The Empire State Building Repositioning an Icon as a Model of Energy Efficient Investment

Similar documents
FIVE YEAR PLAN FOR ENERGY EFFICIENCY

New Jersey Clean Energy Collaborative. Regulatory Reporting

For the Efficiency Maine Trust October 15, 2009 Eric Belliveau, Optimal Energy Inc.

Board of Trustees Budget, Finance and Facilities Committee Meeting January 24, 2019

Financing for Energy & Sustainability

TransformTO Short-term Strategies Business Case

Exhibit DAS-1. Tucson Electric Power Company Demand-Side Management Program Portfolio Plan

PACE Financing. J. Caleb Bell, Partner Bricker & Eckler LLP

Richmond Building Energy Challenge

ENERGY EFFICIENCY AND

Incentive Scenarios in Potential Studies: A Smarter Approach

EX22.2v REPORT FOR ACTION. TransformTO Short-term Strategies Financial Estimates SUMMARY

Implementation of (I) Nationally Determined Contribution (NDC) & Post Enhanced Transparency Framework

ADB Support to Thailand on the Development of Emissions Trading; Project synopsis

Third-Year Program Results for a Utility Recommissioning Program

Administrative Response PwC - CO2 Reduction Initiatives Audit Report

Terms of Reference. Contract #: (to be provided by PSU)

DSM Mid-Term Review. Presentation to the Conservation Mid-term Review Advisory Group Valerie Bennett

Demand-Side Management Annual Status Report Electric and Natural Gas Public Service Company of Colorado

Republic of Kazakhstan. Director Climate Change Department. Ministry of Energy

Experience with Traditional and Emerging ESCO Models. Peter White

MTEP16 Futures Development Workshop 1/15/15

Morocco Final Market Readiness Proposal

Capital Planning tools that can help. Chris Hodges, P.E., CFM, LEED AP, IFMA Fellow Principal, Facility Engineering Associates

Climate Action Reserve Forest Project Protocol Proposed Guidelines for Aggregation

Compensation Rules for Climate Policy in the Electricity Sector

Dollars to $ense Energy Efficiency Financing Mini-Workshop

Dollars to $ense. Energy Efficiency Financing Mini-Workshop. February 11, 2014 The International Centre

CALIFORNIA CLEAN ENERGY JOBS ACT LAUSD PROPOSITION 39 ENERGY EFFICIENCY PROGRAM

How Ontario is Putting Conservation First

CUSTOMER BENEFITS. buildingrenewal.org

MANAGING FOR RESULTS: An Implementation Plan for the City of Portland

PERFORMANCE & PERSPECTIVE. Disclaimer

EVALUATION, MEASUREMENT & VERIFICATION PLAN. For Hawaii Energy Conservation and Efficiency Programs. Program Year 2010 (July 1, 2010-June 30, 2011)

Proposed Rule 350 Greenhouse Gas (GHG) Program Fees. SMAQMD April 29, 2010

APPENDIX B: PORTFOLIO OPTIMIZATION MODEL

The Bottom Line to Carbon Abatement in Existing Buildings

Snohomish PUD. Energy Services Team November 7, 2018

The UK's policy proposal for a small emitter and hospital opt out from the EU ETS according to Article 27, as notified to the European Commission

Evaluation of the Pilot Project of Domestic Emissions Trading Scheme

China s National ETS. LIU Wenbo, SU Chang CHINA Kyiv, Ukraine

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

Carbon report SEB Norway Focus Fund

Environmental, Social Responsibility and Corporate Governance Policy

The Real Meaning of Total Cost of Ownership (TCO)

JOLIET LANDLORD CONFERENCE October 20 21, 2014

Sustainable investments in real estate development and trends. The Fund Manager Perspective

Sustainability: Quo vadis? Energy Efficiency Opportunities in Real Estate

Existing Building Policy Proposal. Cost Evaluation

Market-based Policy Instruments for Climate Change IEST5011: Managing the Greenhouse, July Iain MacGill

Supported NAMA Template Discussion Draft

Stanford Life Cycle Cost Analysis Guide. Introduction & Methodology Interpreting LCCA Results LCCA Timeline Tool Instructions

Brief course information Strategic planning and project selection Project integration management Project scope management

Unlocking the Building Retrofit

DRAFT. Chair s Proposed Draft Text on the Outcome of the Work of the Ad Hoc Working Group on Long Term Cooperative Action under the Convention

Implications for Building Owners

Toronto Atmospheric Fund

Energy Conservation Resource Strategy

Proposition 39 Implementation Guidelines

Financing Energy Efficiency in Developing Countries Lessons Learned and Remaining Challenges

Building Systems and Performance: an Introduction to Building Operator Certification Lesson 19: Energy Audits

