 51 Pissard Plum Prunus cerasifera 'Newport' 52 Cherry plum Prunus cerasifera 'Thundercloud' 53 Black Cherry Prunus serotina 54 Kwanzan Cherry Prunus serrulata 55 Yoshino Cherry Prunus yedoensis 56 Bradford Pear Pyrus calleryana cleveland 57 Sawtooth oak Quercus acutissima 58 White Oak Quercus alba 59 Swamp White Oak Quercus bicolor 60 Scarlet Oak Quercus coccinea 61 Southern Red Oak Quercus falcata 62 Overcup Oak Quercus lyrata 63 Swamp Chestnut Oak Quercus michauxii 64 Water Oak Quercus nigra 65 Nuttall Oak Quercus nuttallii 66 Pin Oak Quercus palustrus 67 Willow Oak Quercus phellos 68 English oak Quercus robur 'Fastigiata','Skyrocket' 69 Post Oak Quercus stellata

70 Live Oak Quercus virginiana 71 Sassasfras Sassafras albidum 72 Japanese stewartia Stewartia pseudocamellia 73 Stewartia Stewartia rostrata 74 American snowbell Styrax americanus 75 Japanese snowbell Styrax japonicus (esp. 'Pink Chimes') 76 Fragrant snowbell Styrax obassia 77 Japanese tree lilac Syringa reticulata 78 Baldcypress Taxodium distichum 79 American Linden Tilia americana 80 Littleleaf Linden Tilia cordata 81 Silver Linden Tilia petiolaris 82 American Elm Ulmus americana (disease resistant varieties) 83 Chinese Elm Ulmus parvifolia 84 Zelkova Zelkova serrata 'Village Green'

BID FORM A PRICE IS REQUIRED FOR EVERY LINE ITEM. LINE ITEMS LEFT BLANK OR MARKED 0 SHALL DEEM THE BIDDER NON-RESPONSIVE. Delivery F.O.B: Various sites throughout the City Required Time for Delivery: November 1, 2017 until April 15, 2018 GROUP 1 (1 1/2 Caliper 3.5 Caliper) Pricing for Group 1 shall include equipment, materials and maintenance with one year warranty. Item # Description Unit Unit Bid Price 1 1 ½ Caliper Each $ 2 2 Caliper Each $ 3 2.5 Caliper Each $ 4 3 Caliper Each $ 5 3.5 Caliper Each $ Total Unit Extended Bid Price Group 1 *Total unit extended bid price shall be comprised of the total unit price of items 1-5.* GROUP 2 (4 C aliper 6 C aliper) Pricing for Group 2 shall include equipment, materials and maintenance with one year warranty. Item # Description Unit Unit Bid Price 1 4 Caliper Each $ 2 4.5 Caliper Each $ 3 5 Caliper Each $ 4 5.5 Caliper Each $ 5 6 Caliper Each $ Total Unit Extended Bid Price Group 2 $ *Total unit extended bid price for group 2 shall be comprised of the total unit price of items 1-5.*

GROUP 3 (other) Pricing for Group 3 shall include equipment, materials and maintenance with one year warranty. Item # Common Name Latin Name Size Unit Unit Bid Price Mutistemmed Lagerstromemia 12-14 1 Crapemyrtle indica Each $ 2 Southern Magnolia Magnolia grandiflora 12-14 Each $ 3 Cryptomeria Cryptomeria japonica 14-16 Each $ 4 American Holly Ilex opaca 8-10 Each $ 5 Ilex x atteneuata Foster Holly fosteri 8-10 Each $ 6 Multistemmed Serviceberry Amerlanchier sp 10-12 Each $ Balled and Burlaped Stock only Total Unit Extended Bid Price Group 3 $ *Total unit extended bid price shall be comprised of the total of items 1 through 6.* In compliance with the Invitation for Bids and subject to all the terms and conditions thereof, the undersigned offers and agrees that if this bid is accepted within 90 calendar days from the date of the opening, to furnish any or all of the items upon which prices are quoted, at the same price set opposite each item, delivered at the point specified above or in any purchase order and unless otherwise specified within the time specified in the Invitation for Bids or any purchase order. I hereby certify that I am authorized to sign as a Representative for the Firm. Authorized Signature Date Print Name & Title Firm / Bidder Name

