BOAT DOCK INFORMATION DPW- ENGINEERING DIVISION (650)

Similar documents
FLOODPLAIN DEVELOPMENT VARIANCE APPLICATION PACKET

Building Permit Application

Uniform Construction Code Permit Package For. Zerbe Township

Town of Lloyd Building Department Building Permit Information Sheets

Porch & Deck Permit Application

SPECIAL LICENSE PERMIT APPLICATION AND INFORMATION OUTLINE TEMPORARY SPECIAL EVENT

Oak Island 1999 Hurricane Floyd

Project Information Form. Date of Submission: Zoning District: Tax Map # (s): Project Size (Acres): City: State: Zip: City: State: Zip:

PART #2 IDENTIFY WHO WILL PERFORM THE WORK (Complete either 2a or 2b)

GENERAL PROVISIONS I. WORK REQUIREMENTS

DEVELOPMENT PERMIT APPLICATION CHECKLIST New: Commercial Industrial Institutional - Multiple Family Residential

Town of Fort Myers Beach Public Works Department Application

TABLE OF CONTENTS CHAPTER 80: AREA ZONING CODE

Attachment 14. Due Diligence Right of Entry RIGHT OF ENTRY. (Oakland Army Base City Property)

Sub cards for all applicable Sub Contractors with postage affixed

CANNABIS BUSINESS OPERATOR PERMIT APPLICATION Finance Department Grand Avenue, SSF CA Phone: (650)

Floodplain Development Permit Application

Contractor and Service Provider. 2018/2019 Registration Packet

Permit Use. Garage Porch. Comments

BUILDING PERMIT-GENERAL INFORMATION

Encroachment Permit. Permit Fee: Receipt #: Bond Fee: Receipt #: Expiration Date: Phone# Mailing Address:

City of Saratoga Springs

New Construction and additions require verification of setbacks by a Massachusetts Registered Land Surveyor (RPLS).

LAKE WORTH DRAINAGE DISTRICT OPERATING POLICIES. Engineering & Permitting Requirements

Floodplain Development Permit Application

DRIVEWAY (Residential) PERMIT

RESIDENTIAL POWER ACTIVATION PROCESS

Manor Township, Lancaster County, PA Zoning Permit Application ( section 702) App. number App. date

CITY OF SOUTH SAN FRANCISCO GRADING PERMIT APPLICATION CHECKLIST

CITY OF NEWBURYPORT BUILDING DEPARTMENT 60 Pleasant Street Newburyport, Ma Main: Fax:

CITY OF DUBUQUE SPECIAL EVENTS APPENDIX A PROMOTIONAL MATERIALS OVER THE STREET RIGHT OF WAY POLICY AND APPLICATION

TOWN OF SPENCER Office of Development & Inspectional Services

Plumas County Building Department Miscellaneous Construction Permit Application

APPLICATION FOR DEMOLITION PERMIT

LICENSE W I T N E S S E T H

County Road Access Application Instructions

City of St. Clair. Request for Proposals. (Lawn Maintenance Services)

APPLICATION FOR BUILDING PERMIT

GAINESVILLE REGIONAL UTILITIES PLAN REVIEW APPLICATION

East Brunswick Township Uniform Construction Code Building Permit Application

New Construction and additions require verification of setbacks by a Massachusetts Registered Land Surveyor (RPLS).

Case No. Fee. Accepted By COMMERCIAL MEDICAL CANNABIS OPERATION PERMIT APPLICATION. Pursuant to City of Morro Bay Municipal Code Chapter 5.

SECOND AMENDED MASTER DEED OF SANDSTONE RIDGE CONDOMINIUMS HOMEOWNERS' ASSOCIATION

SPECIAL EVENT APPLICATION

BUILDING PERMIT RESIDENTIAL BASEMENT FINISH

OTTAWA COUNTY FLOODPLAIN DEVELOPMENT PERMIT APPLICATION

TOWN OF SOUTHPORT Code Enforcement 1139 Pennsylvania Avenue Elmira, NY Phone: (607) Fax: (607)

UNION SAILING CLUB REVOCABLE PERMIT AND AGREEMENT

City of Ocean City Permit and Application Process Quality Improvement

CITY OF JENKS COMMERCIAL BUILDING PERMIT P.O. Box N. Elm Jenks, OK 74037(918)

THIS IS AN APPLICATION FOR A BUILDING PERMIT

STREET CLOSURE APPLICATION STAFF APPROVAL (LESS THAN 400 FEET)

GENERAL ZONING AND BUILDING CONSTRUCTION PERMIT APPLICATION. Application # Receipt # Permit # Zone: Date :

TOWN OF PALMER BUILDING PERMIT APPLICATION FOR OTHER THAN ONE AND TWO FAMILY DWELLINGS (or their accessory structures)

City of Carson 701 E. Carson St., Carson, CA Telephone: (310) ; ci.carson.ca.us

%n Siegel, City Manager

NEW YORK STATE DEPARTMENT OF TRANSPORTATION LESSEE/PERMITTEE CONSTRUCTION OR ALTERATION APPLICATION

The Zoning. Associated. Description N/A. Commission be filed with. been filed. regulation.

