PUBLIC CREDIT OFFICE MANAGING LIQUIDITY RISK THROUGH CONTINGENT LINES OF CREDIT

Similar documents
Catastrophe Risk Financing Instruments. Abhas K. Jha Regional Coordinator, Disaster Risk Management East Asia and the Pacific

Guidance Note to Staff

Public Disclosure Copy. Implementation Status & Results Report Costa Rica Catastrophe Deferred Draw Down Option (CAT DDO) (P111926)

Public Disclosure Copy. Implementation Status & Results Report Costa Rica Catastrophe Deferred Draw Down Option (CAT DDO) (P111926)

Public Disclosure Copy. Implementation Status & Results Report Costa Rica Catastrophe Deferred Draw Down Option (CAT DDO) (P111926)

Catastrophe Risks and their Financing in India including Regulatory Landscape

Knowledge FOr Resilient

PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE

Financing Options and Issues Session 6: Access to Financing Options and Instruments

Loss and Damage Associated with Climate Change Impacts The (possible) role of Disaster Risk Financing and Insurance

PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: Second Disaster Risk Management Development Policy Loan with a CAT-DDO Region

An Overview of Disaster Risk Financing Instruments in the World Bank Operations

2012 Development Policy Lending Retrospective

Information Sharing Event on Work Program for Loss and Damage

The Bank s Emergency Policy

A Client Focused Approach. SDM Forum October 2010

SISRI Knowledge Notes. The Small Island States Resilience Initiative (SISRI) OVERVIEW NOTE: #1 FOCUS: PROGRAM OVERVIEW OVERVIEW: NOTE: #1

GOVERNMENTS IN THE LEAD ON FINANCIAL PREPAREDNESS

Implementation Status & Results Guatemala Second Fiscal and Institutional Development Policy (P114373)

Boosting Financial Resilience to Disaster Shocks

Public Disclosure Copy. Implementation Status & Results Report Dominican Republic DRM Development Policy Loan with a Cat DDO (P159351)

Accrual concepts are vital to manage Fiscal Risks

Disaster Risk Management in the Caribbean Case Study: Rapid Damage and Loss Assessment following the 2013 Disaster

Disaster Risk Financing and Insurance in Indonesia

Approach Paper. Evaluation of Contingent Lending at the IDB

We have shown that there is a wide gap between present

CONTINGENT CREDIT FACILITY

REPUBLIC OF KENYA THE NATIONAL TREASURY AND MINISTRY OF PLANNING

How can Fiscal Risk be Managed? Fiscal Risk Management Strategy. Final Remarks

PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE November 16, 2016 Report No:

INTERNATIONAL MONETARY FUND DOMINICA. Debt Sustainability Analysis. Prepared by the staff of the International Monetary Fund

Peru: A Comprehensive Strategy for Financial Protection Against Natural Disasters

Resolution adopted by the General Assembly. [on the report of the Second Committee (A/67/435/Add.3)]

AON Re Hazards Conference

Financing the U.S. Trade Deficit

L/C/TF Number(s) Closing Date (Original) Total Financing (USD) IBRD Jun ,000,000.00

The fiscal response to the currency crisis and the challenges ahead - Korea s experience

Disaster Risk Financing and Contingent Credit

PROGRAM OF INDICATORS OF DISASTER RISK AND RISK MANAGEMENT IN THE AMERICAS. Review and Update. Omar D. Cardona

Luis Felipe Puente Espinosa, National Coordinator of Civil Protection, Ministry of the Interior; Mexico

PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE

CHARTER FOR FISCAL RESPONSIBILITY

DEFINING THE PROTECTION GAP. 1: Decide who /what should be protected:

International Bank for Reconstruction and Development

BELIZE. 1. General trends

THE IMF: INSTRUMENTS AND STRATEGIES. Lecture 4 LIUC 2008

CARIBBEAN DEVELOPMENT BANK SUPPORT FOR HAITI TO MEET COMMITMENT TO CARIBBEAN CATASTROPHE RISK INSURANCE FACILITY FOR THE HURRICANE SEASON

Financial Terms and Conditions of Bank Financing. Bank Access to Information Policy Designation Public

AFRICAN DEVELOPMENT BANK GROUP

Planning and Disaster Risk Reduction in Latin America

Review of Financing Plans of Emission Reductions Programs and Options to Address the Financing Gap

