Approved Prices and Structures for Electricity Pricing Pilots Board File No.: EB

Similar documents
IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15;

AND NOTICE OF HEARING REVIEW OF NON-PAYMENT OF ACCOUNT SERVICE CHARGES FOR ELECTRCITY AND NATURAL GAS DISTRIBUTORS BOARD FILE NO.

December 20, All Electricity Distribution Utilities

Power Accountants Association Annual Meeting Potential Impacts from Oct 2015 Rate Change

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

EB Union Gas January 1, 2019 QRAM Application

ANNEXE I. Gazifère Inc. Modifications du Tarif 200 avec commentaires Ajustement du coût du gaz

Akbar Jazayeri Vice President, Regulatory Operations Southern California Edison Company P O Box 800 Rosemead, CA 91770

NOTICE OF REVISED APPLICATION

DICO Regulatory Guidance

EB Union Gas Limited October 1, 2017 QRAM Application

SCHEDULE DR-SES Sheet 1

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Ontario Electricity Support Program Application Form

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Ontario Power Generation Inc. Application for payment amounts for the period from January 1, 2017 to December 31, 2021

Con Edison Performance-Based Gas Demand Response Pilot Guidelines

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

May 25, Revisions to Southern California Edison s Critical Peak Pricing Programs for Large Customers with Demands Above 200 kw

AFM Pension / Health and Welfare

SCHEDULE 19 LARGE POWER SERVICE

Load and Billing Impact Findings from California Residential Opt-in TOU Pilots

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB UNION GAS LIMITED

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ) ) ) )

Ontario Electricity Support Program Application Form. Before you begin, check to be sure that: Once your application is complete:

ICE LIBOR Holiday Calendar 2019

SCHEDULE TOU-M Sheet 1 T

American Federation of Musicians Sound Recording Scales (Non-Symphonic) Effective February 9, 2009

Enersource Hydro Mississauga Inc. Application for Distribution Rates Effective January 1, 2017 Board File No.: EB

The Filing includes the Application; the Manager s Summary; and live versions of the following models:

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB TILLSONBURG HYDRO INC.

WHITBY HYDRO ELECTRIC CORPORATION

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB WEST COAST HURON ENERGY INC.

RCTC 91 Express Lanes Toll Policy Adopted June 7, 2012

PowerStream Inc. (Licence Name PowerStream Inc. ED ) 2010 Electricity Distribution Rate Adjustment Application EB

Residential Rate OIR Rate Design and Bill Impact Analysis Model

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB ALGOMA POWER INC.

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB HYDRO ONE NETWORKS INC.

Energy Budgeting and Procurement: Securing Stable Energy Prices in Today s Volatile Markets

Pay or Play Penalties Look-back Measurement Method Examples

SCHEDULE EECC-TOU-A-P Sheet 1

OPTIONAL DOMESTIC TIME-OF-USE CRITICAL PEAK PRICE + DAILY DEMAND PRICING

FOR RELEASE: MONDAY, MARCH 21 AT 4 PM

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB WEST COAST HURON ENERGY INC.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

ONTARIO ENERGY REPORT Q3 2018

EB Ontario Energy Board Commission de l énergie de l Ontario DECISION AND INTERIM ORDER UNION GAS LIMITED

Consumer Deposit Security Policy

NEWMARKET - TAY POWER DISTRIBUTION LTD.

PARTIAL DECISION AND RATE ORDER

Essex Powerlines Corporation 2730 Highway #3, Oldcastle, ON, N0R 1L0 Telephone: (519) Fax: (519)

Hydro One Networks' Request for Leave to Sell Distribution Assets to Bell Canada

Re: Hydro One Networks' Request for Leave to Sell Distribution Assets to Cole s Point Resort

Ontario Energy Board Commission de l énergie de l Ontario

SERVICE CLASSIFICATION NO. 1 RESIDENTIAL AND RELIGIOUS

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B);

ATLANTIC CITY ELECTRIC COMPANY BPU NJ

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Management Comments. February 12, 2015

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB COLLUS POWERSTREAM CORP.

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB ORANGEVILLE HYDRO LIMITED

Ontario Energy Board Commission de l énergie de l Ontario RATE ORDER EB HYDRO ONE NETWORKS INC.

ANNJVERSARY SMITHS CONSTRUCTION EMPLOYEE ASSOCIATION AGREEMENT FOR 2017, 2018, 2019

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

MAR 2017 JAN 2017 DEC 2016 FEB 2017 HOEP*

Additional Agenda. City of Mississauga. General Committee. Date June 27, 2018 Time 9:00 A.M. Location Council Chamber 2 nd Floor 300 City Centre Drive

Rate W: Applies to customers who were on Rate W as of May 1, A-6: Applies to customers who were on A-6 as of May 1, 2006.