BIDDER INFORMATION SHEET A BIDDER INFORMATION SHEET IS REQUIRED FOR EVERY BID SUBMITAL. ALL QUESTIONS ON THE BIDDER INFORMATION SHEET MUST BE COMPLETED. QUESTIONS LEFT BLANK OR MARKED N/A SHALL DEEM THE BIDDER NON-RESPONSIVE. 1. How many years of tree planting experience do you or your company have? 2. Can you obtain and plant 2,000 trees to bid specification from November 1 to April 30th? 3. How many trees does your company plant in an average season? 4. List any certifications of the people planting and overseeing the planting of the trees. 5. What is your capability or plan for watering in new trees at the time of planting, as well as, watering trees during the first growing season? 6. Do you have experience planting bare root trees? 7. Do you have experience planting seedling trees (whips)? 8. Do you have experience/capability transplanting larger trees (up to 6 caliper)? 9. Do you have experience planting with community groups or with citizen participation? 10. Are you familiar with the ANSI Standards for tree planting? All bidders, prior to award of contract must present satisfactory evidence that they have been regularly engaged in this type of work and they are prepared with the necessary labor, materials and equipment to execute work to the satisfaction of the City of Richmond. This evidence could include a reference list including name, address, phone number and description and dates of completed projects. Other evidence might include a payroll list, equipment inventory, nursery stock inventory or other evidence that indicates these resources are available to the bidder. PART I

SPECIFICATIONS 1. BACKGROUND The City of Richmond s (the City ) Department of Public Works, (DPW) Urban Forestry Division, is responsible for Trees and Planting of Trees. 2. STATEMENT OF WORK The Contractor shall provide, on an, if and when needed basis, Trees and Planting of Trees. 3. CITY REQUIREMENTS a) Bidder shall provide at least three (3) references of current contracts or projects similar in size and scope of work. b) Contracting agency may request inspection of equipment prior to awarding contract. c) All bidder questions to be acknowledged by the City must be submitted in writing to the assigned Contract Specialist for this solicitation. All written questions will be answered and published, added to the bid document by way of addendum. Any multiple questions will be included and answered only once. 4. CONTRACT AWARD Contract Award shall be made to the responsive and responsible bidder(s) that submits the lowest Hourly Rate for each individual line item. The City may award one or more contracts for each line item if deemed to be in the best interest of the City. Bidders may receive a contract for multiple line items. 5. PRICING A. All pricing shall be provided on the City s Bid Form and shall be in U.S. Dollars. B. The Bid Form is provided on a Microsoft Excel document. Bidders are to complete the Bid Form pricing electronically, print off, and submit with the Signature Sheet in lieu of a handwritten Bid Form submission. C. The quantities shown are estimates only and the City reserves the right to purchase only its requirements whatever the quantity may be, plus or minus, during the period specified. 6. PLANTING SCHEDULE a. The planting schedule shall begin no earlier than November 1 and continue through April 15th with the exception of Crape Myrtles. b. Planting in temperatures that drop below 32 degrees Fahrenheit for a prolonged period of time shall not be done, as this is injurious to the plant s root system. 7. TREE SELECTION All trees must have self-supporting, straight single stemmed trunks and strong central leader's. They must be free from injury to include: scrapes, wounds, and improper pruning cuts. They must be free from disease, insect or other infestations.

a. All trees shall be single stemmed unless otherwise specified. b. Trees shall be in good health, free of insects, disease or wounds. c. Root balls shall be dug or tree shall be bare root. d. As some species are difficult to obtain, substitutions may be necessary. Substitutions are only allowed by the signed consent of a City of Richmond Arborist. e. Trees branching habits shall conform to ANSI Z60.1 standards for the appropriate type of tree. f. Minimum root ball size shall conform to the ANSI Z60.1 standards. Minimum root spread for rare root trees shall meet the ISA Best Management Practices for minimum root spread. Root balls shall be sufficient size to encompass enough of the root system to promote the health and survival of the tree. Placing soil around tree roots after the tree has been dug to create a root ball is not acceptable. The bottom of the trunk flare SHALL be at or above finished grade. No container plant material shall be accepted, unless both parties agree to this in writing. All containers shall be coated with a material that inhibits the roots from girdling the plant. The City of Richmond reserves the right to inspect all trees before delivery. Trees of unacceptable quality will be rejected and the contractor shall replace them with an acceptable tree of the same species or a replacement approved by the arborist who manages the area. 8. TRANSPORTATION TO SITE a) All evergreens or plant material in full leaf shall be sprayed with an anti- desiccant and covered with shade cloths to prevent water loss. b) All trees shall be covered during transport to prevent windburn damage. c) Leaves shall not be removed from the trees as a substitute for antidesiccant treatment. d) The utmost care shall be taken during unloading to prevent damage to the plant material. e) The City of Richmond reserves the right to refuse delivery of trees damaged during loading and unloading. 9. Site Preparation A) No trees that grow larger than thirty feet tall (30) shall be selected for use under existing utility lines unless otherwise specified in writing. B) The planting area must be a shallow hole that is 2 to 3 times wider at the top than at the bottom, and large enough to accommodate the entire root ball. C) No loose dirt shall be placed at the bottom of the planting hole. D) Holes dug by machine shall have their sides scored to prevent glazing. E) The piling of excess dirt on top of the root ball shall not be allowed. F) The planting hole shall be dug to a depth that places the root flair of the.

