Similar documents
South East Europe Regional Electricity Market. Belgrade, 01 November 2007

Obstacles to Trade and Compatibility of Market Rules in Southeast Europe

EFET Proposal on Regional Independent System Operator (R_ISO) A CEER Response Paper

NordREG Activities 2008

Draft Outline of the 2019 Work Programme

Work Programme 2007 Report 1/2007

REGIONAL ACTION PLAN FOR MARKET INTEGRATION IN SOUTH EAST EUROPE

ERGEG Public Consultation on Guidelines on Transmission Tarification 1. - Evaluation of the Comments Received

Regional Flow-based allocations. State-of-play

Introduction. 1.1 The CACM Regulation & all TSOs. 1.2 Geographical application of this proposal

Regulatory framework for crossborder redispatching and countertrading

Developing the internal energy market further - the European Network Codes

Congestion Management Guidelines. Compliance report

Kostis Sakellaris Regulatory Authority for Energy, Greece. 5 th South East Europe Energy Dialogue 2-3 June 2011, Thessaloniki, Greece

Public consultation. 6 October 2015

18 April 2016 Draft for consultation

The current ETSO ITC Model and possible development

TSOs perspective of the CACM requirements. Athanasios Troupakis Market Advisor ENTSO-E

Current State of Intraday Markets in Europe May 2007

Grid Investments from a Nordic Perspective

Work Programme Nordic Energy Regulators (NordREG)

GB TSOs Intraday proposal for arrangements concerning more than one Nominated Electricity Market Operator (NEMO) in the GB Bidding Zone in accordance

EUROPEAN COMMISSION DIRECTORATE-GENERAL POR ENERGY

Draft Outline of the 2016 Work Programme

2011 Work Programme of the Agency for the Cooperation of Energy Regulators

EUROPEA U IO. Brussels, 12 June 2009 (OR. en) 2007/0198 (COD) PE-CO S 3651/09 E ER 173 CODEC 704

The new electricity market arrangements in Ukraine

FORTUMS RESPONSE TO ACER CONSULTATION ON FORWARD RISK-HEDGING PRODUCTS AND HARMONISATION OF LONG-TERM CAPACITY ALLOCATION RULES

Power Trading in the Coupled European Markets

Transelectrica and the Romanian Power Market A Regional Perspective

Wholesale power market challenges:

EFET reaction 25 April 2017

All TSOs response to the consultation on the Intraday Cross-Zonal Gate Opening and Gate Closure Times

Wholesale Electricity Market Monitoring Report for the Energy Community Contracting Parties and Georgia

C2-102 COMMON NORDIC BALANCE MANAGEMENT. K.LINDSTRÖM FINGRID (Finland)

We appreciate your feedback

COMMISSION REGULATION (EU)

February February 2017 Page 1 of 12

Proposal for Multiple NEMO Arrangements (MNA) for the Belgian bidding zone in accordance with Article 45 and Article 57 of the Commission Regulation

ENERGY COMMODITIES C O N F E R E N C E

Draft. COMMISSION REGULATION (EU) No /

earning every Day Ahead your trust

APPROVAL BY ALL CONCERNED CCR HANSA AUTHORITIES

Comments on CEPA s draft conclusions in relation to European transmission tariffs

NOTE OF DG ENERGY & TRANSPORT ON DIRECTIVES 2003/54/EC AND 2003/55/EC ON THE INTERNAL MARKET IN ELECTRICITY AND NATURAL GAS THE UNBUNDLING REGIME


CID Methodology Explanatory note

Marcel Cailliau, GDF Suez (Electrabel)

Mr. Heinz HILBRECHT Director DG TREN EC Rue de la Loi 200 BE-1049 BRUXELLES. 17 March Dear Mr. Hilbrecht,

