GOV : Enterprise Risk Management Policy

Similar documents
Kidsafe NSW Risk Management Plan. August 2014

MEMORANDUM. To: From: Metrolinx Board of Directors Robert Siddall Chief Financial Officer Date: September 14, 2017 ERM Policy and Framework

Procedures for Management of Risk

ENTERPRISE RISK MANAGEMENT (ERM) GOVERNANCE POLICY PEDERNALES ELECTRIC COOPERATIVE, INC.

Applying COSO s Enterprise Risk Management Integrated Framework

Scouting Ireland Risk Management Framework

Enterprise Risk Management Integrated Framework

Understanding Enterprise Risk Management: An Overview

Applying COSO s Enterprise Risk Management Integrated Framework. September 29, 2004

Version: th November 2010 RISK MANAGEMENT POLICY

Practical aspects of determining and applying a risk appetite for SMEs

RISK MANAGEMENT POLICY AND STRATEGY

Enterprise Risk Management Program

Fraud Risk Management

University Risk Management Policy

ENTERPRISE RISK MANAGEMENT (ERM) POLICY Republic Glass Holdings Corporation. Purpose. Goals

An Introductory Presentation for ECU Staff

Risk Management Policy and Framework

Risk Management Framework

An Overview of the Enterprise Risk Management Process

Risk Management Framework

RISK MANAGEMENT FRAMEWORK

Procedure: Risk management

Risk Management Strategy January NHS Education for Scotland RISK MANAGEMENT STRATEGY

Approved by: Diocesan Council 17 December 2015

Perpetual s Risk Management Framework

Policy Number Functional Field. Governance and Management. Related Policies. Policy of Making University Policies.

Policy Number: 040 Risk Management August 2018

Risk Management Policy Appendix A: Institutional Risk Tolerance Statement

College Procedure. 1. Introduction

Risk Management Plan PURPOSE: SCOPE:

RISK MANAGEMENT FRAMEWORK

Thirty-Second Board Meeting Risk Management Policy

Risk Management: Principles, Methodologies and Techniques. Peter Getugi Internal Audit Manager ILRI

28 July May October 2016

Sections of the ORSA Report

UNITED NATIONS JOINT STAFF PENSION FUND. Enterprise-wide Risk Management Policy

Risk Management. Webinar - July 2017

Integrated Risk Management Framework Sept Page 1 of 17

Risk Management. Seminar June Compiled by: Raaghieb Najjaar, Yaeesh Yasseen & Rashied Small

Risk Management at Central Bank of Nepal

WHS Risk Assessment and Control Form

GUIDE TO RISK ASSESSMENT AND RESPONSE

ENTERPRISE RISK MANAGEMENT (ERM) The Conceptual Framework

Risk Management Framework

Risk Management Policy

GRINDROD SOUTH AFRICA//Policy Risk and opportunity governance framework

Topic RISK MANAGEMENT Procedure Category Risk Management Updated 07/2011

University of Greenwich Risk Management Guide Revised October 2017

Nagement. Revenue Scotland. Risk Management Framework

Energize Your Enterprise Risk Management

Nagement. Revenue Scotland. Risk Management Framework. Revised [ ]February Table of Contents Nagement... 0

Risk Management Framework

ENTERPRISE RISK MANAGEMENT Framework

Navigating the New Normal Enterprise Risk Management After e-risk Identification and Assessment

Risk Management Policy

ก ก Tools and Techniques for Enterprise Risk Management (ERM)

RISK MANAGEMENT POLICY

Risk Management Policy

BERGRIVIER MUNICIPALITY. Risk Management Risk Appetite Framework

Risk Management Policy and Procedures.