Ex Ante Financing for Disaster Risk Management and Adaptation

Practice Area(Lead) Social, Urban, Rural and Resilience Global Practice

STATUS OF PROJECTS IN EXECUTION FY09 SOPE

REDUCING DISASTER RISK a challenge for development

THE UNITED REPUBLIC OF TANZANIA

MEMORANDUM OF ECONOMIC AND FINANCIAL POLICIES

FROM BILLIONS TO TRILLIONS:

Financial Protection of the State against Natural Disasters. Summary. Introduction

Public Disclosure Copy. Implementation Status & Results Report Disaster Risk Management Development Policy Loan with CAT DDO (P148861)

DISASTER RISK FINANCING STRATEGIES AND ITS COMPONENTS

CPSCR Review Independent Evaluation Group

DIRECTORATE-GENERAL FOR ECONOMIC AND FINANCIAL AFFAIRS MULTI ANNUAL EVALUATION PROGRAMME. Evaluations planned for Years

Second Disaster Risk Management Development Policy Loan with a CAT-DDO (P155656)

Customized Financial Solutions Energy Week. Banking and Debt Management Department (BDM) World Bank Treasury

IBRD Lending Rates and Spreads Applicable July 1, 2014

Managing Natural Disasters

Financing Energy Projects

WBG Infrastructure Response to the Crisis

Executive Summary (in one page)

Sint Maarten National Recovery and Resilience Plan A Roadmap to Building Back Better

Global Facility for Disaster Reduction and Recovery. of the Hyogo Framework for Action. Kobe, January 15, 2007

DISASTER RISK FINANCING AND INSURANCE PROGRAM

PUBLIC DISCLOSURE AUTHORISED

IRAQ: SECOND EXPENDITURE RATIONALIZATION, ENERGY EFFICIENCY AND STATE-OWNED ENTERPRISE GOVERNANCE PROGRAMMATIC DPF (P161

Risk Transfer Schemes the Example of CCRIF SPC

Angola - Economic Report

Lima, Peru March 13, Mr. Stanley Fischer Acting Managing Director International Monetary Fund Washington, D.C Dear Mr.

Draft UN resolution on external debt sustainability and development

Strategic Framework for the Financial Management of Disaster Risk

INTERNATIONAL MONETARY FUND. Establishment of an Exogenous Shocks Facility Under the Poverty Reduction and Growth Facility Trust

International Bank for Reconstruction and Development

Overview of Disaster Risk Financing in APEC Economies

Debt Portfolio Management Quarterly Review. September 2013

PUBLIC DEBT MANAGEMENT. The Tunisian experience

Hitotsubashi university

Managing Risk-Related Contingent Liabilities in Public Finance Frameworks

OVERVIEW. Linking disaster risk reduction and climate change adaptation. Disaster reduction - trends Trends in economic impact of disasters

Disaster Risk Reduction and Financing in the Pacific A Catastrophe Risk Information Platform Improves Planning and Preparedness

SPS Brief Financing Disaster Risk Reduction - The Indian Context

The Fiscal Policy Role in Recession Economy and Issues to be Considered Roongthip Jindapol Visiting Scholar, PRI, Ministry of Finance, Japan 24 July

DOCUMENT OF THE WORLD BANK RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING HONDURAS AND NICARAGUA CATASTROPHE RISK INSURANCE PROJECT

Sponsored by the Government of Japan

Euro Summit. Brussels, 12 July 2015 SN 4070/15 EUROSUMMIT. Euro Summit Statement

The Development of Government. Bond Market in Cambodia

Vilyna SISA-AD Visiting Scholar Policy Research Institute, Ministry of Finance, Japan. September

Central government administration (80%); Sub-national government administration (20%) Operation ID

Terms of Reference (ToR) Budget Tracking Officer, Line Ministry Budget Information System (LMBIS)

FEATURE ADDRESS SENATOR THE HONOURABLE FAZAL KARIM, MINISTER OF SCIENCE, TECHNOLOGY AND TERTIARY EDUCATION AT THE

PROGRAM INFORMATION DOCUMENT (PID) Appraisal stage Report No Operation Name Financial Sector Development Policy Loan Region

Transcription:

COSTA RICA: MANAGING LIQUIDITY RISK THROUGH CONTINGENT LINES OF CREDIT Juan Carlos Pacheco Director of Public Credit Department Ministry of Finance PUBLIC CREDIT OFFICE

