Government of Maharashtra Industries, Energy and Labour Department Government Resolution No.: PSI -2013/ (CR- 54 )/IND-8

Package Scheme of Incentives for Industries in Maharashtra

Manufacturing!!! Destination MAHARASHTRA. PACKAGE SCHEME OF INCENTIVES 2013 Page 1

Transitional Provisions

ELIGIBILITY CRITERIA & REQUIREMENTS FOR FULFILMENT BY COMPANIES APPROACHING FOR SANCTION AND DISBURSAL OF SPECIAL INCENTIVES/BENEFITS

CHAPTER II : SALES TAX

India Tax Workshop Strategic Tax Incentives September 2014

MSMED Act, Overview. CS Shilpa Dixit, Partner, MRM Associates, Practising Company Secretaries

The Institute of Chartered Accountants of India Western India Regional Council

No.VAT/AMD-1009/IB/Adm-6:-In exercise of the powers conferred by. sub-rule (2) of Rule 17A of the Maharashtra Value Added Tax Rules,

National conclave on GST Transitional Credit Issues and recap of MVAT Audit organized by CPE Committee, ICAI hosted by WIRC of ICAI

CA. Hrishikesh Wandrekar Wandrekar & Co.

Form 234 The following instructions may please be noted before filling the return

6 Input Tax Credit and Composition Scheme for Small Dealers

Current Issues & Vat Compliance in Maharashtra by CA Deepak Thakkar, Mumbai at STPAM Mumbai 3 Oct 2013

GOVERNMENT OF WEST BENGAL DIRECTORATE OF COMMERCIAL TAXES, 14, BELIAGHATA ROAD, KOLKATA TRADE CIRCULAR No. 09/2015 Dated:

Provisions Applicable to Micro, Small and Medium

1st April, 2013 to 31st March, 2018

Form 221 Return form for only VAT dealer

IMPORTANT DATES DIRECT TAXES. TDS / TCS returns are to be filed Quarterly.

Frequently Asked Questions on Companies (Cost Audit Report) Rules, 2011

CASE No. 28 of Dr Pramod Deo, Chairman Shri A. Velayutham, Member ORDER

1 Introduction 2 Tax Return 3 Goods and Services Tax Return 4 GST Model Law and Draft GST Rules 5 Outward supplies return (GSTR-1)

Changes in new MVAT Audit Report in form 704 Whether this new VAT Audit Report in Form 704 has been notified by the Commissioner of Sales Tax? Updated

Lecture Meeting Wednesday 21 st January 2009

THIS CHAPTER COMPRISES OF. Working knowledge of : AS 1, AS2, AS 3, AS 6, AS 7, AS 9, AS 10, AS 13, AS 14.

Employees Provident Funds & Miscellaneous Provisions Act, 1952

FILING OF RETURNS UNDER GST INCLUDING MATCHING OF INPUT TAX CREDIT

WEBINAR ON - GST REFUND

GST related Corrigendum to GCC Rev 06

The following instructions may please be noted before filling the return

Recent Amendment in MVAT & CST Laws & Issues in MVAT Set off. Recent Amendment in the Central Sales Tax Act, 1956

Maintenance Of Records, Data Compilation & Issues In Vat Audit

Certification, Reporting, Accounting and Reconciliation of Turnover & Determination of Turnover of Sales and Purchases- WIRC ICAI Cuffeparade

Ref: Plexh/Cir/

MaharashtraIndustrial Policy Highlights

CHAPTER II TAXES ON SALES, TRADE, ETC.

