FINANCIAL INSTRUMENT VENTURE CAPITAL FUND

Similar documents
Financial Instrument Seed/Acceleration and Start-up Fund OP Innovation & Competitiveness

TECHNOLOGY TRANSFER FUND. Concept summary

The investment shall be newly originated (not a refinancing). The investments shall be expected to be financially viable.

INDICATIVE TERM SHEET. Mezzanine / Growth Fund. This Indicative Term Sheet is structured of:

Innovation Window. Technology Transfer Fund(s) / Accelerator Fund(s). The financial instrument(s) must be established as a closed-end fund.

Indicative technical specification for conducting market consultations in connection with a Technology Transfer Fund financial instrument, funded

INDICATIVE TERM SHEET Venture Capital Fund

OP HRD Risk-sharing Micro- Finance facility in Bulgaria in the programming period

amended from time to time concerning the definition of micro, small and medium-sized enterprises

Capital split between compartments

INDICATIVE TERM SHEET

1. Financial instrument KOFFI

ESIF Financial Instruments: State aid considerations

Financial instruments - opportunities offered by the framework. Key novelties and Commission guidance Riga, 30 October 2015

How does an equity scheme work? Miglena Dobreva, EIB, Financial Instruments Advisor

1.Financial Instruments under ESIF Synergies between ESIF and EFSI (Juncker Plan) 3. Commission Guidance on Financial Instruments

Financial Instruments supported by the European Structural and Investment (ESI) Funds in CSI-Europe towards FIs for Cities

Financial Instruments - Implementation in the EU and in Lithuania

Financial Instruments in Cohesion Policy

European Structural application: and Investment Funds

Ex-ante assessment for ESIF financial instruments. Quick reference guide

Case study Financial instruments for Research, technological development and innovation for Romanian SMEs Brussels, Thursday, 30 November 2017

Financial instruments - Commission guidance notes. Paris, 22 March 2016

Reporting on financial instruments (FI) in the annual implementation report for the programming period

Ex-ante assessment. Quick reference guide

Guidance for Member States on Performance framework, review and reserve

Financial instruments - Commission guidance notes (and new off the shelf instruments) Warsaw, 8 March 2016

Guidance for Member States on Article 41 CPR - Requests for payment

ANNEX 2 to the Call for Expression of Interest No JER-009/1 Financial Instrument: Description and Selection Criteria

Financial instruments - Commission guidance notes. Commission guidance Lisbon, 18 January 2016

Instrumentos Financeiros na Política de Coesão

Financial instruments for SME support in practice Case study demonstrating the use of equity instruments Charles HAMILTON, Invest Northern Ireland

Eligibility of expenditures in Structural Funds Trainer: Marco Lopriore, EIPA

Ex-ante assessment methodology for financial instruments in the programming period. General methodology covering all thematic objectives

Guidance for Member States on CPR_37_7_8_9 Combination of support from a financial instrument with other forms of support

Key features and opportunities of financial instruments under ESI Funds in

Quick appraisal of major project. Guidance application: for Member States on Article 41 CPR. Requests for payment

Financial instruments under the European Structural and Investment Funds

Guidance for Member States on Performance framework, review and reserve

Financial Instruments DG Regional and Urban Policy Budapest 24th April 2015

EUROPEAN COMMISSION. EGESIF_ final 22/02/2016

Financial Instruments supported by the European Structural and Investment (ESI) Funds in

Ex-ante assessment methodology for financial instruments in the programming period

State aid issues for RDI programmes Workshop on RIS3 Cross-regional Learning, Chania-Greece, 21 February 2018 Mihalis Kekelekis

Official Journal of the European Union

Briefing. Financial instruments in cohesion policy. December 2016

Ex-ante assessment for financial instruments, Sweden. Case Study

Financial Instruments under JEREMIE In Bulgaria. Miglena Dobreva Ministry of Economy of Republic of Bulgaria Kiril Velitchkov CIBANK, KBC Group

Co-investment Instrument under the JEREMIE Initiative in Languedoc-Roussillon (FR) Ljubljana 21 January 2016

Financial instruments in ESIF programmes

Experience with financial instruments in the period of and the new framework for the period of