MULTNOMAH COUNTY, OREGON

RELEASE AND HOLD HARMLESS AGREEMENT

CHECKLIST FOR CONSTRUCTION STAGING PLAN IN CORAL GABLES

ALAMEDA MUNICIPAL POWER INTERCONNECTION AGREEMENT GENERAL CONDITIONS

Reasonable Modification from the Planning Code

TEMPORARY USE PERMIT APPLICATION PUMPKIN/CHRISTMAS TREE LOT

CITY OF INGLEWOOD Film Permit Application One Manchester Blvd. - Inglewood, CA (310) Fax: (310)

Residential Debris Removal Right-of-Entry Permit Checklist for Property Owners

APPLICATION FOR PERMIT

AIA Document C196 TM 2008

Special Conditions, Regulations and Instructions for Right of Way Permit Applications

RIGHT-OF-WAY PERMIT APPLICATION

TOWN OF JUNO BEACH 340 Ocean Drive Juno Beach, FL Phone: (561) Fax: (561)

The Firemen s Association of the State of New York

TOWN OF KENT, CT PLANNING AND ZONING COMMISSION

APPLICATION CHECKLIST. Workers Compensation Certificate (C or waiver) Three (3) sets of Architectural Plans, signed and sealed (if applicable)

Lompoc Redevelopment Agency Seismic Retrofit Loan Fund Guidelines

Please Refer to Attached Sample Form

SECTION 7: SITE INFORMATION (refer to 780 CMR for details on each item) Sewage Disposal: Indicate municipal or on site system

Owners Request for Alteration to Strata Lot

Request for Proposals (RFP): Lake Avondale Stormwater Mitigation Facility Design and Construction Documents

Right-of-Way Utilization Permit Please complete a separate application for each road

AIRPORT HANGAR LICENSE AGREEMENT

COMMERCIAL FACADE IMPROVEMENT PROGRAM GUIDELINES AND APPLICATION

Debris Removal Right-of-Entry Permit (For Providing Debris Removal on Private Property)

AGREEMENT Between The Northwest Seaport Alliance and Seattle City Light For Terminal 5 Modernization. Recitals

REQUEST FOR PROPOSALS FOR DESIGN OF THE GRAPE DAY PARK RESTROOM PROJECT

Orange Tree Master Maintenance Association Information Package for Architectural Review

Construction of the Leased Premises

Bureau of Environmental Services

Huntington Beach LCPA 1-16 (Sunset Beach Specific Plan) DRAFT Hazard Analysis Sug Mod Working Document/Not for general circulation.

APPLICATION FOR BUILDING PERMIT CITY OF PORT JERVIS, NEW YORK. Section Block Lot Zone

Second Amendment. North American Title Insurance Company

BUSINESS LICENSE PERMIT INFORMATION AND PROCEDURE

INSURANCE AND INDEMNIFICATION MANUAL. Supplement to Policy 560 i

CITY OF PORT JERVIS 13 STEPS TO HIRING A CONTRACTOR

Not operate above a maximum speed of 10 miles per hour; Have a gross weight of less than 80 pounds, excluding cargo;

EXHIBIT A. The land referred to is situated in the County of Alameda, City of Oakland, State of California, and is described as follows:

Department of Finance Phone: (914) North Avenue FAX: (914) New Rochelle, NY REQUEST FOR PROPOSAL Spec # 5254

BOAT & BROKERAGE SHOW. In-Water SEPT OCT. 1, Don t Miss Out On This Tremendous Three Day Sales Opportunity!