Workshop on Regional Electricity Trade and Market Development

The INTERREG III Community Initiative

The Agency s Work Programme Outline for 2019

The Road to the I-SEM

NOTE OF DG ENERGY & TRANSPORT ON DIRECTIVES 2003/54-55 AND REGULATION 1228\03 IN THE ELECTRICITY AND GAS INTERNAL MARKET

Capacity Calculation Region Nordics regional design of long-term transmission rights in accordance with Article 31 of the Commission Regulation (EU)

Harmonised Allocation Rules for Forward Capacity Allocation Summary of the assessment of the comments from the public consultation

5) What will be the contract duration (daily,..) of TRU at the SCPs? (UNIPER). Product runtimes of TRU are missing. (Econgas)

European Market Desing and focus on Flow-Based Market Coupling

ENTSO-E Network Code on Electricity Balancing

*,!"# $#%&" % () ' "# $ %. & ', (,,! (, : ()),, border capacity, %, dry-run,, %, 1.! * ()) $ ("#) $ $ "# %, $ $ 2006.,! $ $ ', " +! $ %. ) .

REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL

Response to ENTSOE public consultation. Network Code on Capacity Allocation and Congestion Management for. Electricity

Annex to the EX-ANTE EVALUATION

COMMISSION OF THE EUROPEAN COMMUNITIES. Proposal for a DECISION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

Mr Alberto Pototschnig, Director ACER. CC: Dr Klaus-Dieter Borchardt, Director Internal Energy Market DG ENER European Commission

European transmission tariff structures Cambridge Economic Policy Associates

***I DRAFT REPORT. EN United in diversity EN. European Parliament 2016/0379(COD)

Prepared for: Directorate-General Energy European Commission PHYSICAL AND FINANCIAL CAPACITY RIGHTS FOR CROSS-BORDER TRADE FINAL REPORT R01071

Source: Romanian Energy Framework Dr. Cristina Micu board member of AFEER

REQUEST FOR AMENDMENT BY ALL REGULATORY AUTHORITIES AGREED AT THE ENERGY REGULATORS FORUM ON

Trans-European Energy Networks

CONSULTATION ON A POSSIBLE STATUTE FOR A EUROPEAN FOUNDATION

VALUE ADDED TAX COMMITTEE (ARTICLE 398 OF DIRECTIVE 2006/112/EC) WORKING PAPER NO 895

AUDIT REFERENCE MANUAL FOR THE STRUCTURAL FUNDS

The TSO side of pan-european XBorder trading in high frequencies: The Role of Scheduling. Michael Schaefer Project Manager, Amprion System Operation

THE INTERNATIONAL COMPETITIVENESS OF ECONOMIES IN TRANSITION THE UNTAPPED POTENTIAL: A CHALLENGE FOR BUSINESS AND GOVERNMENT MOLDOVA

Intraday CWE. Bernard Malfliet Convenor CWE-TSO-work group

The North Seas Countries Offshore Grid Initiative

We appreciate your feedback

COMMISSION OPINION. of

EFET pan-european survey amongst energy traders about market distortions

THE ESTONIAN MINISTRY OF FINANCE

EAI Response to ACER Consultation on Forward Risk-Hedging Products and Harmonisation of Long-Term Capacity Allocation Rules

Solvency II: Orientation debate Design of a future prudential supervisory system in the EU

Publishing date: 21/06/2012 Document title: on Recommendations as regards the records of wholesale energy market transactions

Traders perspective on the World Bank Report for development of the Bulgarian power market. En.Trading 017 Seminar Sofia, Bulgaria

ON TRANSFER CAPACITY ALLOCATION OVER THE GRID INTERCONNECTING ITALY WITH FRANCE FOR THE YEAR 2004

Brunis, *00007 REGIO Il/AI/rs D(2008) /970002

The Nordic Market Model 10 Years of Experience

The Model of Implicit Capacity Allocation in the Baltic States

Report on regulation and the electricity market. Norway

Integrated power markets in Europe. Electricity markets open seminar Tokyo. Matti Supponen

Report on regulation and the electricity market. Norway

3 rd Technical Workshop: Gas Market Design and Natural Gas Transmission Grid Codes