7 VAT Procedures. 1. Registration. Learning objectives

E-filing under MVAT & Profession Tax Laws

TRANSITIONAL PROVISIONS UNDER GST

GOODS AND SERVICE TAX (GST) TRANSITIONAL PROVISIONS COMPILED AND PREPARED BY : CA SAGAR THAKKAR

Due Diligence Indirect Taxes. CA Yash Arya

DILIP PHADKE Chartered Accountant Contact: /

INDIRECT TAXES UPDATE 150

POLICY FOR PROVIDING PREFERENCE TO DOMESTICALLY MANUFACTURED IRON & STEEL PRODUCTS IN GOVERNMENT PROCUREMENT

Website: New System for MVAT & CST Returns & C form application from April 2016 onwards

E-filing of MVAT - CST Returns. CA Dharmen Shah WIRC - ICAI 18 October 2014

Office of the Development Commissioner (Handicrafts) Government of India, Ministry of Textiles, West Block 7, R.K.Puram, New Delhi

LIFE INSURANCE CORPORATION OF INDIA CENTRAL OFFICE. Ref : Actl /PD / 2148 /4. Re: INTRODUCTION OF LIC S CHILD FORTUNE PLUS (Plan No.

WIRC of ICAI. Understanding Annual Returns & Reconciliation Statement. Presented By CA. Kevin Shah

JATIN MEHTA & CO Tax Consultants.

TENDER INVITATION FROM CHARTERED ACCOUNTANTS FIRM/COST ACCOUNTANT FIRM FOR APPOINTMENT OF SERVICE TAX & SALES TAX CONSULTANT ON RETAINERSHIP BASIS

FAQ on filing of Transition form

Return-cum-chalan of tax payable by a dealer under M.V.A.T.Act, ) M.V.A.T. 1 TIN/R.C.

TRADE CIRCULAR. Subject : Manual filing and processing of claim of refund of inverted tax structure and deemed exports.

INTERMEDIATE EXAMINATION

The following instructions may please be noted before filling the return

Recent Amendment in MVAT & CST Laws

Master class on GST. Institute of Company Secretaries of India - WIRC. CA Ashit Shah. Shah & Savla LLP. Chartered Accountants

All About GST and Model GST Law

LIFE INSURANCE CORPORATION OF INDIA CENTRAL OFFICE

GOODS AND SERVICE TAX FILING OF RETURN. Prepared by Dharmendra Academy of GST Awareness

Preamble : Policy Frame Work :

GOODS AND SERVICES TAX

Composition. Exports

INPUT INPUT TAX TAX CREDIT

VAT On Builders / Developers Recent Developments

VAT Procedures. 5.1 Registration

SYNOPSIS OF CHANGES IN NEW VAT AUDIT REPORT IN FORM NO C. B. THAKAR B.Com., LLB, F.C.A. Advocate

REVENUE (COMMERCIAL TAXES-II) DEPARTMENT G.O.MS.No. 179 Dated: Read the following:

Taxable events VAT vs CST Transfer of property VAT Sale occasion the interstate movement Different types of sale Sales simplicitors HP / installment s

[Chapter IX] Edition NBC, Chartered Accountants and member of Allinial Global Accounting Association. All Rights Reserved.

Refunds. Chapter IX. FAQ s. Refund of tax (Section 54)

Income Computation and Disclosure Standards

S. No. Questions / Tweets Received Replies Registration 1. Does aggregate turnover include value of inward supplies Refer Section 2(6) of CGST Act.

BCA - Workshop on NBFC St Regis Hotel Palladium, Mumbai 4 August 2016

Goods and Services Tax INPUT TAX CREDIT September 22, P V SRINIVASAN Corporate Advisor Mobile:

Beginners Course on GST (Registration, Returns, Payment & Documentation) organised by WIRC 3rd October Presenter CA Mandar Telang

INPUT TAX CREDIT (ITC) PROVISIONS. CA Nammitta Gangwal Nilange LCS, DISA, GST Faculty R. I. Nilange & Co. Chartered Accountant

DOCUMENT FOR EMPANELMENT OF TEV STUDY CONSULTANT

Budget 2017 Synopsis Part II Analysis of Rupiya

Input Tax Credit (ITC)

31 March March 2013 Authorised 10,000,000,000 (previous year: 10,000,000,000) equity shares of Rs. 10/- each 1,000,000 1,000,000