Project Specific Application For Insurance

SUBJECT: RESPONSES TO QUESTIONS FOR RFP FOR CMP ASSESSMENT

Transcription:

BOAT DOCK INFORMATION DPW- ENGINEERING DIVISION (650) 522-7320 CDD - BUILDING DIVISION (650) 522-7172 330 W. 20 th Ave. San Mateo, CA 94403-1388 The Marina Lagoon is used as a dual function facility: (1) to provide recreation, and (2) to store and manage storm water from the drainage basins west of the Lagoon. Generally, the level of the Lagoon is maintained between 96.0 97.0 elevation from May to October and 95.0 95.5 elevation from November to April. However, management of the Lagoon and storms may cause variations in the water level to occur during the year. In addition, as a convenience to the residents, the Lagoon is lowered approximately 3.5 feet during the month of January to facilitate work on docks and other structures on the shoreline. Please take note of these variations and construct docks or lifts accordingly. Conditions permitting, the Department of Public Works will announce planned lowering of the waters by publishing notices in the San Mateo County Times, posting notices at the public boat launches and recreation centers, and mailing notices to the homeowners associations around the Lagoon. The United States Army Corps of Engineers claims jurisdiction over the Marina Lagoon waterway and has delegated permitting of docks to the City of San Mateo. Complete plans and specifications (refer to Exhibits A through G) is required to be submitted to the Building Division. No construction of any dock is allowed without obtaining a Building Permit from the Building Division and an Encroachment Permit from Public Works Department and paying all associated fees. An application for Building Permit and an application for Encroachment Permit is attached. In some areas along the lagoon, Homeowners Association Approval is also required. When this is applicable, the Association letter of approval must accompany the plan submittal. Any docks on the Lagoon must be in good repair, and have a current dock permit and insurance on file or the City Public Works Department may serve notice to remove the dock whereupon the dock must be dismantled by the owner and taken out of the Lagoon. Docking is a permitted use, not a mandatory obligation on the Federal government or the City. Each dock must pay an annual dock permit fee and the owner must maintain a current Certification of Insurance as well ass a Hold Harmless Agreement that covers the City with regard to liability for personal injury or property damage that may occur because of the dock. As part of the United States Army Corps of Engineers Regional Permit, the California Regional Water Quality Control Board issued a waiver of Waste Discharge Requirements and Water Quality Certification pursuant to the following conditions: 1. No creosote-treated wood or creosote-treated pilings shall be used for any construction, replacement or repair of structures. 2. Appropriate erosion control measures shall be implemented and maintained throughout construction areas. All work shall be conducted in a manner so as to minimize the discharge of earthen materials into the waters of Marina Lagoon. 3. All equipment staging material storage areas shall be located on upland sites. The property owner should be aware that the Lagoon is known to have marine organisms that attack wood pilings. The area of concern is from the mudline to the high water elevation, the area of wetting and drying. This may affect the service life of the dock and should be considered in design. The attached Plans and Specifications are provided as a City approved Standard Plan. Any deviation from the Standard Plan will require submittal of structural calculations stamped and signed by an Architect or Engineer licensed by the State of California. No dock, boatlift or any other structure shall extend into the Lagoon more than 25 feet beyond the point on the shoreline intersected by the plane of the summer high water level (elev. 97.0 ) (except within the limits of Mariners Island subdivision, Unit 1, 2, and 3, where the existing housing structures extend into the lagoon. In these cases, docks/ramps/lifts, etc. shall conform to the following criteria: 1) Where the existing house structure extends 10 feet or less into the lagoon, boat docks shall extend no more than 25 feet beyond the point on the shoreline intersected by the plane of the summer high water level; or 2) Where the existing house structure extends greater than 10 feet into the lagoon, boat docks shall not extend more than 15 feet beyond the edge of the existing house structure. Under no circumstances shall boat docks extend more than 40 feet beyond the point on the shoreline intersected by the plane of the summer high water level. Fences shall not extend any more than 6 feet into the Lagoon from the same point noted previously in this paragraph and only along established property lines.

