UNITED NATIONS OFFICE FOR PROJECT SERVICES (UNOPS) INTERNAL AUDIT REPORT. 19 October 2017

Similar documents
UNITED NATIONS OFFICE FOR PROJECT SERVICES (UNOPS) FINANCIAL AUDIT REPORT 14 FEBRUARY 2018

UNITED NATIONS OFFICE FOR PROJECT SERVICES (UNOPS) FINANCIAL AUDIT REPORT. 26 August 2016

UNITED NATIONS OFFICE FOR PROJECT SERVICES (UNOPS) FINANCIAL AUDIT REPORT. 27 February 2017

AUDIT UNDP COUNTRY OFFICE AFGHANISTAN FINANCIAL MANAGEMENT. Report No Issue Date: 10 December 2013

UNITED NATIONS OFFICE FOR PROJECT SERVICES (UNOPS) FINANCIAL AUDIT REPORT. 20 September 2017

Terms of Reference for Financial Audit of Implementing Partners. UNICEF Nigeria Country Office Expenditures

UNITED NATIONS OFFICE FOR PROJECT SERVICES (UNOPS) FINANCIAL AUDIT REPORT. 01 March 2018

AUDIT UNDP BANGLADESH. Comprehensive Disaster Management Programme Phase II (Project No , Output Nos )

THE GLOBAL FUND to Fight AIDS, Tuberculosis and Malaria

UNITED NATIONS OFFICE FOR PROJECT SERVICES (UNOPS) FINANCIAL AUDIT REPORT. 12 December 2014

UNITED NATIONS DEVELOPMENT PROGRAMME (UNDP) AUDIT REPORT. 31 July 2017 FINANCIAL AUDIT OF THE UNDP DIRECTLY IMPLEMENTED (DIM) PROJECT

AUDIT UNDP AFGHANISTAN. Local Governance Project (Project No ) Report No Issue Date: 23 December 2016

AUDIT. UNDP Pakistan. Early Recovery Programme in Pakistan (Directly Implemented Project No ) Report No. 990 Issue Date: 19 June 2013

AUDIT UNDP NEPAL. Comprehensive Disaster Risk Management Programme (Directly Implemented Project No )

REQUIRED DOCUMENT FROM HIRING UNIT

OFFICE OF THE INSPECTOR GENERAL

Rural Renewable Energy Agency (RREA) Financial Audit Report. for the period from 1 March 2016 to 30 June Project ID: P

TERMS OF REFERENCE FOR AUDITS OF NIM/NGO PROJECTS

DESK REVIEW UNDP AFGHANISTAN OVERSIGHT OF THE MONITORING AGENT OF THE LAW AND ORDER TRUST FUND FOR AFGHANISTAN

Global Fund Internal Controls Compliance with Key Internal Policies Including Operational, Financial and Procurement Controls

Internal Audit of the Lao People s Democratic Republic Country Office

TERMS OF REFERENCE (TOR) FOR AUDITS OF UN-WOMEN NGO, GOV T, IGO AND GRANT PROJECTS

Audit Report Internal Financial Controls. GF-OIG March 2015 Geneva, Switzerland

REPORT 2013/142. Audit of accounts receivable and payable in the United Nations Operation in Côte d Ivoire

Audit of Global Fund Grants to the Central African Republic. GF-OIG February 2013

UNFPA EXECUTIVE BOARD DECISION-TRACKING MECHANISM

Internal Audit of WFP Operations in the Republic of Mali

United Nations Development Group (UNDG)

AUDIT UNDP COUNTRY OFFICE SOMALIA. Report No Issue Date: 20 June 2014

AUDIT UNDP NIGERIA. DEMOCRATIC GOVERNANCE FOR DEVELOPMENT: DEEPENING DEMOCRACY IN NIGERIA (Directly Implemented Project No , Output No.

