CASE STUDIES IN PRIVATE SECTOR PARTICIPATION: WATER SUPPLY SERVICES

Similar documents
Infrastructure development in the Private Sector

Pacific Infrastructure Review Background Paper Final Report

Money, Finance, and Prices

Alternative ways of Financing Urban Development

Draft PPP Policy Outline

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT Sector Performance, Problems, and Opportunities

GCCA Support Facility Training on mainstreaming of climate change March 20100, Port Vila, Vanuatu

Private sector participation in WATSAN services

Economy Profile 2016 Papua New Guinea

MFA-PUB ASEAN Bilateral Programme

Doing Business 2015 Fact Sheet: East Asia and the Pacific

FORUM ECONOMIC MINISTERS MEETING FORUM ECONOMIC OFFICIALS MEETING SME RISK SHARING FACILITY:

Project Development Under PPPs

Aid for Adaptation to Climate Change in the Pacific Island Countries

Public Private Partnerships What is That??? Raymond Partridge, Program Manager July 17, 2013

MEETING ASIA S INFRASTRUCTURE NEEDS HIGHLIGHTS ASIAN DEVELOPMENT BANK

The Importance of Fiscal Transparency. PFM Panel Session PFTAC Steering Committee 27 March 2018

Governor Statement No. 21 September 23, 2011

Undertaking Successful PPPs in Kazakhstan

Inclusive Growth, Poverty and Inequality in Pacific Island Countries

MDG 8: Develop a Global Partnership for Development

Papua New Guinea Tax Profile

Delivering Public Private Partnerships in PNG

Road Infrastructure Maintenance: Lessons from Africa and the Pacific

Doing Business 2018 Papua New Guinea

INFRASTRUCTURE NEEDS

IMPLEMENTING SOE REFORM IN THE PACIFIC: CHALLENGES, PROGRESS AND LESSONS LEARNED

Goal 8: Develop a Global Partnership for Development

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT

PPP - ADB's role in structuring, financing and procurement. Asean Connectivity Forum 8 November, 2016

Chinese development assistance in the Pacific

Financing Sustainable Infrastructure In Asia. Fei Yu Deputy Representative Asian Development Bank North American Representative Office

Submission by the Pacific Islands Forum Secretariat, Suva, Fiji. To the UNFCCC Standing Committee on Finance

Agenda 3. The research framework for compiling and analyzing income support scheme

VANUATU NATIONAL INFRASTRUCTURE MASTERPLAN. Terms of Reference for Consultants

Workshop: Compiling and forecasting gross domestic product October Suva, Fiji

Asia-Pacific Countries with Special Needs Development Report Investing in infrastructure for an inclusive and sustainable future

Macroeconomic Policy Challenges in the Pacific Islands and IMF work. Patrizia Tumbarello Unit Chief, Small States Apia, February 26, 2016

Asia-Pacific Countries with Special Needs Development Report Investing in Infrastructure for an Inclusive and Sustainable Future

MAJURO WATER AND SEWER COMPANY, INC. (A COMPONENT UNIT OF THE REPUBLIC OF THE MARSHALL ISLANDS) FINANCIAL STATEMENTS AND INDEPENDENT AUDITORS' REPORT

Yanino Waste Processing Plant City of St. Petersburg

Papua New Guinea. Economy Profile. Page 1

SESSION 2 PFTAC TECHNICAL ASSISTANCE ON ECONOMIC STATISTICS: PROGRESS AND PRIORITIES

Keynote Address: Legal Issues for PPP Transactions

Trends in ODA to the Pacific islands: Budget support, conditionality and effectiveness

THE MANAGEMENT OF ROAD PROJECTS IN PAPUA NEW GUINEA

Disaster Risk Reduction and Financing in the Pacific A Catastrophe Risk Information Platform Improves Planning and Preparedness

FREE TRADE AGREEMENTS ANALYSIS

PPP Arrangement in WtE Plants

FOURTH MEETING INTERSESSIONAL WORKING GROUP REGIONAL OBSERVER PROGRAMME (IWG-ROP4)

Plenary 2: Public-Private Partnerships. Monday, 12:00 to 13:00

MDG 8: Develop a Global Partnership for Development

Economy Profile 2017 Papua New Guinea

Capacity Development: Managing for Results PFTAC Coordinator: David Kloeden

Challenges with climate change financing in the Pacific

Financial Sector Supervision Report YE2016 Activities YE2017 Pursuits

PROJECT PREPARATION TECHNICAL ASSISTANCE

Strategy #1: Partnering with the Private Sector through PPP. EY Infrastructure Advisory. October 2017

