Copper market outlook: Transitioning to deficits Prepared for: Nonferrous Metals Forum of the Shanghai Derivatives Market Forum, 25 th May 27 Prepared by: Erik Heimlich, Senior Consultant, Copper
Price has recovered from the lows and concentrates market is tightening 6,5 6, 5,5 5, 4,5 4, LME copper price recovers from the lows $/tonne 2 3 4 5 6 7 8 9 1 11 12 17 2 3 17 17 4 17 5 17 9.% 7.% 5.% 3.% 1.% -1.% -3.% -5.% Global mine output to fall due to disruptions % 23 24 25 2 27 Production losses were sizeable in Q1 Mine output losses, t Q1 27 Escondida 4 12 11 1 9 Spot TC s (Chinese smelter) drop sharply $/tonne Grasberg 117 8 Total 281 7 6 14 4 14 7 14 1 14 15 4 15 7 15 1 15 4 7 1 17 4 17, LME www.crugroup.com 2
Refined market is insulated by scrap and stocks for the time being t Cathode stocks are high Scrap availability has surged 2 LME Comex SHFE Chinese Bonded 8% Direct use scrap, % growth 15 1 5 12 5 12 9 12 13 5 13 9 13 14 5 14 9 14 15 5 15 9 15 5 9 17 6% 4% 2% % -2% 22 23 24 25 2 27 14 Blister stocks have increased Change in Cu production by smelters & refineries, t 4 Refined market cushioned by stocks Global S/D balance for concs and refined Cu, 27, t 12 1 8 6 4 Smelter Refinery Blister stockbuild 2-2 Deficit Surplus 2 24 25 2-4 Concentrates Refined, LME, Comex, SHFE www.crugroup.com 3
Nevertheless Cu will be one of the best performing metals in 27 Expected performance of selection of metals in 27 vs 2 Price supportive factors Met Coal Nickel Iron Ore Zinc Aluminium Copper Cobalt Stronger demand -1.% 3.1%.% 2.3% 5.2% 1.8% 5.2% Limited new supply x x x x No production cuts (1) are required x x x (not in H1) Market forecast in deficit x x x x Stocks critically low x x x (Concs) x x x Mine costs rising Up (temp) Up 5% Up 5% Up 2% Up 8% Up 1% - CRU price outlook (2) Down 5% Down 9% Down 9% Up 7% Up 1% Up 11% Up 58% Notes: (1) Over and above those announced. (2) Average price in 27 versus Q4-2 www.crugroup.com 4
Structural deficits are imminent for the copper market Existing mine production to decline by 1% p.a. in years to 225, due to declining ore grades and reserve exhaustion The downturn has led to project delays, downsizing and cancellations of projects and expansions Scrap availability to grow more strongly in higher price environment but will not fully compensate for the slow growth in mine supply Exploration Discovery Feasibility Construction Production There are limits to the speed at which producers can bring new mine supply on-stream quickly As long as global demand continues to expand at close to 2.% p.a., structural deficits in this market appear inevitable www.crugroup.com 5
Demand growth expected to remain robust despite slowdown Global growth in refined copper consumption by decade, t 7, 6, 5, Commodity boom saw demand growth rise to ~4.7-5.1m tonnes every 1 years Despite China slowdown, volume growth will remain robust 4, 3, Global growth was ~2m tonnes in each 1-year period 2, 1, 1945-55 1955-65 1965-75 1975-85 1985-95 1995-5 25-15 25-25 www.crugroup.com 6
China will represent less than 4% of growth in demand in 2-21 Growth in world refined copper consumption and volume growth in selected 5-year periods 3.% Growth in global refined copper demand, % 5. Absolute consumption growth in period, Mt 2.5% 2.5% 4. China Rest of World 2.% 1.8% 2.2% 2.1% 1.8% 1.8% 3. 2. 1.5% 1.2% 1. 1.%..5% CAGR 2-221: 1.9% p.a. -1..% 25 2 27 28 29 22 221-2. 26-11 21-2-21 www.crugroup.com 7