2. Amendment in Mega Exemption Notification 25/2015

CA. Krunal J. Davda. Intensive Study Circle Meeting. Organized by. The Sales Tax Practitioner s Association of Maharashtra

CUSTOMS TARIFF ACT. Act 59 of January 1970

ARTICLE. On Finance Bill (Budget) Proposals 2013 Income Tax Act, 1961 By CA. SATISH AGARWAL

Important provisions of the Companies Act, 2013 Regarding Deposits

GST transitional provisions on credits key issues and challenges. Sagar Shah 17 June 2017

CS Professional Programme Solution June Paper - 6 Module-III Advanced Tax Laws and Practice Part-A

CHAPTER-HEADS. Contents I-7 Rule-wise Index I-25

GST Overview. ~CA Unmesh G. Patwardhan~ Mobile No Unmesh Patwardhan Mobile No

Reliance Defence Systems Private Limited. Accounts for the year ended on March 31, 2016

REVENUE FROM VAT IN PUNJAB AND HARYANA

PARIMAL PATEL P. J. E-CONSULTANTS AHMEDABAD

Government of Gujarat Finance Department, Sachivalaya, Gandhinagar Dated the 1 st, 2006

Government of West Bengal Labour Department Employment Cell Writers Buildings, Kolkata N O T I F I C A T I O N

INDIRECT TAX LAWS & PRACTICE. Paper-18. Syllabus Set-1. Answer of Postal test Paper. Set-1.

MTP_Intermediate_Syllabus 2012_Jun2017_Set 2 Paper 11- Indirect Taxation

BUDGET 2016 SONALEE GODBOLE

Transcription:

Package Scheme of Incentive 2013 (PSI 2013) Incentives to Large Scale Units, Mega Projects & Ultra Mega Projects 1

1) PSI 2013 is governed by following Government Resolutions/Circulars: a) Main GR dated 01/04/2013 amended from time to time. b) Modalities dated 04/12/2008 for IPS & 19/10/2013 for incentives under Para 4.9. c) GR of operative period dated 21/05/2008. d) Circular dated 08/07/2016 related to exemption from payment of electricity duty and refund for prior period. e) GR dated 14/05/2013 related to waiver of stamp duty. 2) Directorate of Industries headed by Development Commissioner of Industries, Mumbai is the implementing agency of the scheme for LSI, Mega & Ultra Mega Units. 3) From August 2016 application for the eligibility and claims of incentives is become online having website www.di.maharashtra.gov.in 2

Incentives for Mega & Ultra Mega Projects: The quantum of incentives for Mega Projects and Ultra Mega Projects shall be decided by the High Power Committee under the Chairmanship of the Chief Secretary, Government of Maharashtra on a case to case basis. But Principal Secretary of Industries is empowered to approve the project as per standard templates. The Cabinet Sub Committee for Industry, under the chairmanship of the Chief Minister of Maharashtra will have the powers to sanction customized package of incentives and even offer special / extra incentives for prestigious Mega Projects / Ultra Mega Projects, on a case to case basis. 3

Short forms used: DI EC IPS FCI ED SD ITC DOP SSI Directorate of Industries Eligibility Certificate Industrial Promotional Scheme Fixed Capital Investment Electricity Duty Stamp Duty Input Tax Credit Date Of Production Small Scale Industry (Investment in P&M less than Rs. 5 Cr) MSI Medium Scale Industry (Investment in P&M more than Rs. 5 Cr but less than Rs.10 Cr) LSI Large Scale Industry (Investment in P&M more than Rs. 10 Cr) 4

Mega Projects / Ultra Mega Projects: New Industrial Units or Expansion Units satisfying the minimum threshold limits of Fixed Capital Investment OR Direct Employment prescribed in the following table shall be classified as Mega Projects/ Ultra Mega Projects. Type of unit Mega Project Ultra Mega Project Area Classification Minimum Fixed Capital Investment (Rs. Crore) Minimum Direct Employment (Nos) Maximum Investment Period Minimum Eligibility Period A & B 750 OR 1500 5 years 7 years C 500 OR 1000 5 years 7 years D & D+ 250 OR 500 5 years 7 years No Industry Districts & Naxalism Affected Area 100 OR 250 5 years 7 years Entire State 1500 OR 3000 7 years 20 years 5