RISK AND BUSINESS CONTINUITY MANAGEMENT

AFERM Best Practices: Guideposts, Risk Registers and a Maturity Model

CORPORATE RISK MANAGEMENT POLICY

STRATEGIC RISK MANAGEMENT

Risk Management Strategy

Risk Management Policy. September 2015

Best Practices in ENTERPRISE RISK MANAGEMENT. [ Managing Risks Holistically ]

Certified Enterprise Risk Professional (CERP) Test Content Outline

RISK MANAGEMENT FRAMEWORK

ISO/DIS 9001:2015 Risk-Based Thinking

RISK MANAGEMENT - CORPORATE COMPLIANCE & ETHICS

Delivering Clarity to Credit Unions Through Expertise and Experience

Risk Management Policy

RISK AND OPPORTUNITY ASSESSMENT GUIDE RISK CRITERIA

CITY OF JOHANNESBURG METROPOLITAN MUNICIPALITY GROUP RISK AND ASSURANCE SERVICES GROUP RISK MANAGEMENT POLICY

Risk Management Strategy

Risk. Protocol for the Management of Risk

RISK MANAGEMENT - CORPORATE COMPLIANCE & ETHICS

Executive Board Annual Session Rome, May 2015 POLICY ISSUES ENTERPRISE RISK For approval MANAGEMENT POLICY WFP/EB.A/2015/5-B

RISK MANAGEMENT FRAMEWORK

Risk Evaluation, Treatment and Reporting

UNIVERSITY OF ABERDEEN RISK MANAGEMENT FRAMEWORK

Risk Management at the Deutsche Bundesbank March 2011

Risk Assessment Workshop Pam Walaski, CSP, CHMM Director, Health and Safety GAI Consultants, Inc. Pittsburgh, PA

An Update On Association Policies, Health Checks & Guidelines To A Safer Hockey Association. Lauren Woods Member Engagement & Operations

POLICY. Date initially approved: March, 2010 Date of last revision:

South Lanarkshire College Risk Management Policy and Procedures

Risk Management Policy

Risk Assessment Mitigation Phase Risk Mitigation Plan Lessons Learned (RAMP B) November 30, 2016

Hazard Identification, Risk Assessment and Control Procedure

Risk Management. Policy and Procedures

Risk Management Policy. Apollo Hospitals. Risk Management Policy

NATIONAL RISK MANAGEMENT SYSTEM

West Coast District Municipality. Risk Management Policy

RISK REGISTER POLICY AND PROCEDURE

1. Define risk. Which are the various types of risk?

Senior Director, Fire Life Safety & Risk Management

Enterprise Risk Management Focusing on the Right Risks

Excellence in Risk Management via Enterprise Risk Management. Presentation to: Audit Committee Ashok K. Roy, Ph.D., CIA, CFSA, CBA September 18, 2015

Transcription:

Name: Responsibility: Complements: Enterprise Risk Management Framework Coordinator, Enterprise Risk Management GOV-080-005: Enterprise Risk Management Policy Draft Date: November 2006; January 2012 Revised Date: November 2016 Overview The University of Regina (the University ) is committed to establishing an institution that ensures risk management is a core capability and an integral part of all the University s activities. The University has developed an Enterprise Risk Management (ERM) Framework to manage change and uncertainty. The ERM framework applies to all academic and administrative levels, and assists in achieving the University s strategic objectives by bringing a systematic approach to identifying, analyzing, mitigating and reporting risks. The ERM process enables enhanced and proactive decision making. This framework is intended to ensure that information about risk is collected and shared in a relevant and timely manner, and that this information sharing leads to continuous improvement. Objective To meet the University s strategic goals, the University Executive Team and the Board of Governors (the Board) have committed to develop rigorous, structured and effective risk management processes across the institution. The risk management framework is developed to: - Establish common risk language and direction related to risk management; - Assign responsibilities for risk oversight among the Board and other stakeholders; - Identify critical risks and opportunities in the University s activities and strategy; - Increase the likelihood that strategic objectives will be achieved; Page 1