AUDIT UNDP COUNTRY OFFICE UGANDA. Report No Issue Date: 22 August 2013

UNITED NATIONS OFFICE FOR PROJECT SERVICES (UNOPS) FINANCIAL AUDIT REPORT. 4 September 2015

Acronyms List. AIDS CCM GFATM/GF HIV HR HSS IP M&E MDG MoH NGO PLHIV/PLH PR SR TA UN UNAIDS UNDP UNESCO UNFPA UNICEF WG WHO NSP NPA MEC

UNITED NATIONS OFFICE FOR PROJECT SERVICES (UNOPS) FINANCIAL AUDIT REPORT. 4 September 2015

UNITED NATIONS OFFICE FOR PROJECT SERVICES (UNOPS) IN CAMBODIA (PRINCIPAL RECIPIENT) INTERNAL AUDIT REPORT. 14 July 2017

Financial report and audited financial statements. Report of the Board of Auditors

UNITED NATIONS OFFICE FOR PROJECT SERVICES (UNOPS) FINANCIAL AUDIT REPORT. 4 September 2015

Draft annual workplan 2015 of the Executive Board of UNDP, UNFPA and UNOPS

AUDIT UNDP DOMINICAN REPUBLIC

IFAD Handbook for Financial Reporting and Auditing of IFAD- Financed Projects

IFAD Handbook for Financial Reporting and Auditing of IFAD-financed Projects

Proposal to adopt International Public Sector Accounting Standards (IPSAS) by the Agency

REPORT 2015/072 INTERNAL AUDIT DIVISION

Executive Board of the United Nations Development Programme, the United Nations Population Fund and the United Nations Office for Project Services

United Nations Development Programme

The Global Fund. Financial Management Handbook for Grant Implementers. December 2017 Geneva, Switzerland

INTERNAL AUDIT DIVISION AUDIT REPORT 2013/078

OPENING REMARKS AT FIFTH COMMITTEE BY MR. LIU YU CHAIR, AUDIT OPERATIONS COMMITTEE (AOC) OF THE BOA OF AUDITORS (BoA) FRIDAY, 12 TH OCTOBER 2012 IN

Progress report on implementation of the recommendations of the Board of Auditors on the UNICEF accounts for the biennium

External Audit. April 2012

REPORT 2014/134 INTERNAL AUDIT DIVISION. Audit of financial and administrative functions in the United Nations Truce Supervision Organization

INTERNAL AUDIT DIVISION AUDIT REPORT 2013/068

October 19, Board of School Directors North Hero School District c/o Grand Isle Supervisory Union 5038 US Route 2 North Hero, Vermont 05474

Annex BRIEF DESCRIPTION OF HOW INTERNAL OVERSIGHT IS CONDUCTED IN UNITED NATIONS SYSTEM ORGANIZATIONS

REPORT OF THE AUDITOR GENERAL

The Honorable Members of the City Council City of Richmond, Virginia

The Corporation of the City of London

Oversight Office Office of Internal Audit GOVERNMENT DONOR RELATIONS INTERNAL AUDIT REPORT AR/12/13

AUDIT UNDP COUNTRY OFFICE BANGLADESH. Report No Issue Date: 28 May 2015

REPORT 2016/088 INTERNAL AUDIT DIVISION. Audit of rations management in the United Nations Mission in the Republic of South Sudan

REPORT 2015/041 INTERNAL AUDIT DIVISION. Audit of the United Nations Mine Action Service of the Department of Peacekeeping Operations

Guidance: Transition between Allocation Utilization Periods

The Mid Yorkshire Hospitals NHS Trust

Audit of Global Fund Grants. Agenda. Why the increased importance of audits? Audit guidelines and changes in the pipeline

ANNEX 1 MODALITY FOR TARIFF REDUCTION AND ELIMINATION FOR TARIFF LINES PLACED IN THE NORMAL TRACK

Annual Audit Letter Year ending 31 March Kent Community Health NHS Foundation Trust August 2018