2 Costa Rica & World Bank: A Partnership to Reduce Vulnerabilities Exogenous Causes of Liquidity idit Risk: Costa Rica's geographic location makes it prone to natural disasters: Hurricanes, floods, earthquakes, volcano eruptions, etc. Vast experience in managing natural disasters Also, as a small open economy, Costa Rica is highly vulnerable to volatile financial markets conditions: Government was concern about the possible effects of the 2008 financial crisis

3 Costa Rica & World Bank: A Partnership to Reduce Vulnerabilities In March 2008, Costa Rica decided d to use contingent line of credits offered by the World Bank (DDOs) in order to implement a strategy to reduce these vulnerabilities This strategy materialized in two different projects: September 2008: US$65 million project to provide funding in case of natural disasters April 2009: US$500 million project to provide immediate liquidity when the borrower needs it (economic or financial shocks, etc.)

IBRD Financial Products Costa Rica selected Similar to a line of credit, a Deferred Drawdown Option (DDO) designed for countries with no immediate need for funds but that could face liquidity gap due to an unforeseen event. DDOs fall under guidelines for Development Policy Lending (fast disbursing, budget support). 1) DPL with Cat DDO: $65 million 2) DPL with DDO: US$500 million Provides immediate liquidity idi after a natural disaster results in the declaration of a state of emergency. Deferred disbursement of a project from 3 up to 15 years Requires preparation or existence of a disaster risk management program An immediate source of liquidity when the borrowers need it Deferred disbursement of a project from 3 up to 6years Periodic monitoring of borrower s comp liance with DPL program and macroeconomic framework by the Bank 4

1) Managing Vulnerability to Natural Disasters in Costa Rica The Government s Disaster Risk Management Framework The National Risk Prevention and Emergency Management Commission (CNE) It sresponsible for planning, coordinating, directing, and controlling emergency response at the national level. It s in charge of the inicial attention to the affected population; the assessment of damages and needs; the coordination of public entities and the private sector; and the development, contracting and implementation of rehabilitation and reconstruction plans and projects. A state of emergency can be declared only by the Executive Power, through a decree that specifies the occurred event, the general characteristics of the crisis, and outlining the areas covered by the declaration 5

1) Managing Vulnerability to Natural Disasters in Costa Rica The Government s Disaster Risk Management Framework The law obliges other institutions and local governments to act under the direction and coordination of the CNE and to attend to the emergency, with priority it onordinary works. The main source of financing for emergencies, rehabilitation, and reconstruction is the National Emergency Fund, which is capitalized by mandatory transfers from public institutions and donations from various sources. In particular, the law mandates that all public institutions transfer 3% of their financial surplus or profit to the National Emergency Fund. 6

1) Managing Vulnerability to Natural Disasters in Costa Rica Development Objective Before disaster strikes, improve government s capacity to implement disaster risk management program. Costa Rica Needs: Financing Requirement? Government needed contingent source of immediate liquidity to serve as bridge financing while other sources of financing are secured in the event of natural disaster Risk Management Objective Avoid budget reallocations and the disruption to ongoing programs that disaster response would require. 7 7

1) Managing Vulnerability to Natural Disasters in Costa Rica Identifying risks Financial Solution The timing and financial impact of disasters is unpredictable. ( ) ( Unpredictable budgetary reallocations to address disaster recovery can affect other, ongoing programs. Repayment schedule for disaster loans difficult to predict and plan Liquidity/ Cash- Flow Risk Cash-flow Catastrophe Risk Deferred Drawdown Option (Cat DDO) for USD 65 million (0.25% of Costa Rica s 2007 GDP) may be disbursed (partially or in full) upon occurrence of a natural disaster that causes a declaration of state of emergency. Cat DDO will provide a source of bridge financing while other sources are being mobilized following a natural disaster. 8

1) Managing Vulnerability to Natural Disasters in Costa Rica How Costa Rica has used the CAT-DDO? In January 2009, just months after securing the Cat-DDO, a 6.2 magnitude earthquake struck, affecting more than 120,000 people. To date, Cost Rica has used US$24 million of the Cat-DDO to rebuild damaged infrastructure and mitigate other damages (we didn t needthe funds for the immediate response to the emergency). In September 2010 another state of emergency was declared because of floods, so probably we are going g to use US$15 million more in a few months. The undisbursed balance remains available until the project s closing date (October 2011). Government has the option to extend closing date. 9