BOAT DOCK PLAN SUBMITTAL REQUIREMENTS When applying for a boat dock permit, please submit four (4) complete sets of plans and specifications along with a completed Building Permit Application and a Marina Lagoon Application for a Public Works Encroachment Permit. Building permit fees shall be based on a total valuation of $20.00/sf of deck area. Please refer to the Building Division for building permit fee amount. Also, please refer to Public Works Department for encroachment permit fees. All new docks and repairs of existing docks will require complete plans to be submitted to the City for review and approval from the Building Division and Public Works Department. Any deviations from the Approved Standard Plan will require plans to be prepared by a Licensed Architect or Engineer. Construction may not commence until the issuance of a Building Permit and a Public Works Encroachment Permit. Plans and specifications shall include the following items: (Can be used as a checklist) I. Site Plan (Refer to Exhibit A and Exhibit B for sample) 1. Provide a fully dimensioned Site Plan in ink, to scale, indicating property lines, location of the dock and any structures (new or existing) whether attached or not. 2. Specify location of boatlifts, if applicable. 3. Show sizes of proposed improvements from existing structures. II. Foundation/Framing Plan (Exhibit C) 1. Show foundation detail (Exhibit D) 2. Show framing plan with size of material, type of material and spacing. 3. Show method of attachment to other structures. 4. Electrical grounding, GFCI outlet, electrical fixtures and wiring, if proposed. 5. Show any plumbing if included in the installation. 6. Show Boatlifts both manual and electrical. III. Section View (Exhibit E) 1. Show distance from summer high water level to most remote edge of dock. 2. Size and spacing of floor joists. 3. Size and spacing of Pilings. 4. Required bracing. 5. Embedment of pilings into grade. IV. Elevation View (Exhibit F and Exhibit G) 1. Show distance from summer high water level to most remote edge of dock. 2. Building extension into Lagoon. 3. Maximum Dock projection from face of housing structure. NOTE: 1. 2. 3. 4. 5. 6. Any deviations from the standard plan will require plans prepared by a licensed Architect or Engineer. Any awning or cover will require plans prepared by a licensed Architect or Engineer. Docks constructed with stairs would need clear and detailed stairway, guardrail/handrail plans. Community docks, which are used for public use, will require plans prepared by a licensed Architect or Engineer. The deck shall be designed using a 100 psf live load. If dock is within a Homeowner s Association, an HOA approval letter is required. Certificate of Current Insurance with required limits of coverage and indicating the "City" as an additional insured (refer to attached Standards for Insurance form).

WORKSHEET FOR BUILDING PERMIT Dept. of Community Development 330 W. 20 th Ave. San Mateo, CA 94403-1388 1 PLAN CHECK #: PA NUMBER: DATE: PROJECT ADDRESS UNIT NO. WORK DESCRIPTION: Briefly describe the scope of work USE OF BUILDING: Existing Use: 2 Proposed Use: VALUATION: $ (based on dept valuation schedule) 3 Property Owner's Name Number & Street Name City & Zip Code Phone Number 4 Applicant Information: Agent for Owner Owner Owner-Builder Agent for Contractor Contractor Architect Engineer Developer Tenant Applicant's (Contact) Name Number & Street Name City & Zip Code Phone Number Company Name E-Mail Address Fax Number Contractor's Name Number & Street Name City & Zip Code Phone Number 5 Business License # Contractor's State License # License Class Worker's Compensation Carrier Policy # Expiration Date Architect's Name Number & Street Name City & Zip Code Phone Number 6 Company Name Lic# E-Mail Address Fax Number Engineer's Name Number & Street Name City & Zip Code Phone Number 7 Company Name Lic# E-Mail Address Fax Number 8 Tenant's Name Number & Street Name City & Zip Code Phone Number Unless a shorter period of time has been established by an official action, plan check approval expires 180 days after the plan check fee has been paid per SMMC 23.06.037 and UAC 304.4. This permit expires 180 days after the fee has been paid and construction has not commenced or if work is suspended or abandoned at any time after the work is commenced for a period of 180 days per UAC 303.4. 9 SIGNATURE OF APPLICANT: PRINT NAME: DATE: Q:\CDD\Building\FORMS\BLDGAPP.DOC Revised: 10/17/2000

FOR OFFICE USE ONLY ADDRESS: PLAN CHECK #: New Building Addition Alteration Demolition Termite/Dry Rot Repair Relocation Fire Sprinklers Sign Swimming Pool/Spa Tenant Improvement Chimney Repair Fire Repair Ret. Wall/Fence Change Use Other: ASSESSOR'S PARCEL # - - MAP REF # TRACT LOT BLOCK PARCEL INFORMATION ZONE LOT TYPE LOT SIZE ALLEY CENSUS TRACT FIRE ZONE FLOOD ZONE PARKING DIST MAX HEIGHT MAX FAR FRONT SETBACK SIDE SETBACK SIDE SETBACK REAR SETBACK PARCEL DOCUMENTS / EASEMENTS BUIILDING INFORMATION TYPE OCC CONSTR CLASS # UNITS # STORIES # BSMTS HEIGHT EXISTING FLR AREA PROPOSED FLR AREA PARKING REQD PARKING PROV # BDRMS # BATH APPLICATION COMMENTS Q:\CDD\Building\FORMS\BLDGAPP.DOC Revised: 10/17/2000