P3 Procurement Lessons Learned: Regina WWTP

PACIFIC RENEWABLE ENERGY FINANCING. Pacific Panel Session: Connect 2015

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

MFF - Bihar Urban Development Investment Program (Facility Concept)

Vanuatu: Country Partnership Strategy ( )

DOMESTIC PREFERENCE GUIDANCE NOTE ON PROCUREMENT JUNE 2018 ASIAN DEVELOPMENT BANK

Session 1 : Economic Integration in Asia: Recent trends Session 2 : Winners and losers in economic integration: Discussion

reform recovery growth Transforming Tonga a private sector assessment Summary

Finding Balance. Making State-Owned Enterprises Work in Fiji, Samoa, and Tonga

Ministry of Finance Republic of the Marshall Islands. Consultant Recruitment Announcement SEDeP Project Manager

NATIONAL SUSTAINABLE DEVELOPMENT STRATEGIES: NSDS: WHAT IS IT?

Meeting the Challenges in an Era of Globalization by Strengthening Regional Development Cooperation ANNEX II.

Public Private Partnerships 101

International Monetary and Financial Committee

Pacific Region Infrastructure Facility. infrastructure maintenance in the pacific. Challenging the Build-Neglect-Rebuild Paradigm

Pacific High-level Policy Dialogue on The Role of Macroeconomic Policy and Energy Security in supporting Sustainable Development in the Pacific

Annual Report on the 2016 Country Performance Assessment Exercise

Regional economic overview: Midyear assessment. Christopher Edmonds Senior Economist Pacific Department, Asian Development Bank, Manila

An overview of the EBRD. May 2015

Value for Money and Project Report

CONTENTS. Page EXECUTIVE SUMMARY I. OVERVIEW 1 II. FINDINGS AND RECOMMENDATIONS 2 III. CONCLUDING REMARKS 19

Public Private Partnerships IFC s Global Experience

General principles: Principles guiding the delivery of TA remain the same as was in the PFTAC paper, except for the addition of point 4:

2018/SMEWG/DIA/008 National Financial Inclusion Strategy

INSTITUTION BUILDING IN INFRASTRUCTURE SECTOR 1 I. ISSUES TO ADDRESS

Public Private Partnerships An overview from the legal perspective

Independent State of Samoa: Port Development Project

Technical Assistance in Support of the Pacific Financial Technical Assistance Centre in the Pacific Island Countries

T o o l k i t f o r P u b l i c - P r i v a t e P a r t n e r s h i p s i n r o a d s & H i g h w a y s. Advantages of PPP

Project Number: {April 2017} Establishment of the Canadian Climate Fund for the Private Sector in Asia II

International Monetary and Financial Committee

Sameh I. Mobarek Senior Counsel Energy, LEGPS Member, Global Expert Team on Public-Private Partnerships. PPP Financing Overview

New Zealand Vanuatu. Joint Commitment for Development

SECTOR ASSESSMENT (SUMMARY): INDUSTRY AND TRADE

Institutional Strengthening for Aviation Regulation

What is PBC and how it can help deal with the challenges of reducing NRW?

Health Care Financing in Asia: Key Issues and Challenges

Financing Agreement OFFICIAL DOCUMENTS GRANT NUMBER D004-FM FEDERATED STATES OF MICRONESIA INTERNATIONAL DEVELOPMENT ASSOCIATION

Statement of the Asian Development Bank s Operations in 2017

Doing Business in the Pacific

SAMOA S SMOOTH TRANSITION STRATEGY REPORT

Paying Taxes 2019 Global and Regional Findings: ASIA PACIFIC

Transcription:

Pacific Private Sector Development Initiative Enabling the private sector to drive sustainable economic growth and lift Pacific people out of poverty CASE STUDIES IN PRIVATE SECTOR PARTICIPATION: WATER SUPPLY SERVICES Water and Wastewater Services in the Pacific Water and wastewater services in Pacific island countries (PICs) include three broad activities: water treatment, water distribution, and wastewater treatment. In most Pacific urban areas, these functions are the responsibility of public sector departments or state-owned enterprises. Water and wastewater services typically require large capital and maintenance expenditure throughout the life of the assets. In the Pacific, capital expenditure is often funded through donor grants and loans, but maintenance expenditure is rarely sufficient to support the useful life of the assets. Water utilities suffer from high rates of nonrevenue water, both from leakage and from low collection rates. Very few water utilities collect enough revenue from users to recover their costs and provide a commercial return. Where and How is the Private Sector Involved? The private sector has only a limited involvement in providing reticulated water and wastewater services in PICs. The exceptions are Vanuatu and the city of Port Moresby in Papua New Guinea, which have the only concessions for water supply in the Pacific. In most other countries, private sector activity has only recently started to emerge, as countries look to leverage private sector innovation and accountability in the building of new infrastructure and the delivery of services. Amoso Inu of the Ministry of Works, Transport & Infrastructure in Apia, Samoa. The Pacific Private Sector Development Initiative is a regional technical assistance facility cofinanced by the Asian Development Bank, the Government of Australia, and the Government of New Zealand. A survey of public private partnerships (PPPs) in eight PICs, conducted in 2015 and facilitated by the Pacific Regional Infrastructure Facility, identified a total of eight contracts.

