REGULATORY ASSETS. The purpose of this evidence is to provide a description of Hydro One Transmission s Regulatory Assets.

Similar documents
REGULATORY ACCOUNTS. The purpose of this evidence is to provide a description of Hydro One Transmission s Regulatory Accounts.

EB Hydro One Networks Inc. s 2019 Transmission Revenue Requirement Application and Evidence Filing

Canadian Manufacturers & Exporters (CME) INTERROGATORY #1 List 1

REGULATORY ACCOUNTS. The purpose of this Exhibit is to provide a description of Hydro One Distribution s regulatory accounts.

SUMMARY OF APPLICATION

PAYMENTS IN LIEU OF CORPORATE INCOME TAXES

PAYMENTS IN LIEU OF CORPORATE INCOME TAXES

PAYMENTS IN LIEU OF CORPORATE INCOME TAXES

Balsam Lake Coalition Interrogatory # 8

CLEARANCE OF DEFERRAL AND VARIANCE ACCOUNTS

EXECUTIVE SUMMARY OF APPLICATION

REGULATORY ASSETS, VARIANCE AND DEFERRAL ACCOUNTS

EXHIBIT LIST. Administration. Summary of Board Directives and Undertakings from Previous Proceedings A 5 1 Corporate Organization Charts

OVERVIEW OF DEFERRAL AND VARIANCE ACCOUNTS

IN THE MATTER OF the Ontario Energy Board Act, 1998, Schedule B to the Energy Competition Act, 1998, S.O. 1998, c.15;

SUMMARY OF CAPITAL EXPENDITURES

OVERVIEW OF DEFERRAL AND VARIANCE ACCOUNTS

Ontario Energy Board (Board Staff) INTERROGATORY #16 List 1

SUMMARY OF APPLICATION

COMPARISON OF NUCLEAR OUTAGE OM&A

Electricity Power System Planning

OVERHEAD CAPITALIZATION RATE

REGULATORY ASSET RECOVERY ALLOCATION TO CUSTOMER GROUPS

COMMON ASSET ALLOCATION

REFURBISHMENT AND NEW GENERATION NUCLEAR

Power Workers' Union (PWU) INTERROGATORY #1. Ref (a): Participant Information Package: Exhibit C1-2-1, Page 5 of 6, Table 2 (OM&A Expenditures)

OVERHEAD CAPITALIZATION RATE

CLEARANCE OF DEFERRAL AND VARIANCE ACCOUNTS

PROJECT COSTS, ECONOMICS, AND OTHER PUBLIC INTEREST CONSIDERATIONS

TAXES. Filed: EB Exhibit F4 Tab 2 Schedule 1 Page 1 of 16

PENSION AND OPEB COST VARIANCE ACCOUNT

DEPRECIATION AND AMORTIZATION

COST OF SHORT-TERM DEBT

2.11 EXHIBIT 8: RATE DESIGN... 2 Overview... 2

SUPPORTING EVIDENCE FOR ENTRIES INTO NUCLEAR ACCOUNTS

DISPOSITION OF SMART METER DEFERRAL ACCOUNT AND STRANDED METER BALANCES

DARLINGTON REFURBISHMENT CONSTRUCTION WORK IN PROGRESS IN RATE BASE

COMPENSATION, WAGES, BENEFITS

CAPITAL EXPENDITURES - REGULATED HYDROELECTRIC

DEFERRAL AND VARIANCE ACCOUNTS

OTHER OPERATING COST ITEMS

Deferral and Variance Accounts and Darlington CWIP in Rate Base

COST ALLOCATION. Filed: EB Exhibit G1 Tab 3 Schedule 1 Page 1 of INTRODUCTION

ECONOMIC INDICATORS. 2.1 Distribution Cost Escalation for Construction, Operations and Maintenance

ONTARIO ENERGY BOARD

DEFERRAL AND VARIANCE ACCOUNTS

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B);

Energy Probe (EP) INTERROGATORY #50 List 1

Line Principal Component Cost Rate Cost of No. Capitalization Note ($M) (%) (%) Capital ($M) (a) (b) (c) (d)

ATTACHMENT 8 SUMMARY OF FIXED/VARIABLE SPLITS HORIZON UTILITIES RZ

CALCULATION OF INCREMENTAL CAPITAL MODULE REVENUE REQUIREMENT

OSHAWA PUC NETWORKS CUSTOM INCENTIVE REGULATION RATE PLAN MID-TERM UPDATE INTRODUCTION & OVERVIEW

RATE RIDERS. Filed: EB Exhibit G1 Tab 5 Schedule 1 Page 1 of REGULATORY ASSET RATE RIDER

CONTINUATION OF DEFERRAL AND VARIANCE ACCOUNTS

CAPITAL STRUCTURE AND RETURN ON EQUITY

TABLE OF CONTENTS. C. Business Planning and Budgeting Process and Economic Assumptions

IN THE MATTER OF the Ontario Energy Board Act, 1998, S. O. 1998, c.15, Schedule B;

EB Hydro One Networks Inc. s 2017 and 2018 Transmission Cost-of-Service Application Updated Evidence Filing

Filing Guidelines for Ontario Power Generation Inc.