Thailand Final Market Readiness Proposal

Carbon report SEB US All Cap

ROUNDTABLE MEETING ON SUSTAINABLE PALM OIL

AN INTRODUCTION TO RENEWABLE ENERGY

HVAC Unitary Incentives

+ 50% by In the short term: 50% increase in low carbon investments. + investment

BRAZIL MRP IMPLEMENTATION STATUS REPORT (ISR)

Five-Day Schedule and Course Content

High Performance Schools- How do we get there? Build an Energy Team and Utilize Performance Contracting

California s Cap and Trade Program. Session 5 Use of Offsets. PMR Technical Workshop March 13, 2012

Time consistency and the duration of government debt: a signalling theory of quantitative easing

OVERVIEW PRELIMINARY DRAFT REGULATION FOR A CALIFORNIA CAP-AND-TRADE PROGRAM - FOR PUBLIC REVIEW AND COMMENT - November 24, 2009

Carbon report SEB Nordic Focus Fund

SUBMISSION DOCUMENT EXECUTIVE SUMMARY

RGGI Program Review: REMI Modeling Results

Technical Workshop Corporate Climate Change Reporting: Towards consistent and targeted schemes OECD (Paris) 15th February 2012

Toronto Atmospheric Fund

Executive Director s Summary Report

Prepared for the BC Sustainable Energy Association. Expanding Energy Efficiency for BC Hydro: Lessons from Industry Leaders.

INTEGRATING ECOLOGICAL RISK IN SOVEREIGN CREDIT RATINGS AND INVESTMENTS

Canada s Submission on SBSTA Item 11(a): Article 6, Paragraph 2 October, 2017

2017 Governor s Energy Summit. Holly Kauffman President, West Virginia Operations

PMR Turkey Request for Additional Funding

Airside Efficiency Program

How could LDCs benefit from NAMAs?

Managing Long Term Liability Associated with Carbon Storage

3. The paper draws on existing work and analysis. 4. To ensure that this analysis is beneficial to the

Financing Energy Efficiency and Implementation Models in Developing Countries

False Dilemmas, Energy Projects and Value Creation

Facilities Management and Real Estate

Ameren Missouri MEEIA Energy Efficiency Plan

A Portfolio Approach to Securing Internal Financing for Energy Efficiency

Green-e Direct Requirements

RULE 250 SACRAMENTO CARBON EXCHANGE PROGRAM Proposed Adoption INDEX

Context and framework

Second-Party Opinion EDP Green Bond The Framework applies to issuances by EDP Energias de Portugal S.A. and EDP Finance BV.

New York State Energy Research and Development Authority

Energy Efficiency Simple, Safe Investment. Tim Gasper, PE Brady Energy Services (919)

ACRP Report 139 Overview

Transcription:

The Empire State Building Repositioning an Icon as a Model of Energy Efficient Investment Paul Rode, P.E. Johnson Controls Inc. ACEEE National Symposium on Market Transformation April 12 th, 2011

The Empire State Building Demonstrate the business case for cost effective energy efficient retrofits through verifiable operating costs reductions and payback analysis 102 stories and 2.8 million square feet` 3.8 million visitors per year $11 million in annual energy costs Peak electric demand of 9.5 MW down from 11.6 (3.8 W/sqft, inc HVAC) 88 kbtu per sq ft per yr for the office building CO 2 emissions of 25,000 tons per yr (22 lbs/sqft) 2

PROJECT DEVELOPMENT PROCESS 1) Five key groups and contributors used a collaborative and iterative approach. The project development process, which the team focused on, is the first step towards executing and verifying the success of a retrofit. Retrofit Project Timeline 2010 2025 Project Execution Measurement & Verification Project development 3

PROJECT DEVELOPMENT PROCESS 2) A 4-phase project development process helped guide progress. Project activities (audits, workshops, presentations, analyses, reports, etc.) were divided into 4 phases. Phase I: Inventory & Programming Phase II: Design Development Phase III: Design Documentation Phase IV: Final Documentation Activities April 14 th kick-off meeting May 7 th /May 14 th team workshops June 2 nd Presentation to Ownership June 18 th Theoretical Minimum workshop July 2 nd workshop July 15 th Presentation to ownership July 30 th Tenant Focus workshop August 13 th equest workshop August 27 th Presentation to Ownership Sept. 10 th workshop Sept 29 th Presentation to Ownership October 6-8 th Finance workshop (Boulder) Nov 10 th Presentation to Ownership Outputs Baseline Capital Projects Report Baseline Energy Benchmark Report Tenant Initiatives (prebuilts, design guidelines, energy management) Report Tuned equest model Model (equest, financial, GHG) outputs Integrated Sustainability Master Plan Report (inc. Energy Master Plan) 4