Developments in Polish Electricity and Gas Market. EFET Board Brainstorming August 29, 2013, Warsaw

ACER ON ALL TRANSMISSION SYSTEM OPERATORS PROPOSAL FOR INTRADAY CROSS-ZONAL GATE OPENING AND INTRADAY CROSS-ZONAL GATE CLOSURE TIMES

We appreciate your feedback

Minutes of Workgroup European Market Design 29/09/2015

Intraday Cross-Zonal Gate Opening and Gate Closure Times. Consultation document. PC_2018_E_01 9 January 2018

Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

Transcription:

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR ENERGY AND TRANSPORT DIRECTORATE C - Conventional Energies Electricity & Gas Brussels, 5 December 2005 DG TREN/C2/MS South East Europe Electricity Market options paper 1. INTRODUCTION South East Europe Electricity Market has been subject to a number of papers discussing the market design in the region. The papers present mostly a rather similar view of the future market. The main difference is in the time-table for implementation; some proposals are very ambitious and some others call for a pragmatic step-by-step approach. Firstly this paper tries to summarise what has been explicitly or implicitly agreed regarding the SEE market design. Secondly this paper summarises agreed actions and proposes new actions needed for an efficient progress in establishing a well functioning electricity market in SEE. An action plan is annexed to this paper. Thirdly the paper presents a time table with key milestones for the development of the market. South East Europe needs to apply the European market design. The European electricity market design is not based on one single concept, but has rather evolved from different regional designs, all fulfilling the requirements of the European legislation. However, several aspects are harmonised either through application of the legislation or through a voluntary approach. Florence process has been the key activity for this voluntary harmonisation. 2. MARKET DESIGN ELEMENTS 2.1. Third party access Third party access will be opened for all customers in the EU at the latest in July 2007. SEE: Market opening for non-household customers at the latest 1 January 2008, for household customers at the latest in 2015, as stated in the Treaty. Distribution Commission européenne, B-1049 Bruxelles / Europese Commissie, B-1049 Brussel - Belgium. Telephone: (32-2) 299 11 11. Office: DM 24 06/51. Telephone: direct line (32-2) 2992743. Fax: (32-2) 2958180. Internet: http://europa.eu.int/comm/dgs/energy_transport/index_en.html E-mail: matti.supponen@cec.eu.int

companies will be eligible and wholesale trading will be opened at the latest 1 January 2008. (action SEE governments and regulators). A possible later stepwise opening for certain groups of small non-household customers shall be discussed in the PHLG and in the Athens. 2.2. Unbundling of network companies The Transmission System Operator (TSO) has to be legally and functionally separated from a vertically integrated utility. The same requirement for Distribution System Operators (DSO) serving more than 100.000 customers applies from July 2007 onwards in the EU. SEE: Legal, functional and account unbundling of the TSOs at the latest 1 January 2008, for DSOs at the latest 1 January 2010, according to the Treaty. The recommended target date for the TSOs is 1 January 2007 at the latest (action SEE governments and regulators). 2.3. Cross Border Trade compensation mechanism The EU regulation 1228/2003 provides for a cross-border trade compensation mechanism for transits. Control areas which host transits from other control areas are compensated by the ones causing the transits. The current compensation mechanism is based on a voluntary agreement between TSOs as proposed by ETSO. A mechanism based on the regulation 1228/2003 is under development and it should be ready for the year 2006. SEE: Voluntary CBT mechanism approved for 2005 by the Athens prolonged for 2006 (action SETSO TF). The SEE CBT mechanism shall merge with the EU CBT mechanism in 2007. The mechanism following the guidelines of inter-tso compensations under the regulation 1228/2003 will be implemented once available. 2.4. Security rules and grid codes Security rules in Europe are determined per synchronous zone and per control zone. UCTE is currently revising its security rules and will compile them in a UCTE Operational Handbook. These rules will be made legally binding through a Multilateral Agreement. Each control zone has national security rules included in Grid Codes. The requirements of the UCTE Operational Handbook should be enforced through these codes at national level. TSOs use a tool called Day Ahead Congestion Forecast (DACF) for the security checking, one day ahead, of the transmission system. This tool is important to provide a reliable forecast of network flows and shall be implemented by all TSOs. SEE: Full adherence to the UCTE rules. 2