G) Excess soil and other material present in the planting site shall be removed by the contractor at the time of planting. H) The planting hole shall be at least 1.5 times wider than the diameter of the rootball, except for when the Hardscape and infrastructure do not allow it. Any exceptions to this 1.5 rule must be approved in writing by the Director of the Public Works. 10. PLANTING AND PRUNING A) All trees shall be pruned according to ANSI A300 Pruning standards before planting to remove crossing, rubbing and/or broken branches. B) Typically, single-stemmed trees with co-dominant stems should be pruned to encourage dominance of one primary stem. C) All trees shall be planted according to ANSI A300 Transplanting D) The American Nursery and Landscape Association, American Society of Landscape Architects, and the Professional Grounds Management Society are represented in the ANSI Standards. E) No tree roots shall be pruned at time of planting except to remove broken or girdling roots. F) The bottom of the trunk flare shall be at or above finished grade. G) All trees shall have an upright 15 to 20 gallon portable drip irrigation bag watering device install on the tree. The contractor is responsible for supplying the watering device, and filling the bag upon installation. H) All trees shall have an adequate trunk protector installed on the tree. Appropriate materials should be selected and should be checked frequently for refitting during the warranty period. The contractor is responsible for supplying and installing the trunk protectors. The following guidelines shall be observed: Do: Remove all tags and labels. Cut away balling rope. Remove the top 1/3 of the wire basket. Cut and remove the burlap from the top of the root ball. Do Not: Use black plastic below mulch cover. Wrap the tree trunk with protective wraps, other than an approved trunk protector. Stake the tree unless necessary to maintain the tree in an upright position. Create a mulch layer deeper than 2 inches. Place mulch within 2 inches of tree s trunk. Trees shall be watered in 10-20 gallons at time of planting to remove any pockets from around the root ball and allow for settling.

Once the soil in the planting pit has settled, back fill holes with existing soil or with a better quality of soil so that it provides a dish to allow water to be transported to the root system. 11. BARE ROOT PLANTING a) All bare root plantings will be prescheduled with the contractor at least 7 days in advance. All Bare root trees shall be kept cool with the roots kept constantly moist until the trees are planted. The contractor is responsible for keeping the roots moist from the time of pick up until the trees are planted. b) All Bare root trees (and balled and burlaped trees if in exposed, windy areas) will be staked to keep them upright for one growing season. Stakes to be removed after one year. c) The planting hole shall be dug at least two times wider than the tree ball with sloping sides. The hole shall be dug to a depth so the root flare, at the first order lateral root, will be at finished grade. d) A firm soil mound must be at the bottom of the planting hole. e) Roots must be over the soil mound so that root flare is at finished grade and the tree is straight. f) Prune off any secondary/adventitious, girdling, and potential girdling roots. g) The planting hole shall be backfilled with existing un-amended soil and thoroughly water. h) The entire planting surface shall be mulched no less than two inches (2") deep and no more than four inches (4") deep, leaving three inches (3 ) adjacent to the tree trunk free of mulch. 12. MAINTENANCE AND WARRANTY A) Unless otherwise specified all trees shall be watered by the contractor, and given the necessary maintenance to survive the one year warranty period from time of planting. B) All trees shall be watered during periods where there is no appreciable rainfall for the length of the warranty period. During a typical growing season, each tree shall be watered a minimum of 6 times with 15-20 gallons per tree. The Contractor shall keep records of watering reports. The Contractor must provide a copy of the watering records to the City of Richmond. C) Stakes shall be 1x1 to 2x2 and wooden. The tree shall be protected from wire or other material that may injure the tree. If stakes were used to support weakstemmed trees, these stakes and strapping material shall be removed at the end of