Rules on eligibility of expenditure

ELIGIBILITY RULES. Rule No 1: Expenditure Actually Paid Out

Quick appraisal of major project application: Guidance for Member States on Financial Instruments - Glossary

Financial Instruments supported by the European Structural and Investment (ESI) Funds in

OPERATIONAL PROGRAMME under THE FUND FOR EUROPEAN AID TO THE MOST DEPRIVED

fi-compass State aid survey

DRAFT GUIDANCE FICHE FOR DESK OFFICERS PROGRAMMING OF TECHNICAL ASSISTANCE AT THE INITIATIVE OF THE MEMBER STATES VERSION 2 25/06/2014

State of play of Financial Instruments in the ERDF programmes. David Read DCLG (Managing Authority), England

GUIDANCE FICHE PERFORMANCE FRAMEWORK REVIEW AND RESERVE IN VERSION 1 9 APRIL 2013 RELEVANT PROVISIONS IN THE DRAFT LEGISLATION

Overview of the Northern Ireland Ireland - Scotland VA Programme. Electric Vehicles Call Workshop

Revised 1 Guidance Note on Financial Engineering Instruments under Article 44 of Council Regulation (EC) No 1083/2006

Summary of data on the progress of implementation of ESF financial instruments under programming period

Financial instruments in Cohesion Policy : Ex-ante assessments

Reference number: Call for EoI CVCi FoF 01/2018

LIST OF FINAL GUIDANCE NOTES APPROVED BY COCOF FROM 2006 TO 2011

The European Maritime and Fisheries Fund. Financial instruments

MTR - Legislative changes affecting the ESI Funds

Guidance for Member States on Article 42(1)(d) CPR Eligible management costs and fees

COSME Financial Instruments for SMEs

CE TEXTE N'EST DISPONIBLE QU'EN VERSION ANGLAISE

Annex IV to the Open Call for Expression of Interest to select Financial Intermediaries under the Silesia EIF Fund of Funds

Financial instruments under the European Structural and Investment Funds

Financial instruments for enhancing SME competitiveness

ANNEX 2 to the Call for Expression of Interest No JER-00. Part I: Description of the Financial F

Financial Instruments in Energy Efficiency in Lithuania Agnė KAZLAUSKAITĖ, Ministry of Finance Junona BUMELYTĖ, EIB

European Structural and Investment FUNDS and European Fund for Strategic Investments complementarities

An overview of the eligibility rules in the programming period

Ex-ante assessment methodology for financial instruments in the programming period

Official Journal of the European Union. (Non-legislative acts) REGULATIONS

The urban dimension. in the legislative proposals for the future cohesion policy. Zsolt Szokolai DG REGIO C.2 Urban development, territorial cohesion

Simplified Cost Options:

ESF contribution to EaSI under article 38.1(a) Guadalupe de la Mata, European Investment Fund

Thematic Smart Specialisation Platforms

Financial instruments under ESI funds

Guidance for Member States on Integrated Sustainable Urban Development (Article 7 ERDF Regulation)

ANNEX 3 to the Call for Expression of Interest No JER-001/2011/2

Europe s Leading Developer of Risk Financing for Entrepreneurship & Innovation

JESSICA. UDF Handbook

means a Financial Intermediary applying to this Call for Expression of Interest;

Guidance for Member States on Definition and use of repayable assistance in comparison to financial instruments and grants

SCOTTISH ENTERPRISE REGIONAL AIRPORTS, MARITIME PORTS AND INLAND PORTS AID SCHEME

EU level and "Off-the-shelf" Financial Instruments

content/en/all/?uri=celex:32006r1893 (bilingual display is possible). Q14 In case of a team that is not yet organized under a legal structure, what

The SME Initiative. A joint Commission presentation. SME Initiative workshop Brussels, 23 April 2015

Investing in regions: The reformed EU Cohesion Policy

THE FOSTER PROJECT. Financial instruments for enhancing SME competitiveness. Brussels, 19 April 2018

Financial Instruments

MEMORANDUM OF UNDERSTANDING BETWEEN THE GOVERNMENT OF THE REPUBLIC OF BULGARIA AND THE INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