Water and Wastewater Contracts in Pacific Island Countries, 2015 Country Project Form of Public Private Partnership Term Services Provided Payment Mechanism Contract Size Papua New Guinea Mt Eriama (Port Moresby) Water Treatment Plant Build-operatetransfer 22 years Design, build, financing, and operation of water treatment plant Fixed facilities fee, plus payment against volume of water treated K123 million capital cost; K22.5 million annual fixed facilities fee for 18 years Eda Ranu Management contract 22 years Consumer services agreement for operation and maintenance (O&M) of all system assets, billing, and collection of water and sewerage fees Monthly service fee for facilities management, based on a monthly fixed rate of 7% of retail proceeds from the sale of water to consumers Vanuatu Port Vila water supply Concession 40 years (1994 2034) Management of water production and distribution, including financing of new capital expenditure Revenues from tariff collection, with tariffs set at a level to ensure a 12% return on capital expenditure Tonga Tonga Water Board outsourcing Service contract 2 years Contracting out plumbing services Samoa Apia wastewater Design-buildoperatemaintain (DBOM) 5 years Design, build, operate, and maintain; original contract for 5 years of O&M expired in September 2015; Samoa Water Authority now operating and will assess staff performance in 12 months in light of skills transfer from now-completed O&M contract; possibly then retender O&M Fixed monthly rate, with provisions for penalties based on performance targets; payments never withheld $5 million total, including $750,000 for 5 years of O&M Federated States of Micronesia Pohnpei: Kolonia Sewage Treatment Plant DBOM 2 years Similar model to Apia DBOM; original DBOM contract included 12 months O&M and expired on 9 June 2015; contractor was CCB Envico; Public Utilities Corporation has now entered into a new contract with CCB Envico for operation of the Kolonia Sewage Treatment Plant for 2 additional years, commencing on 7 August 2015 Fixed monthly rate, with provisions for penalties based on performance targets $5.5 million for capital expenditure, plus $550,000 per annum O&M, including consumables (power is free) Marshall Islands Ebeye Desalination Plant (reverse osmosis) DBOM 4 years (2 years of design and construction; 2 years of O&M) Design, build, operate, and maintain; similar model to Apia wastewater Payment based on (i) the successful delivery of the plant against performance criteria; (ii) the fixed monthly rate for personnel during operation period; and (iii) the payment for volume of water produced ($ per million gallons), including operation, management inclusive of all consumables, and maintenance, but exclusive of electricity costs and Kwajalein Joint Utility Resources operational staff Approximately $4.4 million; with capital expenditure of $2.8 million and O&M at $1.6 million Palau Wastewater treatment DBOM 5 years Design, build, operate, and maintain; similar model to Apia wastewater; procurement to commence in 2016 Fixed monthly rate, with provisions for penalties based on performance targets Approximately $8.5 million, including an estimated $1 million per year O&M for 2 years Source: Pacific Private Sector Development Initiative.