COST ALLOCATION. Cost Allocation Informational Filing Guidelines for Electricity Distributors dated November 15, 2006.

BUSINESS PLANNING ASSUMPTIONS

EXHIBIT 9 DEFERRAL AND VARIANCE ACCOUNTS

IN THE MATTER OF subsections 78(2.1), (3.0.1), (3.0.2) and (3.0.3) of the Ontario Energy Board Act, 1998;

CAPITALIZATION, RETURN ON EQUITY AND COST OF CAPITAL

OPG REPORTS 2017 FIRST QUARTER FINANCIAL RESULTS. Company completes major projects on time and within budget

PENSION. Filed: August 17, 2005 RP /EB Exhibit C1 Tab 4 Schedule 3 Page 1 of OVERVIEW

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB GUELPH HYDRO ELECTRIC SYSTEMS INC.

DECISION AND ORDER ON PHASE 1

COMPENSATION AND BENEFITS

EXHIBIT 5 COST OF CAPITAL

London Property Management Association (LPMA) INTERROGATORY #1

Ontario Power Generation Inc. Application for payment amounts for the period from January 1, 2017 to December 31, 2021

Regional Planning and Cost Allocation Review EB Working Group meeting #1 - Webinar

Filed: EB Exhibit Al Tab 2 Schedule 1 Page 1 of 6 1 ONTARIO ENERGY BOARD

PowerStream Inc. (Licence Name PowerStream Inc. ED ) 2010 Electricity Distribution Rate Adjustment Application EB

Third Quarter 2017 Earnings Teleconference

COMPENSATION, WAGES, BENEFITS

BILL IMPACTS LEGACY CUSTOMERS

OVERVIEW OF DEFERRAL AND VARIANCE ACCOUNTS

NIAGARA-ON-THE-LAKE HYDRO INC.

Consolidated Financial Statements. Toronto Hydro Corporation DECEMBER 31, 2007

Filed: EB H1-1-2 Attachment 2 Page 1 of 10. Aon Hewitt

UPDATE FOR AUDITED ACTUAL BALANCES FOR DEFERRAL AND VARIANCE ACCOUNTS

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB HYDRO ONE NETWORKS INC.

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, Schedule B;

CASH WORKING CAPITAL

London Property Management Association (LPMA) INTERROGATORY #29 List 1. Issue 18 Is the forecast of long term debt for appropriate?

Fourth Quarter 2017 Earnings Teleconference

NIAGARA-ON-THE-LAKE HYDRO INC.

Essex Powerlines Corporation 2730 Highway #3, Oldcastle, ON, N0R 1L0 Telephone: (519) Fax: (519)

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB ALGOMA POWER INC.

HYDRO ONE NETWORKS INC. DISTRIBUTION Revenue Deficiency/(Sufficiency) Year Ending December 31, 2010 and 2011 ($ Millions)

SECOND QUARTER REPORT

BRUCE GENERATING STATIONS - REVENUES AND COSTS

SUMMARY OF BOARD DIRECTIVES AND UNDERTAKINGS FROM PREVIOUS PROCEEDINGS

RATE DESIGN. The proposed distribution rates for each rate class over the Custom COS period are summarized in Table 1.

TORONTO HYDRO CORPORATION MANAGEMENT S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS FOR THE YEAR ENDED DECEMBER 31, 2005

Enersource Hydro Mississauga Inc. Application for Distribution Rates Effective May 1, 2012 Board File No. EB Evidence Update

An Application. Canadian Niagara Power Inc. To Adjust. Electricity Distribution Rates. Effective January 1, 2019 EB

ONTARIO POWER GENERATION REPORTS 2013 FINANCIAL RESULTS

Transcription:

Filed: May, 0 EB-0-000 Page of REGULATORY ASSETS.0 INTRODUCTION The purpose of this evidence is to provide a description of Hydro One Transmission s Regulatory Assets. All of the Regulatory Assets reported by Hydro One Transmission have been established consistent with the Board s requirements as set out in the Accounting Procedures Handbook, subsequent Board direction, or as per specific requests initiated by Hydro One Transmission. The Transmission Regulatory Asset balances are summarized in Table below: 0 Table Transmission Summary of Regulatory Asset Balances For Approval ($ Millions) Description Dec, 00 Dec., 00 Dec., 0 Total Regulatory Assets 0. (.) (.) Hydro One Transmission is requesting approval of actual Regulatory Asset values as at December, 00, plus forecasted interest for 0 on the principal balances as at December, 00. The actual Regulatory Asset values are calculated by applying simple interest to the monthly opening principal balance in the accounts using the Board prescribed interest rate. The forecasted interest for 0 is calculated by applying simple interest on the