Incentives to Mega & Ultra Mega Projects : The eligible Mega & Ultra Mega Projects are normally eligible for following incentives subject to maximum monetary ceiling limit as per EC: Area Classification Mega Projects Ultra Mega Projects Units in all districts in Vidharbh, Marathwada, Dhule, Nandurbar, Ratnagiri & Sindhudurga Units other than above IPS @ 100% Gross VAT on local sales + CST payable + Exemption from payment of Electricity Duty & Stamp Duty IPS @ 50% Gross VAT on local sales + CST payable + Exemption from payment of Electricity Duty & Stamp Duty IPS @ 100% Gross VAT on local sales + CST payable + Exemption from payment of Electricity Duty & Stamp Duty IPS @ 50% Gross VAT on local sales + CST payable + Exemption from payment of Electricity Duty & Stamp Duty 6

Mega projects based on employment criteria shall be required to maintain the qualifying direct employment throughout the year and 75% of such employees should be local persons. If the employment criteria is not maintained in any month of the year for which IPS is claimed, then IPS shall not be admissible for such year. Minimum Direct Employment prescribed in the table above should be created within a period of two years from the date of commercial production (DOP). The investment in Captive Power Plant shall not be considered for determining the qualifying criteria for eligibility as Mega Project/Ultra Mega Project. Mega Projects are eligible to claim IPS on CST at higher rate if, finished goods are sold without C Form. Mega Projects have also option to choose effective date of incentives. However effective date should be within 3 years from DoP. 7

Incentives to Large Scale Industries: The eligible New/Expansion Large Scale Manufacturing Units, which are set up in different parts of the State, will be eligible for IPS as per below given scales : 8

Incentives available to NEW units - LSI Particulars A & B Zone C Zone D Zone D plus Zone No Industry District Minimum Investment Investment Period Maximum % of Incentive (Para 4.1) Eligibility period (Para 4.1) Yearly % of IPS [Para 4.3 (1)] Additional Incentives for Food and Agro Processing units 9 In P&M more than 10 Crores In P&M more than 10 Crores In P&M more than 10 Crores In P&M more than 10 Crores In P&M more than 10 Crores 4 years 4 years 4 years 4 years 4 years NIL 30% of actual FCI in four years NIL 7 years from DOP 60% of VAT NIL minus ITC or Zero whichever is more + CST Payable NIL 10% of FCI & 1 year 40% of actual FCI in four years 7 years from DOP 70% of VAT minus ITC or Zero whichever is more + CST Payable 10% of FCI & 1 year 50% of actual FCI in four years 70% of actual FCI in four years 7 years from DOP 7 years from DOP 80% of VAT minus ITC or Zero whichever is more + CST Payable. It is 90% for eligible units in Vidharbha & Marathwada 10% of FCI & 1 year 90% of VAT minus ITC or Zero whichever is more + CST Payable. This % is also applicable to eligible units in Vidharbha & Marathwada 10% of FCI & 1 year C o n t i n u e d.

10 Incentives available to NEW units - LSI Particulars A & B Zone C Zone D Zone D plus Zone No Industry District Yearly Cap NIL 1/7 of Maximum 1/7 of Maximum 1/7 of Maximum 1/7 of Maximum amount of amount of amount of amount of incentives incentives incentives incentives subject subject to subject to subject to to provision for provision for provision for provision for carried forward & carried forward carried forward carried forward brought forward as & brought & brought & brought per Para 6.1 forward as per Para 6.1 forward as per Para 6.1 forward as per Para 6.1 Stamp duty 100% for 100% for 100% for 100% for purchase exemption NIL purchase of purchase of purchase of of factory land & (Para 4.7) factory land & factory land & factory land & term loan term loan term loan term loan agreement agreement agreement agreement Electricity Duty 7 yrs being EC 7 yrs being EC 7 yrs being EC 7 yrs being EC (Para 4.6) NIL period from DOP period from DOP period from DOP period from DOP Power Tariff Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Subsidy (Para 4.8) Interest Subsidy (Para 4.5) Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Other benefits Available as Available as per Available as per Available as per Available as per per para 4.9 para 4.9 (C) of para 4.9 (C) of para 4.9 (C) of para 4.9 (C) of PSI (C) of PSI 2013 PSI 2013 PSI 2013 PSI 2013 2013