DECREE No 104 OF 17 MAY 2008 ON ORGANIZATION AND COORDINATION OF MANAGEMENT OF RESOURCES FROM THE FUNDS OF THE EUROPEAN UNION

Transcription:

FINANCIAL INSTRUMENT VENTURE CAPITAL FUND EXECUTIVE SUMMARY OPIC 2014-2020 NOVEMBER 2017 FOR DISCUSSION PURPOSES ONLY 1

Dear Partners, We have prepared this presentation as a summary for the financial instrument Venture Capital Fund within the Operational Programme Innovation and Competitiveness. We advise you to review the presentation in conjunction with the indicative term sheet for the Venture Capital Fund published on our website during the market testing phase of the implementation process of thefinancial instrument. These materials are put together to provide а basis for detailed discussions aimed at establishing the appropriate structure of the financial instrument. We would appreciate any queries or suggestions you may have and look forward to discussing with you further. Kind regards, 2

Glossary of Terms BGN CPR DA EC EU ESIF ERDF FI FoF FMFIB ICT ISSS VCF OA OPIC OP PPA PE R&D SAR VC Bulgarian Lev National currency of Bulgaria Common Provisions Regulation Delegated Act European Commission European Union European Structural & Investment Funds European Regional Development Fund Financial Instrument Fund of Funds Fund Manager of Financial Instruments in Bulgaria Information and Communication Technology Innovation Strategy for Smart Specialisation Venture Capital Fund Operational agreement Operational Programme Innovations and Competitiveness Operational Program Public Procurement Act Private Equity Research and Development State Aid Regime Venture Capital 3

Introduction Background FMFIB has been appointed by the Managing Authority of Operational Programme Innovations and Competitiveness 2014-2020 (OPIC) to manage the financial instruments under the programme This mandate incorporates, among others, the design and set-up of four financial instruments for equity and quasi-equity investments with a total budget of EUR 150 million Our role FMFIB is tasked with: (i) structuring the financial instruments as investment funds in line with the objectives of OPIC; (ii) selection of fund managers with relevant and applicable experience to manage the funds; and (iii) monitoring and supervising the fund managers and funds during the course of the fund life Market testing Aiming to execute its mandate in a transparently, as well as align the structures of the instruments with the prevailing market practices, FMFIB is conducting comprehensive consultations with potential stakeholders, i.e. potential fund managers, investors, investees, policy makers, entrepreneurs etc. Purpose of this document This document provides а high level overview of the financial instrument Venture Capital Fund within the OPIC In addition, FMFIB published an indicative term sheet with respect to the financial instrument as a basis for a detailed discussion (ref www.fmfib.bg). Structure of this document The document encompasses brief descriptions of: Structure and role of FMFIB Background and policy rationale of the financial instrument Main features and key indicative terms & conditions of the instrument and the prospective investment fund(s) Tentative roadmap of the overall process up to first closing 4

Fund of Funds Financial Instruments ERDF CF EAFRD/ EFMAF ESF ESF/ YEI State budget The EU has recognised the financial instruments (FI) as an important tool towards achieving its policy objectives FIs are designed to support final recipients via loans, guarantees, investments etc. as opposed to grants European funding National co-financing They mobilise additional funds and expertise from the private sector OPIC BGN 459.6 m OPRG BGN 369.9 m OPHRD BGN 70.0 m OPE BGN 286.4 m FIs structure also entails revolving funds, i.e. reuse of the public funds for the same policy goals FoF Rationale Private investors BGN 1.2 bln Fund of funds ФМФИБ FMFIBЕАД Bulgaria has taken the strategic decision to implement the FIs via a national investment vehicle structured as a Fund of funds (FoF) Currently, four OPs contribute moneys earmarked for FIs in the Fund of funds in the amount of BGN 1.2 billion Private funding OP contribution Financial instrument BGN 2.7 bln Financial intermediaries FIs are expected to mobilise support and capital from the private sector and fully a leveraged Fund of funds is expected to facilitate the investment of ~BGN 2.7 billion in the Bulgarian economy (including its own dedicated resources) The investment of the FIs would be entrusted to intermediaries selected and monitored by FMFIB Final recipients 5