2.5. Development of metering and control systems of the networks The technical level of all networks in the region is not yet sufficient for full implementation of the SEE Electricity Market. Particularly investments in metering and system control equipment are required. SEE: Pursuing the upgrade of metering and control systems in the transmission and distribution networks. EU experience in this area should be exploited (action TSOs and DSOs). 2.6. Transparency Transparency is of utmost importance for the proper functioning of the market and in order to get new market actors to the region. Firstly transparency is needed for market operations like trading. Secondly, newcomers must have access to data necessary for their investment decisions. Thirdly, transparency is needed to detect and remove the price distortions and cross-subsidies. Finally, transparency is essential to prevent fraud in electricity contracts. In the EU energy statistics are gathered by the European Statistical Office (Eurostat). National statistical offices provide data to Eurostat. Additional market relevant information is published by the regulators, electricity associations, TSOs, ETSO, UCTE and Power exchanges. There is no harmonisation what data shall be published. The level of information varies considerably from country to country. Congestion management guidelines under the EU regulation 1228/2003 provide for transparency requirements for TSOs. The congestion management guidelines are under revision and should be finalised before the end of 2005. SEE: The Energy Information Centre for South East Europe will be responsible for gathering statistics over the whole region (action CEER). TSOs will follow the transparency requirements imposed by the congestion management guidelines under the regulation 1228/2003. TSOs will improve publishing on their websites all relevant information useful to market participants, in accordance with the ETSO standards for transparency and data publication (action SETSO TF). Improvement in the financial and accounting systems of the electricity companies in the region is needed in order to achieve sufficient transparency and regulatory oversight (action electricity companies and regulators). 2.7. Network tariffs The transmission and distribution companies will charge a network tariff to cover the monopoly part of the electricity delivery. The energy supplier will charge for the energy, the competitive part of the delivery. A third component is taxes and levies imposed by the authorities. Charges due to system services, like balancing power are either included in above mentioned price components or they are charged separately as an additional price component. 3

When a customer becomes eligible, these price components need to be clearly defined. In several EU countries there have been serious concerns about a possible cross-subsidy from the network charges to the energy charges. SEEM: Tariff components need to be clearly defined for all customers. Even if the households remain captive customers, it is important to define the components in the tariffs, to be able to monitor possible price distortions and cross-subsidies (action CEER). 2.8. Price distortions Removal of price distortions is a prerequisite for having competitive electricity markets. The region still suffers important subsidies from the big consumers to the smallest ones. Non-paying and stealing of electricity are other distortion elements in the market. Removal of price distortions can not take place overnight. The timetable for opening the market allows a gradual approach, all distortions shall be removed at the latest when the household customers become eligible in 2015. SEE: Removal of price distortions shall start immediately and shall be achieved at the latest by 2010 (action SEE governments and regulators). 2.9. Monitoring of the functioning of SEE Electricity Market At EU level the monitoring of the functioning of the internal electricity market is done in the yearly benchmarking report. The SEE countries were partly included already in the 2004 report. This monitoring is primarily looking at the performance and the structure of the market in view of improving the functioning of the market. In addition to this upper level monitoring, a system at a national level needs to be in place to detect any market misbehaviour. This national monitoring needs to be complemented by a regional activity in order to monitor the cross-border trade. SEE: Monitoring will be organised by the SEE Secretariat. Regulatory benchmarking report, TSOs Benchmarking report and TSOs annual report are key tools for monitoring. This process will give input also to the European Commission benchmarking report (action SEE Secretariat, regulators and SETSO). Tasks and responsibilities for detailed market monitoring need to be defined for both national and regional level (action CEER together with USAID). 2.10. Network investment planning TSOs are responsible for the network infrastructure development. Regional cooperation has taken place in the UCTE. SEE: Co-ordination by UCTE, with the support of ETSO, regulators, PHLG and Ministerial Council (action UCTE). 4