the warranty period. Use only slow release fertilizers e.g. Osmocote (slow release fertilizer), or sulfur coated urea, or tree spikes if required. D) The contractor shall be required to provide a one year warranty for all trees that the contractor supplies. Any trees which is dead or over 50% dead prior to the end of the warranty period planting shall be acknowledged by communication between the contractor and the arborist in whose service area the tree exists. The tree is to be removed, as soon as possible, and replaced; both at the contractor s expense. Both parties shall maintain a log of these sites, and ensure the tree is replanted during the next planting season. Each replacement tree shall carry the same warranty as the tree it has replaced. 13. Grades and Standards for Nursery Stock and GRADING of CITY TREES Since most trees have a long life expectancy, it is important to plant quality trees. The quality or grade of a tree at planting can have a large impact on longevity in the landscape. Tree quality is based on trunk, branch, crown, leaf and root characteristics. Large-growing trees with double or multiple trunks should not be planted, as they become increasingly prone to failure as they grow. Trees graded UFD Fancy have one dominant trunk through the crown to the top of the tree. The exception would be for small trees (standard or multi-trunked) such as crape-myrtle, ligustrum, and others. Branch diameter should not be larger than 2 / 3 the diameter of the trunk measured directly above the branch union. There should be no flush cuts anywhere on the tree, and no open wounds on the trunk or major branches. The crown should be full of foliage and show little, if any, evidence of chlorosis, necrosis, disease or insect infestation. The root ball should be appropriately sized and be free of severe defects. Trees graded UFD No. 1 may require some corrective pruning to develop good trunk and branch structure. They may have minor trunk injuries or other defects. Defects can be corrected by pruning the tree at planting, and/or once or twice within a year or two after planting. UFD No. 2 is a lesser grade. These trees require major corrective pruning to form a structurally strong tree, or are misshapen. Large pruning dose will be required to develop a structure in these trees. Defects may take several prunings over time to correct. Cull is the lowest grade. These trees lack vigor or vitality, and/or have poor trunk and branch structure, or circling roots. They have other problems such as large open wounds, flush cuts or a loose root ball which may prevent them from becoming established in the landscape. Defects may take several years to correct, or may not be correctable. The better grades of trees require less pruning after planting. These have been properly trained and pruned in the nursery to develop a structure which resists damage from winds and other outside forces. Most tree maintenance budgets do not allow for pruning a tree after planting; it makes sense to plant only trees that are healthy and well formed. UFD requires all trees planted in the City of Richmond meet the standards for UFD Fancy or UFD No. 1. Lesser grades of trees are not acceptable for city planting sites and will rejected by the city arborist.

14. STEPS FOR GRADING TREES Note: Grades and Standards do not apply to specialty trees like braided stems, poodles, espalier, topiary, and bonsai. Trunk, Canopy, Roots 1. Assess trunk structure. Large growing species should have one trunk with evenly spaced, horizontal branches radiating away from center. Skip this step on small-growing species. 2. Assess crown uniformity, health, and vigor. 3. Assess root health and structure. If any of the following statements are true, the tree may be downgraded. a) Flush cuts were made when pruning branches from the trunk. b) Branch stubs were left beyond the collar. A branch stub can be removed and not reduce the grade. c) Open trunk wounds are evident. Wounds are considered open when they are greater than 10% of trunk circumference and/or more than 2 tall. Open or closed proper pruning cuts, surface abrasions or scratches to the bark should not be downgraded. d) More than 10% of the crown exhibits necrosis, chlorosis or damage from pests, diseases or tip dieback. e) The crown is thin and sparsely foliated. Some species are thin and sparsely foliated in fall through early spring. Recently harvested field grown trees might also be thin and should not be downgraded. f) There is included bark between the trunk and a major lateral branch or between main trunks. g) Trunks and/or major branches are touching. The tree may be a Cull if one of the following conditions is true: a) The top-most structural root (roots among largest on the tree) emerges from trunk (root collar) more than two inches below the top of the root ball surface. Soil, substrate and/or roots can be removed from the top 1 /3 of the root ball to conform to this depth requirement. b) One or more roots greater than 1 /10 the trunk caliper, circle more than 1 /3 of trunk, in the top ½ of the root ball. All three conditions (> 1 /10 trunk caliper, 1 /3 around, top ½ of the root ball) must be true to grade as a Cull. One or more circling roots less than 1 /3 the trunk diameter can be cut at the point just inside where they begin to circle. For multi-trunked trees, caliper equals the sum of the three largest trunks. Following cutting, the tree is no longer a Cull.

UFD FANCY UFD No.1 UFD No.2 CULL UFD Fancy Tree has one centered trunk; trunk does not have to be perfectly straight. Tip of leader on main trunk must be intact and its terminal bud must be the highest part of the tree. No trunk or branch can have a diameter greater than 2 /3 the trunk diameter measured directly above the branch union. If the trunk divides in two nearly equal diameter stems in the upper 10% of the tree, the trunk is not downgraded to a UFD No. 1. UFD No. 1 Trunk splits into two nearly equal diameter trunks in the upper ½ of the tree. If one trunk is 2 /3 or less diameter of the other trunk, they do not have equal diameters, making the tree a UFD Fancy. Pruning in the upper ½ of the tree to subordinate the competing trunk may leave a noticeable void in the crown. The tip of the leader on the main trunk must be intact and its terminal bud must be the highest part of the tree. UFD No. 2 Trunk splits in two nearly equal trunks in the lower ½ of the tree, or into three or more nearly equal diameter trunks in the upper ½ of the tree. Do not downgrade the tree if competing trunks are 2 /3 or less the diameter of one main trunk measured above the union. Pruning to subordinate competing trunks will leave a large void in the crown. If there is a dogleg in the clear trunk portion of the tree, grade the tree a UFD No. 2. A dogleg in the crown of the tree is not a downgrading factor. Cull Trunk divides into three or more nearly equal diameter trunks in the lower ½ of the trunk. END OF SPECIFICATIONS