OPIC equity and quasi-equity investment scope Priority axis I Equity investments budget BGN 59 m BGN 59 m (max 90%) Technology Transfer Fund SMEs & Large Mechatronics Clean tech ICT Life sciences Creative and recreational industries Tech transfer Resource efficiency OPIC Investment strategy re. equity investments BGN 108 m (max 90%) Seed/Acceleration and Start-up Fund Priority axis II Equity investments budget BGN 235 m FMFIB BGN 49 m (max 90%) Venture Capital Fund SMEs BGN 78 m (max 60%) Mezz. / Growth Fund ~ BGN 65 m ~ BGN 119 m ~ BGN 54 m ~ BGN 131 m SMEs Generalist Generalist SMEs Generalist OPIC equity & quasi equity investments The scope of the FIs under OPIC s has been established as a result of a formal Ex-ante assessment of the experience and demonstrated inefficiencies of the investment market in Bulgaria Base on its conclusions, OPIC has committed a total of EUR 150 million for investment and fund management The Investment Strategy of OPIC envisages the set-up of four types of investment funds across the PE/ VC /Early Stage spectrum FMFIB would structure and perform tender procedures for the selection of fund managers of the these funds adhering to an open and transparent process in accordance with market practice FoF would have the role of a limited partner in the resulting funds The funds would also attract private financial resources which would depend on the selected state aid regime. The currently contemplated regime provide for FMFIB participation ranging from 40% to 90% of the fund size The minimum required private co-financing (10% to 60%), respectively the target fund size depends on the applied state aid regime which would be specified in the final term sheet and would be subject to discussion during the market test. 6

Structure Fund rationale Key policy objectives encompass: fostering productivity and export capabilities of SMEs Private investors Fund of Funds BGN 49 m Venture Capital Fund SMEs Fund manager The fund would has a generalist sector strategy with a sector concentration according to market practice The fund will pursue Bulgaria-based projects or projects which benefits would accrue for Bulgaria Eligible investees include SMEs which are not companies in difficulty and do not operate in the Agriculture sector (NACE Chapter A) The fund will provide equity and quasi-equity financing in line with the goals defined by its policy rationale The FoF commitment may be provided to one or more investment funds The minimum required private co-financing (10% to 60%), respectively the target fund size depends on the applied state aid regime Key indicative terms & conditions FoF commitment: BGN 49 million including fees & costs FoF max participation: between 40% and 90% Fund life: 10+1+1 years Investment Period: ~five years since first closing Commitments from private investors / co-financing: relative to the FMFIB commitment Risk sharing/ distr. cascade: TBD (pari-passu / asymmetric return) 7

Target group of investees and Eligible investments Target Group of Investees Eligible Investees Eligible Investments SMEs in the early stages of development; innovative SMEs; hightech SMEs; SMEs with high risk profile. Are micro, small or medium enterprises Have an establishment, branch or headquarters in Bulgaria at the moment of investment Investments implemented outside of the programme area but within the EU and where the benefit of the investment is for Bulgaria Investments that are not physically completed or fully implemented at the date of the investment decision Are not manufacturing, processing and marketing of tobacco and tobacco products In case SAR I is applied SMEs not operating in any market or operating for less than 7 years following their first commercial sale or require an initial risk finance investment in view of entering a new product or geographical market as further specified in the GBER Are not undertaking active in Section A - Agriculture, forestry and fishing Not undertakings in difficulty Investments where the investment amount is up to EUR 5 million including follow-on investments Investments where there is transfer of property rights in enterprises, the transfer takes place between independent investors Compliant with art. 37, par. 4 of the CPR and art. 4, par. 1 of the DA Investments for replacement capital, combined with new capital representing at least 50% of each investment round in eligible undertaking Not subject to an outstanding recovery order following a previous Commission decision In case SAR I is applied In case SAR II is applied Not undertakings in difficulty according to points 20 and 24 of the Guidelines on State aid for rescuing and restructuring non-financial undertakings in difficulty Business plan containing details of product, sales and profitability development, establishing ex-ante financial viability Investments that have a clear and realistic exit strategy Following the discussions with market participants during the Market Test, taking into account the prospective investment strategies and in accordance with the applicable regulations, two types of State Aid Regime (SAR) may be applied: SAR I: Fund(s) attracting a between 10% - 60 % commitments from Independent Private Investors and are subject to compliance with GBER and/or SAR II: Fund(s) attracting a minimum of 30% commitments from Independent Private Investors, applying parri passu principle and are subject to compliance with the Guidelines on State aid to promote risk finance investments (state aid free). Follow-on investments are eligible if the following conditions are met : the possibility was foreseen in the original business plan, total amount of risk finance and the private participation is in compliance with GBER 8