2.11. Price regulation Energy price regulation for certain type of customers in some European countries has been maintained. True competition will only start gradually leaving the customers in the beginning exposed to the pricing policy of the incumbent company, if no energy price regulation is applied. The target is, however, to have regulated energy prices only for captive customers and for customers of the supplier of last resort. Energy price regulation is a matter of national regulatory authorities. However, the approach should be harmonised across the region, to avoid distortions between market participants. SEE: National approach, with monitoring at the regional level (action SEE governments and regulators). 2.12. Wholesale markets Europe uses a zonal pricing model in the electricity market. Wholesale electricity has the same price within a price zone. In case of congestion inside a price zone, TSOs use redispatching of generation plants in order to keep the uniform price zone 1. The European wholesale market is mainly based on voluntary bilateral trading and on voluntary power exchanges. Voluntary power exchanges have had increased volumes but on many markets the volume still remains limited. Some EU countries have pool-type power exchanges in place or under development. Bilateral trading is organised in Europe through private companies. Some standard contracts exist, however, often each trader has his own contract model with the possibility for tailor made clauses to fit the contract to the customer s needs. Power exchanges are concentrating on single auction day-ahead spot markets and on financial products, futures and forwards, based on spot prices. There is a need to guarantee bilateral trades. Power exchanges offer bilateral contract clearing, which allows reducing the counterpart risk in the bilateral contracts. Power exchanges, even when established as voluntary for-profit companies, need favourable conditions for their functioning to achieve a sufficiently liquid market. The role of regulators, TSOs and market participants is crucial in this. SEE: Zonal pricing, price zones initially coinciding with the control zones. 2 1 2 In case congestion becomes structural, TSOs redefine the price zones or set different limits for transmission capacity between price zones. Control zones borders generally coincide with national borders. 5

Bilateral trade SEE: The wholesale power market will primarily be based on voluntary bilateral trading. Trading will start between market participants within a control zone and cross the borders. The market will develop on a voluntary basis when the appropriate structure is in place. Market rules need to be harmonised (action TSOs and EFET). Power exchanges in the region together with Europex will work on introducing bilateral trading clearing for the whole region (action Borzen, OPCOM and EuroPex). Spot markets SEE: Power exchanges in the region together with Europex will work on establishing a spot market for all zones in the region (action Borzen, OPCOM and EuroPex). Long term Power Purchase Agreements (PPAs) Long term Power Purchase Agreements (PPAs) between generators and distribution companies or industrial customers can seriously hinder the emergence of liquid wholesale markets. On the other hand, long term contracts are sometimes needed to secure the investments in new capacity. It is important to differentiate between the existing and future agreements. Long term contracts are subject to EU competition policy. Their compatibility with the EU legislation has been decided on a case by case basis. SEE: SEE countries are quite different regarding their needs for long-term contracts. Long term agreements are left to the national regulators and competition authorities to decide. The question has to be considered in connection with generation adequacy (point 3.5). Regional co-ordination is needed (action regulators). Intra-day market An intra-day market enables market participants to balance their power contract portfolio during the day of operation. SEE: An intra-day market for the balance responsible parties will be created for each control zone following the creation of national or regional markets (action TSOs). Power exchanges will study organising an intra-day market on a regional basis (action Borzen, OPCOM together with EuroPex). Real time balancing market Real time balancing markets enable TSO to maintain the generation/load balance. Until recently these markets have been national or control zone specific. The Nordic and the Germany-Austria arrangements have demonstrated that a real time 6