PART II INSTRUCTIONS TO BIDDERS 1. AUTHORIZED SIGNATURE All bids must be signed in order to be considered. If the bidder is a firm or corporation, the bidder must show the title of the individual executing the bid and a resolution authorizing the individual to sign the bid and subsequent contract. 2. AWARD Pursuant to City Code 21-55(a), the City will make the award to the lowest responsive and responsible bidder. Whenever the City, in its sole discretion, deems it to be in the City s best interest to do so, the City reserves the right: A. To conduct any test it deems advisable. B. To make all evaluations necessary. C. To cancel this solicitation or to reject any or all bids, in whole or in part, as authorized by City Code 21-72(a). D. To waive informalities as authorized by City Code 21-72(b). E. To delete items prior to making the award. F. To negotiate an adjustment of the bid price with the lowest responsive and responsible bidder if and to the extent permitted by City Code 21-55(b). G. To award to more than one bidder as authorized by City Code 21-55(a). Each bidder to whom a contract is to be awarded must register with the City prior to award through the City s Supplier Registration Portal (http://www.richmondgov.com/procurement/supplierportal.aspx) and provide the banking

information necessary to facilitate Automated Clearing House electronic payments. This registration is a condition of award. 3. BIDDERS NOT DEBARRED By signing its bid in response to this Invitation for Bids, the bidder warrants and represents that neither its organization nor any of its officers, directors, partners or owners is currently barred from bidding on contract by any agency of the federal government, any agency of the Commonwealth of Virginia, any agency of any other state, or any other public body or agency thereof. 4. CONTRACTOR MISREPRESENTATION A. If any bidder knowingly makes a material misrepresentation in submitting information to the City, such misrepresentation will be sufficient grounds for rescinding any contract awarded under this solicitation to that bidder. B. Any bidder falsely representing past or proposed Minority Business Enterprise / Emerging Small Business participation may be in breach of contract. Upon determination of a breach, the City shall have all available remedies for breach of contract. 5. DELIVERY AND TIME FOR HOLDING OF BID A. General terms such as stock, immediately, and as soon as possible, if included as part of a bid, will not be deemed more favorable to the City than any required delivery terms and, in the absence of any required delivery terms, may result in the bidder being deemed nonresponsive. B. By signing its bid, the bidder offers and agrees, if the City accepts its bid within 90 calendar days from the date of the opening of bids, to furnish any and all items upon which prices are quoted at the same prices set opposite each item, delivered to the point specified in this Invitation for Bids, and at the time specified in the bid. 6. DESCRIPTIVE LITERATURE The bidder shall submit with its bid descriptive literature of equipment or supplies, which it proposes to furnish, if such articles are of a different manufacture than those specified herein. Should the description furnished in such literature differ from the specifications submitted by the City, and no mention is made to the contrary, it shall be construed to mean that the bidder proposes to furnish equipment or supplies in accordance with such description and not in accordance with the City's specifications, and its bid will be evaluated accordingly. 7. DISQUALIFICATION DUE TO PARTICIPATION IN PREPARATION OF SOLICITATION. A. City Code 21-281(a) prohibits any person who, for compensation, prepares a solicitation for or on behalf of the City from submitting a response to that solicitation or any portion thereof. B. For purposes of this section 7 ( Disqualification Due to Participation in Preparation of Solicitation ), the word prepares has the meaning set forth in City Code 21-281(b) and thus includes but is not limited to the following:

(1) Serving as a director or deputy director of the agency which has initiated the procurement; (2) Serving as the director of procurement services after the department of procurement services has received information on an agency's intent to procure; (3) Serving as the procurement manager for the agency which has initiated the procurement; (4) Serving as the procurement officer in charge of the procurement; (5) Assisting in the development of specifications for invitations for bids or requests for proposals; (6) Attending an evaluation committee meeting that is closed to the public; (7) Voting on or scoring a bid or proposal; or (8) Any other participation in the procurement process which could lead to unfair advantage. C. Pursuant to City Code 21-281(c), the Chief Administrative Officer shall make the determination that a person is disqualified from submitting a response to a particular solicitation because of that person s participation in preparing that solicitation. D. If a person planning to submit a response to a solicitation contacts the Chief Administrative Officer concerning such a disqualification, such person and the person s firm shall be disqualified from responding to the solicitation for violating the City s no contact policy because the person discussed the solicitation with a City representative other than the contract specialist responsible for the procurement. E. In accordance with City Code 21-281(d), any person who has been disqualified pursuant to this section 7 ( Disqualification Due to Participation in Preparation of Solicitation ) and City Code 21-281 may appeal the Chief Administrative Officer s determination of disqualification by following the administrative appeals procedure set forth in City Code 21-168 or by instituting legal action as provided in City Code 21-169. 8. ETHICS IN PUBLIC CONTRACTING; NO KICKBACKS OR CONFLICTS OF INTEREST A. By signing this solicitation, the bidder certifies that he has not violated any provisions of Federal law, the Code of Virginia, the Richmond City Code or Charter. The bidder certifies that its bid is made without collusion or fraud and that the bidder has not offered or received any kickbacks or inducements from any other bidder, supplier, manufacturer or subcontractor in connection with its bid and that the bidder has not conferred on any public employee having official responsibility for this procurement transaction any payment, loan, subscription, advance, deposit of money, services or anything of more than