Incentives to Expansion/Diversification of existing Large Scale Industries: Existing units undertaking expansion/diversification are eligible for incentives as per Para 4.2 of the scheme subject to fulfillment of following all conditions : 1. Increase in fixed capital investment exceeding minimum 25% of the gross fixed capital investment prior to expansion/diversification. 2. Increase in existing installed production capacity by at least 25% of the existing installed production capacity prior to expansion/diversification. This increase will be determined by pollution consent granted by MPCB. 3. Increase in employment in non supervisory category at least 10% of the preexpansion/diversification level. Further 80% of the such increase must be from local persons. (Local persons means person continuously residing in Maharashtra for at least 15 years) This increase will be determined by PF record. 11

Incentives available to EXPANSION units - LSI Particulars A & B Zone C Zone D Zone D plus Zone No Industry District Minimum Investment Investment Period Maximum % of Incentives (Para 4.1) Eligibility Period (Para 4.1) Yearly % of IPS [Para 4.3 (1)] Additional Incentives for Food and Agro Processing units 12 In P&M more than 10 Crores In P&M more than 10 Crores In P&M more than 10 Crores In P&M more than 10 Crores In P&M more than 10 Crores 4 years 4 years 4 years 4 years 4 years 75% of 30% i.e. 22.50% of actual FCI in four years 75% of 40% i.e.30% of actual FCI in four years NIL 6 years from DOP 6 years from DOP 60% of VAT 70% of VAT NIL minus ITC or Zero minus ITC or whichever is Zero whichever more + CST is more + CST Payable Payable Proportionate to Proportionate to increase in New increase in New FCI FCI NIL 10% of FCI & 1 year 10% of FCI & 1 year 75% of 50% i.e. 37.50% of actual FCI in four years 75% of 70% i.e. 52.50% of actual FCI in four years 6 years from DOP 6 years from DOP 80% of VAT minus ITC or Zero whichever is more + CST Payable. It is 90% for eligible units in Vidharbha & Marathwada, Proportionate to increase in New FCI 10% of FCI & 1 year 90% of VAT minus ITC or Zero whichever is more + CST Payable. This % is also applicable to eligible units in Vidharbha & Marathwada, Proportionate to increase in New FCI 10% of FCI & 1 year C o n t i n u e d.

Incentives available to EXPANSION units - LSI Particulars A & B Zone Yearly CAP NIL 1/6 of Maximum amount of incentives subject to provision for carried forward & brought forward as per Para 6.1 C Zone D Zone D plus Zone No Industry District 1/6 of Maximum amount of incentives subject to provision for carried forward & brought forward as per Para 6.1 1/6 of Maximum amount of incentives subject to provision for carried forward & brought forward as per Para 6.1 1/6 of Maximum amount of incentives subject to provision for carried forward & brought forward as per Para 6.1 Stamp exemption (Para 4.7) duty NIL 100% for purchase of factory land & term loan agreement 100% for purchase of factory land & term loan agreement 100% for purchase of factory land & term loan agreement 100% for purchase of factory land & term loan agreement Electricity Duty (Para 4.6) Power Tariff subsidy (Para 4.8) Interest Subsidy (Para 4.5) Other benefits 13 NIL Not Applicable Not Applicable Available as per para 4.9 (C) of PSI 2013 For expansion exemption is not available For expansion exemption is not available For expansion exemption is not available For expansion exemption is not available Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Available as per para 4.9 (C) of PSI 2013 Available as per para 4.9 (C) of PSI 2013 Available as per para 4.9 (C) of PSI 2013 Available as per para 4.9 (C) of PSI 2013