balancing market can be a cross border market. France and UK are also accepting bids to their real time balancing market from the neighbouring countries. SEE: Real time balancing market will be created for each control zone. TSOs will contract real time balancing power. TSOs are invited to seek technical solutions for allowing bids from the neighbouring zones (action TSOs). Reserve power market Reserve power markets for slow reserves enable TSOs to call for reserve power in case of disturbances 3. TSOs will contract reserve power. TSOs are invited to seek technical solutions for allowing bids from their neighbouring zones (action TSOs). 2.13. Management of cross-border trade There is no uniform European model on the management and co-ordination of the capacity allocation and congestion management tasks for cross-border trade. However, present European congestion management methods are de facto becoming a combination of explicit and implicit auctions. Congestion management is covered by the EU regulation 1228/2003 on Crossborder trade. Congestion management guidelines under the regulation provide for rules for congestion management. The guidelines are under revision and should be finalised before the end of 2005. SEE: Congestion management is executed by TSOs in full compliance with EU regulation 1228/2003 and corresponding guidelines. A regional auction office 4 commonly operated by the TSOs is envisaged, a dry-run to test the feasibility of the office and its functions is made during 2006 (action SETSO TF). The tasks of the TSOs auction office are: Calculation of PTDFs 5 through TSOs co-ordinated network analyses, based on a complete 380-220 kv network model, and validation of the cross border capacities 6, preliminarily assessed and harmonised between TSOs, 3 4 5 6 Reserve power markets are sometimes combined with regulating power markets. Auction office in this paper refers to the tasks that are foreseen for this office. The question of physical, juridical and organisational form is left to be decided once the test runs have been achieved. PTDF, Power Transmission Distribution Factor. PTDFs indicate how power lowes are distributed to various interconnectors in a meshed transmission network. Cross border capacity indicates the max power flow transferable under N-1 security conditions through the interconnection of two involved control zones/countries. 7

single multilateral capacity allocation through explicit auctions for yearly, monthly and weekly capacities single multilateral capacity allocation through implicit auctions 7 ahead cross border allocation for the day 2.14. Generation adequacy Generation adequacy is in most European countries government s responsibility. A wide range of approaches exist, from no-intervention-in-the-market policy to a centralised planning and tendering policy. The recent proposal for a directive on electricity security of supply calls for the governments to publish their policy regarding security of supply. There is no requirement to have a uniform generation adequacy approach. However, it is important that there is some level of harmonisation in the measures in order to avoid distortion between market players in a region. This is particularly true for the level of possible capacity payment type of measures, which aim to attract new investments. SEE: National approach with regional harmonisation, with monitoring by UCTE and ETSO (action regulators, UCTE and ETSO). 3. INSTITUTIONAL ARRANGEMENTS The following regional institutions will be the key instruments in the creation and proper functioning of the SEE Electricity Market. Their functions can be summarised in general as follows: SEE Regulatory board Tasks to be defined by February 2006. SEE Secretariat Practical implementation of the SEE Treaty TSOs auction office Allocation of cross-border trade capacity Regional Energy Information Centre Collection of energy statistics from the region 7 Using bids in power exchanges for different zones, once power exchanges are ready to perform this task. 8

4. TIME-TABLE FOR IMPLEMENTATION An overall time-table for the development of the SEE Electricity Market is presented in the following. It summarises the actions described in this document. This time table is based on the assumption that the SEEElectricity is compatible with the EU electricity market at the latest in 2010, except for eligibility for household customers. 2005 CBT agreement 2006 Trading at wholesale level fully opened. Dry-run of the auction office Energy information centre operational 2007 TSOs unbundled Common EU-SEE CBT TSOs auction office operational 2008 Opening of the market for non-household customers including distribution companies, at the latest 2009 2010 Unbundling of DSOs with more than 100.000 customers Full compatibility with the EU Internal electricity market (except households) 2015 Opening of the market for household customers, at the latest 5. ACTION PLAN The most important regional actions required for the completion of the SEE Electricity Market are presented in the Action plan in the Annex 1. The list does not contain actions which will be done on a national basis without other regional coordination than follow-up and monitoring. 9 Matti Supponen