nominal value, present or promised, unless consideration of substantially equal or greater value was exchanged. The bidder agrees that if such warranty is in any respect breached, the bidder will pay to the City the full price agreed by the City to be paid for the supplies, materials, equipment or services to be furnished under the bidder s bid. B. By signing and submitting its bid in response to this Invitation for Bids, the bidder represents and warrants that it is in compliance with the provisions of section 2.3 ( Anti-Kickback Provision ) of the General Terms and Conditions included with this Invitation for Bids and, further, that the bidder s firm has no business or personal relationships with any other companies or persons that could be considered as a conflict of interest or potential conflict of interest to the City, and that there are no principals, officers, agents, employees, or representatives of the bidder s firm that have any business or personal relationships with any other companies or persons that could be considered as a conflict of interest or a potential conflict of interest to the City, pertaining to any and all work or services to be performed as a result of this Invitation for Bids and any resulting contract with the City. 9. EXCEPTIONS An exception is any condition, limitation, restriction, term or other deviation from the requirements of the Invitation for Bids that is a condition of the bidder s bid or that the bidder expects to become part of a contract with the City. Bidders are strongly discouraged from taking exceptions to the requirements of the Invitation for Bids. Exceptions may result in the City declaring the bidder s bid to be non-responsive. Any exceptions taken must refer to the specific language of the Invitation for Bids to which the bidder objects and must be included with the bid on a separate page. The City shall be entitled to assume that the absence of any exceptions constitutes the bidder s willingness to comply with all requirements of all parts of the Invitation for Bids. 10. INCORPORATION OF POLICIES AND PROCEDURES This solicitation is subject to the provisions of the Chapter 21 of the Code of the City of Richmond, the Department of Procurement Services Policies and Procedures and any revisions thereof, all of which are hereby incorporated into this solicitation by reference. Copies of these documents may be viewed at the City s website (www.richmondgov.com). 11. LICENSES, PERMITS, AND FEES. All bids submitted shall have included in price the cost of any business or professional licenses, permits or fees required by the City of Richmond or the Commonwealth of Virginia. 12. MINORITY BUSINESS ENTERPRISE / EMERGING SMALL BUSINESS PARTICIPATION The City has a commitment to the development of its minority and emerging small business communities. The City therefore encourages the use of minority business enterprises and emerging small businesses on all City contracts to the fullest extent reasonably possible. For this particular solicitation, it has been determined that minority business enterprise and emerging small business participation of 10% is reasonably possible given the availability of minority business enterprises and emerging small businesses for the scope of work covered by this solicitation. The City's Office of Minority Business Development is available at 646-3985 as a resource in identifying local MBEs and ESBs. Bidders assistance in helping the City achieve its priorities is greatly appreciated.

13. WITHDRAWAL OF BIDS 13.1 CONDITIONS FOR WITHDRAWAL 13.1.1 BEFORE DEADLINE FOR RECEIPT A bidder may withdraw the bidder s bid before the deadline fixed in this Invitation for Bids for the receipt of bids by submitting a written notice to the person identified on the cover sheet of the Invitation for Bids as the preparer of the Invitation for Bids. The written notice must be signed by the person who signed the bid, provided that another person may sign the written notice instead if a valid power of attorney authorizing such other person to sign on behalf of the person who signed the bid is attached to the written notice. 13.1.2 AFTER DEADLINE FOR RECEIPT Pursuant to section 21-53(d) of the Code of the City of Richmond, a bidder may withdraw the bidder s bid after the deadline fixed in this Invitation for Bids for the receipt of bids only for the reasons set forth in subsections (a) and (b) of section 21-53 of the Code of the City of Richmond and the provisions of this section 13. 13.2 PROCEDURE FOR WITHDRAWAL DUE TO ERROR OR MISTAKE A. Bids will be opened on the date and at the time fixed in the Invitation for Bids, as amended by any addendum. Bids are usually opened at the time of the deadline for the receipt of bids fixed in the Invitation for Bids, as amended by any addendum. B. The bidder shall give notice in writing of the claim of right to withdraw the bid within two business days after the conclusion of the bid opening procedure and shall submit the bidder s original work papers, documents and materials used in the preparation of the bid with such notice. Under these procedures, the mistake shall be proved only from the original work papers, documents and materials delivered as required in this section 13.2. The work papers, documents and materials submitted by the bidder shall, at the bidder s request, be considered trade secrets or proprietary information subject to the conditions of section 21-5(f) of the Code of the City of Richmond. C. The failure of a bidder to submit the bidder s original work papers, documents and materials used in the preparation of the bidder s bid at or prior to the time fixed for the opening of bids constitutes a waiver by the bidder of the bidder s right to withdraw the bidder s bid due to an error or mistake. D. Pursuant to section 21-53(e) of the Code of the City of Richmond, no bid shall be withdrawn under this section when the result would be the awarding of the Contract on another bid of the same bidder or of another bidder in which the ownership of the withdrawing bidder is more than five percent.