Basket Of Incentives to LSI units: Yearly Cap i.e. basket of incentive includes following: 1) Industrial promotion subsidy 2) Incentives as per Para 4.9 of the scheme i.e. Water Audit, Energy Audit, Improving Energy Efficiency etc. The total quantum of incentives are linked to the actual Fixed Capital Investment made by the eligible unit during investment period. 3) Above total quantum of incentives is excluding the incentives of: Exemption from payment of ED and Waiver of Stamp Duty (SD) In o t h e r wo r d s exe m p t i o n f ro m p ay m e n t of ED a n d wa ive r of SD is n o t c ove re d u n d e r b a s ke t of i n c e n t ive s a n d no m o n e t a r y c e i l i n g l i m i t is a p p l i c a b l e to t h i s i n c e n t ive s. 14

Important Points: 1. Eligibility period shall be depend on the nature and location of the Eligible Unit. In respect of Mega Projects/ Ultra Mega Projects, the eligibility period shall be as, approved by the Cabinet Sub Committee or the High Power Committee, subject to fulfillment of the conditions of the PSI- 2013. 2. Eligible investment shall and include the investment in the fixed assets acquired at site and paid for within the permissible investment period, limited to the item wise maximum limit (i.e. Land, Land development, Building, Plant and Machinery etc.) 3. The Investment Period for Micro, Small and Medium manufacturing Enterprises will be three years, and for the LSI units, four years. For Mega Projects /Ultra Mega Projects, the Investment period will be five years from the date of application or such greater period as may be approved by the High Power Committee or the Cabinet Sub Committee on case to case basis. The Investment Period will be counted from the date of submission of application to the Implementing Agency or the date suggested by the Eligible Unit. 15

Employment: Direct Employment shall mean employees on the pay roll of the company covered under Employee s Provident Funds and Miscellaneous Provisions Act, 1952 and Employee s Provident Funds Scheme, 1952 and for which Employees Provident Fund (EPF) contribution is paid by the Eligible Unit and shall not include employees on the pay roll of contractors. 16

Gross Fixed Capital Investment (FCI): 1. Gross Fixed Capital shall, the case of New Fixed Assets, mean and include the value of new Fixed Assets acquired at site and duly paid for within the permissible investment period, limited to the item wise maximum limit ( i.e. Land, Land development, Building, Plant and Machinery etc.) as per the approved Project Scheme by the concerned term lending agency or as appraised by the approved agency in case of self financed projects and accepted by the Implementing Agency. 2. The Value for which imported second hand fixed assets (used imported machinery) are acquired or the value thereof as certified by an approved valuer, whichever is less, subject to the condition that the assets shall have residual performing life of a minimum 10 years as certified by an approved valuer, shall also be considered towards Gross Fixed Capital Investment. 3. The investment in intangible assets including pre-operative expenses, interest capitalised, technical know-how, deposits paid for utility services etc. shall be considered only to the extent of 10% of the total project cost for the purpose of incentives. 17

4. The Gross Fixed Capital Investment at:- The end of each year will be computed as Gross Fixed Capital Investment at the beginning of the year, plus additions as per the approved Project Scheme made, if any, to the Gross Fixed Capital Investment during the year, less the original value of any Fixed Assets of the Eligible Unit shifted disposed of / sold / written off, if any, during the year. 5. If the admissible Gross Fixed Capital Investment as endorsed in the EC is reduced as a result of any shift / disposal / sale / write off / replacement of the Fixed Assets, the ceiling as endorsed in the EC shall be reduced proportionately and if the incentives availed by the Eligible Unit exceed the ceiling revised as a result of shifting / disposal / sale / write off / replacement, the benefits availed in excess of such revised ceiling shall stand recoverable/refundable forthwith with interest at the rate of 12% from the date of such excess availment till the date of actual payment. 6. Any increase in the Gross Fixed Capital Investment as a result of replacement of any of the Fixed Assets earlier considered under the EC shall not have any additional incentives. 18