- Facilitate open communication with respect to risk and risk tolerance; - Build an appropriate culture of integrity and risk awareness; - Encourage proactive decision making; - Guide the University s risk management processes; and - Improve operational efficiency and effectiveness. Key ERM Definitions The University has developed definitions based upon ISO 31000, the internationally accepted risk management standard 1. Risk the effect of uncertainty on business objectives. Risk typically refers to an event and related consequences, and is often described in terms of the impact and the associated likelihood of occurrence. Risks may also arise from trends, changes, disruptions and emerging issues, and are not always negative, but may also present opportunities. Risk Management coordinated activities to identify, assess and respond to risk. Risk Management Framework the plans, directions and guidelines to strengthen risk management practices within the University. Inherent Risk the level or amount of risk without management or control Residual Risk the level or amount of risk with management or control Risk Owner the person or group with the responsibility and authority to manage a risk. Risk Tolerance refers to the level of risk the University is willing to accept. The risk tolerance may be different for different risks, and should be aligned with overall strategic objectives. Risk tolerance will inform the University s approach to assess and eventually accept, mitigate, transfer, or avoid risk. 1 International Standard ISO 31000: 2009 Risk Management Principles and Guidelines Page 2

Risk Register official recording of the identified risks facing the University. A catalogue of the significant risks (with impact and likelihood assessed) forms the University risk register. Control measure or action to modify risk. Controls include the policies, procedures, reporting and initiatives performed by individuals to ensure that the desired risk response is carried out. These activities take place at all levels and functions of the University. Likelihood the probability of an event occurring. For more information, see Appendix I. Impact the severity of an event. For more information, see Appendix I. Communication and Consultation continual and iterative processes conducted to provide, share or obtain information regarding the management of risk. Stakeholders Roles and Responsibilities Risk Management is the responsibility of every employee of the University. Different stakeholders have different objectives and levels of accountability with respect to risk management. The risk management framework outlines the roles and responsibilities of stakeholders with significant accountability for risk identification, mitigation and response. The University ensures that those who are responsible are equipped to fulfil their role by providing them with the appropriate authority, training and resources. Board of Governors Responsibility for management and administration of the property, revenues, business and affairs of the university is vested in the Board of Governors by The University of Regina Act (1974). Page 3

To fulfill this responsibility related to risk management, The Board is required to: Establish a strategic planning process Ensure the strategic plan considers potential risks and opportunities Approve the Enterprise Risk Management policy and framework Support management efforts to identify risks and their mitigation strategies, and Ensure internal controls are working effectively. The University s Board of Governors, through its Audit and Risk Management Committee, is accountable for the oversight of risk management. The Board is responsible to ensure the risk management framework and corresponding results work towards achieving the strategic priorities of student success, research impact, and commitment to our communities, as identified in the University s strategic plan 2015-2020 peyak aski kikawinaw: We are one with Mother Earth. Audit and Risk Management Committee The Audit and Risk Management Committee of the Board is responsible for: Reviewing the risk management policy and framework, Supporting management to identify the risks inherent in the University s strategy, and Monitoring and evaluating the effectiveness of risk management activities. University Executive Team (Including the President, Vice-Presidents and University Secretary) The University Executive Team is responsible for: Providing oversight and support Reviewing and evaluating key risks, processes, controls and the effectiveness of the corresponding mitigation strategies, Ensuring the University has effective crisis management systems and contingency plans, and Page 4

Ensuring alignment between the University s strategic objectives and risk management. University Leadership Team (Including AVPs, Deans, Directors, Registrar and Librarian) The University Leadership Team is responsible for: Identifying strategic and operational risks and providing input on likelihood and impact, and Ownership and day-to-day oversight and management of individual risks. Enterprise Risk Management Coordinator The Enterprise Risk Management Coordinator is responsible for: Facilitating the development and implementation of the ERM framework Providing risk assessment training and workshops to University officials as required Conducting risk assessments to identify internal and external risks to the University Facilitating the development of the risk register Ensuring accurate and reliable risk documents exist, and relevant information is provided to the University Executive Team, University Leadership Team and Audit and Risk Management Committee. ERM Methodology The University s methodology for risk management is shown in Figure 1 2, a flow chart expression of the risk management activities. This process is continuous and can be applied at both the University (enterprise) level or at an individual academic and administrative unit level. 2 International Standard ISO 31000; 2009 Risk Management Principles and Guidelines Page 5

