Documentation of a project with EU funding

Similar documents
EIB-Geld für Waldviertler Energieprojekte? Julije Domac ManagEnergy Expert Mission to Energieagentur der Regionen, September 2018

Energy Efficiency: EU legislative framework - Concrete actions

Financing energy efficiency measures in Maltese public buildings

ENSAMB. Norway Sør Østerdal

Development of Energy Efficiency Projects in 7 Municipalities in Attica Presentation of the PRODESA project

European ESCO Market Survey 2018

JESSICA JOINT EUROPEAN SUPPORT FOR SUSTAINABLE INVESTMENT IN CITY AREAS JESSICA INSTRUMENTS FOR ENERGY EFFICIENCY IN LITHUANIA FINAL REPORT

Financing models for energy-efficient urban street lighting Matthias Hessling Aleksandra Novikova Kateryna Stelmakh Julie Emmrich

Guide on the statistical treatment of EPC European Energy Network, Thinking Group Meeting Sofia, 24 October 2018

Supporting cities to cut carbon: perspective of EIB

The Covenant of Mayors: Energy efficiency and Local Authorities, How to finance it?

The city housing accounts for 36% of energy consumption

FINANCING ENERGY EFFICIENCY

Empowering public authorities in the Macro Adriatic Ionian Region to establish long term energy renovation strategies. Hrvoje Maras (REGEA)

EPC Financing in practice. Lieven Vanstraelen, Senior Partner, Energinvest

RenoWatt was launched thanks to the support of: RENOWATT SEIF Sofia June 28, 2018

ESCOLIMBURG2020 (Infrax ESCO)

Financial Instruments in Energy Efficiency in Lithuania Agnė KAZLAUSKAITĖ, Ministry of Finance Junona BUMELYTĖ, EIB

Financing energy refurbishment in the housing sector

Energy Performance Contracting. for. EAFIP Construction in Innovation Procurement Workshop 14 November 2017 Prague

Sustainable Energy Investment Forums Practitioner's Guide on Energy Performance Contracts Webinar 4 July 2018

EU Funding for Sustainable Energy

Annex 1: Conceptual Framework of the Swiss-Slovenian Cooperation Programme

it not only limits and decreases the energy use of their homes but also improves the quality, comfort and value of the property.

Delivering on the European Fund for Strategic Investments (EFSI)

This project receives funding from the European Union s Horizon 2020 research and innovation programme.

New Financing Models for the Energy Retrofitting of Buildings 15 dicembre :30-12:30

Financing Energy Efficiency in the Tertiary Sector. Paolo Michele Sonvilla Creara SEI Forum Madrid, 15 June 2017

From INTERREG IVC to INTERREG EUROPE Info Day

Cooperation for refurbishment of municipal buildings in Limburg (B)

Energy Efficiency (EE) Financing Strategies and Considerations in Commercial Real Estate

URBACT II PROGRAMME MANUAL

Promoting Energy Efficiency in the UK Landscape and Considerations

State of play - Financial Instruments in Croatia 24/11/2015, Zagreb

Investment Plan for Europe

EU funding for energy efficiency and sustainable energy in cities

Financing energy efficiency EIB support to energy efficiency, including EFSI

SETTING UP INNOVATIVE FINANCING SCHEMES FOR ENERGY EFFICIENCY RENOVATIONS: A GUIDANCE FOR LOCAL AUTHORITIES

Alternative financing schemes for energy efficiency in buildings

Eurostat - EIB practitioner s guide for statistical treatment of EPC

COMMISSION OF THE EUROPEAN COMMUNITIES

The KredEx Revolving Fund Estonia

EE-10: Mainstreaming energy efficiency finance

Project Plan for Installing LED Street Lights Adam Carey, Citelum

Policy measures introduced in order to achieve energy savings among final customers in the Czech Republic

Smart Finance for Smart Buildings Initiative

URBACT II PROGRAMME MANUAL. (Technical Working Document)

Scottish Futures Trust

Possibilities of financing a biogas investment

Horizon 2020 & Smart Specialisation

European Bank for Reconstruction and Development s areas of intervention in the water sector