Finished Products: Finished product shall mean and include the item/s of manufacture by the Eligible Unit as considered under the project scheme approved by the concerned term lending agency and / or by the Implementing Agency, together with by-product /scrap which may get generated as incidental to and during the main production activity. Explanation: The units will be allowed inclusion of items freely during the eligibility period. However the incentives for included items will be available prospectively and addition to the Fixed Capital Investment made for purpose of additional items shall not be entitled for additional incentives. 19

IPS Claim : Preparation & Submission Procedure Under PSI 2013 IPS & other subsidy claims are now become online from August 2016. Valid EC holder can submit IPS Claim to DI after obtaining an Identification Certificate from Sales Tax Department. Unit to whom EC under PSI 2013 has been granted in physical format prior to Aug 2016 (not online) will have to upload all EC related documents on DI, portal. After uploading of documents fresh online EC will be issued to the eligible unit to claim online IPS & other subsidies. Yearly IPS claim must be submitted to the DI in prescribed formats alongwith certified copy of VAT Audit Report submitted to Sales Tax Department & other necessary enclosures within 11 months from the closure of the financial year i.e. on or before 28 th February. 20

IPS Claim : Sanction & Disbursement Procedure IPS claims are generally processed by the Implementing Agency within 30 days from the submission of the claim, if all necessary information is available in claim file. As per provisions of the scheme first provisional 85% of the eligible claim is sanctioned to the LSI units & 90% to the Mega & Ultra-mega Projects. In expansion cases IPS claims are processed for sanction by applying expansion ratio of additional fixed capital investment to the total gross fixed capital investment. After receipt of provisional claim sanction letter it is necessary to execute & submit claim disbursement agreement in prescribed format. After submission of disbursement agreement unit will be eligible to get disbursement of sanctioned amount. After completion of assessment under MVAT & CST balance 15% or 10% claim processed on the basis of reconciliation statement as per Form A received from Assessing Officer (AO) to Implementing Agency. AO issues Form A only when unit has not preferred any appeal/revision application against assessment done by the AO. After submission of Form A to DI final claim of IPS claim for the particular year is sanctioned. There is possibility of changes in provisional & final claim due to actual assessment. 21

IPS : Income Tax & Excise related issues W.e.f. 01.06.2015 all subsidies are become taxable under Income Tax Act. So IPS, though in the nature of capital receipt, is as per my opinion IPS is Taxable under Income Tax Act. Recently Central Excise Dept. has also issued notices to eligible units to pay Excise Duty on amount of IPS received by the unit. Legal cases related to this issues are pending in various courts and Departments, as per my opinion as IPS received is not in the nature of additional consideration received for particular product, Central Excise Duty is not applicable. Moreover IPS is not received from the buyer of the finished goods to the seller. Hence Excise Duty is not applicable on amount of IPS. 22

Key Points: Project Appraisal 1. For obtaining EC under PSI 2013 project appraisal from is compulsory. 2. If unit has availed term loan from FI or Bank, detailed appraisal note prepared by the lending agency along with term loan sanction letter is necessary. 3. If unit has NOT availed term loan from FI or Bank i.e. in the case of self financed cases project unit may appraise its project either from its banker or SIOCM. SICOM is doing job of project appraisal by charging fees. 4. There are some cases where projects are partly financed and partly self financed. In that case it is advisable to appraise total project from either bank or SICOM. 5. In project appraisal following points should be covered. Complete address of the manufacturing unit of the company. Products and its production capacities. Here everybody should take care to mention all products including byproducts and scrap. Before finalizing the appraisal products and its capacities should be compared with Pollution consent, IEM, Statutory Licenses like State Excise, Food and Safety, etc. Normally products and its capacities mentioned in Pollution consent are considered while issuing EC. 23