PROJECT DEVELOPMENT PROCESS 3) A variety of tools were used and developed to triangulate to the best answer. Industry standard and newly developed design tools, decision-making tools, and rating tools helped to evaluate and benchmark existing and future performance. Design Tools Decision-Making Tools Rating Tools 5

PROJECT DEVELOPMENT PROCESS A 4-phase project development process helped guide progress. Determining the optimal package of retrofit projects involved identifying opportunities, modeling individual measures, and modeling packages of measures. Identify Opportunities Model Individual Measures Create Packages of Measures Model Iteratively Outcome: Package of measures with best economic & environmental benefits 6

Balance financial return & carbon reduction ESB can achieve a high level of CO 2 and energy reduction cost-effectively A solution that balances CO 2 reductions and financial returns is in this range. There are diminishing (and expensive) returns for greater efficiency. 7

LESSONS LEARNED 2) At a certain point, there is tension between CO2 savings and business value. Maximizing business value leaves considerable CO2 on the table. Choice package to maximize NPV. 8

KEY FINDINGS 1) Eight interactive levers ranging from base building measures to tenant engagement deliver these results. Achieving an energy reduction greater than 38% appears to be cost-prohibitive. The average cost per ton of carbon dioxide saved for the first 90% of the savings is -$200/ton while the average cost per ton for the last 10% is over $300 per ton. 9

LESSONS LEARNED At a certain point, CO2 savings and business value become polarities. Attempting to save CO2 faster may be cost prohibitive. Acceleration reduces the NPV as projects become out of sync with replacement cycles 10

LESSONS LEARNED Several approaches help maximize cost-effective savings. Projects are most cost-effective when coordinated with equipment replacement cycles. Incremental CapEx Absolute CapEx 11

LESSONS LEARNED At a certain point, CO2 savings and business value become polarities. Anticipated CO2 regulation in the U.S. doesn t change the solution set though European levels of regulation would. 12

Implementing recommended measures Eight interactive levers ranging from base building measures to tenant engagement deliver these results 38% Reduction 13

IV. IMPLEMENTATION 1) Three stakeholders, with different implementation mechanisms, will deliver the savings. Johnson Controls, the Empire State Building, and Tenants are each responsible for delivering some of the total savings. 14

Business case through verifiable operating costs reductions and payback analysis With a $550 million capital improvement program underway, ownership decided to re-evaluate certain projects with cost-effective energy efficiency and sustainability opportunities in mind. 2008 Capital Budget for Energy- Related Projects = $93m+ 0% Energy Savings Sum of adds / changes / deletes = +$13m 3.1 year payback on incremental cost New Capital Budget w / Efficiency Projects = $106m + 38% Energy Savings 15

III. KEY FINDINGS 1) Eight interactive levers ranging from base building measures to tenant engagement deliver these results. Though it is more informative to look at financials for the package of measures, capital costs and energy savings were determined for each individual measure. Project Description Projected Capital Cost 2008 Capital Budget Incremental Cost EstimatedAnnual Energy Savings* Windows $4.5m $455k $4m $410k Radiative Barrier $2.7m $0 $2.7m $190k DDC Controls $7.6m $2m $5.6m $741k Demand Control Vent Inc. above $0 Inc. above $117k Chiller Plant Retrofit $5.1m $22.4m -$17.3m $675k VAV AHUs $47.2m $44.8m $2.4m $702k Tenant Day/Lighting/Plugs $24.5m $16.1m $8.4m $941k Tenant Energy Mgmt. $365k $0 $365k $396k Power Generation (optional) $15m $7.8m $7m $320k TOTAL (ex. Power Gen) $106.9m $93.7m $13.2m $4.4m *Note that energy savings are also incremental to the original capital budget. 16

Limited internal capital is greatest barrier 3.1 Average maximum payback period for energy efficiency 48% require a 3 year payback or less 17 Energy Efficiency Indicator Global 2010 Findings Copyright 2010 Johnson Controls, Inc. 17

Internal capital budgets is primary funding source 18 Energy Efficiency Indicator Global 2010 Findings Copyright 2010 Johnson Controls, Inc. 18

VI. INDUSTRY NEEDS a) Select the right buildings for whole-systems retrofits Retrofitting the right buildings in the right order can reduce the societal cost ($/metric ton) for carbon abatement. 4 3 1 2 19

VI. INDUSTRY NEEDS b) Develop solutions for small to mid-range commercial buildings. Most retrofit or energy service companies only address large commercial buildings or residential buildings. Yet 95% of the U.S. building stock is small to mid-sized buildings that consume 44% of total energy use. Source: EIA data 20

www.esbsustainability.com 21