Work Plan of the External Auditor

Financial Report for the period from 1 October 2015 to 30 September 2016

Financial report and audited financial statements. Report of the Board of Auditors

ADDITIONAL INFORMATION REQUIRED BY GOVERNMENT AUDITING STANDARDS

Audit of Financial Statements Report and Management Letter Cardiff and Vale of Glamorgan Pension Fund

Work Plan of the External Auditor

Financial reports and audited financial statements and reports of the Board of Auditors for the period ended 31 December 2009

GUIDELINES: ANNUAL FINANCIAL REPORTING AND AUDITING FOR WORLD BANK-FINANCED ACTIVITIES

The Grant Risk Assessment and Management (GRAM ) Tool

Schedule of Findings and Questioned Costs For the Year Ended December 31, 2011 SECTION II FINANCIAL STATEMENT FINDINGS

E Distribution: GENERAL RESOURCE, FINANCIAL AND BUDGETARY MATTERS. Agenda item 6 AUDITED ANNUAL ACCOUNTS, For approval

AUDIT UNDP PROGRAMME OF ASSISTANCE TO THE PALESTINIAN PEOPLE

Atlas Financial Closure Instructions

Workstream II: Govenance and Institutional Arrangements Workstream III: Operational Modalities Revised background note: Direct Access

MINISTRY OF LANDS, HOUSING & URBAN DEVELOPMENT

Executive Board of the United Nations Development Programme, the United Nations Population Fund and the United Nations Office for Project Services

AUDIT UNDP PROGRAMME OF ASSISTANCE TO THE PALESTINIAN PEOPLE. PROCUREMENT OF DRUGS TO GAZA (Directly Implemented Project No , Output No.

AUDIT OF THE FUND ACCOUNTABILITY STATEMENT OF USAID RESOURCES MANAGED BY MERCY CORPS AND IMPLEMENTED BY PUBLIC AID ORGANIZATION ( PAO ) UNDER

AUDIT UNDP SIERRA LEONE. Support to the Electoral Cycle in Sierra Leone (Directly Implemented Project, Output No )

Amendments to UNICEF Financial Regulations and Rules. Report of the Advisory Committee on Administrative and Budgetary Questions

Executive Board Annual Session Rome, May 2015 POLICY ISSUES ENTERPRISE RISK For approval MANAGEMENT POLICY WFP/EB.A/2015/5-B

ANNUAL REPORT ON THE ACTIVITIES FUNDED BY THE 8TH, 9TH AND 10TH EUROPEAN DEVELOPMENT FUNDS (EDFs)

Financial report and audited financial statements. Report of the Board of Auditors

INTERNAL AUDIT DIVISION AUDIT REPORT 2013/091. Audit of the United Nations Peacebuilding Support Office

United Nations Development Programme Cambodia Office

Financial Instructions No 1 of 2017 Examination of Payment Vouchers Prior to Disbursement

REPORT 2014/153 INTERNAL AUDIT DIVISION. Audit of the United Nations Office for Disaster Risk Reduction

HLCM Procurement Network Procurement Process and Practice Harmonization in Support of Field Operations, Phase II

REPORT 2015/079 INTERNAL AUDIT DIVISION. Audit of United Nations Office on Drugs and Crime operations in Peru

Project Reporting: GCF Legal Agreements and GCF Monitoring & Evaluation

Guidelines for Financial Assurance Planning

LFA Terms of Reference. Reviews relating to CCM Funding

Handling of Cash and Receipts

Additional Modalities that Further Enhance Direct Access: Terms of Reference for a Pilot Phase

Transcription:

UNITED NATIONS OFFICE FOR PROJECT SERVICES (UNOPS) INTERNAL AUDIT REPORT 19 October 2017 PROJECT NAME: GLOBAL FUND REGIONAL ARTEMISININ INITIATIVE (RAI) MYANMAR - PRINCIPAL RECIPIENT - UNOPS PROJECT NUMBER: 00089550 COUNTRY: AUDITOR: MYANMAR MOORE STEPHENS LLP PERIOD SUBJECT TO AUDIT: 1 JANUARY TO 31 DECEMBER 2016

Contents Acronyms and abbreviations... 3 Executive summary... 4 The engagement context... 4 Audit objectives... 4 Audit scope... 4 Audit rating... 4 Key issues and recommendations... 5 Operational overview... 7 Detailed assessment... 8 Annex I - Definitions... 17 1 January to 31 December 2016 2

Acronyms and abbreviations GF GFATM EFR HQ IAIG IPSAS LFA M&E MMOH OC PC PO PR PUDR RAI RO SR UNDP UNFPA UNOPS USD WFP Global Fund The Global Fund to Fight Aids, Tuberculosis and Malaria Enhanced Financial Reporting Headquarters Internal Audit and Investigations Group International Public Sector Accounting Standards Local Fund Agent Monitoring and Evaluation Myanmar Operational Hub Operations Centre Project Centre Purchase Order Principal Recipient Progress Update and Disbursement Request Regional Artemisinin Initiative Regional Office Sub-recipient United Nations Development Programme The United Nations Population Fund United Nations Office for Project Services United States Dollars World Food Program 1 January to 31 December 2016 3

Executive summary The engagement context From 9 to 26 May 2016, the Internal Audit and Investigations Group (IAIG) of the United Nations Office for Project Services (UNOPS), through Moore Stephens LLP ( the audit firm ), conducted an audit of the project Global Fund Regional Artemisinin Initiative (RAI) Principal Recipient Myanmar - Principal Recipient UNOPS (oneunops project ID 00089550), ( the project ), which is implemented and managed by the UNOPS Operations Hub in Myanmar. The audit firm was under the general supervision by IAIG in conformance with the International Standards for the Professional Practice of Internal Auditing. The project reported expenditure amounting to USD 1,623,055 during the period from 1 January to 31 December 2016. Audit objectives The overall objective of the audit was to assess the management of the project operations to obtain reasonable assurance towards the achievement of the project objectives. The areas of focus included: a) Effective, efficient and economical use of resources; b) Reliability of reporting; c) Safeguarding of assets; and d) Compliance with applicable legislation. The purpose of the audit was to provide reasonable assurance that: a) Client/donor contributions and project expenditure are properly accounted for; b) Project expenditure was incurred in accordance with the contribution agreement, and is supported by adequate documentation; and c) The related financial statements prepared by UNOPS for the year under review present a fair view of the operations. In particular, the audit firm provided an overall assessment of the operational and internal control systems that are in place for the management of the project so that related transactions are processed in accordance with UNOPS policies and procedures to achieve the project s objectives. Audit scope The audit firm conducted the audit in accordance with International Standards on Auditing issued by the IASSB and UNOPS internal audit practices, and in consideration of the requirements of International Public Sector Accounting Standards (IPSAS). Audit rating Based on the audit report and corresponding management letter submitted by the audit firm, IAIG assessed the management of the project as partially satisfactory (some improvement needed), which means, The assessed governance arrangements, risk management practices and controls were generally established and functioning, but need some improvement. Issues identified by the audit do not 1 January to 31 December 2016 4

significantly affect the achievement of the objectives of the audited entity/area. The details of the audit results are presented in Tables 1 and 2. Table 1: Summary results of the financial audit Project title Period Project no. Global Fund Regional Artemisinin Initiative (RAI) Myanmar - Principal Recipient UNOPS 1 January 31 December 2016 00089550 Financial statement Statement of non-expendable property Amount USD Opinion Amount USD Opinion 1,623,055 Unqualified 19,776 Unqualified Table 2: Internal control rating summary for project Rating summary by functional area Functional area Programme management Finance Procurement and supply chain Human resources General administration Overall rating of internal control Rating Partially satisfactory (some improvement needed) Partially satisfactory (major improvement needed) Partially satisfactory (some improvement needed) Satisfactory Satisfactory Partially satisfactory (some improvement needed) Key issues and recommendations The audit raised four issues. There are four recommendations, of which one is ranked high and three are medium ranked. Among the four issues, one was noted to be caused by factors beyond the control of UNOPS (Issue 1). 1 January to 31 December 2016 5