Revised Cal. P.U.C. Sheet No E Cancelling Revised Cal. P.U.C. Sheet No E. ELECTRIC SCHEDULE A-1 Sheet 1 SMALL GENERAL SERVICE

EB Hydro One Networks Inc. s 2019 Transmission Revenue Requirement Application and Evidence Filing

Dynamic Pricing Proposals of Southern California Edison Company in Compliance with D

GUELPH HYDRO ELECTRIC SYSTEMS INC.

CHAPLEAU PUBLIC UTILITIES CORPORATION ED IRM APPLICATION EB

The update is to make a correction to sections 2.5 and 2.6 of the application as illustrated in the amended application attached to this letter.

Enersource Hydro Mississauga Inc. Application for Distribution Rates Effective May 1, 2012 Board File No. EB Evidence Update

BUSINESS INCENTIVE PROGRAM APPLICATION

An Application. Canadian Niagara Power Inc. To Adjust. Electricity Distribution Rates. Effective January 1, 2019 EB

Cash & Liquidity The chart below highlights CTA s cash position at July 2016 compared to July 2015.

Southern Sanitation Exhibit A Rate Structure for City of Lauderdale Lakes Effective October 1, 2016

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

BY COURIER. August 16, Ms. Kirsten Walli Board Secretary Ontario Energy Board 2300 Yonge Street Suite 2700 P.O. Box 2319 Toronto, ON M4P 1E4

MODIFICATION TO THE TRADING HOURS

Two original versions of the additional evidence will be sent to the Ontario Energy Board in addition to filing via RESS.

BY COURIER. October 11, Ms. Kirsten Walli Board Secretary Ontario Energy Board Suite Yonge Street Toronto, ON M4P 1E4. Dear Ms.

January 26, Advice Letter 3721-E

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

IN THE MATTER OF subsections 78(2.1), (3.0.1), (3.0.2) and (3.0.3) of the Ontario Energy Board Act, 1998;

Seasonal Court Information

P.S.C. No. 2 - Retail Access Consolidated Edison Company Fifteenth Revised Leaf No. 21 of New York, Inc.

91 Express Lanes Toll Policy Adopted July 14, 2003

October 31, CBOE Futures Exchange, LLC Rule Certification Submission Number CFE

Federal Reserve Bank of Dallas. December 21, 2001 SUBJECT. Request for Comment on a Proposal to Revise the Official Staff Commentary to Regulation Z

EB Hydro One Remote Communities Inc Request for an Exemption from Specific DSC Amendments Application and Evidence Update Filing

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB ALGOMA POWER INC.

Direction to ESB PES on Tariffs to apply from 1 st November 2007 CER/07/191

The Impact of Dynamic Pricing on Low Income Customers

Housing Bulletin Monthly Report

Transcription:

P.O. Box 2319 27 th Floor 2300 Yonge Street Toronto ON M4P 1E4 Telephone: 416-481-1967 Facsimile: 416-440-7656 Toll free: 1-888-632-6273 Commission de l énergie de l Ontario C.P. 2319 27 e étage 2300, rue Yonge Toronto ON M4P 1E4 Téléphone: 416-481-1967 Télécopieur: 416-440-7656 Numéro sans frais: 1-888-632-6273 BY WEB POSTING August 24, 2017 To: Re: All Interested Parties Approved s and Structures for Electricity Pricing Pilots Board File No.: EB-2016-0201 On November 16, 2015, the (OEB) issued its Regulated Plan Roadmap setting out a multi-year plan to redesign the RPP to better respond to policy objectives, improve system efficiency and give greater customer control. A key element of the Roadmap is the implementation of electricity pricing pilots to test alternative pricing structures. The OEB invited electricity distributors to participate in the development and implementation of priority price pilots, in accordance with the Guidelines for Pilot Projects on RPP Pricing issued on July 18, 2016. As stated in the Guidelines, the OEB has responsibility for approving the structure of each pilot as well as the electricity prices used in each pilot. The OEB has now approved the structure and prices for six pilot price plans as set out in Appendix A. These price plans are based on the priority pilots described in the OEB s Guidelines with, in some cases, modifications that have been proposed by distributors in their applications. The Low Overnight pilot, not specifically described in the Guidelines, was proposed in an application from a distributor and has been approved by the OEB. -Setting Methodology For each pilot price plan that has been approved, the prices have been calculated so as to recover the same revenue as would be expected to be recovered from the RPP timeof-use (TOU) and tiered prices that have been in effect since July 1, 2017 as set out in the OEB s report on Regulated Plan s and the Global Adjustment Modifier for the July 1, 2017 to April 30, 2018. In this way, each pilot price plan has been designed so as to be revenue neutral relative to the existing RPP prices if the pilot were to be implemented throughout Ontario, based on a robust sample of Ontario residential electricity time-of-use consumption data.