Communication & Consultation Monitor & Review Figure 1 Risk Management Process Set Strategic/Operational Objectives Establish the Context Risk Assessment Identify Risks Analyze Risks Evaluate Risks Risk Treatment These eight interrelated components form the basis for establishing and putting ERM into practice at the University. Each component is described in more detail as follows: a. Setting Strategic/Operational Objectives is the process of determining the strategic objectives for the University and its risk strategy. The strategic planning process also requires that all divisions and business units define their key business/operational objectives and targets. Page 6

b. Establishing the Context consists of an assessment of the internal and external environment of the University. This forms the foundation for defining the University s risk approach and risk appetite. Internal Environment comprises the University s history, culture, values, organizational structure, strategy, policies or procedures. External Environment comprises the social, cultural, political, legal, regulatory, financial, economical or technological environment in which the university operates. c. Risk Identification describes those developments either internal or external to the University that could significantly affect its ability to meet its strategic objectives. In order to assure that the full scope of the University is considered, event and trend identification is done broadly, engaging a cross-section of University members. There are two approaches utilized for identifying key risks at the University: 1. Top-down approach: starts by identifying enterprise-wide risks that affect the University s strategic objectives. This approach involves the University s Leadership Team and the Board. 2. Bottom-up approach: starts by identifying business unit level or operational risks. d. Risk Analysis describes the extent to which potential events and trends might affect the University s objectives. Events and trends are assessed by two criteria impact and likelihood. Figure 2 displays a matrix known as a Risk Heat Map that graphically represents the impact and likelihood of each risk, as well as the corresponding management action. The color gradient from green (low) to red (high) provides a comparative level of priority when evaluating the University s risks. This matrix is used to evaluate risk at both the inherent (without management or control) and residual (with management or control) levels. The corresponding management action guide suggests the appropriate response or treatment for risks assessed in that area of the matrix. Risk analysis can be done by qualitative and/or quantitative methods. Page 7

Figure 2 Sample Risk Heat Map IMPACT Severe 5 Major 4 Moderate 3 Minor 2 Insignificant 1 Significant Risk Moderate Risk Low Risk Rare 1 Unlikely 2 Possible 3 LIKELIHOOD Likely 4 Almost Certain 5 e. Risk Evaluation is the process of prioritizing risks (based on the result of risk analysis) for making a decision which risks require immediate treatment. The decision takes into consideration the risk tolerance level of the University, along with the interrelation and aggregate effect of key risks. f. Risk Treatment means that once the risks are clearly identified, assessed, and prioritized, it is essential to evaluate existing mitigation plans. ERM best practices suggest first listing any mitigation plans and controls that already exist, then, brainstorming and proposing additional mitigation plans. Finally, it is important the Board and the University Executive Team assess the adequacy of existing mitigation Page 8

plans in relation to the significance of the risk 3. Typical risk response considered for a risk event includes avoidance, reduction, transferring, sharing, or acceptance. g. Communication and Consultation is required for an effective ERM program and requires information to be obtained from all levels of the University for identifying, assessing and responding to risk. Consultation will be as broad as possible within the University community and will use a variety of approaches. University personnel will be encouraged to identify risks that are both internal and external to the institution. The knowledge gained through ERM will be communicated with stakeholders in a relevant and timely manner. h. Monitoring and Review refers to managing risk in the course of day-to-day operations. Management will complete periodic evaluations to assess the scope, methodology and frequency of risk assessment practices to ensure the currency of information in the University s risk register. Integration Universities are complicated institutions that typically generate a risk register that is broad and diverse, while several laws, regulations, policies and agreements also affect the operating environment. The ERM framework is a methodology that formalizes the risk management process in order to support the achievement of the University s strategic objectives. A systematic and integrated risk management approach ensures that risk management practices are an integral part of strategic planning, budget planning and audit planning. ERM creates efficiency and effectiveness by promoting team work, strengthening trust, reducing redundancies, and sharing responsibility. 3 Risk Management Guideline for the BC Public Sector: http://www.fin.gov.bc.ca/pt/rmb/ref/rmb_erm_guideline.pdf Page 9