Below is a list of the audit findings, further details of which can be found in the detailed assessment section. No. Functional area Audit finding title Priority rating (high / medium) Financial impact (USD) 1 Programme management Late reporting of Progress Update and Disbursement Requests Medium - 2 Finance Duplication of transactions High - 3 Finance Incorrect commitments balance Medium - 4 Procurement and supply chain Late reporting of procurement transactions Medium - Total - Management s comments The Program Director accepted all the recommendations and is in the process of implementing them. Signed: Mark Henderson Partner Moore Stephens LLP 19 October 2017 1 January to 31 December 2016 6

Operational overview The United Nations Office of Project Services (UNOPS) is one of the Principal Recipients (PR) for the Round 9 programme funding of The Global Fund to Fight AIDS, Tuberculosis and Malaria (GFATM) in Myanmar. The grants were awarded in 2010 and implementation started January 2011. The grants are currently in their Phase II of implementation which commenced in January 2013. Project implementation is undertaken by the PR and Sub-Recipients (SR) in close association with the PR, while funding for the activities is handled by UNOPS as the PR. the PR is managing the Global Fund s Regional Artemisinin Initiative (RAI) grant in the total amount of US$100 million (2014-2016) which aims to support various Program activities in the Greater Mekong Sub-region in five countries: Kingdom of Cambodia, Lao People s Democratic Republic, Republic of the Union of Myanmar, Kingdom of Thailand and Socialist Republic of Vietnam. Under the RAI grant the PR is responsible for the audit of the RAI grant implemented in Laos s People Democratic Republic. The UNOPS GFATM team has three units Programme Unit, M&E Unit and Programme Support Unit. At the start of 2016 UNOPS adopted a new accounting system, OneUNOPS, through which all 2016 funds were managed. The audit team extends its appreciation to the management and staff members of UNOPS office in Myanmar for their full cooperation during the audit. 1 January to 31 December 2016 7

Detailed assessment # Observation Recommendation Functional Area: Project management Management comments and action plan Responsible Manager / Due Date / Priority 1 Title Late reporting of Progress Update and Disbursement Requests Comparison criteria Annex A, Section D of the Grant Agreement states that: Not later than forty-five (45) days after the end of each semester of the Principal Recipient s fiscal year, the Principal Recipient shall submit to the Global Fund a periodic report on the Program using the On-going Progress Update and Disbursement Request. The Operational Policy Manual also states: The PR should complete the Enhanced Financial Reporting (EFR) template within 45 days of the end of the reporting period. It should be submitted to the LFA alongside the Progress Update & Disbursement Request (PU/DR). In exceptional circumstances, if compilation of the financial information risks delaying the submission of the PU/DR, the PR may submit the EFR template separately from the PU/DR (but within a maximum of 60 days after the end of the reporting period). Global Fund granted UNOPS a reporting extension for the reporting period 1 July 31 December 2016. The revised reporting deadline was 20 March 2017. Facts / observation As illustrated below, the submission of all PUDRs was delayed. Management of MMOH should ensure that reports required by donors are submitted to them within the timeframes specified in the project documents. Timely submission of grant consolidated PU/DRs by UNOPS PR is entirely dependent on timely receipt and clearance of the last SR report under the respective grant. The Global Fund is aware of this challenge and while GF was not able to grant UNOPS exception from the official reporting deadlines, the delay in submission of the consolidated reports per grant have never had an impact on the timely fund disbursement to PR from the GF and subsequently from UNOPS PR to SRs. The PR will continue to implement its capacity building and training activities to improve reporting timelines from SRs to the PR and PR Responsible manager: Programme Director Due date: On-going Priority: Medium