E. Pursuant to section 21-53(f) of the Code of the City of Richmond, if a bid is withdrawn in accordance with this section 13.2, the lowest remaining bid shall be deemed to be the low bid. F. Pursuant to section 21-53(g) of the Code of the City of Richmond, no bidder who is permitted to withdraw a bid shall, for compensation, supply any material or labor to or perform any subcontract or other work agreement for the person to whom the Contract is awarded or otherwise benefit, directly or indirectly, from the performance of the project for which the withdrawn bid was submitted. The person or firm to whom the Contract was awarded and the withdrawing bidder are jointly liable to the City in an amount equal to any compensation paid to or for the benefit of the withdrawing bidder. G. Pursuant to section 21-53(h) of the Code of the City of Richmond, the Director of Procurement Services shall notify the bidder in writing within five business days of the Director s decision regarding the bidder s request to withdraw the bidder s bid. If the Director of Procurement Services denies the withdrawal of a bid under the provisions of this section 13.2, the Director of Procurement Services shall state in such notice the reasons for the decision and award the Contract to such bidder at the bid price, provided such bidder is a responsible and responsive bidder. At the same time that the notice is provided, the Director of Procurement Services shall return all work papers and copies thereof that have been submitted by the bidder. 13.3 CONSEQUENCE IF BID NOT WITHDRAWN If the bidder does not withdraw the bidder s bid as provided in this section 13, or if the bidder is not permitted to withdraw the bidder s bid as described in section 13.2(G), the City shall not be liable for any costs associated with mistakes or errors in the bid, and in no event may the amount of the Contract, without adequate consideration, be increased for any purpose, including, but not limited to, relief of the bidder from the consequences of an error in the bidder s bid or offer. 14. NON-DISCRIMINATION The City does not discriminate against faith-based organizations. By signing its bid, the bidder, if a faith-based organization, agrees that it understands the requirements of City Code 21-43 (Va. Code 2.2-4343.1). 15. ORAL EXPLANATIONS OR INTERPRETATIONS A. All inquiries requesting clarification of this Invitation for Bids should be made in writing no later than ten business days prior to the closing date to the Contract Specialist identified on the cover page of this solicitation. If submitting an inquiry by facsimile transmission, the bidder should notify the Contract Specialist by telephone that the person is faxing the inquiry. All inquiries should clearly state the number of this Invitation for Bids. Because each bidder may have different needs for information, that bidder must make whatever inquiries it deems necessary in order to respond to the Invitation for Bids. Inquiries that the Contract Specialist

determines to be pertinent to all solicited bidders will be answered by addenda to all solicited bidders. B. No oral explanation in regard to the meaning of this Invitation for Bids will be made and no oral instructions will be given before the award of the contract. Any explanation, interpretation or modification of the Invitation for Bids that is pertinent to all solicited bidders will be made only by an addendum duly issued by the City, a copy of which will be mailed or delivered to each bidder known to have received the Invitation for Bids. The City shall not be responsible for any other explanations or interpretations anyone presumes to make on behalf of the City before the expiration of the ultimate time set for the receipt of bids. C. From time to time, addenda may be issued that will provide clarifications or supplemental information about the Invitation for Bids documents. All persons receiving Invitation for Bids documents issued by the City will be provided copies of addenda. If a bidder fails to acknowledge any addendum that (i) has a material effect on the bid (i.e., that relates to price, quantity, quality or delivery) and (ii) is not merely administrative, the City may consider that bidder s bid incomplete, and the bid thus may be rejected as nonresponsive. The bidder shall acknowledge receipt of all addenda as part of its bid and on the form provided for that purpose by the City. The bidder shall be solely responsible for verifying the existence of all addenda items. D. Any contact with any City representative concerning this Invitation for Bids other than that outlined in subsection (A) of this section is prohibited. Any such unauthorized contact may disqualify the bidder from this procurement. E. The Specifications and the General Terms and Conditions attached to this Invitation for Bids are hereby expressly made a part of and incorporated into this Invitation for Bids. The Specifications and the General Terms and Conditions shall be a part of any contract that results from this Invitation for Bids. This Invitation for Bids also includes a sample of the City s form contract as an attachment. All conditions contained in this attached contract are hereby expressly made a part of and incorporated into this Invitation for Bids. 16. POSTING OF INTENT TO AWARD Following the selection and signing of a contract, the Purchasing Officer will notify those bidders whose bids are not selected of the name of the selected bidder. Bidders should note that it may take up to two months to award this contract. 17. PUBLIC INSPECTION OF RECORDS. A. All proceedings, records, contracts and other public records relating to the procurement transaction that this solicitation concerns shall be open to the inspection of any citizen or any interested person, firm or corporation, in accordance with the Virginia Freedom of Information Act. B. Any bidder, upon request, shall be afforded the opportunity to inspect bid records within a reasonable time after the opening of all bids, but prior to award, except in the event that