Annex 1 DG TREN/C2/MS 11.11.2005 SEE Electricity Market Action plan Action Expected results Content Responsible party Timetable Financing Follow-up Remark s 1. Creating a CBT for SEE Electricity market Combined EU and SEE CBT mechanism for 2007 Agree among SEE TSOs and with EU TSOs on a European CBT mechanism SETSO TF October 2006 TSOs 8 th Athens 2. Regional grid-code Implementation of a regionally compatible Grid Code in all SEE countries. Follow-up the SEE grid code project recommendations CEER October 2006 CEER 8 th Athens 3. Study on improvement of financial and accounting systems of electricity companies A report on financial and accounting systems. Study on the present status and recommendations CEER End of 2006 Donors 8th Athens Action Expected results Content Responsible Time- Financing Follow-up Remark Commission européenne, B-1049 Bruxelles / Europese Commissie, B-1049 Brussel - Belgium. Telephone: (32-2) 299 11 11. Office: DM 24 06/51. Telephone: direct line (32-2) 2992743. Fax: (32-2) 2958180. Internet: http://europa.eu.int/comm/dgs/energy_transport/index_en.html E-mail: matti.supponen@cec.eu.int

party table s 4. Study on tariffs Report on tariffs and possible price distortion in SEE Collection of tariffs from the region, analysing them and give recommendations CEER/ USAID 2006 USAID 8 th Athens 5. Follow-up on affordability of electricity Measures at national level on affordability of electricity for poor consumers. Actions following recommendations of the affordability study. Guidelines on customer protection. EBRD CEER 2006 Donors 8 th Athens 6. Comparison of national market models Understanding of how each market works and what are the obstacles for efficient functioning of the market. A detailed analysis of each market. EC, CEER, Eurelectric, ETSO, EFET and Donors May 2006 CIDA 8 th Athens 7. Benchmarking Benchmarking report Continuing monitoring activity SEE secret., CEER and TSOs Yearly report October in Donors and TSOs 7 th, 9 th, etc. Athens 8. Update on network investment projects in the region Report on network investment projects in the region Co-ordination of network investment projects in the region and reporting on them. UCTE Yearly report October in TSOs 7 th, 9 th, etc. Athens 11

Action Expected results Content Responsible party Timetable Financing Follow-up Remark s 9. Dry run of the flow-based capacity allocation and the auction office Validate the flow-based capacity allocation system for the region Dry run of the system starting from October 2005 SETSO 2006 TSOs and donors 7 th,8 th and 9 th Athens 10. Study on wholesale markets Report on wholesale markets and trading in the region with recommendations Analysis of present situation and proposing options for the future EBRD End 2006 EBRD 8 th Athens 11. Bilateral trade rules Harmonised rules for bilateral trade in the region Proposing standard contracts and procedures for bilateral trade EFET October 2006 Donors 8 th Athens 12. Spot markets and intra-day markets Spot markets and intraday markets covering the whole region Analyse and propose a network of power exchanges in the region Borzen, OPCOM together with Europex 2006 Donors 8 th Athens 13. Study on real time balancing and reserve power markets Options for the scope for a regional market Study the feasibility and benefits of integration, implement a pilot project SEETEC 2006 CIDA 8 th Athens 12

Action Expected results Content Responsible party Timetable Financing Follow-up Remark s 14. Investment support mechanism study Report on investment support mechanisms Options investment mechanisms for support World Bank/EC 2006 World Bank 7 th and 8 th Athens 15. Investment workshop Increased interest to invest in the region. Present and discuss generation and transmission investment projects in the region. World Bank/EC March 2006 EC 8 th Athens 16. Generation adequacy Generation report adequacy Collect the information and present it in the European report. UCTE/ETS O Yearly report March in TSOs 8 th, 10 th, etc. Athens 17. Energy Information Centre 18. Market monitoring Fully operational Information Centre Definition of tasks and responsibilities in market monitoring Start up of the Information Centre Drafting of the implementation procedure SEE Secretariat CEER/USAI D 2006 Bulgaria, EC 8 th Athens 2006 USAID 8 th Athens 13