Ineligible investments Investment directly linked to quantities exported, establishment and operation of a distribution network or other current costs linked to the export Investment contingent upon the use of domestic goods Investment to facilitate the closure of uncompetitive coal mines Investments restricting the possibility for the investees to exploit the R&D results Ineligible in case SAR I is applied The decommissioning or the construction of nuclear power stations Ineligible investments Pure financial activities or real estate development when undertaken as a financial investment activity Investment to achieve the reduction of greenhouse gas emissions from activities Any investment affected by an irregularity or fraud Investment in airport infrastructure unless related to environmental protection The financing of the same expenditure items where the conditions are not satisfied The pre-financing of a grant 9

Selection procedure process map Stage 1 Stage 2 Stage 3 Stage 4 Stage 5 Stage 6 Preparation of Indicative term sheet Market test Amendment of the indicative term sheet Preparation of final term sheet and tender pack Tender submission period Q&A with tenderers Selection of Fund managers & OA Private fund raising Vehicle design & set-up Legal structuring 10

Important notice Opinion. Investment recommendation. Advice This Investment opportunity outline ( the Document ), in whole or in part, is not to be construed as an opinion, or an investment recommendation, or a recommendation, or an advice to proceed or not with any considered transaction or other course of action. The information provided is considered by FMFIB as indicative might be and will be subject to changes. According to the applicable regulations, the selection of financial intermediaries with respect to the implementation of the financial instruments under OPIC is subject to successful completion of a formal tender procedure and decision of FMFIB s competent authorities. Change in regulations The information provided in this Document is based on a number of laws and other regulations, both national and European, effective as of the date of its preparation. Changes in the applicable regulations may render the Document, in part or in whole, obsolete or not applicable. FMFIB assumes no responsibility towards third parties in relation with any such changes, amendments as well as with respect to interpretations of either the law or other legal documents with respect to any legal forum. FMFIB shall assume no liability or responsibility for any costs, damage, losses or expenses incurred by any party arising out of use of or reliance on this Document. Document distribution This Document has been prepared solely for the purpose stated herein and should not be used for any other purpose. Neither it nor its contents are to be referred to or quoted, in whole or in part, in any legal document without our prior written consent. This Document is intended for publication but it should not be reproduced or distributed without FMFIB prior express consent. Third party information In preparing this Document, we have used information and documents provided by the Managing authority of Operational programme Innovations and Competitiveness as well as information available from publicly available sources. We have not sought to establish the reliability of the above mentioned data by reference or analyses and hence we do not accept responsibility for such information. PPA The terms and concepts used in this presentation have the same meaning as in the indicative technical specification of the Financial Instrument. Any information you provide will be used solely for the purposes of market consultations in the context of the requirements of the Public Procurement Act ( "PPA"). In light of the requirements of Article 44 of the PPA, FMFIB reserves the right to publish the received feedback without mentioning specific organization bringing it together with the answers from our side and occurred in this regard changes to the indicative technical specification (if applicable). 11

Contacts Аddress 30 32, Gen. Totleben Blvd. 1606 Sofia, Bulgaria Т +359 2 801 40 50 office@fmfib.bg www.fmfib.bg Copyright Fund manager of financial instruments in Bulgaria EAD is a Bulgarian joint stock company owned by the Bulgarian state, represented by the Ministry of finance. Fund manager of financial instruments in Bulgaria EAD logo and the logo of Operational programme Innovations and Competitiveness are owned by the respective organisations. All rights reserved 12