- 2 - Peak Pricing Structures Several of the approved pilot price plans incorporate irregularly scheduled Peak (CPP) events during which a pilot participant s electricity price increases in response to periods of high electricity demand in Ontario. For the purposes of setting the prices for the pilot programs, CPP events need to be defined in advance in order to estimate the expected volume of energy consumption to which these prices will be subject. In the interest of testing consumer response in different months throughout the year, the OEB has determined that a set number of CPP events will be triggered on the highest demand days in each month that typically experiences high demand, with the exception of the Variable Peak Pricing with CPP pilot plan. That pilot plan is the continuation of Alectra Utilities existing Advantage Power Pricing plan which triggers 6 CPP events on the highest demand days in both the summer and the winter in whichever month the highest demand days occur in each season respectively. For the purposes of continuity, this structure of triggering 6 CPP events in summer and winter, as opposed to triggering a specific number of events in each month, has been preserved in the Variable Peak Pricing pilot plan as defined in Appendix A. For most approved pilot plans that incorporate CPP, customers will be notified in advance of a CPP event to provide them the ability to respond to the period of high electricity prices. In the case of the Quick-Ramping CPP pilot plan, participating customers will be equipped with load control devices that can respond automatically to CPP events without the need for direct customer intervention. As such, Quick-Ramping CPP events occur more frequently and over shorter periods of time under this plan relative to the other price plans that incorporate CPP as described in Appendix A. Applicability While the OEB will continue to consider different pilot project plans proposed by applicants, any pilot applicant proposing the use of one of the six defined structures set out in Appendix A would be expected to also use the prices for the applicable structure as set out in Appendix A. The OEB will update these pilot project prices whenever it resets RPP prices so as to ensure reasonable alignment between pilot prices and RPP prices as described under the heading -Setting Methodology above. The current RPP prices are expected to be in place until April 30, 2018. Sincerely, Original signed by Kirsten Walli Board Secretary

- 3 - Appendix A Approved Pilot Structures and s The structure of the six pilot price plans and associated prices that have been approved by the OEB are set out below. Note that, for the sake of brevity, the term weekdays refers only to weekdays that are not holidays 1 and the term weekends refers to weekends and holidays. A. Enhanced Time-of-Use Increases the on- to off-peak price differential from 2:1 (status quo) to 4:1 Increases the mid- to off-peak price differential from 1.5:1 to 3:1 4.4 13.2 17.6 B. Low Overnight Creates a low-priced overnight rate between midnight and 6am Slightly lowered mid-peak rate and increased on-peak rate Overnight 12am to 6am 12am to 6am 2.0 Weekdays: 6am Weekends: 6am 12am Weekdays: 6am Weekends: 6am 12am 6.5 9.2 18.4 1 Days that are considered holidays for pilot pricing purposes are the same as those that are considered holidays for the purposes of the application of RPP time-of-use prices; namely: New Year s Day, Family Day, Good Friday, Christmas Day, Boxing Day, Victoria Day, Canada Day, Civic Holiday, Labour Day, and Thanksgiving Day. When any such holiday falls on a weekend (Saturday or Sunday), the next weekday following (that is not also a holiday) is to be treated as the holiday.

- 4 - C. Variable Peak Pricing with CPP periods are the same throughout the year (no difference between summer and winter) On-peak price period occurs later in the day On-peak prices vary depending on system demand 12 CPP events throughout the year Low On- Peak Medium High On- Peak Peak Hours 3pm and 9pm-12am Weekends: all day 4.9 50% of Weekdays: 3pm-9pm 10.0 30% of Weekdays: 3pm-9pm 19.9 20% of Weekdays: 3pm-9pm 39.8 On the top six system peak days in summer and winter, each event lasting four hours. Start time of events determined by peak demand hour of event day. 49.8 D. Quick-Ramping CPP Discounted off-peak rate 48 Quick-Ramping CPP events Participants equipped with load control devices to respond to Quick- Ramping CPP events 5.5 9.5 13.2

- 5 - Quick- Ramping Peak On the top eight July and August, and the top four system peak days in June and September: two highest consecutive demand hours between 4pm-8pm On the top eight January and February, and the top four system peak days in December and March: two highest consecutive demand hours between 4pm-8pm 49.9 E. Seasonal Time-of-Use with CPP Discounted off-peak rate Introduction of a flat rate in the shoulder months of September-November and March-May (June through Aug) 7pm (Dec through Feb) 7pm Shoulder Hours (Sept through Nov, Mar through May) N/A 5.3 N/A 13.2 Shoulder N/A N/A All hours 7.9 Peak On the top four July and August, and the top two system peak days in June: 4pm-8pm F. Super-Peak Time-of-Use On the top four January and February, and the top two system peak days in December: 4pm- 8pm N/A 26.4 Introduction of a Super-Peak period on summer weekday afternoons (June through Aug) (Sept through May) 7am, 7pm 12am 7am, 7pm 12am 1pm Weekdays: 7am-7pm 9.5 Super-Peak Weekdays: 1pm-7pm N/A 25.3 6.3