Contract reference Period QMU-M-UNOPS 1 January to 30 June 2016 PUDR due date 14 August 2016 Date delivered (signed version) 12 September 2016 No. of days late 29 to LFA. The trend is improving. The GF had never expressed any dissatisfaction with the timing of reports, nor it resulted in cash shortages with partners QMU-M-UNOPS 1 July to 31 December 2016 20 March 2017 11 April 2017 22 The office indicated this was due to delays in receipt and clearance of the last SR report under the respective grant. Impact Late reporting may delay the disbursement of funds and consequently jeopardise program activities. Cause Other: Factors beyond the control of UNOPS. Resources: Lack of or insufficient resources (financial, human, or technical resources) 1 January to 31 December 2016 9

# Observation Recommendation Management comment and Action Plan Responsible Manager / Due Date / Priority Functional Area: Finance 2 Title Duplication of transactions Comparison criteria IPSAS 1 Presentation of Financial Statements Facts / observation During our testing of project expenditure, we noted that some transactions were entered twice in the OneUNOPS accounting system. This was caused by expenditure being recorded initially when it was incurred, with a corresponding entry to the receipt accrual account, and then again when the request for payment of the related invoice was submitted. At the time of payment, the corresponding accruals balance should have been reduced instead of increasing expenditure. The entry at the time of the payment request was, therefore, made in error which resulted in that expense being recorded twice. This was caused by OneUNOPS procedures and guidelines not being adequately followed by all users. The receipt accrual account was not reviewed to ensure it was appropriately adjusted following the payment. The following transactions were identified during the audit as being recorded twice in the accounting system: No. PO ID Cost type Project code Amount (USD) Management of MMOH should ensure that a thorough review of the accounting records is performed to determine whether there are any remaining duplicated transactions, so that they can be corrected. Any financial impact will be recorded in the 2017 financial year, however, as stated in the observation, it is highly unlikely that any such impact is material. Given that the cited instances of duplication were not initially identified by the project team, it indicates that there was inadequate analysis of or reconciliation between the various reported balances, namely The Management takes note of the observation. We are now certain that all transactions have been corrected. The double posting of expenses accounts have net effect on Receipt Accrual Account 23205. Account 23205 has now been reconciled and double expenditure posting is cleared. MMOH Finance Officer will ensure that adequate guidance and procedures are in place and any required correction is processed immediately. Responsible manager: Finance Officer Due date: On-going Priority: High 1 January to 31 December 2016 10

1 PO:3008996-L:28- REC:4053683 2 PO:3008996-L:28- REC:4053683 Transportation charges Pharmaceutical Products 77267 22,511 77267 321,114 Total 343,625 expenditure and its performance against budget, the project cash balance, and open purchase orders. Such reconciliations are critical in determining the accuracy of financial information. Upon further investigation by the UNOPS Myanmar Operational Hub (MMOH) and UNOPS HQ, other duplicate transactions were identified. They were subsequently removed from project expenses in OneUNOPS and Certified Financial Statements were adjusted and re-issued. We understand that the OneUNOPS system configuration was subsequently updated to mitigate the risk of double posting of expenditure. The UNOPS HQ implemented a controls system where Certified Financial Statements can only be issued based on confirmation from project teams that the receipt accrual account has been reviewed and corrected as needed. In addition, the UNOPS MMOH has implemented a monthly recurring review of receipt accruals by its central finance unit. Whilst the duplicate transactions identified during the audit were correctly adjusted and mitigating controls implemented, given the volume of transactions recorded in 2016, there remains a risk that some duplicate transactions still exist in the accounting system and in the Certified Financial Statements. However, the impact on the Certified Financial Statements is unlikely to be material. 1 January to 31 December 2016 11