VADEMECUM ON FINANCING IN THE FRAME OF THE EASTERN PARTNERSHIP

PROCEEDINGS OF THE REGIONAL CONFERENCE ON FINANCING ENERGY EFFICIENCY IN THE BALTIC STATES

CITY OF ZAGREB. Coaching schemes for Local Governments. Centralized training for Supporting Structures March 10, 2016

JASPERS Advisory and capacity building support for projects and investment

Responsible Property Investment (RPI) Summary Policy

Mobilizing Private Capital for Energy Efficiency through PPP Structures

SEAF The Sustainable Energy Asset Framework Creating the Market Place for Energy Efficiency

CLIMATE-FRIENDLY ECONOMY: REDUCING EMISSIONS AND LIMITING CLIMATE CHANGE

THE EUROPEAN INVESTMENT BANK

Lessons Learnt & Policy recommendations

Blending EU grants with PPPs in the next financial perspective ( ) François Gaudet 25 th October, Zagreb

Funds and financing for energy efficiency

1.7 INNOVATIVE PUBLIC SERVICES ( ) IDENTIFICATION OF THE ACTION EXECUTIVE SUMMARY

Policy Context. Smart Cities & Communities. Information Day on. Smart Cities & Communities. Horizon September 2016, Brussels

ESCO projects how to commercially finance energy efficiency investments with the help of Energy Performance Contracting

Horizon 2020 Programme Energy Efficiency Call Increase capacities for actual implementation of energy efficiency measures in Industry and Services

Financial Instruments in Lithuania: ex-ante assessments

DRAFT GUIDANCE NOTE ON SAMPLING METHODS FOR AUDIT AUTHORITIES

State Aid in Energy Efficiency (Financial Instruments)

Financial instruments in Lithuania (ESIF): lessons learned

URBACT IMPLEMENTATION NETWORKS

PROJECT DATA SHEET EU STRATEGY FOR THE DANUBE REGION. PILLAR 2. PRIORITY AREAS 4, 5, 6

SPAIN Zaragoza Tramway SUMMARY OVERVIEW ZARAGOZA TRAMWAY. Location Zaragoza, Aragón, Spain

ENERGY PERFORMANCE CONTRACTING IN GREECE. National Roadshow Event Zagreb, Croatia - 28 September 2016

THE INVESTMENT PLAN FOR EUROPE

FINANCING ENERGY EFFICIENCY. Christoph Lassenberger European Investment Bank

Project Preparation in Energy Sector in Nepal

How to Develop High-Quality Full Application Writing a Winning Proposal

Delivering on the European Fund for Strategic Investments (EFSI)

Brussels, COM(2016) 361 final. ANNEXES 1 to 2 ANNEXES. to the

1 December 2016, Rome Christos Pouris, EIB

Presentation at Civitas Forum

COMMISSION STAFF WORKING DOCUMENT EXECUTIVE SUMMARY OF THE IMPACT ASSESSMENT. Accompanying the document. Proposal for a Council Directive

Workshop, Lisbon, 15 October 2014 Purpose of the Workshop. Planned future developments of EU-SILC

Evaluation in : Challenges and Opportunities First annual conference of the National Coordination Authority s Evaluation Unit

JESSICA - Financing residential energy efficiency renovations in Latvia

Rural Development Programmes. Financial Instruments: making funding go further

The Investment Plan for Europe. European Fund for Strategic Investments (EFSI)

Options for financing streetlight conversion (and acquiring existing lights, if necessary) include:

Silvio De Nigris Piedmont Region Sustainable Energy Development Sector. ENERGY EFFICIENCY FINANCE MARKET PLACE January19 th, 2017

Facilitating Finance: A case for the Super ESCO. Jeffrey Beyer EU-GCC Workshop 3 May 2017

STRATEGIC ACTION PLAN GUIDELINES & MODEL

Recommendations on what the EC can do to promote uptake of EFSI by the social services sector