A1 2) Using Back Up Financing to Boost Investor Confidence in Costa Rica 10 Development Objective (i) Strengthen public finances and their transparency and (ii) improve competitiveness by enhancing secondary education and facilitating market entry in the telecommunications and insurance sectors. Costa Rica Needs: Financing Requirement Counter the of possibility of adverse economic and financial events that could limit debt market access for Costa Rica Risk Management Objective Government needed a back up financing facility that would signal the availability of resources to capital markets without having to necessarily draw down the loan itself. 10

Slide 10 A1 During the worse stage of the financial crisis CR managed to fulfill his funding needs throgh the domestic market, this is, we knew that we had a strong domestic market but uncentatly worldwide made us look for new funding options just in case things were even worse. Administrador, 10/24/2010

2) Using Back Up Financing to Boost Investor Confidence in Costa Rica 11 Financial Solution Costa Rica Needs: USD 500 mm DPL with Deferred Drawdown Option (DDO) provides the country with ihimmediate source of liquidity when needed Mitigates the risk of a downturn in economic growth or adverse changes in commodity prices or terms of trade 11

2) Using Back Up Financing to Boost Investor Confidence in Costa Rica How Costa Rica has used the DPL with DDO? Following the Government s request, the line of credit was prepared in a few months and made available to the government in April 2009. Even with and important fiscal deficit during 2009 (3.5%) we didn t use the DPL DDP. There was uncertainty about the final approval of the Congress (Presidential i elections were approaching) so we made all our funding strategy with the domestic market. But the market always knew that we had the possibility to use the $500 million from the DPL DDO. This helped us to control pressures over interest rates in the Government auctions. 12

2) Using Back Up Financing to Boost Investor Confidence in Costa Rica How Costa Rica has used the DPL with DDO? In 2010 we had a different situation: Even though we have been successful in funding Government needs in 2009 and 2010 with the crisis we have an increase in the interest rate risk and mainly in the roll over risk in the debt portafolio. With increase of the deficit we got more debt and so more interest payments that make pressure to the social expenses and to infrastructure investments. The new Government is taking this situation seriously (is pursuing a tax reform) but from the debt management field we can help reducing the interest expenses. We had room for more dollars in our portafolio. During the previousyearsofthecrisisandbeforewehadthepolicyofreduce our share of foreign debt in the portafolio. We got the final approval in the Congress to use the loan. 13

2) Using Back Up Financing to Boost Investor Confidence in Costa Rica How Costa Rica has used the DPL with DDO? In August 2010, Government of Costa Rica used DPL-DDO to: Replace more expensive debt. Free resources for more important expenses such as social transfers and investment in infrastructure. Improve its db debt profile and reduce financiali risk ikto face next year while the fiscal reform is approve. 14

Annex Terms and Conditions of IBRD Contingent Lines of Credit (Deferred Drawdown Options)

DPL with DDO: Terms and Product Structure t Drawdown/ Fund Availability Provides immediate liquidity when the borrower needs it Full loan amount is available any time within three years of loan signing, renewable once with RVP approval for 3 more years Macro economic policy framework must be in place Satisfactory program implementation monitored by the bank Volume limit equivalent to Fast Disbursing CAS Envelope Volume/ Optionality The client can choose among the same conversion options (interest rate, currency) that are available for IBRD loans Repayment terms can be determined at the time of commitment or disbursement Terms Repayment schedule will commence from date of disbursement Each disbursement may have different repayment schedules Repayment Pricing ii Same interest rate structure as regular IBRD loans But higher fees: 0.75% front end fee; 0.50% renewal fee 16

DPL with Cat DDO: Terms and Product Structure t Drawdown/ Fund Availability Terms Volume/ Optionality Provides immediate liquidity after a natural disaster resulting in a declaration of state of emergency Full loan amount is available for three years, renewable up to four times with RVP approval, for a total maximum drawdown period of 15 years Amounts repaid during the disbursement period will be available for subsequent disbursements Macro framework reviewed at commitment and at renewal A disaster risk management program has to be implemented in accordance with Bank standards Maximum size of 0.25% of GDP or the equivalent of USD 500 million (exceptions possible for small countries on case by case basis) The client can choose among the same conversion options (interest rate, currency) that are available for IBRD loans Repayment Terms Repayment terms can be determined at the time of commitment or drawdown Repayment schedule will commence from date of drawdown Each drawdown may have different repayment schedules Pricing Same interest rate structure as regular IBRD loans But higher fees: 0.50% front end fee; 0.25% renewal fee 17