Impact Expenditure presented in the Certified Financial Statements was misstated prior to the adjustments made by the UNOPS MMOH. We understand that the errors have now been corrected, however, there is a risk that some transactions have not been corrected and that the Certified Financial Statements are misstated. The extent of potential misstatements could not be determined, however, it is not considered to be material to the Certified Financial Statements. Cause Guidelines: Lack of or inadequate OC policies or procedures 1 January to 31 December 2016 12

# Observation Recommendation Management comment and Action Plan Responsible Manager / Due Date / Priority Functional Area: Finance 3 Title Incorrect commitments balance Comparison criteria IPSAS 1 Presentation of Financial Statements Facts / observation During our testing of the commitments balance disclosed in the Certified Financial Statements, it was noted that some open PO balances were not in line with the expected balance, based on the amount of the PO and the corresponding invoices received prior to the reporting period end. Upon further investigation, it was identified that the report from the accounting system (OneUNOPS) which was used to prepare the Certified Financial Statements, reflected PO balances at a date other than the reporting date, thus resulting in the error. The commitments balance was incorrectly reported as US$ 178,050. Management should ensure that all relevant year end reporting procedures are followed and that the commitments balance is complete and accurate as at the reporting date. A review of commitments balances should be performed by the finance team prior to them being reported in the financial statements to ensure they are disclosed at the correct reporting date. The Management takes note of the observation. UNOPS HQ System Support team together with UNOPS Finance Practice group has adjusted the PO report to reflect PO balances as of reporting date. All PO balances have been reviewed for correctness. Moving forward the MMOH Finance Officer will ensure that guidance and procedures are in place and will work together with procurement teams to ensure PO balances are reviewed regularly. Responsible manager: Finance Officer Due date: On-going Priority: Medium Subsequently, the report was generated at the correct reporting date and the Certified Financial Statements were re-issued with the correct commitments balance of US$ 4,023. However, this error highlights weaknesses in the year end reporting procedures, including the checks performed prior to financial statements being approved by both the 1 January to 31 December 2016 13

project and finance teams, and therefore the risk of similar errors occurring in future. Impact The financial reports for the year 2016 were not presented in accordance with IPSAS and the commitments balance was misstated prior to the corrections being made. Even though the error has been corrected and there is no financial impact on the final audited financial statements, a lack of adequate yearend reporting procedures increases the risk of errors in the financial statement disclosures. Cause Lack of or inadequate OC policies or procedures 1 January to 31 December 2016 14

# Observation Recommendation Functional Area: Procurement and supply chain Management comments and action plan Responsible Manager / Due Date / Priority 4 Title Late reporting of procurement transactions Comparison criteria IPSAS 1 Presentation of Financial Statements Facts / observation The UNOPS Myanmar Operational Hub (MMOH), in their role as the Principal Recipient (PR) of donor funding, procures medical supplies on behalf of Sub-recipients (SRs). UNOPS is responsible for repo rting the details of procured items to SRs to ensure that relevant expenditure is recorded in the SRs accounting information and financial statements. It was noted that some transactions related to the purchase of medical supplies by the PR on behalf of SRs were only reported by the PR to SRs in May 2017, i.e. considerably after the SR financial statements had already been prepared. As a result, 12 sets of SR financial statements had to be updated and re-issued. The late reporting was caused by a delay in the reconciliation of relevant accounting information by UNOPS. Management MMOH should ensure that all procurement transactions which need to be reflected in the accounting records of SRs are reported to them on a timely basis to avoid late reporting or errors in the financial statements. Management MMOH takes note of the observation. Late reporting was an exception in 2016 year due to implementation by UNOPS of new ERP. Updated corporate guidance on relevant account reconciliation is now available. Going forward there is no risk of future delays. Responsible manager: Finance Officer Due date: On-going Priority: Medium The details of those transactions are shown in the table below. 1 January to 31 December 2016 15