Six of these contracts were in place at the time of the survey (the Apia wastewater contract had ended, and a contract in Palau had yet to be awarded). The most common form of private sector involvement has been through design-build-operate-maintain (DBOM) arrangements, which combine the design and construction responsibilities for new assets with their ongoing operation and maintenance (O&M). All four of the DBOM contracts in place were developed with the support of the Asian Development Bank. Design-Build-Operate-Maintain Model Under the DBOM model, a single contract is negotiated for the design, construction, operation, and maintenance of an asset, with financing provided by the public sector. The public sector maintains ownership of the asset, and retains a significant level of oversight of the operation, through terms defined in the contract. By making the designer and/or builder financially responsible for the efficient construction and operation of the asset, the DBOM model helps ensure that the critical O&M knowledge is incorporated into the asset s design. With this knowledge, better decisions can be made resulting in a higher-performing asset. As a result, a more efficient and sustainable asset will be turned over to the public sector at the end of the contract. The DBOM model has proved to be an effective mechanism for securing innovation and performance incentives from the private sector as a possible stepping stone to higher-risk build-operate-transfer projects. As in most PPP projects, the payment mechanism is used to transfer risk. It can be tailored to the needs and capacities of the public sector and private sector partners at different stages of the project. For instance, the private partner responsible for the design, construction, and operation of the asset may take the risk on the cost of construction, but the public sector may take the risk on the usage of the assets (e.g., kiloliters supplied), and/or the unit cost of water over time (e.g., cost per kiloliter). A typical structure for a DBOM consortium is illustrated in Figure 1. Under this model, the contract for the various elements of design, construction, operation, and maintenance are held with the DBOM entity. The public sector develops a set of output specifications, but leaves the development of specific design elements to the private sector consortiums that are bidding on the project. Following competitive tendering, the public sector engages a DBOM contractor to design and construct the asset for a fixed lump-sum price, and then to operate the asset and perform maintenance services for a specified period at an agreed price or basis of remuneration. This remuneration for O&M would usually include performance targets. The public sector funds the capital cost of the project and, at the end of a specified O&M period, the operation of the asset can be either retendered, extended with the private sector operator, or transferred back to the public sector. Figure 1: typical Design-Build-Operate-Maintain Consortium Structure Designer Public sector (contracting agency/client) DBOM contractor DBOM = design-build-operate-maintain. Source: Pacific Private Sector Development Initiative. Operator Maintenance contractor The benefits of lifecycle costing, an intrinsic part of the DBOM model, are particularly important. Most infrastructure owners spend more money in maintaining their assets than they do on capital expenditure. The lifecycle approach isolates important maintenance issues from the potential political uncertainties that affect many maintenance budgets in the public sector, with some departments, agencies, and state-owned enterprises often not knowing from year to year how much funding will be available. In such cases, the public sector is forced to allocate its limited funds to the most pressing maintenance needs, rather than using a more rational, cost-effective, and preventative approach.

CASE STUDY Design-Build-Operate-Maintain Contracts in the Pacific The first DBOM contract in the Pacific was for a $5-million wastewater treatment plant in Apia, Samoa. The contract, awarded in 2009, included a 5-year O&M period for $750,000, with payments against key performance targets. The contract resulted in the plant being constructed on time and on budget, and in an O&M period in which performance targets were consistently achieved. Upon completion of the contract in September 2015, the Samoa Water Authority assumed responsibility for O&M, based on training received from the contractor. This move will provide a benchmark to compare the costs and benefits of using the Samoa Water Authority staff to conduct the O&M against the costs and benefits of using external contractors. In Pohnpei, in the Federated States of Micronesia, the $5-million Kolonia Sewage Treatment Plant was also constructed under a DBOM modality. While the original DBOM contract included only 12 months of O&M, it was subsequently extended for an additional 2 years, commencing from 7 August 2015. O&M of the plant is charged at approximately $550,000 per annum, including consumables, and power is provided free. As a result of the DBOM contract, the plant and upgrades to the pump system were constructed on time and on budget, and the frequency and severity of sewerage overflows in Pohnpei has decreased. The success of the DBOM projects in Apia and Pohnpei has inspired the structuring of a similar contract for a new desalination plant in the Republic of the Marshall Islands. The plant will be built and operated in partnership with the local utility the Kwajalein Joint Utility Resources. The contract, awarded in January 2016, involves the design and construction of a new desalination plant for $2.8 million and a 2-year O&M period valued at $1.6 million. Contract payments are based on (i) the successful delivery of the plant against performance criteria, (ii) a fixed monthly rate for personnel during the operation period; and (iii) payment for the volume of water produced (per million gallons), inclusive of all consumables and maintenance, but exclusive of electricity costs and payments to the Kwajalein Joint Utility Resources operational staff. With the new technology to be used by the winning bidder, the plant is expected to consume half the energy used by the existing desalination plant, which dates back to 2000. As a result of the DBOM contract, the plant and upgrades to the pump system were constructed on time and on budget, and the frequency and severity of sewerage overflows in Pohnpei has decreased.