PLEASE PRINT Applicant: (List Owner s name if different from Applicant) Address: City: CITY OF SAN MATEO PUBLIC WORKS DEPARTMENT MARINA LAGOON APPLICATION FOR AN ENCROACHMENT PERMIT (650) 522-7300 Address of Dock: (if different) Owner s Name: Address/City: Phone: Dock #: Date: Homeowners Association: YES NO (if yes is checked, applicant s Association approval letter must be attached) Proposed Start and Completion of Work: Description of proposed work: to Cost of Construction (include labor and materials): I/we hereby apply for an encroachment permit to construct the following improvements within the adjacent Marina Lagoon to a point that shall not extend into the Lagoon further than a 25 distance along the outboard side of the improvement from the shoreline at an elevation of 97.0 (except within the limits of Mariners Island subdivision, Unit 1, 2 and 3 only where existing housing structures extend into the lagoon. In these cases, docks/ramps/lifts, etc. shall conform to the following criteria: 1) Where the existing house structure ends 10 feet or less into the lagoon, boat docks shall extend no more than 25 feet beyond the point on the shoreline intersected by the plane of the summer high water level; or 2) Where the existing house structure extends greater than 10 feet into the lagoon, boat docks shall not extend more than 15 feet beyond the edge of the existing house structure. Under no circumstances shall boat docks extend more than 40 feet beyond the point on the shoreline intersected by the plane of the summer high water level as per attached drawing Exhibit A through G). I/we agree to construct the above-described improvements in accordance with the attached plans and exhibits herein to the satisfaction of the City of San Mateo Public Works Department and/or Building Division and/or Planning Division and to maintain said improvements in a safe manner and in accordance with all laws and ordinances. I/we agree to hold harmless and defend the City of San Mateo and its elective and appointive boards, commissions, officers, agents, and employees as additional insureds from any and all claims, liability, and damages from whatsoever reason arising, which are asserted against them on account of the design, construction, maintenance, operation, location, and/or safety of said dock improvements, except for injury or damage caused by the sole negligence or willful misconduct of City. It is further understood and agreed that evidence of Public Liability and Property Damage insurance in the minimum amounts required by the City, submitted herewith, shall remain in full force and effect at owner s or applicant s expense so long as any dock improvements remain within the Marina Lagoon. Cancellation or expiration of said insurance shall be considered sufficient cause for revocation of this permit by City and removal of dock and appurtenant improvements from the Marina Lagoon at owner s expense. Whenever possible, City and its elective and appointive boards, commissions, officers, agents, and employees shall be named as additional insureds on said policies (refer to attached Standards for Insurance form). Permittee shall comply with all City ordinances and regulations, and Federal and State laws and regulations pertaining to encroachments in easements and/or rights of way. Failure to comply with the provision under which the permit is issued may be the basis for rejecting the work and canceling the permit. I have read the above and therefore submit my documents for review. Owner s Signature: -and- Applicant s Signature: RETURN APPLICATION TO PUBLIC WORKS DEPARTMENT WITH THREE SETS OF SUPPORTING DOCUMENTATION (See Boat Dock Permit Application Requirements Exhibit A) R:\Boat Dock\MarinaLagoonEP rev. 12-23-02

CITY OF SAN MATEO DEPARTMENT OF PUBLIC WORKS 330 West 20th Avenue San Mateo, CA 94403 (650) 522-7300 (650) 522-7301 fax STANDARDS FOR INSURANCE Commercial General Liability (or Comprehensive) and Property Damage Insurance Coverage Required of All Persons Performing Work on Street Rights of Way or Other City Property (except see Standards for Utility Companies and City Contractors) The following requirements must be observed: Must have COMMERCIAL GENERAL LIABILITY (or COMPREHENSIVE) and PROPERTY DAMAGE: COMMERCIAL GENERAL $250,000 EACH PERSON LIABILITY (or COMPREHENSIVE) $500,000 EACH OCCURRENCE* PROPERTY DAMAGE $100,000 EACH OCCURRENCE* $250,000 AGGREGATE *May NOT substitute "each accident" for "each occurrence." Insurance MUST name the City of San Mateo as an additional insured using the following wording EXACTLY, and insurance certificate MUST show: "CITY OF SAN MATEO AND ITS ELECTIVE AND APPOINTIVE BOARDS, COMMISSIONS, OFFICERS, AGENTS, AND EMPLOYEES AS ADDITIONAL INSUREDS" Must have 30-day cancellation clause. NOTE FOR BOAT DOCKS ONLY: For Encroachment Permits for boat docks in the Marina Lagoon, the description of the operatives covered shall show the location of the dock by the street address. q:\pw\pweng\dulik\encroach\insurstd.doc rev.10/01