SR code Project ID Number of transactions Total value of transactions (USD) UNOPS_RAI_ARC_001 00089529 2 9,240 UNOPS_RAI_MMA_001 00089538 2 (1,719) UNOPS_RAI_Laos_001 00089549 2 27,720 UNOPS_RAI_ICC_CPI_001 00090794 2 4,818 UNOPS_RAI_ICC_MAM_001 00090802 2 12,173 Total 10 52,232 These transactions are reflected in the financial statements of the SRs only, and have no impact on the financial statements of UNOPS. The additional expenditure has now been reflected in the revised financial statements of the SRs and, therefore, our finding has no financial impact on the PR s audited financial statements. However, any future delays in the reporting of procured items by UNOPS can result in errors or omissions in the financial statements of SRs. Impact Potential errors or omissions in the financial statements of Subrecipients. Delays to the preparation of SR financial statements. Cause Lack of or inadequate corporate policies or procedures 1 January to 31 December 2016 16

Annex I - Definitions Standard audit ratings for overall performance of internal control system Effective 1 January 2017, the internal audit services of UNDP, UNFPA, UNICEF, UNOPS and WFP adopted harmonized audit rating definitions, as described below. IAIG assesses the entity under review as a whole as well as the specific audit areas within the audited entity: (a) satisfactory (effective), (b) partially satisfactory (some improvement needed), (c) partially satisfactory (major improvement needed), and (c) unsatisfactory (ineffective). The elements of the rating system take into account the audited office s internal control system, risk management practices, and their impact on the achievement of office objectives. The definitions of the ratings are, as follows: Standard rating Satisfactory (effective) Partially satisfactory (some improvement needed) Partially satisfactory (major improvement needed) Unsatisfactory (ineffective) Definition The assessed governance arrangements, risk management practices and controls were adequately established and functioning well. Issues identified by the audit, if any, are unlikely to affect the achievement of the objectives of the audited entity/area. The assessed governance arrangements, risk management practices and controls were generally established and functioning, but need some improvement. Issues identified by the audit do not significantly affect the achievement of the objectives of the audited entity/area. The assessed governance arrangements, risk management practices and controls were established and functioning, but need major improvement. Issues identified by the audit could significantly affect the achievement of the objectives of the audited entity/area. The assessed governance arrangements, risk management practices and controls were either not adequately established or not functioning well. Issues identified by the audit could seriously compromise the achievement of the objectives of the audited entity. 1 January to 31 December 2016 17

Categories for priorities of audit recommendations The audit observations are categorized according to the priority of the audit recommendations and the possible causes of the issues. The categorized audit observation provides a basis by which the UNOPS country office management is to address the issues. The following categories of priorities are used: Categories High Definition Prompt action is considered imperative to ensure that UNOPS is not exposed to high risks (that is, where failure to take action could result in critical or major consequences for the organization). Medium Action is considered necessary to avoid exposure to significant risks (that is, where failure to take action could result in significant consequences). Low Action is considered desirable and should result in enhanced control or better value for money. Possible causes The following categories of possible causes are used: Guidelines: absence of written procedures to guide staff in performing their functions; o o o o o Lack of or inadequate corporate policies or procedures Lack of or inadequate RO/OC/PC policies or procedures Inadequate planning Inadequate risk management processes Inadequate management structure Guidance: inadequate or lack of supervision by supervisors; o o Lack of or inadequate guidance or supervision at the RO/OC/PC level Inadequate oversight by Headquarters Resources: insufficient resources (funds, skill, staff) to carry out an activity or function; o o Lack of or insufficient resources (financial, human, or technical resources) Inadequate training Human error: Un-intentional mistakes committed by staff entrusted to perform assigned functions; Intentional: intentional overriding of internal controls; Other: Factors beyond the control of UNOPS. 1 January to 31 December 2016 18