With the new technology to be used by the winning bidder, the plant is expected to consume half the energy used by the existing desalination plant, which dates back to 2000. Lessons from the Pacific Experience with Design-Build-Operate-Maintain Contracts The success of the DBOM model in the Pacific has been largely due to careful project preparation, transparent tendering processes, and effective monitoring of project implementation. DBOM contracts are more complex to prepare than traditional public procurement for new assets. There must be comprehensive data available at the time of the tendering process so that the private sector operators can assess the design, construction, operation, and maintenance risks that need to be costed and managed. DBOM tenders also require significant effort by the public sector contracting agency or client to evaluate the bids. Once awarded, DBOM contracts require only a limited management effort on the part of the public sector s contracting agency during delivery, commissioning, and operation of the asset. DBOM contracts also provide a single point of accountability. They allow the public sector to leverage private sector know-how and innovation, without having to lock in long-term operational and strategic issues within the contract structure. The fact that all three of the DBOM contracts in the Pacific attracted multiple bids demonstrates that international operators are interested in contracts of this size, even in remote parts of the region. Increased competition among private sector operators will always result in increased value for money for the public sector. What Can be Done to Extract More Value from Design-Build-Operate-Maintain Contracts? DBOM contracts have allowed governments in the Pacific to create strong incentives for efficiency and value in the procurement and operation of water sector assets. DBOM contracts have consistently resulted in more timely construction than traditional public procurement, thereby reducing costs for the public sector and improving service to users. DBOM contracts have consistently resulted in more timely construction than traditional public procurement, thereby reducing costs for the public sector and improving service to users. The incentives inherent in the PPP structure could be further strengthened by expanding the role of the private sector through the extension of O&M periods within contracts, and by including private financing under DBOM and build-operate-transfer modalities.

WHAT ARE PUBLIC PRIVATE PARTNERSHIPS? PPPs are agreements between the public sector and the private sector to provide assets and/or services over a period of time. PPPs can be used in most infrastructure sectors, including solid waste management, water, power, transportation, and telecommunications. PPPs are different from traditional public procurement in that PPP contracts are performance-based, with payments made against the successful delivery of defined outputs over time. PPPs often combine construction of infrastructure with operation of the assets for a set period of time. In the solid waste management sector, for example, PPPs can involve the construction and operation of landfill and/or recycling infrastructure. The existing commercial legal frameworks in most PICs allow public agencies to enter into PPP contracts. WHAT ARE THE DIFFERENT FORMS OF PUBLIC PRIVATE PARTNERSHIPS? PPPs can take different forms, depending on the nature of the service to be provided. PPP arrangements fall into four broad categories as illustrated below: Service contracts. These contracts are the simplest form of PPP. The private partner does not operate any public assets, but simply contracts with the public sector to provide a specified level of service. These contracts are typically 2 3 years in duration and are common for services such as waste collection. Operation and maintenance contracts. These contracts typically involve the operation of public assets by a private partner. The private partner receives a management fee based on performance and, in some cases, a profit-sharing incentive. figure 2: forms of Public Private Partnership contracts 100% private ownership 100% public ownership DBOM Lease BOT Concession Service/O&M Duration 5 10 15 20 25 30 Increasing level of delegation, private investment, and risk Enabler/Regulator Government role Provider BOT = build-operate-transfer, DBOM = design-build-operate-maintain, O&M = operation and maintenance. Source: Pacific Private Sector Development Initiative. Design-build-operate-maintain contracts. These types of contracts are profiled in this case study, where the private sector designs, builds, operates, and maintains public infrastructure with finance provided by the public sector. Build-operate-transfer contracts. These involve a significant investment by the private partner, who constructs and operates the infrastructure required to provide the service. Contract periods can be for as long as 30 years, allowing sufficient time for the private operator to earn a fair return on investment. The Mt Eriama water treatment plant in Papua New Guinea was built using this modality. Concessions. These are the most complex PPPs. They involve the rehabilitation and expansion of an existing asset as well as its operation over time, under an exclusive license. Concessions require careful structuring and monitoring if the public good is to be protected, and for the PPP to deliver the appropriate value for money. * This case study was prepared by the Pacific Private Sector Development Initiative, with input from the Pacific Regional Infrastructure Facility and its Urban Development Sector Working Group. Pacific Private Sector Development Initiative Level 20, 45 Clarence Street Sydney 2000 Australia Tel: +61 2 8270 9444 E-mail: psdi@adb.org www.adbpsdi.org @ADB_Sydney_PSDI www.facebook.com/adbpsdi Creative Commons Attribution 3.0 IGO license (CC BY 3.0 IGO) 2016 ADB. The CC license does not apply to non-adb copyright materials in this publication. Publication Stock No. ARM??????-2 Printed on recycled paper