Annex A: Logical framework

Models for Financing Step-by-step Retrofits

JASPERS Networking Platform

Improving public investment efficiency for infrastructure development

Information Note: Reporting of categorisation data under Article 11 of Regulation N 1828/ May 2009

Marche Region. Ex Ante Evaluation report. Executive summary. Roma, June 2015

Transcription:

Documentation of a project with EU funding One of the aims of the Streetlight-EPC project is to tackle a major barrier for EPC market development: the access of capital for ESCOs and public authorities (owners of public lighting) for project preparation costs and capital expenditure. Since Streetlight-EPC focuses on small to mid-sized projects (where the investment levels are significantly below those required for European funding programmes), guidance and assistance towards European funding options and related Technical Assistance Services is provided (as tools for bundling smaller projects into larger one, making them thereby eligible for European funding). This report shares experience gathered from the NEWLIGHT project. This project consists of the bundling of the streetlight refurbishment measures in 57 municipalities in North-West Croatia. The project has received ELENA funding. NEWLIGHT (EIB ELENA) project What is ELENA? ELENA European Local Energy Assistance Run by the EIB, ELENA is funded through the European Commission s Intelligent Energy- Europe programme. ELENA covers up to 90 % of the technical support cost needed to prepare, implement and finance the investment programme. This could include feasibility and market studies, programme structuring, energy audits and tendering procedure preparation. With solid business and technical plans in place, this will also help attract funding from private banks and other sources, including the EIB. So whether it is the retrofitting of public and private buildings, sustainable building, energy-efficient district heating and cooling networks, environmentally-friendly transport etc, ELENA helps local authorities get their projects on the right track. More on ELENA hier: http://www.eib.org/products/advising/elena/index.htm Why bundle projects? For smaller municipalities and cities, the feasibility of public lighting modernisation projects can be significantly increased if projects are bundled together (aggregated), creating a larger investment opportunity. This can significantly decrease the (specific level of) transaction costs and risks (when standardised methods are used), thereby improving p. 1

access to finance. Regions, provinces, and entities (agencies, networks, utilities or counties/regional authorities) serving a larger number of municipalities can play a significant role in the project bundling process. Zagreb and Krapina-zagorje counties in North-West Croatia played a crucial role in the bundling process for the NEWLIGHT project. REGEA (an energy agency), as final beneficiary, managed the whole project process, but the counties secured 10 % co-financing. Through a combination of ELENA funding and the counties co-financing, 100 % of costs for PDA activities was secured for the end users (cities and municipalities). Advantages and disadvantages of bundling? Advantages: Ideal business model for energy agencies (as they already operate with a number of local and regional authorities making the aggregation process easier) PDA costs can be co-financed (up to 90%) Transaction costs are significantly decreased Disadvantages: Risky venture due to a large number of stakeholders strong management and communication strategy needed Costly project preparation phase - hours needs to be spent in preparing the project Long lasting preparation process from 6 up to 24 months (depending on the size and number of local authorities) needs to be spent on communicating project idea The first step The first step in the bundling process for streetlight refurbishment is to collect basic information on the existing system (targeted infrastructure) showing, for example, the nominal capacity and breakdown of lighting sources, the number of lampposts, annual electricity consumption, annual energy and maintenance and operations costs, ownership of assets, and some other basic features of public lighting. Based on this information, the (economic) investment potential can be analysed and a project proposal can be developed. Issues about calculating the baseline should be addressed in cooperation with territorial and utility organisations. Depending on the number of parties and the size of each individual project, the process can take from 3 to 6 months (to complete a proper baseline survey). REGEA developed a masterplan of street lighting for two counties with extensive details on existing technologies, savings potential, investment potential and financing possibilities for modernisation costs. In addition, REGEA developed a detailed methodology for streetlight energy audits that assures uniformity of the gathered and analysed data. p. 2