Within the University, the following considerations will apply: a. All ERM practices will be guided by the following essential elements: i. Assurance: Stakeholders are assured that risk is being managed and receive information regarding the quality and type of control in place. ii. Oversight and responsibility: All critical risks facing the University are identified, managed and reported on a level and frequency aligned with the University s risk tolerance. iii. Ownership: Risk owners are assigned and understand their responsibility for risk management, oversight and assurance. b. Risk response for identified risks will be assessed by management. The five possible risk responses are to: i. Avoid (eliminate) the risk; ii. Reduce (mitigate) the risk; iii. Transfer the risk (e.g. insurance); iv. Share the risk; or, v. Accept the risk. c. There will be a desire to learn from events that have transpired. The risk management process is a cycle where experience provides key information for new decisions and actions. Open and appropriate communication of results and lessons learned is required to facilitate learning. d. The University risk register will be evaluated at least once annually. New risks will be considered and risks no longer relevant will be removed. Identification of risks will occur on an on-going basis and on an ad-hoc basis as required for significant changes or new processes, program and initiatives. Through ongoing communication and consultation, risks will be rated and prioritized, and this information, in turn, will be aligned with University strategic planning. Page 10

e. Any discussions of risk that occur within externally facing reports, such as the Annual Report or Strategic Plan, will be consistent with the annual risk assessment results. That is, the identification of risks for external disclosure purposes will not be a completely separate process from the regular risk management process. References 1. International Standard ISO 31000: 2009 Risk Management Principles and Guidelines 2. Treasury Board of Canada. Secretariat - Framework for the Management of Risk. https://www.tbs-sct.gc.ca/pol/doc-eng.aspx?id=19422 3. Risk Management Guideline for the BC Public Sector. http://www.fin.gov.bc.ca/pt/rmb/ref/rmb_erm_guideline.pdf Page 11

APPENDIX I: University of Regina ERM Impact and Likelihood Rating Guide IMPACT Financial Human Interruption Reputation Student Faculty / Staff Injury / Illness Teaching Research Service Severe 5 Major 4 Moderate 3 Minor 2 Insignificant 1 Above $2M income impact Between $1M-$2M income impact Between $500 000 - $1M income impact Between $100 000- $500 000 income impact Up to $100 000 income impact Inability to attract or retain students Negative university-wide student experience Negative student experience within more than one faculty Negative student experience within a single faculty Isolated complaints from students Inability to recruit or retain faculty or staff Low morale university-wide Low morale within more than one faculty Low morale within a single faculty/unit Isolated complaints from faculty / staff Death (single or multiple) Multiple individuals with serious injury Campus-wide severe illness One individual with serious long-term injury Severe illness within a single faculty/unit Single or multiple minor injuries requiring off-campus medical treatment Single or multiple minor injuries requiring first aid Inability to provide teaching activities university-wide for more than one week Inability to provide teaching activities university-wide for up to one week Cancellation of examinations Inability of one faculty/unit to provide teaching activities for up to one week Examinations postponed Inability of one faculty/unit to provide teaching activities for more than one day Inability of one faculty/unit to provide teaching activities for one day Inability to increase significant research funding for one year or more Cancellation of a significant research project Cancellation of multiple research projects Loss or corruption of research data Cancellation of a single research project Sustained complaints from sponsors Intermittent complaints from sponsors Inability to provide key administrative functions at critical times (i.e. missing payroll run, system crash impacts graduation) Inability to provide key administrative functions over a sustained but non-critical period Inability to provide key administrative functions for up to one week Reduced ability to perform key administrative functions for more than one day Intermittent reduced ability to perform key administrative functions Sustained front page adverse national media coverage (>2 weeks) Adverse international media coverage Intermittent adverse national media coverage (<2 weeks) Stakeholder faith impacted (>1 year) Sustained front page adverse local media coverage (>2 weeks) Public demonstration of students and/or community concern Intermittent adverse local media coverage (<1 week) Stakeholder faith impacted (<1 month) Intermittent adverse coverage within campus communication channels Page 12

APPENDIX I: University of Regina ERM Impact and Likelihood Rating Guide LIKELIHOOD Almost Certain 5 Likely 4 Possible 3 Unlikely 2 Rare 1 Frequency Once a year or more At least once a year Once in 3 years Once in 10 years Once in 30 years Fully expected to occur; already happening Most probably will occur May occur at some time; more likely than not May occur at some time; less likely than not May occur only in exceptional cases; highly doubtful Page 13