2 21 22 23 24 25 2 27 28 29 22 221 2 21 22 23 24 25 2 27 28 29 22 221 Other parts of global economy expected to offset Chinese slowdown 8% 6% 4% Vehicle production, CAGR % p.a. 26% 24% Investment, as % GDP World China, RHS 48% 46% 2% 44% % -2% -4% CAGR 2-2 CAGR 27-221 China Asia ex- China Europe North America Other World 22% 2% 42% 4% % Growth in construction output*, y-o-y% 1% Industrial production, CAGR % p.a. 12% 8% 4% China Developed economies World 8% 6% 4% 2% CAGR 2-2 CAGR 27-221 % -4% *Weighted by gross value added in construction, 2 prices and market exchange rates % -2%, Oxford Economics, LMC Automotive www.crugroup.com 8
India and ASEAN will see fastest growth in copper demand Refined copper consumption growth and compound annual growth in selected periods, % p.a. 8% 27 CAGR, 27-221 6% 4% 2% % -2% Asean China India Middle East* North America Europe NE Asia www.crugroup.com 9
Supply: Investment in the copper industry is highly pro-cyclical Selected projects* investment plans**, t LME 3-month copper price, real (2$) 3, 12, 2,5 1, 2, Investment plans, LHS Price, RHS 8, 1,5 6, 1, 4, 5 2, 85 87 89 91 93 95 97 99 3 5 7 9 11 13 15 Note: *35 projects with an average nominal capacity of 185,t **based on nominal capacity and measured from date of first approval to first commercial production www.crugroup.com 1
Pipeline of mine projects is very thin: no large projects starting up in 27 Copper mine projects with capacity of >1,t/y; LOM annual copper production capacity; t 4 3 2 2 28 29 22 221 Operating Firm Probable Possible 1 www.crugroup.com 11
Our estimates suggest growth in mine output will be <1Mt in 2-21 Growth in global mine production, copper-in-concentrates and EW cathode, t Cu 5, 4, 3, 2, SXEW Concentrates Dramatic increase in mine production following heavy phase of investment Growth slows sharply due to lack of new projects, declining ore grades and reserve exhaustion 1, -1, 2-6 26-11 21-2-21 www.crugroup.com 12
Causing structural deficits and copper prices to recover Copper LME cash price and global supply/demand balance, 25-221 t Cu 7 World balance Price $/t 8, -7 2 27 28 29 22 221 4, www.crugroup.com 13
Next phase of investment should begin as long as prices hold up Real (2$) full economic costs for all projects due to start-up between 27-228, $/t, 14, <1t/y >=1t/y 25% 5% 75% 12, 1, 8, 6, LME 3 month price, Q1 27 average 4, 2, -2, 2 4 6 8 Cumulative production ( t Cu) www.crugroup.com 14
In the meantime, prices set to rise faster than costs: Margins to improve LME cash price and 75 th percentile net of by-product cash costs, $/t, 1983-221 12, 1, Annual price range Net of by-product cash cost, 75th percentile LME Copper, Cash 8, 6, 4, 2,, LME www.crugroup.com 15
Have we turned the corner? Copper prices recovered sharply at end-2 and were buoyed in early-27 by sizeable disruptions to mine output While the concentrates market has tightened, the refined market will be the last to pick-up in the cycle, due to the existence of stocks However, destocking along the supply chain is already underway, which gives us cause for optimism The increase in copper prices in 27 is expected to be amongst the highest of the major metals Following the downturn, the pipeline of major projects is extremely thin Assuming we continue to see global growth in demand of around 2% p.a., the copper market will move into structural deficit Producer margins are expected to improve to around $3,2/t by 221 for the mine at the 75 th percentile of the cost curve; an increase of 15% compared to 2 www.crugroup.com
Where does KGHM place on the cost curve? Net of by-product cash costs, selected producers, $/lb (LHS) / $/T (RHS) 17 2 CRU International Limited confidential