Project NEWLIGHT activities Phase I: Preparation and execution of joint public procurement for streetlight energy audits (based on REGEA s methodology) duration 12 months Phase II: ESCO (EPC/PPP) documentation preparation duration 12 months Phase III: Preparation and execution of joint public procurement for ESCO services (based on ESCO methodology) duration 12 months Key Challenges baseline (asset & consumption) data, benchmarking standards facilitating an optimal approach pilot projects and know how No ESCO market in Croatia EPC vs PPP EUROSTAT Guidance Note on EPC & debt* Insufficient baseline data methodology for energy audits had to be developed No ESCO market in Croatia the presence of a facilitation service is mandatory Low energy prices (50 % cheaper than EU average) resulting in long payback periods in ESCO projects cofounding (subsidies) or equity is needed Legal aspects of PPP lack of projects (good examples) to learn from NEWLIGHT Insights & recommendations Cooperate on the regional level to ensure availability of skills, technical design capacity, avoid reinventing the wheel, reach for economies of scale (lower level of transaction costs as compared to project value) Involve regional authorities in the bundling process Use standard methods to lower the (perceived) risks of projects and facilitating financing Decrease the cost of audits and preparatory studies through territorial cooperation p. 3

Consider smart city aspects in an integrated manner (i.e. Wi-Fi, sensors, electric charging infrastructure). These raise questions on the potential revenue sources to be associated with these additional cost items, and data confidentiality issues (which differ by country). Consider various contractual possibilities like ESCO-EPC, operation & maintenance contracts with energy efficiency investment, and leasing (check the EUROSTAT Guideline on ESCO and public debt) Ensure independent quality control during investment and operations Take the election calendar into account in the investment programme Target best performance (not only lowest price) in public procurement Introducing new models of contracting in public administration requires time - having reference (pilot) projects can help (PPP, EPC ). Finding a solution for financing is not enough to make a project move forward. Municipalities need coaching throughout the process. Facilitation services are crucial. Consider including citizens in the project and letting them participate from early on as this can increase citizen acceptance. It is not just about energy savings, but also about comfort and security for the citizens. Utilities with a traditional mind-set (focused on selling electricity) have little incentive to helping municipalities save energy unless, for example, the EU Energy Efficiency Directive is transposed in a way that obliged them in this direction. Forward looking utilities are ready to assist the municipalities in order to keep them as clients and since energy efficiency projects can be good business. White certificate schemes can play a significant role in some countries. A culture of collaboration between the public and private sectors needs to be developed Consider using standard information systems (GIS platform or similar) NEWLIGHT project factsheet Location Beneficiary Facility Sector Total project development services (PDS) cost ELENA contribution (90 %) PDS financed by ELENA North-West Croatia: Zagreb County and Krapina-Zagorje County North-West Croatia Regional Energy Agency (REGEA) EIB ELENA Street lighting 790,000 EURO 711,000 EURO The project development services will support the preparation and implementation of energy efficiency measures in public lighting. The Regional Energy Agency of North-West Croatia (REGEA) will support the investments in two associated counties covering 57 local authorities. The foreseen investments will be implemented mainly through a Design and Build contracting model, Energy Performance Contracting (EPC) and Public Private Partnership (PPP). p. 4

Description of ELENA operation Timeframe 2015-2018 Project status Basis for investment identification Investment programme description REGEA will support the refurbishment of luminaires in the two counties to increase the energy performance of public lighting owned by local authorities. The energy efficiency measures foreseen include mainly replacing the luminaires through more efficient technologies like LED and installing power regulation systems. Additional necessary works like the reconstruction of light poles and replacement of power cables are also foreseen. On-going Investment to be mobilised 20 million Expected results Energy saving potential 60 % Simple payback period (SPP) Leverage factor (minimum 20) Market replication potential Contact person (beneficiary) Project web page/contact person NEWLIGHT project video The investment programme has been prepared on the basis of information provided by the local and regional authorities. Energy efficiency street lightning system in the two counties. Energy Efficiency savings 9.5 GWh/year CO 2 reductions savings 2,800 CO 2 eq t/year 14 years (without subsidies) 11 years including maintenance cost reduction 28 The market replication potential for other regions in Croatia is considered high. Ivan Pržulj e-mail: newlight@regea.org Tel: 00385 1 3098 315 www.regea.org https://www.youtube.com/watch?v=jwxkssf3ayg p. 5