Filed: May, 0 EB-0-000 Page of December, 00 year-end principal balance using the forecasted bankers acceptances- month rate of 0.% plus 0.% spread. It is expected that new Transmission rates will be implemented at the start of January 0, and that disposition of these accounts will commence on that implementation Details on these balances are described for each account in Section.0 of this Exhibit. Disposition of the assets is discussed in, Tab,. Further details on deferral and variance accounts are provided in: Exhibit F,,, Regulatory Assets for Approval, and Exhibit F,, Schedule, Planned Disposition of Regulatory Assets: Schedule of Annual Recoveries. Exhibit F,, Schedule, Continuity Schedule Regulatory Assets.0 REGULATORY ASSETS REQUESTED FOR APPROVAL 0 The Board s decision on Hydro One s Transmission Rates for 00 and 0 (EB-00-0) approved or required the establishment or continuance of the following accounts. Table, below, provides a listing of the Transmission Regulatory Assets requested for approval as part of 0 and 0 Transmission Rates:

Table Transmission Regulatory Assets Requested for Approval ($ Millions) Description US of A Account Ref. Dec., 00 Filed: May, 0 EB-0-000 Page of Dec, 00 Dec, 0 Export Service Credit Revenue 0 0.0 (.) (.) External Secondary Land Use Revenue 0 0.0 (.) (.) External Station Maintenance and E&CS Revenue 0 0.0 (.) (.) IPSP & Other LT Project Planning Costs 0.0..0 Pension Cost Differential 0 0... Total Regulatory Assets 0. (.) (.). Export Service Credit Revenue Account This variance account was created as a result of the Board s decision of May, 00 (EB-00-0). The Board requested that Hydro One Transmission establish a variance account to capture any difference between the $.0 million forecast export service credit revenue approved by the OEB as part of 00 and 0 Transmission Rates and the actual export service credit revenue. As at December, 00, Hydro One Transmission had excess export service revenue in the amount of $. million, inclusive of interest accrued. This account is reported to the Board on a quarterly basis consistent with the Board's Reporting and Record Keeping Requirements. 0, 0 to reflect carrying charges anticipated through to the proposed implementation

Filed: May, 0 EB-0-000 Page of. External Secondary Land Use Revenue Account This variance account was created as a result of the Board s decision of May, 00 (EB-00-0). The Board requested that Hydro One Transmission establish a variance account to capture any difference between the $.0 million forecast external secondary land use revenue approved by the Board as part of 00 and 0 Transmission Rates and the actual secondary land use revenue. As at December, 00, Hydro One Transmission had excess external secondary land use revenue of $. million, inclusive of interest accrued. This account is reported to the Board on a quarterly basis consistent with the Board's Reporting and Record Keeping Requirements., 0 to reflect carrying charges anticipated through to the proposed implementation 0. External Station Maintenance and E&CS Revenue Account This variance account was created as a result of the Board s decision of May, 00 (EB-00-0). The Board requested that Hydro One Transmission establish a variance account to capture any difference between the $. million forecast external station maintenance and engineering and construction services (E&CS) revenue (net of the $. million of related cost of sales) approved by the Board as part of 00 and 0 Transmission Rates and the actual net external station maintenance and E&CS revenue.

Filed: May, 0 EB-0-000 Page of As at December, 00, Hydro One Transmission had external station maintenance and engineering and construction revenue of $. million and related excess cost of sales of $. million, which resulted in net excess external station maintenance and E&CS revenue of $. million, inclusive of interest accrued. This account is reported to the Board on a quarterly basis consistent with the Board's Reporting and Record Keeping Requirements., 0 to reflect carrying charges anticipated through to the proposed implementation. IPSP & Other Long Term Projects Planning Costs This account was created as a result of the Board s decision of May, 00 (EB-00-0), which approved the establishment of this deferral account to capture preliminary planning costs for IPSP and other long-term projects. 0 Table, below, provides a list of the 00 principal additions to this account related to pre-engineering OM&A expenditures. The listing is provided by project, where the projects noted are consistent with the Board s decision of May, 00 (EB-00-0):

Filed: May, 0 EB-0-000 Page of Table Transmission Summary of Development OM&A for Approval ($ Millions) Current Investment Description Investment Description in EB- 00-0 Dec., 00 Dec., 0 Northwest Transmission Line Lake Nipigon Enabler Line.. [Pickle Lake x Nipigon] Bowmanville x GTA Incorporation of Darlington B GS 0. 0. Manitoulin Island Enabler Line Manitoulin Island Enabler Line 0. 0. North-South Transmission 00kV Tx Line Sudbury South 0. 0. Expansion x GTA Goderich Area Enabler Goderich Area Enabler 0. 0. Total..0 This account is reported to the Board on a quarterly basis consistent with the Board's Reporting and Record Keeping Requirements., 0 to reflect carrying charges anticipated through to the proposed implementation. Pension Cost Differential 0 This account tracks the difference between the pension cost estimates based on actuarial assessments prepared by Mercer used for Hydro One s Transmission Rate applications and the actual pension costs. This account was established based on the Board s decision on Hydro One s Transmission Rates for 00 and 0 (EB-00-0) which accepted the continuation

Filed: May, 0 EB-0-000 Page of of the Pension Cost Differential account. This account is reported to the Board on a quarterly basis consistent with the Board's Reporting and Record Keeping Requirements. As at December, 00, Hydro One Transmission has recognized a balance of $. million, inclusive of interest accrued., 0 to reflect carrying charges anticipated through to the proposed implementation