the City decides not to accept any of the bids and to reopen the contract. Otherwise, bid records shall be open to public inspection only after award of the contract. C. Pursuant to City Code 21-5(f) (Va. Code 2.2-4342(F)), trade secrets or proprietary information submitted by a bidder in connection with this procurement transaction shall not be subject to the Virginia Freedom of Information Act, provided that the bidder (i) invokes the protections of this section prior to or upon submission of the data or other materials, (ii) identifies the data or other materials to be protected, and (iii) states the reasons why protection is necessary. D. Budgets and price quotations are considered public information in bids submitted to the City. Classifying budgets and price quotations as proprietary or confidential may render the bid non-responsive. Classifying aspects of the bid that are not trade secrets or proprietary may render the bid non-responsive. E. All bids submitted under this solicitation will become the property of the City and will not be returned. 18. SAMPLES Samples of items, if requested, shall be furnished without charge, upon request within ten days. Failure on the part of the bidder to provide such samples within the specified time frame or to comply with these instructions may be cause to consider the bid as non-responsive. If not destroyed and upon request at the time of submission, samples will be returned at the bidder s expense. 19. SEPARATE INVITATIONS Bid responses for separate bid invitations shall not be combined on the same form or placed in the same envelope. Such bids may not be considered. 20. STATE CORPORATION COMMISSION FORM A. State law requires most business entities to register with the Commonwealth of Virginia s State Corporation Commission to obtain legal authorization to transact business in Virginia. A contractor organized as a stock or nonstock corporation, limited liability company, business trust, or limited partnership or registered as a registered limited liability partnership shall be authorized to transact business in the Commonwealth as a domestic or foreign business entity if so required by Title 13.1 or Title 50 of the Code of Virginia or as otherwise required by law. Any business entity described above that enters into a contract with the City shall not allow its existence to lapse or its certificate of authority or registration to transact business in the Commonwealth, if so required under Title 13.1 or Title 50, to be revoked or cancelled at any time during the term of the contract. B. Each bidder organized or authorized to transact business in the Commonwealth of Virginia pursuant to Title 13.1 or Title 50 of the Code of Virginia shall include in its bid the identification number issued to it by the State Corporation Commission. Any bidder that is not required to be authorized to transact business in the Commonwealth as a foreign

business entity under Title 13.1 or Title 50 of the Code of Virginia, or as otherwise required by law, shall include in its bid a statement describing why the bidder is not required to be so authorized. Each bidder shall indicate the above information on the State Corporation Commission Form included with the Invitation for Bids. C. By signing its bid in response to this Invitation for Bids, the bidder represents and warrants that all information the bidder submits on its completed State Corporation Commission Form is true and complete at the time the bidder submits its bid and will remain true and complete throughout the duration of any contract between the City and the bidder that results from this Invitation for Bids. The bidder agrees that the process by which compliance with Title 13.1 and Title 50 of the Code of Virginia is checked during the solicitation stage (including without limitation the State Corporation Commission Form provided) is streamlined and not definitive, and the City s use and acceptance of such form, or its acceptance of the bidder s statement describing why the bidder was not legally required to be authorized to transact business in the Commonwealth of Virginia, shall not be conclusive of the issue and shall not be relied upon by the bidder as demonstrating compliance. 21. SUBMISSION OF BIDS A. Unless otherwise specified in the solicitation, the below provisions apply. Packages containing bids should be sealed and marked in the lower left-hand corner with the invitation number and the date and hour of opening of bids. Failure to do so may cause bid not to be considered. B. Bids shall be submitted on the forms furnished. Erasures or other changes in the bid must be annotated and initialed by the individual signing the bid. C. Bids containing any conditions, omissions, unexplained erasures or alterations or items not called for on the bid sheet may be rejected by the City as being incomplete. D. Bids submitted in pencil may be cause for rejection. E. Should any additions or deductions or any changes in price or specifications be written or otherwise set forth on the outside of any sealed package purporting to contain a bid, such package shall be returned unopened to the bidder. F. The City is not responsible for the mishandling of any bid not properly identified on the outside of the package. G. The City is not responsible for bids delivered to places other than as indicated in the bid package. H. Late bids shall be deemed non-responsive and shall not be accepted. 22. UNIT PRICING